B.08_W9126G21Q0055_Amd#0001 w-Attach.pdf
PDF 565 KB Posted
- Solicitation number
- W9126G21Q0055
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.01_Synop-RFQ_w-Attachments_18AUG2021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W9126G21Q0055 Amendment#0001 (P00001) - Lake O' the PInes, Piney Woods Region Water Testing
See Summary of Changes Block 14 Continued
CT POC: Daisy Ciarlariello, (817) 886-6592, Daisy.Ciarlariello@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Sep-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G21Q0055
X 9B. DATED (SEE ITEM 11)
18-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Sep-2021
CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G21Q0055
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
W9126G21Q0055 Amendment#0001 (P00001) is being revised to correct information in the Instructions to Offerors, Bid Schedule and Performance Work Statement.
Please see attached copies of revised documents – Instructions to Offerors, Bid Schedule and Performance Work Statement for the revisions.
The Quote Due Date is Unchanged: 10 September 2021 10:00AM
A copy of the SF30 Amendment Page (dated and signed) must be returned with your quote package.
Contracting POC: Daisy Ciarlariello, (817) 886-6592, Daisy.Ciarlariello@usace.army.mil
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Instructions to Offerors
(Revised)
Attachment 2 Bid Schedule - Revised 5 Attachment 3 PWS - Revised 19
(End of Summary of Changes) mailto:Daisy.Ciarlariello@usace.army.mil
Amd#0001
INSTRUCTIONS TO OFFERORS
Request for Quotes (RFQ) Solicitation Number: W9126G21Q0055 Solicitation is issued by:
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
PROJECT NAME: RFQ Lake O’ the Pines, Piney Woods Region Water Testing
1. This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.
Description of Services: The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal water testing services in the manner, location and frequency set forth in the Performance Work Statement. Work shall be performed in the USACE Piney Woods Region located at Lake O’ the Pines Project Office, 2669 FM 726, Jefferson, TX 75657. Periods of Performance will be one (1) twelve (12) month base period, and four (4) twelve (12) month option periods.
2. This solicitation document and incorporated provisions and clauses are those in effect through the Federal Acquisition Regulation (FAR) and Department of Defense FAR Supplement (DFARS).
a. The provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition and a statement regarding any addenda to the provision. Offerors are also required to submit a completed copy of the Request for Quotation and a completed copy of the pricing schedule.
b. Offerors include a completed copy of the provision at 52.212-3, Offeror Representations and
Certifications-Commercial Items, with its offer.
c. Clause at 52.212-4, Contract Terms and Conditions-Commercial Items, applies to this acquisition and a statement regarding any addenda to the clause.
d. Clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items, applies to this acquisition and a statement regarding which, if any, of the additional FAR clauses cited in the clause are applicable to the acquisition
3. This acquisition is 100% small business and is set-aside for competitive small business.
4. SC: F103 – ENVIRONMENTAL SYSTEMS PROTECTION - WATER QUALITY SUPPORT
5. NAICS CODE: 221310 Water Supply and Irrigation System
SIZE STANDARD: $30 Million https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1060550 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1060971 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i52_212_5
6. System for Awards Management (SAM): In accordance with FAR 52.204-7(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
7. Evaluation Information: The Government intends to award a firm fixed price (FFP) Purchase Order resulting from this RFQ to the responsible offeror whose offer represents the best value in terms of technical approach, past performance and price IAW 13.106-2(b)(2). Past performance is equivalent to price and technical approach. Quotes for this solicitation are due on 10 September 2021, by 10:00 AM CDT. Amd#0001
The offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.
In accordance with FAR Part 29.3 – State and Local Taxes, and per Title 4 of US Code 104-07, the Government is exempt from paying state and local taxes.
8. Submittals: Offerors must submit representation and certifications in accordance with the provisions at FAR 52.212-3 Offeror Representation and Certifications – Commercial Item (Accessible at https://www.acquisition.gov) or the vendor may verify their Online Representation and Certification Application (ORCA) is updated in SAM by checking “Yes” on the Vendor Information sheet.
Submit the following pages of information in one (1) PDF files in the response to the RFQ:
a. Vendor Information Sheet,
b. Technical Approach and Understanding of the Work (See Clause 52.212-2 Evaluation – Commercial Items)
c. Past Performance NAVFAC/USACE Past Performance Questionnaire (See Clause 52.212-2
Evaluation – Commercial Items). Recent or relevant work is defined as similar work in size and scope within the past four (4) years. The Contracting Officer shall deem an offeror non-responsive if the offeror fails to submit a PPQ IAW 52.212-1(b)(10). If for any reason the contractor does NOT have recent or relevant past performance, they are still required to submit a PPQ with a brief narrative explaining, "No Recent or Relevant Past Performance. An Offeror that submits a PPQ that is deemed neither recent nor relevant will be treated as
“NEUTRAL”.
d. Complete and return the provisions at 52.204-24 & 52.204-26.
e. If applicable, acknowledge and return any amendments with your submittals.
f. Contractors that failure to adhere to the submittal requirements will be determined non-responsive and will be considered ineligible for award.
9. Email all quotes to:
civ-ops.proposals@usace.army.mil
Daisy.Ciarlariello@usace.army.mil https://www.acquisition.gov/ mailto:civ-ops.proposals@usace.army.mil
10. 52.237-1 SITE VIST
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Prospective offerors/quoters are required to contact the Contract Specialist via email to express their interests by 3:00 PM (CST) two business days prior to attending the site visit. Site visit attendees must provide the following information the Solicitation Number, Project Title, Name(s) of Individual(s) who will attend the site visit, Name of Company Represented, Phone Number of Company being represented. All attendees required sign attendance sheet.
Address: Lake O’ the Pines Project Office
2669 FM 726
Jefferson, Texas 75657
CT POC: Daisy Ciarlariello Contact Info: (817) 886-6592 Email: Daisy.Ciarlariello@usace.army.mil
Conference: Tuesday, 31 August 2021 1:00 PM CST
Amd#0001 VENDOR INFORMATION SHEET W9126G21Q0055
Piney Woods, Lake O’ the Pines Refuse Collection & Disposal Water Testing
COMPANY NAME
POC
(Last, First Middle)
ADDRESS
(Number & Street) (City, State and Zip)
PHONE NUMBER MOBILE
(Area code and number) (Area code and number)
EMAIL ADDRESS
DUNS NUMBER CAGE CODE NUMBER
Vendor’s Online Representation and Certification Application (ORCA) are updated in SAM Yes No
Signature Date
NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm name: CAGE Code:
Address: DUNS Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy) Explain Differences:
Original Contract Price (Award Amount):
Final contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION.
CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil Ensure the former employer references the solicitation number in the email subject line.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract
Rating will be neither positive or negative.
mailto:CIV-OPS.Proposals@usace.army.mil
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force? E VG S M U N
b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agree price(s)? E VG S M U N
b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.
Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. YES NO
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
YES NO
f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below. YES NO
6. SAFETY/SECURITY
a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M
U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
YES NO
d) In Summary, provide an overall rating for the work performed by this contractor. E VG S M
U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):
BID SCHEDULE
WATER TESTING SERVICE –
LAKE O' THE PINES, JEFFERSON, TEXAS
BASE YEAR 1: 1 OCTOBER 2021 TO 30 SEPTEMBER 2022
FURNISH ALL EQUIPMENT, MATERIALS, SUPPLIES, TRANSPORTATION, AND LABOR NECESSARY TO
PERFORM WATER TESTING SERVICES AT LAKE O' THE PINES, TX IN ACCORDANCE WITH THE
CONTRACT SPECIFICATIONS AND ATTACHMENTS.
Item No. Supplies/Services Unit Quantity Unit Price ($) Total Price ($)
0001AA Operation and Maintenance of Water System - Johnson Creek Park month 12
0001AB
Operation and Maintenance of Water System - Project Office, Buckhorn Creek Park, Overlook, Outlet month 12
0001AC Collect Water System Samples (All Systems) month 12
0001AD Collect Water Samples at Beaches month 2
0001AE Oxidation Pond Testing month 12
0001AF
0001AE Aerobic System Inspection and Service month 12
0001AG
0001AF Pump Sewage Tank gallon 30000
0001AH
0001AG Test Backflow Prevention Device each 7
0001AJ
0001AH
Operation and Maintenance of Water System - Brushy Creek Park month 12
YEAR 1 TOTAL
LAKE O' THE PINES, JEFFERSON, TEXAS
OPT 1 YEAR 2: 1 OCTOBER 2022 TO 30 SEPTEMBER 2023
FURNISH ALL EQUIPMENT, MATERIALS, SUPPLIES, TRANSPORTATION, AND LABOR NECESSARY TO
1001AA Operation and Maintenance of Water System - Johnson Creek Park month 12
1001AB
Operation and Maintenance of Water System - Project Office, Buckhorn Creek Park, Overlook, Outlet month 12
1001AC Collect Water System Samples (All Systems) month 12
1001AD Collect Water Samples at Beaches month 2
1001AE Oxidation Pond Testing month 12
1001AF
1001AE Aerobic System Inspection and Service month 12
1001AG
1001AF Pump Sewage Tank gallon 30000
1001AH
1001AG Test Backflow Prevention Device each 7
YEAR 2 TOTAL
LAKE O' THE PINES, JEFFERSON, TEXAS
OPT 2 YEAR 3: 1 OCTOBER 2023 TO 30 SEPTEMBER 2024
FURNISH ALL EQUIPMENT, MATERIALS, SUPPLIES, TRANSPORTATION, AND LABOR NECESSARY TO
2001AA Operation and Maintenance of Water System - Johnson Creek Park month 12
2001AB
Operation and Maintenance of Water System - Project Office, Buckhorn Creek Park, Overlook, Outlet month 12
2001AC Collect Water System Samples (All Systems) month 12
2001AD Collect Water Samples at Beaches month 2
2001AE Oxidation Pond Testing month 12
2001AF
2001AE Aerobic System Inspection and Service month 12
2001AG
2001AF Pump Sewage Tank gallon 30000
2001AH
2001AG Test Backflow Prevention Device each 7
YEAR 3 TOTAL
LAKE O' THE PINES, JEFFERSON, TEXAS
OPT 3 YEAR 4: 1 OCTOBER 2024 TO 30 SEPTEMBER 2025
FURNISH ALL EQUIPMENT, MATERIALS, SUPPLIES, TRANSPORTATION, AND LABOR NECESSARY TO
3001AA Operation and Maintenance of Water System - Johnson Creek Park month 12
3001AB
Operation and Maintenance of Water System - Project Office, Buckhorn Creek Park, Overlook, Outlet month 12
3001AC Collect Water System Samples (All Systems) month 12
3001AD Collect Water Samples at Beaches month 2
3001AE Oxidation Pond Testing month 12
3001AF
3001AE Aerobic System Inspection and Service month 12
3001AG
3001AF Pump Sewage Tank gallon 30000
3001AH
3001AG Test Backflow Prevention Device each 7
YEAR 4 TOTAL
LAKE O' THE PINES, JEFFERSON, TEXAS
OPT 4 YEAR 5: 1 OCTOBER 2025 TO 30 SEPTEMBER 2026
FURNISH ALL EQUIPMENT, MATERIALS, SUPPLIES, TRANSPORTATION, AND LABOR NECESSARY TO
4001AA Operation and Maintenance of Water System - Johnson Creek Park month 12
4001AB
Operation and Maintenance of Water System - Project Office, Buckhorn Creek Park, Overlook, Outlet month 12
4001AC Collect Water System Samples (All Systems) month 12
4001AD Collect Water Samples at Beaches month 2
4001AE Oxidation Pond Testing month 12
4001AF
4001AE Aerobic System Inspection and Service month 12
4001AG
4001AF Pump Sewage Tank gallon 30000
4001AH
4001AG Test Backflow Prevention Device each 7
YEAR 5 TOTAL
5-YEAR TOTAL
U.S. ARMY CORPS OF ENGINEERS
FORT WORTH DISTRICT
LAKE O’ THE PINES, TEXAS
PERFORMANCE WORK STATEMENT
WATER TESTING AND SERVICES
Revised 01 September 2021
1.0 GENERAL – This is a non-personal services contract to provide water testing and services at Lake O’ the Pines Project Office. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor (KTR), who in turn is responsible to the Government.
1.1 DESCRIPTION OF SERVICES/INTRODUCTION – The KTR shall provide all personnel, equipment, supplies, facilities, transportation, tools, vehicles, materials, management, supervision, inspection, and other items and non-personal services necessary to effectively perform water testing and services as defined in this Performance Work Statement except for those items specified as Government furnished property and services. The KTR shall perform to the standards in this contract.
1.2 SCOPE – Perform water testing contract, consisting of public water systems operation and testing, swimming beach water collection and testing, and oxidation pond operation and testing for Lake O’ the Pines Project near Jefferson, TX. The KTR shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to effectively perform water testing services at the specified locations and to standards as defined in this Performance Work Statement (PWS).
The KTR will ensure that all work is accomplished in accordance with the contract, all applicable laws, municipal codes, regulations and/or written directives issued by the Contracting Officer (KO) or the authorized representative of the Contracting Officer (COR), if applicable.
1.2.1 WATER SYSTEMS OPERATION – The KTR shall furnish all tools, labor, equipment, transportation, and materials to operate and maintain public drinking water systems at Lake O’ the Pines Project, in accordance with the following specifications.
1.2.1.1 WATER TREATMENT PLANTS – The KTR will be required to inspect, clean, service and maintain sample testing and reporting on chlorination units in accordance with the provisions of the specifications. Inspection will include a visual check of all components, pipes and electrical wiring of the treatment system for leaks, cracks, and other defects. Cleaning will include sweeping the equipment and piping to remove all insects, insect nests and webs from equipment, doors, walls and ceilings. Service of treatment units will include preparation of KTR furnished chlorine solutions.
Calcium hypochlorite (HTH) will not be used in the treatment plants. Operation and maintenance will include making the necessary adjustments in settings of treatment equipment and conducting test operating procedures to assure that properly treated potable water (meeting applicable TCEQ standards) is provided throughout the Public Water System (PWS). The KTR is required to make minor repairs to the chlorination treatment units. The contractor shall provide monthly reports including activity performed, date, meter readings, results, chlorine residual, chlorine used, and any relevant notes.
1.2.1.2 TREATMENT PLANT OPERATIONS AND MAINTENANCE – The following general requirements are provided for proper treatment plant operations and maintenance:
1.2.1.2.1 Water systems shall be operated to provide adequate chlorination treatment, consisting of at least good mixing and a 30-minute contact time.
1.2.1.2.2 Chlorination equipment should be operated so that continuous and effective disinfection is secured under required local conditions. Unless bacteriological and other tests indicate the need for maintaining higher minimum concentrations of residual chlorine, the following requirements will prevail during normal operations: Maintain chlorine residual of 0.2 milligrams per liter (mg/l) to 0.5 mg/l at distant points in the distribution system. The KTR must adhere to all Texas Commission on Environmental Quality (TCEQ) mandates concerning chlorination levels.
1.2.1.2.3 Every effort will be made to reduce or eliminate all deficiencies in quality by properly operating chlorinators.
1.2.1.2.4 KTR’s personnel will be trained in operating procedures and methods of testing water quality. The test kit used will be a Hach kit, or comparable test kit.
1.2.1.2.5 After flooding, any portion of the water system with non-potable water, the entire water system will be considered as unsafe until it has been disinfected and tested.
1.2.1.2.6 Equipment problems shall be reported as soon as possible to the COR Government Quality Assurance Representative (GQAR) or Project Manager. Any re-sampling or testing required will be performed by the KTR and will be included in the original contract price.
1.2.1.2.7 All flush valves in the distribution system will be flushed at each servicing.
Flushing will be conducted for a minimum of fifteen (15) minutes at each flush point. The furthest points of supply in the distribution system will be flushed at each servicing.
1.2.1.3 WATER PRESSURE TANK INSPECTION – Pressure tanks must be inspected annually to determine that the pressure release device and pressure gage are working properly, the air-water ratio is being maintained at the proper level, the exterior coating systems are continuing to provide adequate protection to all metal surfaces, and that the tank remains in water-tight condition. Pressure tanks with an inspection port must have the interior surface flushed out, cleaned, and inspected every five years as required by the TCEQ. The last interior inspection and cleaning of pressure tanks was conducted in January 2019. Water Pressure Tank Inspections must be conducted, and inspection logs must be submitted to the COR GQAR in January each year.
1.2.1.4 WATER TREATMENT ADDITIVES – All chemicals and any additional or replacement process media used in treatment of water supplied by the KTR for the Government water systems must conform to American National Standards Institute/National Sanitation Foundation Standard 60 for direct additives (i.e. hypochlorite solution) and ANSI/NSF Standard 61 for indirect additives (i.e. tank interior paints or coatings). Conformance with these standards must be obtained by certification of the product by an organization accredited by ANSI/NSF. The KTR must supply the COR GQAR with copies of ANSI/NSF certifications for all water treatment additives.
1.2.2 WATER SYSTEMS TESTING – All water systems will be tested for total coliform bacteria and residual chlorine.
1.2.2.1 TOTAL COLIFORM BACTERIA – Sampling and testing will be performed on each water system one (1) time each month during the first week of each month according to a written sample siting plan, initial version provided as appendices. Revised Total Coliform Rule Sample Siting Plans (RTCR) submitted to and approved by the TCEQ shall be followed by the KTR. The Government will provide the current version of RTCR to the KTR. Samples shall be collected in state approved containers and will be delivered to a TCEQ approved laboratory for testing. A TCEQ approved laboratory means any laboratory designated as such by the TCEQ. The samples will be delivered for testing as soon as possible but in no case will the time between collection and delivery to the laboratory exceed 24 hours. Five (5) additional samples are required, also following the approved sample siting plan, the month after a positive coliform result is found at no additional cost to the Government.
1.2.2.2 RESIDUAL CHLORINE – Sampling and testing will be performed weekly on each water system. The results of residual chlorine testing shall be used by the KTR to determine the chlorine dosage requirements.
1.2.2.3 SCHEDULE – Water systems shall be tested according to the following specifications.
1.2.2.3.1 Tests shall be alternated between service points of any one system so that all outlets of a system are sampled before any one outlet is sampled again.
1.2.2.3.2 All samples shall be collected at sites located after the point of process treatment.
1.2.2.3.3 For total coliform bacteria testing, written sample siting plans must be adhered to and their logs submitted to the COR GQAR. The sample siting plans for Lake O’ the Pines water systems are attached in APPENDICES A, B, and C. The sample siting plans may be amended at the Government’s discretion. The KTR shall adhere to current version of RTCR sample siting plans.
1.2.2.3.4 All sampling results shall be submitted to the TCEQ, Public Drinking Water Section MC 155, and the U.S. Army Corps of Engineers, Lake O’ the Pines Project Office.
1.2.2.3.5 KTR’s personnel shall be trained in operating procedures and methods of testing water quality. The test kit used will be a Hach kit, or a comparable test kit.
1.2.2.4 LABORATORY AND TESTING COSTS – The KTR will be responsible for making all arrangements with the approved TCEQ laboratory and will be responsible for the costs incurred for all laboratory tests, which shall be included in the contract price. No separate payment for the costs of any testing will be made by the Government.
1.2.2.5 QUALITY CONTROL – Any source which shows bacterial contamination (as determined from the total coliform bacteria tests) will be re-sampled and re-tested immediately. If two consecutive samples fail the bacteriological limits as set by the TCEQ, the COR GQAR will shall be notified immediately, and the system shut down. The system will only be reactivated after the corrective action is taken and two consecutive satisfactory daily samples are obtained. If the results of a residual chlorine test fail the requirements of Part 6.5.3 and 6.5.6, corrective action will be taken, and the test will be repeated until satisfactory results are obtained. Any additional sampling and testing, if required, will be done by the KTR at no additional cost to the Government.
1.2.2.6 TABULATION OF FACILITIES – A tabulation of water systems is attached for information purposes.
1.2.3 SWIMMING BEACH WATER TESTING – The KTR shall collect water samples from Lake O’ the Pines at swimming beach locations shown below and test samples according to the SWDR 1130-2-9, the current version.
1.2.3.1 SCHEDULE - Five weekly tests will be conducted beginning on a Monday in early June, designated by the COR or GQAR, and usually ending immediately following the fourth of July, excluding any necessary re-testing under Part 1.2.3.3. For each test, two (2) samples will be collected at each of six (6) swimming beaches at Lake O’ the Pines. Test analysis will be electronically mailed (e-mailed) to the designated QA within four days of the date on which the water sample was taken.
Test analysis will also be mailed to the Corps project office within one week of the date on which the water sample was taken. Samples for testing will be taken at the following locations:
Alley Creek Camping Beach Brushy Creek Camping Beach Johnson Creek Camping Beach Johnson Creek Day Use Beach Lakeside Sandy Day Use Beach Shady Grove Day Use Beach
1.2.3.2 PROCEDURE - Two samples will be taken weekly at each location. A sample shall be taken in the center of each of the left and right halves of the swimming area, as viewed from the shoreline. Samples will be taken in the swimming areas where the water depth is three to four feet deep. Samples will be taken about one foot below the water’s surface.
1.2.3.3 RE-TESTING - When elevated levels are found at particular beaches, the Corps’ may require additional test samples within five days of the prior bi-weekly test. These additional test analyses will be electronically mailed as soon as possible (e-mailed) to the designated QA within a maximum of four days of the date on which the water sample was taken. The test analysis will also be mailed to the Project Office within one week of the date on which the water sample was taken. The KTR will be paid separately for each batch of additional tests at the same price per sample as the originally contracted samples.
1.2.4 OXIDATION POND OPERATION AND TESTING - The KTR shall furnish all tools, labor, equipment, transportation, and materials to operate and maintain test the oxidation pond at Lake O’ the Pines Project, in accordance with the following specifications.
TABULATION OF WATER SYSTEMS AT LAKE O’ THE PINES PROJECT
Buckhorn, Overlook, Project Office Buckhorn 63 RV Sites, 37 Tent Sites
Brushy Creek, 63 RV Sites, 37 Tent Sites
Johnson Creek, 64 RV Sites, 22 Tent Sites, Group Area 12 Sites
PWS Number 1580034 1580039 1580038
Depth of Wells (ft) 690 / 681 565 / 562 314 / 828
Treatment Method Chlorine Chlorine Chlorine Gallons of Storage 1000 1000 1000 Feet of Lines Supply 8,000 8,200 9,500 Distribution 1,750 2,450 2,000 Max Served 786 800 688 Connections 71 77 85
Restrooms 6 4 6
1.2.4.1 SPECIFICATIONS - The KTR shall inspect, clean, service and maintain the oxidation pond, including sewer pipelines and structures between lift stations and entry point of sewer water into the oxidation pond. Inspection will include a visual check of all components, pipes, concrete structures, and potential leaks or other defects. Cleaning will include removal of debris or other objects that obstruct free flow and proper system operation. Service and maintain will include inspection and corrective action to ensure the system is operated in compliance with applicable Texas Commission on Environmental Quality (TCEQ) standards.
1.2.4.2 FREQUENCY - The KTR shall perform the specified ongoing services on a monthly basis. Inspections will be conducted beginning on the 15th of each month, and necessary maintenance will be completed within 7 days.
1.2.4.3 REPAIRS - The KTR is required to make minor repairs to the oxidation pond water delivery system and components to ensure proper operation.
1.2.4.4 COMPLIANCE – The KTR is required to operate the oxidation pond in compliance with all TCEQ standards.
1.2.4.5 BIOLOGICAL OXYGEN DEMAND AND PH – The KTR shall furnish all labor, materials and equipment necessary to perform pH and Biological Oxygen Demand (BOD) testing, all services and operations for the Oxidation Pond located below the dam at Lake O’ the Pines.
1.2.4.5.1 1.2.4.6. SCHEDULE - Test to measure pH and BOD will be conducted between the 15th and 20th of each month throughout the year.
1.2.4.5.2 1.2.4.7. REPORTS - The KTR shall furnish the test results on a form approved by the COR by the end of each month.
1.2.4.5.3 1.2.4.8. LOCATION OF TESTING POINT - Readings will be taken at the structure where effluent discharges into the Oxidation Pond.
1.2.4.5.4 1.2.4.9. KTR shall maintain all permits and necessary certifications for the operations as required by any applicable state, federal or local regulations.
1.2.5 AEROBIC SYSTEM INSPECTION AND SERVICE – The KTR shall provide inspection and service for 3 aerobic systems located in Alley, Johnson, and Brushy Creek Parks. Full inspection and service is required at least once every 3 months. Inspection reports shall be filed with the authorized agency, Northeast Texas Municipal Water District. A weather-proof tag or label shall be attached to the controller showing the month that each inspection was performed. A written report shall be sent by mail or fax: USACE Lake O’ the Pines Project Office, 2669 FM 726, Jefferson, TX 75657. Regular operation and maintenance of chlorine supply and aeriation function shall be performed no less than bi-weekly (every 2 weeks).
1.2.5.1 INSPECTION - Aerobic systems shall be serviced, which includes the inspection, adjustment and servicing of all mechanical and electrical component parts, filters, chlorinator, distribution system and spray application field, to insure their proper operation.
1.2.5.2 EFFLUENT - The KTR shall visually inspect effluent quality for color, turbidity, scum, overflow, odor, and test the chlorine residual.
1.2.5.3 BOD AND TSS – BOD AND Total Suspended Solids (TSS) shall be tested for once a year for each system.
1.2.5.4 REPAIRS - If any improper operation is observed which cannot be corrected at the time of the inspecting the property owner shall be immediately notified in writing of the conditions and the estimated date and cost of repairs. This contract does not include the cost of parts or repair calls.
Problems and complaint calls shall be responded to within 48 hours of notification.
1.2.6 PUMP SEWAGE TANK – The KTR shall provide service to pump sewage tanks on a as needed basis, within 24 hours of request from QAR, and properly dispose of effluent. The Government does not have an identified delivery or identified quantity pre-established but can order up to 30,000 gallons of pumping per contract year.
1.2.7 TEST BACKFLOW PREVENTION DEVICE – The KTR shall provide certified service to test water main backflow prevention devices (approximately 2” diameter) on a as needed basis, within 2 weeks of request from QAR. The Government does not have an identified delivery or identified quantity pre-established but can order up to 7 devices tested per contract year.
1.2.8 REPORTS - The KTR shall be responsible for furnishing all reports and data required by the TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ), including the preparation and posting of both unsuitable water notice reports and the annual Drinking Water Quality Reports (Consumer Confidence Report-CCR) for each water system. These reports will be submitted to the TCEQ and the COR GQAR prior to the deadlines established by the TCEQ. The KTR will also be required to maintain a log of tests and work at each well location. A legible copy of the log shall be furnished to the COR GQAR on completion of each week. All laboratory test results will be maintained by the KTR for the duration of the contract and copies will be turned over to the COR GQAR each month.
1.2.9 CERTIFIED LAB – At all times the KTR shall use a TCEQ certified or accredited laboratory for sample analysis.
1.2.10 CLEANUP - All debris, trash, or other material resulting from the KTR’s operation shall be removed from the area, and the job site shall be restored/cleaned to as near a natural condition as possible, upon completion of the job.
1.2.11 SAFETY – The KTR shall perform all services in full compliance with the safety requirements set forth in the current EM 385-1-1, entitled "Safety and Health Requirements Manual", which is available at the Project Office and at https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/ .
Consequently, the KTR shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
1.2.11.1 SAFETY PLAN – The KTR shall develop and submit a written detailed safety plan within fifteen (15) days after award and prior to beginning work. This plan shall indicate in detail the general policies and procedures for safe operation in the accomplishment of this contract. The plan shall show how the KTR intends to perform services in full compliance with the safety requirements set forth in EM 385-1-1, entitled "Safety and Health Requirements Manual", available at https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/ . Consequently, the KTR shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
1.2.11.2 SAFETY MEETINGS - The KTR shall hold a safety meeting with all employees prior to commencement of work and will notify the GQAR GQAR Government Quality Assurance Representative (GQAR) of the location and time of the meeting. When a new employee is hired, the KTR will thoroughly brief that person in all safety procedures and requirements. Any KTR employee who persists in unsafe performance shall be removed from the job at the request of the KO. A copy of the safety meeting report shall be submitted to the GQAR prior to performing work.
1.2.11.3 INJURY - The KTR shall report all occupational injuries and illnesses, if any, to the GQAR as soon as possible after the injury occurred, but no later than the same day of occurrence. The KTR will promptly report all accidents to the GQAR.
1.2.11.4 ACTIVITY HAZARD ANALYSIS (AHA) – The KTR shall develop and submit a written AHA within fifteen (15) days after award and prior to beginning of work. This analysis must indicate specific activities performed during contract duties, associated hazards, and mitigating factors.
1.2.11.5 PERSONAL SAFETY EQUIPMENT - The KTR shall be required to furnish at no expense to employees, all necessary personal safety equipment such as face shields, eye goggles, rain suits, safety-toed boots and hard hats. All safety equipment shall meet all safety requirements as set forth in the EM 385-1-1, Safety and Health Requirements manual and shall be maintained in accordance with manufactures’ recommendations at all times.
1.2.11.6 PUBLIC SAFETY - Care shall be taken when operating water systems to avoid injury to workers, park visitors or damage to Government or private property.
1.2.12 DAMAGES – The KTR shall inspect work areas at each location for damage and/or vandalism and report such immediately to the GQAR. The KTR shall be responsible for restoring any Government property, facilities, or structures damaged by the KTR. The KTR will be responsible for damage to private and/or Government property, and injury to any person as a result of the KTR’s operation. Damage to property will include but not be limited to damage to water systems or recreation facilities. The KTR shall notify the Contracting Officer’s Representative (COR) GQAR immediately of any damages or injuries.
1.2.13 WORKDAY – Work locations will be available for the KTR between the hours of 7:00 a.m. to 6:00 p.m., Monday thru Friday, except as approved in advance by the COR GQAR. Major Federal Holidays during the recreation season (1 April – 30 September) shall be observed by the KTR and no work on site will be permitted except in extreme cases and after specific approval by the COR GQAR. See Part for Major Federal Holidays and, check with Project Office for specific dates that Holidays are observed each year.
1.2.14 WORK SCHEDULE – The contractor shall provide a work schedule detailing what work items will be performed on what days of the week and/or month.
1.3 GENERAL INFORMATION
1.3.1 CONTRACTOR QUALITY CONTROL/DAILY ACTIVITY REPORTS – The KTR is responsible for establishing and maintaining an adequate Quality Control (QC) system to satisfactorily inspect and ensure that all work performed by the KTR’s organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications and maps herein. The KTR shall designate, in writing, a QC Inspector, whose main duty shall be to verify contract conformance of all work performed and to notify the GQAR of anything requiring immediate attention. The KTR shall complete a signed Daily Activity Report of duties each service day. The KTR shall also note any irregularities in a remarks portion of the form. The report will include the following information: location/facility name, date, time, preparer, and service completed. All Daily Activity Reports will be turned in to the GQAR. The KTR shall also complete and submit a Monthly System Report that includes the following information: water meter readings, chlorine used, chlorine residuals, flushing log, and other relative and TCEQ required data.
1.3.2 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP): The Government shall evaluate the KTR’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the KTR has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.3.3 QUALITY ASSURANCE - The GQAR will inspect the work as it is completed to ensure all requirements of the contract have been satisfied. The KTR QCR will be responsible to ensure all work is completed prior to inspection by the Government.
1.3.3.2 PERFORMANCE EVALUATION MEETINGS – The KTR, his superintendent, QC inspector, or all, shall meet with the GQAR, periodically as determined necessary by the GQAR, in order to discuss performance. However, a meeting shall be held not later than one normal workday after a Contract Deficiency Report (CDR) is issued. Mutual effort will be made to resolve any and all problems identified.
1.3.3.3 INSPECTION/ACCEPTANCE - All work must be inspected and accepted by the GQAR before payment for the work can be made. Inspections will be made by the GQAR after work is completed. The KTR will be advised of a deficiency. Upon being advised of a deficiency, the KTR shall take immediate action either to personally correct or have his team member correct such deficiency and to ensure that the deficiency does not recur. Any work that is rejected by the GQAR shall be re-performed by the KTR at the KTR's expense. Inspections will be conducted by using the random sampling method; however, the Government has the right to change or modify inspection methods at its discretion.
1.3.3.4 RE-PERFORMANCE - The GQAR may require that all work which fails to provide the desired results be repeated at the KTR’s expense. The KTR will ensure that these defects do not recur.
The Government…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .