B03_Amendment 0003.pdf
PDF 679 KB Posted
- Attached to
- FY22 - TRINITY SUMMER GATE ATTENDANTS Federal contract opportunity
- Solicitation number
- W9126G22Q0023
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B03_Amendment 0002.pdf | ||
| B03_Amendment 0001.pdf | ||
| B08_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to readvertise one location:Benbrook Lake South Holiday Park B Position. See PWS Appendix and Bid Sheet for the location and adhere to instructions for submitting quote as stated in the original solicitation. The quotes will be due 9:00 a.m. CST on 29 APR 2022.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G22Q0023
X 9B. DATED (SEE ITEM 11)
26-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Apr-2022
CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
X 1
W9126G22Q0023
BID SHEET for GATE ATTENDANTS, BENBROOK LAKE
BENBROOK LAKE, SOUTH HOLIDAY PARK, SHIFT B (SUMMER)
ITEM
NO.
DESCRIPTION
Contract Gate Attendant Services
Quantity Unit Price Days
TOTAL
Base Period:
1 May 2022 - 30 SEPTEMBER 2022
Option Period 1:
05 APRIL 2023 - 30 SEPTEMBER 2023
TOTAL AMOUNT: $___________
APPENDIX PERFORMANCE WORK STATEMENT (PWS)
GATE ATTENDANT SERVICES
BENBROOK LAKE
1. GENERAL: No additional items.
1.1 DESCRIPTION OF SERVICES/INTRODUCTION: No additional items.
1.2. SCOPE: Gate Attendant services as described in the Benbrook Lake Appendix PWS, Section 1.11, Work to be Performed, and the Fort Worth District Gate Attendant Services PWS.
1.3 PERIOD OF PERFORMANCE: Estimated deliverables are shown in table below:
Position Number
Days Surveillance
Hours Gate House
Hours Availability
Hours South Holiday A Summer Season Base (April 1, 2022- September 27, 2022)
92 1472 1472 736
South Holiday A Summer Season Option 1 (April 1, 2023- September 27, 2023)
92 1472 1472 736
South Holiday B Summer Season Base (May 1, 2022- September 30, 2022)
77 1232 1232 616
South Holiday B Summer Season Option 1 (April 5, 2021- September 30, 2021)
91 1456 1456 728
CALENDAR DAYS WORKED (base year and option period)
SHIFT A - South Holiday Park Base year 2022 and Option year 2023:
April: 1-4, 9-12, 17-20, 25-28 Total: 16 days May: 3-6, 11-14, 19-22, 27-30 Total: 16 days June: 4-7, 12-15, 20-23, 28-30 Total: 15 days July: 1, 6-9, 14-17, 22-25, 30-31 Total: 15 days August: 1-2, 7-10, 15-18, 23-26, 31 Total: 15 days September: 1-3, 8-11, 16-19, 24-27 Total: 15 days
Total: 92 days SHIFT B - South Holiday Park Base year 2022 and Option year 2023:
April: 5-8, 13-16, 21-24, 29-30 (Option 1 Only) Total: 14 days May: 1-2, 7-10, 15-18, 23-26, 31 Total: 15 days June: 1-3, 8-11, 16-19, 24-27 Total: 15 days July: 2-5, 10-13, 18-21, 26-29 Total: 16 days August: 3-6, 11-14, 19-22, 27-30 Total: 16 days September: 4-7, 12-15, 20-23, 28-30 Total: 15 days
Total: 91 days
1.4 GENERAL INFORMATION:
1.4.1 Quality Control: No additional items.
1.4.2 Quality Assurance: No additional items.
1.4.3 Government Holidays: The Contractor will work the holidays that fall on their shift.
Memorial Day Independence Day Labor Day
1.4.4 Hours of Operation: All Parks [Bear Creek, North Holiday, South Holiday and Mustang Park:
Both Contractors “A” and “B” will work a four (4) calendar day shift, i.e. four (4) calendar-days-on and four
(4) calendar-days-off, and will work all of the federal holidays that fall within their normal four-day shift.
Twenty-four hour shifts begin at 6:00 a.m. each morning and end at 6:00 a.m. the following morning. Gate Attendant shall be considered on-duty during the hours between 6:00 a.m. and 10:00 p.m., (North Holiday only is 6:00a.m. to 9:00 p.m.). Hours are shown in table below. Contractor “A” will begin work on the first day of the month (March for summer and October for winter) and work 4 days and be off 4 days. Contractor “B” will start work on the fifth day of the month (March for summer and October for winter) and work 4 days then off 4 days. This pattern continues throughout the term of the contract. Number of hours for gatehouse occupancy and availability hours is listed in the table following paragraph 1.3 above.
1.4.5 Place of Performance: The work to be performed under these contracts will be performed at North Holiday, South Holiday, Mustang, Bear Creek, & Rocky Creek Parks.
1.4.5.1 South Holiday Park: The campground offers 79 RV sites with water and electric hookups, 25 tent-only sites, and 1 equestrian site. Additional amenities include hot showers, a sewer dump station, boat launch, accessible fishing pier and horse trail access. The Gate Attendant pad site contains a picnic table, fire ring, electrical service, water hookups and sewer hookup.
1.4.5.2 Mustang Park: This is a mixed day use/primitive camping park that provides open spaces, lakeshore access, swimming, picnicking facilities and primitive camping. There are no designated campsites at this park; however there is one large group site with water and electric hookups. The Gate Attendant pad site contains a picnic table, fire ring, electrical service, water hookups and sewer hookup.
1.4.5.3 Bear Creek Park: Class A campground with 40 RV sites with water and electrical hookups, and 1 6-site group pavilion. Additional amenities include 2 boatramps, 2 bathrooms with showers, 1 vault restroom, and a dumpstation. The Gate Attendant pad site contains a picnic table, fire ring, electrical service, water hookups and sewer hookup.
Contractor location Hours to be worked each day of four-day shift
North Holiday Park Surveillance Hours………………………………………… Gate House Hours………………………………………… Availability Hours…………………………………………..
0600-2100 0600-2100 2100-0600
South Holiday, Bear Creek, Rocky Creek, and Mustang Surveillance Hours………………………………………… Gate House Hours………………………………………… Availability Hours…………………………………………..
0600-2200 0600-2200 2200-0600
1.4.5.4 North Holiday Park: Day Use Park with 37 developed picnic sites, swim beach, playground, future group pavilion, 5 restrooms, and 3 boat ramps. The Gate Attendant pad site contains a picnic table, fire ring, electrical service, water hookups and sewer hookup.
1.4.6 Type of Contract: No additional items.
1.4.7 Security Requirements: The gatehouse shall be kept locked at all times for the security of the Contractor and Government Property. Contractor shall set the alarm and lock all windows and doors when off duty or away from the gatehouse.
1.4.8 Special Qualifications: No additional items.
1.4.9 Pre-Work Conference: Successful bidders will be required to attend a pre-work conference to be held at a date and time specified by the Lake Manager. It is the successful bidder’s responsibility to contact the lake office for pre-work conference time and date prior to the start of the contract. Training session will be held as scheduled with the gate attendant coordinator. Gate Attendants will not receive any separate payment for attending the pre-work conference. Gate Attendants shall attend additional training sessions as required by the Lake Manager during the contract on a regularly scheduled workday.
1.4.9.1 Training: No additional items.
1.4.10 Contracting Officer Representative (COR): No additional items.
1.4.11 Contractor Key Personnel: No additional items.
1.4.12 Identification of Contractor Employees: No additional items.
1.4.13 Contractor Travel: No additional items.
1.4.14 Data Rights: No additional items.
1.4.15 Organizational Conflict of Interest: No additional items.
1.5. GOVERNMENT-FURNISHED ITEMS AND SERVICES:
1.5.1 Facilities: No additional items.
1.5.2 Equipment: No additional items.
1.5.3 Materials: The Government will also supply the Fort Worth District Use Fee Program SOP and the Lake Gate Attendant Handbook.
1.5.4 Trailer Site: A storage building is available for the Contractor’s use.
1.6 CONTRACTOR-FURNISHED ITEMS AND RESPONSIBILITIES:
1.6.1 General: No additional items.
1.6.2 Equipment: No additional items.
1.6.3. Materials: No additional items.
1.6.4. Temporary Living Quarters: No additional items.
1.7 CONTRACTOR MANAGEMENT REPORTING (CMR): No additional items.
1.8 APPLICABLE PUBLICATIONS (CURRENT EDITIONS): No additional items.
1.9 ATTACHMENT/TECHNICAL EXHIBIT LIST:
1.9.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary.
TECHNICAL EXHIBIT 1
Performance Requirements Summary: The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Required Services (Tasks)
Performance Standards
Acceptable Quality Levels
(Allowable Deviation)
Methods of
Surveillance
Incentive (Positive and/or Negative)
(Impact on Contractor Payments)
1. User Fees- Delivery/Inspection of Use Fees
Administer quality control program in accordance with
PWS
One written warnings
100% inspection 25% deduction
2. Campsite Reservations
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
3. Group Shelters
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
4. Camping Status
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
5. Park Inspection
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
6. Visitor Assistance
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
7. Disturbances
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
8. Complaints
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
9. Lost and Found
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
10. Contractor Identification and Personal Appearance
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
11. Cooperation with Others
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
10% deduction
12. Living Area and Gatehouse Maintenance
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
13. No Soliciting
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
14. Weapons
Administer quality control program in accordance with
PWS
None Unscheduled inspections
Immediate Dismissal
15. Alcohol
Administer quality control program in accordance with
PWS
None Unscheduled inspections
Immediate Dismissal
16. Government Property
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
10% deduction
17. Absenteeism
Administer quality control program in accordance with
PWS
Two written warnings
100% inspection or unscheduled inspections
5% deduction
18. Visitors of the Contractor/Gate Attendant
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
19. Security Bonding
Administer quality control program in accordance with
PWS
One written warning
100% inspection 5% (work cannot begin without bond)
20. Physical Security and Key Control
Administer quality control program in accordance with
PWS
One written warning
Unscheduled inspections
15% deduction
1.9.2 Technical Exhibit 2 – Deliverables Schedule
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Financial Statements Within one day of completing shifts
Original and two (2) copies
Hard Copy Lake Office
Deposit Statements Within one day of completing shift
Original and two (2) copies
Hard Copy Lake Office
Security Bond Once, prior to beginning work One Hard Copy Lake Office
1.10 SAFETY: No additional items.
1.11 WORK TO BE PERFORMED: Additional items as described below.
TASK 1. User Fees: No additional items.
(a) User Fee Collection: The Contractor will collect all user fees in accordance with the Fort Worth District Use Fee Program SOP. User fees will be collected through the operation of a computer and the National Recreation Reservation System (NRRS), Outdoor Recreation Management System (ORMS), cash register or User Fee Permit Books. Monies, fee books, annual day use fee passes, credit vouchers, credit card receipts, America the Beautiful Senior Pass, America the Beautiful Access Pass and user fee permits will be stored in a permanently installed vault or safe provided by the Government, or as directed by the Lake Manager. User fee documents will be collected from the Gate Attendants at the gatehouses by a Park Ranger, or the Gate Attendants may be required to turn in user fee documents to Park Ranger at the Lake Office. In the event fees do not balance, the Contractor shall be responsible for any shortage and any excess collections shall be added to the total.
(b) Audits and Fee Security: No additional items.
(c) Cash on Hand: No additional items.
(d) Remittance Procedures and Inspection of Use Fees: The contractor will be responsible for remitting monies for each individual approved DEPOSIT (formerly BFC). The final approved DEPOSIT, cashier check or money order, and all personal checks shall be remitted in a single envelope to the Atlanta Lockbox, the address being on the DEPOSIT. Each DEPOSIT must be mailed separately either the day after a shift ends or the first day of the next shift. The contractor will be required to submit approximately 23 DEPOSITS during this contract period of 6 months and will be required to purchase a cashier check or money order at the expense of the contractor. The contractor will be required to pay all postage needed to submit DEPOSIT with delivery confirmation. Fund instruments will be made payable to the “National Recreation Reservation Service” or “NRRS” and be stamped on the back “For Credit to the U.S. Treasury”. The Unit and Contract/Subcontract number will also be written or stamped on each fund instrument. The use of cashier checks is strongly recommended over the use of money orders. The DEPOSIT must be clear and legible with no hand changes or notes included on this copy. Separate notes can be included to explain extenuating circumstances. One additional copy of the DEPOSIT along with the DEPOSIT Detail Report, DEPOSIT Summary Report, and Financial Session Summaries with park receipts will be printed and picked up at the gate attendant station by a ranger and delivered to the lake office to be kept on file. Any discrepancy in the DEPOSIT will be resolved with the Ranger in charge prior to remitting.
TASK 2. Campsite Reservations: No additional items.
TASK 3. Group Shelters: No additional items.
TASK 4. Camping Status: The Contractor’s camping status will match the reservation arrival reports. The Contractor will make sure that the campers who are listed on the reservation arrival reports are current and are in agreement with NRRS, ORMS (Outdoor Recreation Management System) or the ORMS reservation reports. Contractor shall perform the duty of changing campsite status markers in accordance with established policies of the Lake Manager.
TASK 5. Park Inspection: Gate attendants will make a minimum of three (3) park inspections each workday. Additional inspections may be required to check on visitor complaints, deliver messages, and check park status. The Contractor shall inform park visitors and campers of any violation of rules, regulations, and policies in a friendly, informative manner and ask for compliance.
TASK 6. Visitor Assistance: No additional items.
TASK 7. Disturbances: No additional items.
TASK 8. Complaints: No additional items.
TASK 9. Lost and Found: The Contractor will maintain a lost and found department in the gatehouse. Any items not picked up after two (2) weeks will be turned in to a Park Ranger. The Contractor will prepare a lost and found report on all lost and found property. The Contractor will ensure that proper identification is obtained from individuals before release of any lost and found property.
TASK 10. Image, Personal Appearance and Dress: No additional items.
TASK 11. Cooperation with Others: No additional items.
TASK 12. Living Area and Gatehouse Maintenance:
(a) Trailer Area Maintenance: Gate attendant campsite shall be kept clean and maintained by the contract gate attendant to a perimeter of 30 feet surrounding the campsite.
(b) Pets: No additional items.
(c) Excessive Personal Items: No additional items.
(d) Smoking: No additional items.
(e) Gatehouse Maintenance: The Contractor will maintain the gatehouse, both inside and outside, in a clean, orderly and sanitary condition at all times. The gatehouse will be thoroughly cleaned at the end of each shift to the Lake Manager or designated representative’s satisfaction to include the following:
toilet facilities, carpet (vacuumed), hard floors (swept and mopped), windows, entire interior building surfaces (dusted and cleaned if necessary) and litter free outside building and walking surfaces for seventy-five (75) feet perimeter of gatehouse. Gate Attendants will provide all equipment, tools, supplies, and materials necessary to clean the gatehouse.
(f) Trash Removal: No additional items.
(g) Living Quarters Security: No additional items.
TASK 13. No Soliciting: No additional items.
TASK 14. Weapons: Title 36 prohibits weapons on Government Property. Violation is cause for immediate removal.
TASK 15. Alcohol: No additional items.
TASK 16. Government Property: No additional items.
TASK 17. Absenteeism: No additional items.
TASK 18. Visitors of the Contractor/Gate Attendant: No additional items.
TASK 19. Security Bonding: No additional items.
TASK 20. Physical Security and Key Control: No additional items.
1.12 GENERAL LIABILITY AND OTHER INSURANCE: No additional items.
1.13 DAMAGE RESPONSIBILITY: No additional items.
1.14 LIABILITY: No additional items.
1.15 PERMITS/COMPLIANCE: No additional items.
1.16 COMMUNICATIONS EQUIPMENT: A telephone shall be provided at each gatehouse for official business use. Any charges determined to be personal or long distance other than official business are not allowed and shall be the responsibility of the Contractor. The gatehouse telephone shall be answered by the attendant on duty.
Additional phone lines and/or any change, alteration or tampering with phone or data lines in the gatehouse is prohibited.
1.17 PAYMENT FOR SERVICES: The Contractor shall provide an invoice for payment to the Lake Manager after the last day worked each month.
1.18 TERMINATION. No additional items.
1.19 DUTY OF CONTRACTOR TO FINISH CONTRACT: No additional items.
1.20 OTHER REQUIREMENTS: Gate Attendant teams will consist of a minimum of a two (2) person team and all team member must be at least 21 years of age. A minimum of one of the two person team will man the gatehouse during duty hours. During times of high usage as determined by the lake manager or his representative, both members of the contracting team are required to be in the gatehouse to provide prompt customer service.
Customer waiting time will be kept as short as possible. Some parks have different schedules.
INSTRUCTIONS TO OFFERORS
FROM ORIGINAL SOLICITATION PAGE 4 & 5
5. System for Awards Management (SAM): In accordance with FAR 52.204-7(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
6. Evaluation Information: The Government intends to award a firm fixed price (FFP) Purchase Order resulting from this RFQ to the responsible offeror whose offer represents the best value in terms of price and past performance IAW 13.106-2(4)(ii). Past performance is equivalent to price. Quotes for this solicitation are due on 29 APRIL 2022, by 9:00 A.M. (CST).
The offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.
In accordance with FAR Part 29.3 – State and Local Taxes, and per Title 4 of US Code 104-07, the Government is exempt from paying state and local taxes.
7. Submittals: Offerors must submit representation and certifications in accordance with the provisions at FAR 52.212-3 Offeror Representation and Certifications – Commercial Item (Accessible at https://www.acquisition.gov) or the vendor may verify their Online Representation and Certification Application (ORCA) is updated in SAM. See Vendor information sheet.
Submit the following as separate PDF files in the response to the RFQ –
a. Vendor Information Sheet
b. Price Quotation (CLIN Schedules) (See Clause 52.212-2 Evaluation – Commercial Items)
c. Past Performance NAVFAC/USACE Past Performance Questionnaire (See Clause 52.212-2 Evaluation – Commercial Items). Recent or relevant work is defined as similar work in size and scope within the past four (4) years. The Contracting Officer shall deem an offeror non-responsive if the offeror fails to submit a PPQ IAW 52.212-1(b)(10) and evaluation criteria in 52.212-2. An Offeror that submits a PPQ that is deemed neither recent nor relevant will be treated as “NEUTRAL”.
d. Complete and return the provision at 52.204-26
8. Email all quotes to:
gloria.gonzales@usace.army.mil AND civ-ops.proposals@usace.army.mil
(End of Summary of Changes)
File details come from the government source that posted it. Updated .