3CR Wash Rack - Memo-Preproposal Site Visit.pdf

PDF 143 KB Posted

Attached to
3CR Central Vehicle Washrack Complex Federal contract opportunity
Solicitation number
W9126G21R0026
Issued by
Department of the Army Corps of Engineers Engineering District Fort Worth

About this file

This memorandum documents a pre-proposal site visit for the renovation of the 3rd Cavalry Regiment Wash Rack at Fort Hood, Texas. The U.S. Army Corps of Engineers seeks a firm-fixed price contract between $10 million and $25 million to repair and replace failing components of the existing vehicle wash facility, including pond liners, pumps, piping, electrical systems, exterior walls, roofing, and asbestos and lead abatement. The project also aims to address building codes, life safety standards, ADA compliance, and fire and force protection requirements. Contractors were able to access the wash rack and must submit any questions through the beta.SAM website by the Phase 1 proposal deadline of January 12, 2021. The contract is expected to be awarded in April 2021 to a small business concern.

View the file

Other files for this federal contract opportunity

Other files attached to 3CR Central Vehicle Washrack Complex, newest first.
File Type Posted
Down-Select Contractor Information.docx DOCX document
3CR Wash Rack Site Visit.pdf PDF
Amendment 1.pdf PDF
W9126G21R0026.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CESWF-AO-C 24 March 2021

MEMORANDUM FOR RECORD MEM-0001

SUBJECT: Documentation of Pre-proposal Site Visit, 3rd Calvary Regiment (CR) Wash Rack, Fort Hood, Texas. RFP Number: W9126G21R0026

1. The purpose of this memorandum is to document the pre-proposal site visit for the subject project that was conducted on site at Fort Hood, TX on Wednesday, 24 March 2021. The information provided in the solicitation stated that the prospective bidders shall coordinate with the Area Office to set up a time to walk the site. There was a 0900 grouping of contractors and a 1300 grouping. Contractors were able to access all areas of the wash rack facility to include the tower buildings

2. Enclosure MEM-0001-01 contains the sign-in sheet of those that were in attendance.

3. CTAO personnel in attendance were Brad Butts. Prospective bidders were briefed and reminded that all questions will be submitted through Dr. Checks/Projnet and no questions would be answered on site.

4. USACE personnel stayed on the site until the last contractor left the site.

Respectfully, Enclosure:

CESWF-AO-C 24 March 2021

2021-03-25T10:15:23-0500
BUTTS.BRAD.DUANE.1362359747