B08_Amendment 1.pdf
PDF 586 KB Posted
- Attached to
- Lavonia Gate Attendant Federal contract opportunity
- Solicitation number
- W9126G21Q0057
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Amendment 6.pdf | ||
| B08_Amendment 5.pdf | ||
| B08_Amendment 4.pdf | ||
| B08_Ammendment 3.pdf | ||
| B08_Ammendment 2.pdf | ||
| B08_East Fork Solicitation_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add Lake Lavonia to this solicitation. Adjustment w as also made to the number of days required for East Fork A.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G21Q0057
X 9B. DATED (SEE ITEM 11)
11-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Aug-2021
CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G21Q0057
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN description has changed from East Fork A Winter Gate Attendant to Winter Gate Attendant.
CLIN 1001
The CLIN description has changed from East Fork A Gate Attendnat OY1 to Gate Attendnat OY1.
The following have been modified:
APPENDIX LAVON LAKE
APPENDIX PERFORMANCE WORK STATEMENT (PWS)
GATE ATTENDANT SERVICES
LAVON LAKE
1. GENERAL: No additional items.
1.1 DESCRIPTION OF SERVICES/INTRODUCTION: No additional items.
1.2. SCOPE: Gate Attendant services as described in the Lavon Lake Appendix PWS, Section 1.11, Work to be Performed, and the Fort Worth District Gate Attendant Services PWS.
1.3 PERIOD OF PERFORMANCE: Estimated deliverables are shown in table below:
Position Number Surveillance
Gate House Availability Availability
Days Hours Hours Hours East Fork B
90 1080 1080 1080
a. Winter Season 2021
(5 October 2021 – 31 March 2022)
b. Option 1 (Winter Season 2022)
90 1080 1080 1080 (5 October 2022 – 31 March 2023)
Lavonia A
92 1104 1104 1104
a. Winter Season 2021
(1 October 2021 – 31 March 2022)
b. Option 1 (Winter Season 2022)
92 1104 1104 1104 (1 October 2022 – 31 March 2023)
CALENDAR DAYS WORKED (base year and option period)
SHIFT A – LAVONIA PARK
BASE YEAR:
October: 1-4, 9-12, 17-20, 25-28 Total: 16 days November: 2-5, 10-13, 18-21, 26-29 Total: 16 days December: 4-7, 12-15, 20-23, 28-31 Total: 16 days January: 5-8, 13-16, 21-24, 29-31 Total: 15 days February: 1, 6-9, 14-17, 22-25 Total: 13 days
March: 2-5, 10-13, 18-21, 26-29 Total: 16 days Total: 92 days
SHIFT A – LAVONIA PARK
OPTION YEAR 1:
October: 1-4, 9-12, 17-20, 25-28 Total: 16 days November: 2-5, 10-13, 18-21, 26-29 Total: 16 days December: 4-7, 12-15, 20-23, 28-31 Total: 16 days January: 5-8, 13-16, 21-24, 29-31 Total: 15 days February: 1, 6-9, 14-17, 22-25 Total: 13 days
March: 2-5, 10-13, 18-21, 26-29 Total: 16 days Total: 92 days
SHIFT B – EAST FORK PARK
BASE YEAR:
October: 5-8, 13-16, 21-24, 29-31 Total: 15 days November: 1, 6-9, 14-17, 22-25, 30 Total: 14 days December: 1-3, 8-11, 16-19, 24-27 Total: 15 days January: 1-4, 9-12, 17-20, 25-28 Total: 16 days February: 2-5, 10-13, 18-21, 26-28 Total: 15 days
March: 1, 6-9, 14-17, 22-25, 30-31 Total: 15 days Total: 90 days
SHIFT B – EAST FORK PARK
OPTION YEAR 1:
October: 5-8, 13-16, 21-24, 29-31 Total: 15 days November: 1, 6-9, 14-17, 22-25, 30 Total: 14 days December: 1-3, 8-11, 16-19, 24-27 Total: 15 days January: 1-4, 9-12, 17-20, 25-28 Total: 16 days February: 2-5, 10-13, 18-21, 26-28 Total: 15 days
March: 1, 6-9, 14-17, 22-25, 30-31 Total: 15 days Total: 90 days
1.4 GENERAL INFORMATION:
1.4.1 Quality Control: No additional items.
1.4.2 Quality Assurance: No additional items.
1.4.3 Government Holidays: No additional items.
1.4.4 Hours of Operation: East Fork and Lavonia Parks: Both Contractors “A” and “B” will work a four (4) calendar day shift, four (4) calendar days on and four (4) calendar days off, and will work all of the federal holidays that fall within their normal four-day shift. Twenty-four hour shifts begin at 6:00 a.m. each morning and end at 6:00 a.m. the following morning. Gate Attendant shall be considered on-duty during the hours between 1000 a.m. and 10:00 p.m. The Gate Attendant shall be in the gate house between the hours of 10:00 a.m. and 10:00 p.m. The Gate Attendant shall open the gate at 10:00 a.m. and close the gate at 10:00 p.m. Contractor “A” will begin work on 1 October and work 4 days, and then be off 4 days. Contractor “B” will start work on 5 October, and work 4 days, and then be off 4 days. This pattern continues throughout the term of the contract. Number of hours for gate house occupancy and availability hours is listed in paragraph
1.3 above.
1.4.5 5 Place of Performance: The work to be performed under these contracts will be performed at East Fork Park and Lavonia Park.
1.4.5.1 East Fork Park: Facilities include 50 campsites with water and electric hook-ups, 12 primitive campsites, 11 equestrian campsites, playground, group pavilion, day use area, 5 restrooms with 2 restroom buildings having showers, 2 boat ramps and 1 dump station.
A storage building is available for the contractors’ use.
1.4.5.2 Lavonia Park: Facilities include 38 campsites with water and electric hook-ups, 15 primitive campsites, playground, day use area, 5 restrooms with 1 restroom building having showers, and 1 boat ramp. A storage building is available for the contractors’ use.
1.4.6 Type of Contract: No additional items.
1.4.7 Security Requirements: The gatehouse shall be kept locked at all times for the security of the Contractor and Government Property. Contractor shall set the alarm and lock all windows and doors when off duty or away from the gatehouse.
1.4.8 Sustainability
1.4.8.1 The contractor must meet the recycled content requirements set forth by the EPA for specified products. The following web site contains a list of EPA designated products:
http://www.ssc.nasa.gov/environmental/pdf/AffirPro.pdf. Contractor will ensure compliance of the EPA guidelines under the categories of: non-paper office products, paper and paper products.
1.4.8.2 The contractor must meet the Bio Preferred Program requirements set forth by USDA. The following is a link to USDA-designated product categories:
https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml. Contractor will ensure compliance under the categories of: Janitorial, Groundskeeping, and Personal Care.
1.4.8.3 The contractor shall ensure all deliverables be printed double sided on paper that contains post-consumer fiber (recycled content).
1.4.9 Special Qualifications: No additional items.
1.4.10 Pre-Work Conference: Successful bidders will be required to attend a pre-work conference to be held at a date and time specified by the Lake Manager. It is the successful bidder’s responsibility to contact the lake office for pre-work conference time and date prior to the start of the contract. Training session will be held as scheduled with the gate attendant coordinator. Gate Attendants will not receive any separate payment for attending the pre-work conference. Gate Attendants shall attend additional training sessions as required by the Lake Manager during the contract on a regularly scheduled workday.
1.4.10.1 Training: No additional items.
1.4.11 Contracting Officer Representative (COR): No additional items.
1.4.12 Contractor Key Personnel: No additional items.
1.4.13 Identification of Contractor Employees: No additional items.
1.4.14 Contractor Travel: No additional items.
1.4.15 Data Rights: No additional items.
1.4.16 Organizational Conflict of Interest: No additional items.
1.5. GOVERNMENT-FURNISHED ITEMS AND SERVICES:
1.5.1 Facilities: No additional items.
1.5.2 Equipment: No additional items.
1.5.3 Materials: The Government will also supply the Fort Worth District Use Fee Program SOP and the Lavon Lake Gate Attendant Handbook.
1.5.4 Trailer Site: A storage building is available for the Contractor’s use.
1.6 CONTRACTOR-FURNISHED ITEMS AND RESPONSIBILITIES:
1.6.1 General: No additional items.
1.6.2 Equipment: No additional items.
1.6.3. Materials: No additional items.
1.6.4. Temporary Living Quarters: No additional items.
1.7 CONTRACTOR MANAGEMENT REPORTING (CMR): No additional items.
1.8 APPLICABLE PUBLICATIONS (CURRENT EDITIONS): No additional items.
1.9 ATTACHMENT/TECHNICAL EXHIBIT LIST:
1.9.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary.
TECHNICAL EXHIBIT 1
Performance Requirements Summary: The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Required Services (Tasks)
Performance Standards
Acceptable Quality Levels
(Allowable Deviation)
Methods of
Surveillance
Incentive (Positive and/or Negative)
(Impact on Contractor Payments)
1. User Fees- Delivery/Inspection of Use Fees
Administer quality control program in accordance with
PWS
One written warning
100% inspection 25% deduction
2. Campsite Reservations
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
3. Group Shelters
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
4. Camping Status
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
5. Park Inspection
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
6. Visitor Assistance
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
7. Disturbances
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
8. Complaints
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
9. Lost and Found
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
10. Contractor Identification and Personal Appearance
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
11. Cooperation with Others
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
10% deduction
12. Living Area and Gatehouse Maintenance
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
13. No Soliciting
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
14. Government Property
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
10% deduction
15. Absenteeism
Administer quality control program in accordance with
PWS
Two written warnings
100% inspection or unscheduled
5% deduction
16. Visitors of the Contractor/Gate Attendant
Administer quality control program in accordance with
PWS
Two written warnings
Unscheduled inspections
5% deduction
17. Security Bonding
Administer quality control program in accordance with
PWS
One written warning
100% inspection 5% (work cannot begin without bond)
18. Physical Security and Key Control
Administer quality control program in accordance with
PWS
One written warning
Unscheduled
15% deduction
1.9.2 Technical Exhibit 2 – Deliverables Schedule
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Financial Statements Within one day of completing shift
Original and two (2) copies
Hard Copy Lake Office
Deposit Statements Within one day of completing shift
Original and two (2) copies
Hard Copy Lake Office
Security Bond Once, prior to beginning work One Hard Copy Lake Office
1.10 SAFETY: No additional items.
1.11 WORK TO BE PERFORMED: Additional items as described below.
TASK 1. User Fees: No additional items.
(a) User Fee Collection: The Contractor will collect all user fees in accordance with the Fort Worth District Use Fee Program SOP. User fees will be collected through the operation of a computer and the National Recreation Reservation System (NRRS), Outdoor Recreation Management System (ORMS), cash register or User Fee Permit Books. Monies, fee books, annual day use fee passes, credit vouchers, credit card receipts, America the Beautiful Senior Pass, America the Beautiful Access Pass and user fee permits will be stored in a permanently installed vault or safe provided by the Government, or as directed by the Lake Manager. User fee documents may be collected from the Gate Attendants at the gatehouses by a Park Ranger, or the Gate Attendants may be required to turn in user fee documents to a Park Ranger at the Lake Office. In the event fees do not balance, the Contractor shall be responsible for any shortage and any excess collections shall be added to the total.
(b) Audits and Fee Security: No additional items.
(c) Cash on Hand: No additional items.
(d) Remittance Procedures and Inspection of Use Fees: The contractor will be responsible for remitting monies for each individual approved DEPOSIT (formerly BFC). The final approved DEPOSIT, cashier check or money order, and all personal checks shall be remitted in a single envelope to the Atlanta Lockbox, the address being on the DEPOSIT. Each DEPOSIT must be mailed separately either the day after a shift ends or the first day of the next shift. The contractor will be required to submit approximately 23 DEPOSITS during this contract period of 6 months and will be required to purchase a cashier check or money order at the expense of the contractor. The contractor will be required to pay all postage needed to submit DEPOSIT. Fund instruments will be made payable to the “National Recreation Reservation Service” or “NRRS” and be stamped on the back “For Credit to the U.S. Treasury”. The Unit and Contract/Subcontract number will also be written or stamped on each fund instrument. The use of cashier checks is strongly recommended over the use of money orders. The DEPOSIT must be clear and legible with no hand changes or notes included on this copy. Separate notes can be included to explain extenuating circumstances.
One additional copy of the DEPOSIT along with the DEPOSIT Detail Report, DEPOSIT Summary Report, and Financial Session Summaries with park receipts will be printed and delivered to the lake office to be kept on file. Any discrepancy in the DEPOSIT will be resolved with the Ranger in charge prior to remitting.
TASK 2. Campsite Reservations: No additional items.
TASK 3. Group Shelters: If group shelters in the park are rented, Gate Attendants will unlock entrance gates for the renter. Upon departure of a renter, Gate Attendant will relock access gates.
TASK 4. Camping Status: The Contractor’s camping status will match the reservation arrival reports. The Contractor will make sure that the campers who are listed on the reservation arrival reports are current and are in agreement with NRRS, ORMS (Outdoor Recreation Management System) or the ORMS reservation reports. Contractor shall perform the duty of changing campsite status markers in accordance with established policies of the Lake Manager.
TASK 5. Park Inspection: Gate attendants will make a minimum of three (3) park inspections each workday. Additional inspections may be required to check on visitor complaints, deliver messages, and check park status. The Contractor shall inform park visitors and campers of any violation of rules, regulations, and policies in a friendly, informative manner and ask for compliance.
TASK 6. Visitor Assistance: No additional items.
TASK 7. Disturbances: No additional items.
TASK 8. Complaints: No additional items.
TASK 9. Lost and Found: The Contractor will maintain a lost and found department in the gatehouse. Any items not picked up after two (2) weeks will be turned in to a Park Ranger. The Contractor will prepare a lost and found report on all lost and found property. The Contractor will ensure that proper identification is obtained from individuals before release of any lost and found property.
TASK 10. Image, Personal Appearance and Dress: No additional items.
TASK 11. Cooperation with Others: No additional items.
TASK 12. Living Area and Gatehouse Maintenance:
(a) Trailer Area Maintenance: Gate attendant campsite shall be kept clean and maintained by the contract gate attendant to a perimeter of 30 feet surrounding the campsite.
(b) Pets: No additional items.
(c) Excessive Personal Items: No additional items.
(d) Smoking: No additional items.
(e) Gatehouse Maintenance: The Contractor will maintain the gatehouse, both inside and outside, in a clean, orderly and sanitary condition at all times. The gatehouse will be thoroughly cleaned at the end of each shift to the Lake Manager or designated representative’s satisfaction to include the following:
toilet facilities, carpet (vacuumed), hard floors (swept and mopped), windows, entire interior building surfaces (dusted and cleaned if necessary) and litter free outside building and walking surfaces for seventy-five (75) feet perimeter of gatehouse. Gate Attendants will provide all equipment, tools, supplies, and materials necessary to clean the gatehouse.
(f) Trash Removal: No additional items.
(g) Living Quarters Security: No additional items.
TASK 13. No Soliciting: No additional items.
TASK 14. Weapons: No additional items.
TASK 15. Alcohol: No additional items.
TASK 16. Government Property: No additional items.
TASK 17. Absenteeism: No additional items.
TASK 18. Visitors of the Contractor/Gate Attendant: No additional items.
TASK 19. Security Bonding: No additional items.
TASK 20. Physical Security and Key Control: No additional items.
1.12 GENERAL LIABILITY AND OTHER INSURANCE: No additional items.
1.13 DAMAGE RESPONSIBILITY: No additional items.
1.14 LIABILITY: No additional items.
1.15 PERMITS/COMPLIANCE: No additional items.
1.16 COMMUNICATIONS EQUIPMENT: A cell phone shall be provided at each gatehouse for official business use. Any charges determined to be personal or long distance other than official business are not allowed and shall be the responsibility of the Contractor. The gatehouse cell phone shall be answered by the attendant on duty.
Additional phone lines and/or any change, alteration or tampering with phone or data lines in the gatehouse is prohibited.
1.17 PAYMENT FOR SERVICES: The Contractor shall provide an invoice for payment to the Lake Manager after the last day worked each month.
1.18 TERMINATION. No additional items.
1.19 DUTY OF CONTRACTOR TO FINISH CONTRACT: No additional items.
1.20 OTHER REQUIREMENTS: Gate Attendant team will consist of a minimum of a two (2) person team and all team member must be at least 21 years of age. A minimum of one of the two person team will man the gatehouse during duty hours. During times of high usage as determined by the lake manager or his representative, both members of the contracting team are required to be in the gatehouse to provide prompt customer service.
Customer waiting time will be kept as short as possible.
BID SCHEDULE
BID SCHEDULE
LAVON LAKE, EAST FORK PARK, A POSITION (WINTER)
ITEM
NO.
DESCRIPTION
Contract Gate Attendant Services
Quantity
Unit Price Days
TOTAL
Base Period:
01 October 2021 to 31 March 2022
Option Period 1:
01 October 2022 to 31 March 2023
TOTAL AMOUNT :
LAVON LAKE, LAVONIA, A POSITION (WINTER)
(End of Summary of Changes)
ITEM
NO.
DESCRIPTION
Contract Gate Attendant Services
Quantity
Unit Price Days
TOTAL
Base Period:
01 October 2021 to 31 March 2022
Option Period 1:
01 October 2022 to 31 March 2023
TOTAL AMOUNT :
File details come from the government source that posted it. Updated .