B.08_RTA Drawings Set July 2021.pdf
PDF 38 MB Posted
- Solicitation number
- W9126G21B0049
About this file
This document provides details for a federal contract solicitation for renovation work at White Sands Missile Range in New Mexico. The solicitation will be issued as an Invitation for Bid to renovate Building 460 to accommodate family and morale services. Work includes replacing ceilings, lighting, plumbing fixtures, HVAC systems, electrical panels, and structural repairs, along with new interior offices, fire sprinklers, and a mass notification system. The solicitation is set aside for small businesses and falls under NAICS code 236220 with a size standard of $39.5 million. Bids are due by August 9th, 2021 with anticipated award by the same date. The Department of the Army Corps of Engineers Engineering District Fort Worth will issue the solicitation. Interested parties must register in the System for Award Management and with the contracting officer by the specified dates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.07_July 28 Site Visit sign in sheet.pdf | ||
| B.07_July 27 Site Visit sign in sheet.pdf | ||
| B.08_W9126G210049.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
F
E
D
C
B
A
1 2 3
BUILDING 460-RENOVATION
WSMR, ARMY POST
WHITE SANDS MISSILE RANGE, NM 88002
SOLICITATION NO: W9126G2180049
CONTRACT NO:
THIS PROJECT WAS DESIGNED BY THE TULSA DISTRICT OF THE
U.S. ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES
AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEARING
ON THESE PROJECT DOCUMENTS ARE WITHIN THE SCOPE OF
THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
PLOT DATE:
FILE PATH:
5 6 7
THIS PROJECT WAS DESIGNED BY THE TULSA DISTRICT ARMY CORPS OF ENGINEERS.
SIGNATURES AFFIXED INDICATE OFFICIAL RECOMMENDATIONS AND APPROVAL OF ALL
DRAWINGS IN THE SET AS INDEXED. THE INITIALS OR SIGNATURES AND REGISTRATION
DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE
SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
9 10
SHEET NUMBER SHEET NAME SHEET ISSUE DATE
GENERAL
G-001 COVER SHEET/DRAWING INDEX 9/4/2020
G-002 GENERAL NOTES AND ABBREVIATIONS 9/4/2020
G-003 PROJECT LOCATION AND SITE LA YD OWN /STAGING AREA 9/4/2020
Gl-001 LIFE SAFETY PLAN 9/4/2020
ARCHITECTURE
AD-101 FIRST FLOOR DEMOLITION PLAN 9/4/2020
AD-102 BASEMENT DEMOLITION PLAN 9/4/2020
AD-103
HAZARDOUS MATERIAL SURVEY REPORT
5/24/2021
LOCATION PLANS
A-101 FIRST FLOOR PLAN 9/4/2020
A-102 BASEMENT PLAN 9/4/2020
A-103 REFLECTED CEILING PLAN 9/4/2020
A-104 ROOF PLAN 9/4/2020
A-601 DOOR/WINDOW SCHEDULE AND DETAILS 9/4/2020
A-602 MILLWORK ELEVATIONS AND DETAILS 9/4/2020
IF-101 ROOM FINISH SCHEDULE AND LEGEND 9/4/2020
IF-102 FINISH FLOOR PLAN 9/4/2020
IF-501 SIGNAGE 9/4/2020
STRUCTURAL
S-001 GENERAL NOTES 9/4/2020
S-101 STRUCTURAL PLANS 9/4/2020
S-301 STRUCTURAL ELEVATIONS AND DETAILS 9/4/2020
MECHANICAL
M-001 MECHANICAL LEGENDS & SYSMBOLS 9/4/2020
M-002 MECHANICAL LEGENDS & SYSMBOLS 9/4/2020
MD-101 MECHANICAL FLOOR PLAN DEMO 9/4/2020
MD-102 MECHANICALROOF PLAN DEMO 9/4/2020
MD-103 BASEMENT DEMOLITION PLAN 9/4/2020
M-101 MECHANICAL FLOOR PLAN 9/4/2020
M-102 MECHANICAL ROOF PLAN 9/4/2020
M-103 MECHANICAL BASEMENT PLAN 9/4/2020
M-104 BASEMENT BOILER PIPING ISOMETRIC 9/4/2020
M-201 MECHANICAL HYDRONICS 9/4/2020
M-202 MECHANICAL HYDRONICS ISOMETRIC VIEW 9/4/2020
M-501 MECHANICAL DETAILS 9/4/2020
M-502 MECHANICAL DETAILS 2 9/4/2020
M-601 MECHANCALEQUIPMENTSCHEDULE 9/4/2020
M-602 MECHANCALEQUIPMENTSCHEDULE 9/4/2020
M-603 MECHANCALEQUIPMENTSCHEDULE 9/4/2020
M-701 HVAC CONTROLS-SYSTEM ARCHITECTURE 9/4/2020
M-702 HVAC CONTROLS-HEATING WATER SYSTEM 9/4/2020
M-703 HVAC CONTROLS-HEATING HOT WATER POINTS 9/4/2020
M-704 HVAC CONTROLS-RTU DIAGRAM 9/4/2020
M-705 HVAC CONTROLS-RTU-1,2 POINTS LIST 9/4/2020
M-706 HVAC CONTROLS-RTU-3 DIAGRAM 9/4/2020
M-707 HVAC CONTROLS-RTU-3 POINTS LIST 9/4/2020
M-708 HVAC CONTROLS-EXHAUST FAN 9/4/2020
M-709 HVAC CONTROLS-VAV WITH HW REHEAT DIAGRAM 9/4/2020
M-710 HVAC CONTROLS-UNIT HEATER 9/4/2020
M-711 HVAC CONTROLS-DUCTLESS SPUT SYSTEM 9/4/2020
PLUMBING
P-001 PLUMBING LEGEND AND SYMBOLS 9/4/2020
PD-101 PLUMBING FLOOR PLAN DEMO 9/4/2020
P-101 PLUMBING FIRST FLOOR 9/4/2020
P-102 BASEMENT WATER HEATER ISOMETRIC 9/4/2020
P-501 PLUMBING DETAILS 9/4/2020
P-601 PLUMBING SCHEDULES 9/4/2020
ELECTRICAL
E-001 ELECTRICAL LEGENDS AND SYMBOLS 9/4/2020
ED101 LIGHTING PLAN-DEMO 9/4/2020
ED102 POWER PLAN-DEMO 9/4/2020
ED103 ROOF PLAN-DEMO 9/4/2020
E-101 LIGHTING PLAN-IMPROVEMENTS 9/4/2020
E-102 POWER PLAN-IMPROVEMENTS 9/4/2020
E-103 ELECTRICAL ROOF PLAN IMPROVEMENTS 9/4/2020
E-501 ELECTRICAL DETAILS 9/4/2020
E-601 EXISTING AND NEW RISER DIAGRAM 9/4/2020
E-602 PANEL SCHEDULES- EXISTING I 9/4/2020
E-603 PANEL SCHEDULES- EXISTING II 9/4/2020
E-604 PANEL SCHEDULES- EXISTING Ill 9/4/2020
E-605 UPDATED PANEL SCHEDULES I 9/4/2020
E-606 UPDATED PANEL SCHEDULES II 9/4/2020
E-607 UPDATED PANEL SCHEDULES Ill 9/4/2020
TELECOMMUNICATIO
T-101 TELECOMMUNICATION PLAN 9/4/2020
T-501 TELECOMMUNICATION DETAILS 9/4/2020
FIRE PROTECTION
FA001 FIRE ALARM/ MASS NOTIFICATION PLAN 9/4/2020
FP001 FIRE SPRINKLER PLAN 9/4/2020
REVIEWED BY: APPROVED BY:
SHAWN PAINTER, P.E. KATHRYN WHITE, P.E.
CHIEF, ENGINEERING BRANCH CHIEF, ENGINEERING & CONSTRUCTION DIVISION
m US Army Corps of Engineers® Fort Worth District
"' 08 z"' .
"'"" C:
N O C'\I z 0; (!)..,.,. I
N,S«>ul ··>-•-Ne:!I -S!...J~...--ci a1:::,o~ol o-,cn>O
<i;
c::
Cll C " Cl) .c z
Cl) <(
L!J Cl)
C
C:
1;'
E:
f-
I I C
R LU LL
0::: a. !:!:! a.
z
,Ji1 a.
z fi
L!J :i: > ~u 0 zZ 0 .. :::, (!)
.c L!J "C:;;;
" <( C: u
-~1--
" a. cu
L!J .c <( C: u " fe? a. cu
>.I E'o::: [i ..c ...J "'O I- Cl
~w~cnz _!,£<C--cno u:r: Ei32u ~S:2-g:r:= u :;;; Cl) u ::;;
K!
w w z f- U)
- CJ
Cl - ~ z c:: f-w f- U)
u. ~ a:: 1-o co :c en ::c ... q ...
a.~~c::
n::0>-0 0 > "'~ (.);::i,,"'""1- ► f- co c::
::E c:: 0
~ 0 IL
<( IL
oi :i wZ t!l w· Zt9 Z <tz~o 0::<t:N W 0:: ~ !;i:
-'w ··> cn_,>-o cn-1.Lz -cn..,w :::;;; en "' c:: cn:::;;;No Ocn~co zo..-..
<tz ··t9 cn<t:zo wcnc.._, I- W CD
J:t- S::i::: s:
z
QI
Cl)()
.._-Z c,><C Z O 0::
0:: z co wo<9 w-Z zt--
- (.) 0::
e9::JW zO::W wt--Z
C/)- 2(9 oz ow
_x 1-W wCl wz ::c c:: z w :;:
6~ (.)Cl
SHEET
NUMBER
G-001
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H a_
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
FO
R
T W
O R
TH
D
IS
TR
IC
T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
TA
YL
O R
S T
US Army Corps of Engineers ® Fort Worth District
W
G
-2 1-
B-
C H
R
IS
TO
PH
ER
S
TR
U
N K, P .E
S.
E.
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
JU
LY
KI
M S
O R
R
EL
S, P
.E
S.
E.
KI
M
S O
R R
EL
S, P .E
S.
E.
BU
TC
H G
R
EE
N , P
.E
BL
D
G
R
EN
O
VA
TI
O N
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
G E, N M
S-001
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
G E
PN
: 4
F Y:
G
EN
ER
AL
N O
TE
S
JULY 2021
DESIGN CRITERIA
STEEL MATERIAL TABLE
STEEL ELEMENT ASTM/TYPE Fy (KSI) Fu (KSI) COMMENTS
ADHESIVE ANCHORS A193 B7 -- 125 THREADED ROD
ANCHOR RODS F1554 GR 55 55 75 WELDABLE, HEAVY HEX HEADED
BOLTS A325 OR F1852 -- 120 --
DAS A496 70 80 --
HAS A108 51 65
OTHER SHAPES A36 36 58 --
PLATES A36 36 58 --
RECT HSS A500 GR B 46 58 --
WELDING ELECTRODES E70 -- -- PER AWS
A992 50 65 --
STUDS ARE 3/4"Ø UNO
W, WT
1. CODES AND STANDARDS:
A. GENERAL DESIGN
INTERNATIONAL BUILDING CODE, 2018
B. LOADS
ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
UFC 1-200-01, DoD BUILDING CODE (GENERAL BUILDING REQUIREMENTS), 8 OCTOBER 2019
UFC 3-301-01, STRUCTURAL ENGINEERING, 01 OCTOBER 2019
C. CONCRETE
ACI 318-14: "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE"
D. STEEL
ANSI/AISC 360: SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, 14TH EDITION
2. DESIGN LOADS:
RISK CATEGORY II
A. DEAD LOADS:
ROOF DEAD LOAD.................................................................................................. 11.25 PSF AHU DEAD LOAD..................................................................................................... 2.5 K (MAX) MECHANICAL DUCT ALLOWANCE......................................................................... 4.0 PSF MISCELLANEOUS.................................................................................................... 3.0 PSF EXISTING JOISTS LOAD (SJ 124)........................................................................... 6.0 PLF
B. LIVE LOADS:
ROOF LIVE LOAD, NON-REDUCIBLE..................................................................... 20 PSF
B. SNOW LOADS:
GROUND SNOW LOAD........................................................................................... 0 PSF
3. OTHER DESIGN CRITERIA:
A. DEFLECTION CRITERIA:
ROOF MEMBERS, NOT SUPPORTING CEILING (ROOF LIVE LOAD).................... L/180
ROOF MEMBER, NOT SUPPORTING CEILING (DEAD + LIVE LOAD).................... L/120
GENERAL REQUIREMENTS
1. GENERAL:
A. ENGINEER: REFERENCES ON THE STRUCTURAL DRAWINGS TO ‘ENGINEER’ MEAN THE STRUCTURAL
ENGINEER OF RECORD.
B. THESE NOTES SUPPLEMENT THE SPECIFICATIONS, WHICH SHALL BE REFERENCED FOR ADDITIONAL
REQUIREMENTS.
C. STRUCTURAL ELEMENTS ARE CENTERED ON GRID LINES AND GRID LINES INTERSECTIONS UNLESS
DIMENSIONED OTHERWISE.
2. USE OF DRAWINGS:
A. DO NOT SCALE DRAWINGS.
B. WHERE DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS, GENERAL NOTES, AND SPECIFICATIONS, THE MORE STRINGENT REQUIREMENTS SHALL GOVERN. DETAILS ON DRAWINGS TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. DETAILS NOTED AS TYPICAL APPLY TO ALL SIMILAR CONDITIONS.
WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION SHALL SUBMIT A REQUEST FOR INFORMATION.
3. TEMPORARY CONDITIONS:
A. THE STRUCTURE IS DESIGNED TO FUNCTION AS A UNIT UPON COMPLETION. THE CONTRACTOR IS RESPONSIBLE FO FURNISHING ALL TEMPORARY BRACING AND/OR SUPPORT THAT IS REQUIRED PRIOR TO ANY DEMOLITION OR REMOVAL OF EXISTING COMPONENTS. CONTRACTOR CONSTRUCTION METHODS, SEQUENCING, AND SHORING PLAN MUST BE SUBMITTED FOR APPROVAL PRIOR TO CONSTRUCTION.
4. OSHA STANDARDS DURING CONSTRUCTION:
A. THE STRUCTURE IS DESIGNED TO FUNCTION AS A UNIT UPON COMPLETION. NOTHING SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE CONSTRUED AS ELIMINATING THE NEED FOR THE CONTRACTOR TO
COMPLY WITH ALL OSHA REQUIREMENTS.
B. WHERE THE STRUCTURAL DRAWINGS APPEAR TO CONFLICT WITH OSHA REQUIREMENTS, THE
STRUCTURAL DRAWINGS REPRESENT FINAL CONDITIONS ONLY. THE CONTRACTOR SHALL ADD ALL
ERECTION FRAMING NECESSARY TO COMPLY WITH OSHA.
5. CONSTRUCTION ENGINEERING:
THE STRUCTURE DEFINED ON THE CONTRACT DOCUMENTS HAS BEEN DESIGNED ONLY FOR LOADS
ANTICIPATED ON THE STRUCTURE DURING ITS SERVICE LIFE. PROVIDE ALL REQUIRED ENGINEERING AND OTHER MEASURE TO ACHIEVE THE MEANS, METHODS, AND SEQUENCES OF WORK. SUCH ENGINEERING
WORK SHALL INCLUDE, BUT IT NOT LIMITED TO:
-LAYOUT
-DESIGN FOR FORMWORK
-DESIGN FOR SHORING
-DESIGN OF CONCRETE MIXES
-ERECTION PROCEDURES WHICH ADDRESS STABILITY OF THE FRAME DURING CONSTRUCTION
-WELD PROCEDURES
-SURVEYING TO VERIFY CONSTRUCTION TOLERANCES
-STRUCTURAL ENGINEERING TO RESIST ANY OTHER LOADS NOT IDENTIFIED ON DESIGN DRAWINGS.
6. COORDINATION
A. STRUCTURAL DRAWINGS ARE NOT STAND-ALONE DOCUMENTS AND ARE INTENDED TO BE USED IN CONJUNCTION WITH CIVIL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND DRAWINGS FROM OTHER DISCIPLINES. THE CONTRACTOR SHALL COORDINATE ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS
INTO SHOP DRAWINGS AND WORK.
B. COORDINATE DIMENSIONS OF ALL OPENINGS, BLOCKOUTS, DEPRESSIONS, ETC. WITH ARCHITECTURAL FRAWINGS, DRAWINGS FROM OTHER DISCIPLINES, AS-BUILT DRAWINGS, AND FIEL CONDITIONS PRIOR TO
SHOP DRAWING SUBMITTAL.
C. SEE ARCHITECTURAL PLANS FOR INTERIOR PARTITIONS.
D. COORDINDATE CONCRETE INFILL CONSTRUCTION WITH SITE WORK CONTRACTOR.
STEEL NOTES
1. WELDING REQUIREMENTS:
A. WELDERS: HAVE IN POSSESSION CURRENT EVIDENCE OF PASSING THE APPROPRIATE A.W.S
QUALIFICATION TESTS.
B. MINIMUM WELDS: AISC SPECIFICATION, NOT LESS THAN 3/16" FILLET, CONTNUOUS UNLESS OTHERWISE
NOTED.
C. WELD SIZES AND LENGTHS CALLED FOR ON THE DRAWINGS ARE THE NET EFFECTIVE REQUIRED.
INCREASE WELD SIZE IF GAPS EXIST AT THE FAYING SURFACE.
D. WELD SIZES SHALL BE AS SHOWN UNLESS A GREATER SIZE IS REQUIRED BY ANSI/AISC 360 TABLES J2.3
AND J2.4.
E. ALL GROOVE WELDS SHALL BE COMPLETE PENETRATION UNLESS NOTED.
F. FIELD WELDING SYMBOLS INDICATE SUGGESTED CONSTRUCTION PROCEDURES.
STRUCTURAL TESTS AND INSPECTIONS
1. GENERAL:
A. GENERAL
PERFORM STRUCTURAL TESTS AND SPECIAL INSPECTIONS FOR ALL STRUCTURAL MEMBERS AND
ASSEMBLIES AS NOTED IN SECTIONS BELOW.
REFER TO THE SPECIFICATIONS FOR ADMINISTRATIVE AND PROCEDURAL REQUIREMENTS FOR QUALITY
ASSURANCE AND QUALITY CONTROL.
B. DEFINITIONS
SPECIAL INSPECTION: INSPECTION PERFORMED BY THE OWNER'S DESIGNATED REPRESENTATIVE ENGAGED TO PERFORM INSPECTIONS ACCORDING TO IBC 2018 SECTION 1704. THESE INSPECTIONS ARE IN
ADDITION TO THE INSPECTIONS SPECIFIED ACCORDING TO IBC 2018 SEFCTION 109.
(P) PERIODIC INSPECTION: THE PART-TIME OR INTERMITTENT OBSERVATION OF WORK BY THE OWNER'S DESIGNATED REPRESENTATIVE PRESENT IN THE AREA WHERE THE WORK HAS BEEN OR IS BEING
PERFORMED, AND AT THE COMPLETION OF THE WORK.
(C) CONTINUOUS INSPECTION: THE FULL-TIME OBSERVATION OF WORK BY THE OWNER'S DESIGNATED REPRESENTATIVE PRESENT IN THE ARE WHERE THE WORK HAS BEEN OR IS BEING PERFORMED, AND AT
THE COMPLETION OF THE WORK.
(T) TESTING: TESTING BY THE OWNER'S DESIGNATED REPRESENTATIVE
2. STRUCTURAL STEEL CONSTRUCTION
A. FRAMING (C)
CONTINUOUS INSPECTION TO VERIFY SHAPES AND PLATES CONFORM TO ASTM STANDARD SPECIFIED IN
THE CONSTRUCTION DOCUMENTS.
VERIFY MANUFACTURER'S CERTIFIED MILL TEST REPORTS
CONTINUOUS INSPECTION OF STEEL FRAMING TO VERIFY MEMBERS AND CONNECTIONS ARE IN
COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS.
PERIODIC INSPECTION OF ALL BOLTED CONNECTIONS TO VERIFY CONNECTED MATERIALS HAVE BEEN DRAWN TOGETHER AND PROPERLY SNUGGED AND VERIFY COMPLIANCE WITH AISC 360 LATEST EDITION.
PROVIDE INSPECTION FOR 10% OF ALL BOLTS BUT NOT LESS THAN 2 BOLTS PER CONNECTION.
B. WELDING (C)
ALL WELDS SHALL BE VISIBLY INPECTED IN ACCORDANCE WITH AWS D1.1
1. GENERAL:
A. ACCOMPLISH WORK IN ACCORDANCE WITH THE MOST RECENT ACI PUBLICATIONS. PROVIDE CONCRETE THAT MEETS THE
REQUIREMENTS OF ASTM C94/C94M.
B. EXPANSION/CONTRACTION JOINT FILLER TO FOLLOW ASTM D1751 OR D1752 TYPE 1. MATERIAL MUST BE 1/2 INCHES THICK.
C. SURFACES AGAINST WHICH CONCRETE IS TO BE PLACED MUST BE FREE OF DEBRIS, LOOSE MATERIAL, STANDING WATER, AND OTHER DELETERIOUS SUBSTANCES BEFORE START OF CONCRETE PLACING.
D. PLACE AND SECURE ANCHORS, BOLTS, AND OTHER SUCH ITEMS IN POSITION BEFORE CONCRETE PLACEMENT AND
SUPPORT AGAINST DISPLACEMENT.
E. SURFACES OF SET CONCRETE AT JOITS, MUST BE ROUGHENED AND CLEANED OF LAITANCE, COATINGS, LOOSE PARTICLES, AND FOREIGN MATTRS. ROUGHEN SURFACES IN A MANNER THAT EXPOSES THE AGGREGATE UNIFORMLY AND DOES NOT LEAVE LAITANCE, LOOSENED PARTICLES OR AGGREGATE, NOR DAMAGED CONCRETE AT THE SURFACE.
F. FINISH FLOOR SLAB INFILL TO MATCH EXISTING FLOORS. PROTECT FINISHED CONCRETE SURFACES FROM DAMAGE BY
CONSTRUCTION OPERATIONS.
2. CONCRETE MIX REQUIREMENTS:
A. STANDARD MIX TO BE SUPPLIED BY REGIONAL READY MIX SUPPLIER TO BE SUBMITTED FOR APPROVAL THAT MEETS THE
FOLLOWING MINIMUM REQUIREMENTS:
28 DAY COMPRESSIVE STRENTGH, f'c .............................................................................. 4,000 KSI NORMAL WEIGHT CONCRETE ............................................................................................ 150 PCF MAXIMUM W/C RATIO, INCLUDING FLY ASH ..................................................................... 0.45 PSF
MINIMUM CEMENT MATERIAL (#/CY), INCLUDING FLY ASH
MAXIMUM AGGREGATE SIZE (IN), ASTM C33/C33M.......................................................... 1" SLUMP LIMITS (IN), TOLERANCE = +1", -1"......................................................................... 4" MAXIMUM TOTAL AIR CONTENT (%), ASTM C260/C260M.................................................. 3% CEMENT TYPE, ASTM C150/C150M ..................................................................................... I OR II REQUIRED ADMIXTURES .................................................................................................... ASR INHIBITOR
B. OTHER REQUIREMENTS:
I. READ-MIXED CONCRETE MANUFACTURER MUST PROVIDE DUPLICATE DELIVERY TICKETS WITH EACH LOAD OF CONCRETE DELIVERED. PROVIDE DELIVERY TICKETS WITH THE INFORMATION REQUIRED BY ASTM C94/C94M INCLUDING.
II. WATER MUST BE POTABLE, FREE FROM INJURIOUS AMOUNTS OF OILS, ACIDS, ALKALIS, SALTS, ORGANIC MATERIALS, OR
OTHER SUBSTANCES DELETERIOUS TO CONCRETE.
III. FLY-ASH MUST CONSTITUTE A MINIMUM OF 15% BUT NO MORE THAN 25% OF THE TOTAL MASS OF THE CEMENTITIOUS
MATERIALS.
IV. CHECK FIELD DIMENSIONS BEFORE BEGINNING INSTALLATION. DETERMINE QUANTITY OF CONCRETE NEEDED AND
MINIMIZE THE PRODUCTION OF EXCESS CONCRETE.
V. TRANSPORT CONCRETE FROM THE MIXER TO THE FORMS AS RAPIDLY AS PRACTICABLE. PREVENT SEGREGATION OR LOSS OF INGREDIENTS. PLACE CONCRETE WITHIN 90 MINUTES OF EITHER ADDITION OF MIXING WATER TO CEMENT AND AGGREGATES OR ADDITION OF CEMENT TO AGGREGATES IF THE AIR TEMPERATURE IS LESS THAN 84 DEGREES F.
3. CEMENTITIOUS NON-SHRINK GROUT REQUIREMENTS:
A. PROVIDE NONSHRINK GROUT IN ACCORDANCE WITH ASTM C1107/C1107M, GRADES B OR C.
B. ACHIEVE 6000 PSI COMPRESSIVE STRENGTH AT 28 DAYS.
C. CEMENT GROUT MUST CONSIST OF EQUAL PARTS OF PORTLAND CEMENT AND FINE AGGREGATE BY WEIGHT WITH NOT MORE THAN 6 GALLONS OF WATER PER SACK OF CEMENT. APPLY CEMENT GROUT WITH A STIFF BROOM OR BRUSH TO A
MINIMUM THICKENESS OF 1/16 INCH.
D. CEMENTITIOUS MATERIALS MUST BE STORED AND KEPT DRY AND FREE FROM CONTAMINANTS.
CONCRETE NOTES
C.5 C.5
4.5
4.5
4.1
4.1
C C
D D
S-301
20' - 8" 20' - 4" 20' - 0"
W10X33
HSS6X6X1/4HSS6X6X1/4
EXISTING 8" CMU EXISTING 8" CMU
0' - 6 3/8" 1' - 9" EXISTING SJ124 SPACED @ 2'-8"
56' - 0"
1' - 9" 0' - 4"
EXISTING SJ124 SPACED @ 2'-8"
56' - 0"
1' - 9"
EXISTING 8" CMU
EXISTING 8" CMU
EX
IS
TI
N
G
" C M
U
EX
IS
TI
N G
" C
M U
EX
IS
TI
N
G
2" C
M U
EX
IS
TI
N
G
2" C
M U
0' - 4 3/8" 1' - 9"
IN FIELD
VERIFY
2' - 8 3/16" 17' - 7 13/16" 4' - 10 3/8"
CMU TO BE
REMOVED
20' - 4" 4' - 10 3/8"
25' - 2 3/8"
C.5 C.5
4.5
4.5
4.1
4.1
C C
D D
S-301
GB-42 GB-43 GB-44
SF-51 SF-43
P1 P1
20' - 8" 20' - 4" 20' - 0"
0' - 8" 20' - 0" 20' - 4" 20' - 0"
EXISTING EXISTING EXISTING
EXISTINGEXISTING
EXISTING
EXISTING
5/ 8"
/8
EXISTING 4" SLAB W/ #3 REINF
@13" E.W. THICKENED SLAB
EDGES AT GRADE BEAMS
SEE NOTE 1
0'
5/
8"
0'
8"
/8
0'
4"
KEY PLAN
LO
C
AT
IO
N A
LO
C
AT
IO
N B
BEAM REPAIR
LOCATION
C C
D D
BB
0.5
0.5
2 1
1' - 0" 4' - 0" 4' - 0" 4' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 4' - 0" 5' - 0"
1' - 0"
24' - 8" 49' - 4" 13' - 8"
26' - 9 1/2" 10' - 1 1/2" 11' - 1 3/4"
3' - 8 3/4"
1' - 3 1/4"
5' - 0"
3' - 10 1/4"
1' - 1 3/4"
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LH
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
L0
RTU-1
/8
74' - 0" 13' - 8"
0' - 4" 2' - 5" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 8" 2' - 5" 0' - 4"
33' - 5 1/2" 10' - 1 1/2" 28' - 1 3/4"
1' - 5 3/4"
1' - 2 1/4"
2' - 8" 2' - 8" 2' - 8"
0' - 11 1/4"
1' - 8 3/4"
RTU-2
/4
EXISTING 12" CMU
EXISTING 12" CMU
EXISTING 8" CMU
EX
IS
TI
N
G
" C M
U
EX
IS
TI
N
G
" C
TI
N
G
2" C
TI
N
G
2" C
/1 6"
7'
3/
4"
/1
6"
/1 6"
7'
3/
4"
/1
6"
REF 6/S-101
REF 6/S-101
D D
E E
4.12
4.12
4'
0"
SP
AC
ED
A
T 5'
O .C
EX
IS
TI
N
G J
O
IS
TS
40' - 2 3/8"
/8
0'
5/
8"
40' - 10"
RTU-3
22K5
22K5
22K5
22K5
22KCS3
22KCS3
22K5
22K5
22K5
22K5
22K5
EXISTING 8" CMU
EXISTING 8" CMU
EX
IS
TI
N
G
" C M
U
EX
IS
TI
N
G
" C M
U
14' - 0 3/4" 4' - 5 1/4" 21' - 8 3/8"
7'
5/
8"
1/
8"
0'
1/
4" 5'
0"
1'
/8
14' - 4 9/16" 4' - 5 1/4" 22' - 0 3/16"
REF 6/S-101
POINT LOAD
L2x2x1/4 EACH SIDE, TYP.
CUT LEG AS REQUIRED
POINT LOAD
1/8
1/8 TYP. AT
EACH END,
EACH ANGLE
NOTE: ADD CHORD AT EVERY PANEL POINT LOCATION
FOR EACH RTU. LOCATIONS TO BE VERIFIED IN FIELD.
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H a_
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
FO
R
T W
O R
TH
D
IS
TR
IC
T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
TA
YL
O R
S T
US Army Corps of Engineers ® Fort Worth District
W
G
-2 1-
B-
C H
R
IS
TO
PH
ER
S
TR
U
N K, P .E
S.
E.
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
JU
LY
KI
M S
O R
R
EL
S, P
.E
S.
E.
KI
M
S O
R R
EL
S, P .E
S.
E.
BU
TC
H G
R
EE
N , P
.E
BL
D
G
R
EN
O
VA
TI
O N
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
G E, N M
S-101
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
G E
PN
: 4
F Y:
ST
R
U C
TU
R
AL
P
LA
N
S
JULY 2021
1/8" = 1'-0"3 Framing Plan Beam Repair
1/8" = 1'-0"1 Foundation Plan Beam Repair
EXISTING FOUNDATION SCHEDULE
TYPE T/FOOTING ELEVATION LENGTH WIDTH DEPTH
SF-51 -3' - 10 1/8" 5' - 6" 5' - 6" 1' - 0"
SF-43 -3' - 6 1/8" 5' - 6" 5' - 6" 1' - 0"
NOTES:
1. DEMO PORTION OF CONCRETE TO TOP OF EXISTING PEDESTAL. VERIFY ON
SITE. DO NOT DAMAGE EXISTING GRADE BEAMS AND FOOTINGS.
2. EXISTING SLAB 4" IN DEPTH WITH ANTICIPATED 4" TURNDOWN. VERIFY
DEPTH TO TOP OF PEDESTAL AT EACH COLUMN.
3. VERIFY LOCATION OF EXISTING REBAR IN PEDESTALS PRIOR TO ANCHOR
DRILLING AND PLACEMENT.
4. DO NOT OVER TIGHTEN NUT AT CANTILEVERED END OF BEAM. THREAD
DEFORMATION BEYOND FINGER TIGHTENING MUST BE AVOIDED.
5. SHORING AND TEMPORARY BRACING OF EXISTING AND REMAINING
STRUCTURAL MEMBERS MUST BE IN PLACE PRIOR TO DEMOLITION AND
CONSTRUCTION IN ACCORDANCE WITH SUBMITTED AND APPROVED SHORING
AND TEMPORARY BRACING PLANS. ANY DEVIATIONS FROM APPROVED PLANS
OR DISCREPANCIES DETERMINED IN THE FIELD MUST BE APPROVED BY THE
EOR PRIOR TO CONTINUED DEMOLITION OR CONSTRUCTION.
3/32" = 1'-0"4 Framing Plan AHU Location A
3/32" = 1'-0"5 Framing Plan AHU Location B
3/4" = 1'-0"6 JOIST REINFORCEMENT @ POINT LOAD
T/Beam 10' - 8"
4.5
EXISTING CMU
WALL
1/2" CAP PL
3/16 2
3/16 2
ACCESS HOLES
3/4" DIA. HILTI HAS EPOXY
CMU ANCHOR
M
IN4"
W10x33
T/Existing Slab 0' - 0"
C.5
SEE NOTE 1EXISTING
SLAB
PLATE 10x10x3/4" W/ HAS 3/4"
DIA. HIT-HY 200 ANCHOR BOLTS
W/ 3/4" NON-SHRINK GROUT
EXISTING SPREAD
FOOTING AND PEDESTAL
T/Existing Slab 0' - 0"
T/Beam 10' - 8"
C.5
SE
E
N O
TE
VA
R
IE
S
S-301
EXISTING PEDESTAL
AND SPREAD FOOTING
EXISTING OPEN WEB
STEEL JOISTS
HSS 6X6X1/4
W10x33
T/Existing Slab 0' - 0"
T/Beam 10' - 8"
4.5 4.15 3
23' - 0 3/8"
4' - 10 3/8"17' - 4"3' - 0"
20' - 0"20' - 4"20' - 8"
S-301
EXISTING
8" CMUEXISTING
8" CMU
EXISTING CMU
TO BE REMOVED
SEE NOTE 5
W10X33
HSS6X6X1/4
HSS6X6X1/4
EXISTING OPEN
WEB STEEL JOISTS
S-301
S-301
EXISTING
GRADE BEAM
EXISTING SPREAD
FOOTING AND PEDESTAL
T/Beam 10' - 8"
4.1
1/2" CAP PL
W10x33
HSS6x6x1/4 3/162
3/162
T/Beam 10' - 8"
W10X33 3/4" DIA. HILTI HAS EPOXY
CMU ANCHOR
SEE NOTE 4
EXISTING CMU WALL
L3x3x3/8
BOTH SIDES
1 1/2" SLOT TO ALLOW FOR
VERTICAL MOVEMENT
1" 10" 1"
10x10x3/4" PLATE
(4) 3/4" DIA. HAS HIT-HY
200 ANCHOR BOLTS
HSS 6x6x1/4
3/16
1"
1/ 2"
7"
1/ 2"
1"
EXISTING PEDESTAL
EXISTING REBAR,
SEE NOTE 3
12"
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H a_
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
FO
R
T W
O R
TH
D
IS
TR
IC
T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
TA
YL
O R
S T
US Army Corps of Engineers ® Fort Worth District
W
G
-2 1-
B-
C H
R
IS
TO
PH
ER
S
TR
U
N K, P .E
S.
E.
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
JU
LY
KI
M S
O R
R
EL
S, P
.E
S.
E.
KI
M
S O
R R
EL
S, P .E
S.
E.
BU
TC
H G
R
EE
N , P
.E
BL
D
G
R
EN
O
VA
TI
O N
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
G E, N M
S-301
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
G E
PN
: 4
F Y:
ST
R
U C
TU
R
AL
E
LE
VA
TI
O
N S
AN
D
D
ET
AI
LS
JULY 2021
1 1/2" = 1'-0"3 COLUMN TO CMU CONNECTION
1/2" = 1'-0"7 TYPICAL FOUNDATION CONNECTION
1/4" = 1'-0"2 FRAME SECTION
1/4" = 1'-0"1 FRAME ELEVATION
1 1/2" = 1'-0"4 TYP. BEAM TO COLUMN CONNECTION
1 1/2" = 1'-0"5
CANTILEVER BEAM TO CMU
CONNECTION
1 1/2" = 1'-0"8 TYPICAL BASE PLATE DETAIL
NOTES:
1. DEMO PORTION OF CONCRETE TO TOP OF EXISTING PEDESTAL. VERIFY ON
SITE. DO NOT DAMAGE EXISTING GRADE BEAMS AND FOOTINGS.
2. EXISTING SLAB 4" IN DEPTH WITH ANTICIPATED 4" TURNDOWN. VERIFY
DEPTH TO TOP OF PEDESTAL AT EACH COLUMN.
3. VERIFY LOCATION OF EXISTING REBAR IN PEDESTALS PRIOR TO ANCHOR
DRILLING AND PLACEMENT.
4. DO NOT OVER TIGHTEN NUT AT CANTILEVERED END OF BEAM. THREAD
DEFORMATION BEYOND FINGER TIGHTENING MUST BE AVOIDED.
5. SHORING AND TEMPORARY BRACING OF EXISTING AND REMAINING
STRUCTURAL MEMBERS MUST BE IN PLACE PRIOR TO DEMOLITION AND
CONSTRUCTION IN ACCORDANCE WITH SUBMITTED AND APPROVED SHORING
AND TEMPORARY BRACING PLANS. ANY DEVIATIONS FROM APPROVED PLANS
OR DISCREPANCIES DETERMINED IN THE FIELD MUST BE APPROVED BY THE
EOR PRIOR TO CONTINUED DEMOLITION OR CONSTRUCTION.
SHEET
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
F O
R T W
O R
T H D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
A S
C h e c k e d b y
US Army Corps of
Engineers ®
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
E N
G
IN
E E
R
IN
G
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G B
R A
N C
H
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
J U
L Y
.S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B L
D G
R
E N
O V
A T
IO
N
P N
Y
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
N E
W M
E X
IC
O
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
T
A Y
L O
R S
T
C H
IE
F
M
IL
IT
A R
Y D
E S
IG
N S
E C
T
IO
N
C H
R
IS
S
T R
U N
K P .E
W
G
B
BOILER FEED WATER
BOILER BLOW DOWN
AIR RELIEF VENT (VENT)
LOW TEMP HOT WATER RETURN
EXISTING PIPING
PIPE TO BE REMOVED (START/END POINT)
BFW
BBD
(OR) V
HWS
HWR
(NAME)E
(NAME)R
(NAME)A
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
DRAIN
CWS
CWR
D
GATE,ANGLE
GLOBE
GLOBE,ANGLE
THREE WAY
BUTTERFLY
BALL
PLUG VALVE
VALVE IN RISER (INDICATE TYPE)
MOTOR
SOLENOID
SWING CHECK
NEEDLE
CALIBRATED BALANCING W/PRESSURE PORTS
HOSE END DRAIN
SCREWED
WELDED
BUSHING
CAP
CONNECTION,BOTTOM
CONNECTION,TOP
CROSS
ELBOW,LONG RADIUS
ELBOW,TURNED UP (RISER UP)
ELBOW,TURNED DOWN (RISER DOWN)
LATERAL
REDUCER,CONCENTRIC
REDUCER,ECCENTRIC
TEE
TEE,OUTLET UP
TEE,OUTLET DOWN
UNION
AIR ELIMINATOR
AIR SEPARATOR
ANCHOR,INTERMEDIATE
ANCHOR,MAIN
HANGER,ROD
HANGER,SPRING
EXPANSION JOINT
EXPANSION LOOP
FLEXIBLE CONNECTOR
FLOW SWITCH
PRESSURE SWITCH
PITCH OF PIPE,RISE(R),DROP(D)
PRESSURE GAUGE & COCK
PUMP,INDICATE USE
THERMOMETER
THERMOMETER,DIAL
THERMOWELL
M
S
FLANGED
S
H
H
D
FS
P D
M
T
BELL &
SPIGOT
PIPE ABANDONED IN PLACE(START/END POINT)
LOW TEMP HOT WATER SUPPLY (0-250^F)
ELBOW,90^
ELBOW,45^
THERMOSTAT
CONDENSATE CD
CONDENSATE RETURN CDR
CONDENSATE RETURN PUMPED CDRP
AUTO FLOW CONTROL W/PRESSURE PORTS
DIAPHRAGM
PA
PA
METER(GAS,WATER,ETC)
PS
RPBP
REDUCED PRESSURE BACKFLOW PREVENTER
BOILER WATER SUPPLY
BOILER WATER RETURN
BWS
BWR
TEMPERATURE SWITCH
TS
SP EP
EPSP
STRAINER
STRAINER W/BALL VALVE & CAP
AIR ELIMINATOR
AUTOMATIC AIR VENT
GLOBE (BALANCING)
AUTOMATIC AIR VENT
SUPERVISORY SWITCH
SW
INDICATED ON PLANS)
VALVE IN VALVE BOX(INSTALL VALVE TYPE
VALVE ACTUATORS
VALVES SPECIAL DUTY
ELECTRIC
FITTINGS
PIPING SPECIALTIES
GATE
VALVES FOR SELECTIVE ACTUATORS
UNION, DIELECTRIC
ROOF DRAIN
GAS,NATURAL
WATER
RD
G
W
HUMIDSTAT
TRAP,WATER
TRAPS,STEAM,INDICATE TYPE
CONNECT TO EXISTING
VACUUM RELIEF
H
T-1
WATER HAMMER ARRESTOR(WHA)
TEMPERATURE INDICATOR
PETES PLUG
TI
PT
C DETECTOR (60" AFF)
C0
GENERAL NOTES FOR ALL BUILDINGS:
PIPING PIPING SPECIALTIES
M-001
M E
C H
A N
IC
A L L
E G
E N
D S S
Y M
B O
L S
E R
IC
S
L A
T E
R P .E
B
D A
W S
O N
B
D A
W S
O N
CONTROL LOGIC IS FUNCTIONAL TO INSURE PERFORMANCE AS INTENDED.
17. SYSTEM CONTROLLERS AND EQUIPMENT CARDS SHALL BE FACTORY TESTED TO VERIFY
16. BASE STANDARD IS BACNET CONTROLS.
15. EQUIPMENT AND COMPONENTS SHALL HAVE COMPATIBLE CONTROLS.
14. EQUIPMENT PACKAGES SHALL BE SIMILAR, PROVIDED BY ONE MANUFACTURER.
STATE IN SUBMITTAL, WHICH EQUIPMENT WILL BE UTILIZED.
CLEARLY
EQUIPMENT FROM ONE OF THE APPROVED MANUFACTURERS. CONTRACTOR SHALL
SUBMIT
13. BASIS OF DESIGN CONTAINS SOME VARIABLE SPEED EQUIPMENT, CONTRACTOR MAY
BALANCING OUTSIDE AIR, EXHAUST AIR AND RETURN.
12. PROVIDE MANUAL VOLUME DAMPER ON EACH AIR DEVICE AND DUCT CONNECTION FOR
11. PROVIDE FLEXIBLE DUCT CONNECTIONS TO EACH PIECE OF MECHANICAL EQUIPMENT.
HARD CEILINGS.
10. PROVIDE ACCESS PANELS FOR ALL DAMPERS, HVAC UNITS, EXHAUST FANS, ETC. ABOVE
PRESSURE DROP.
9. ALL RECTANGULAR RADIUS ELBOWS SHALL BE PROVIDED WITH TURNING VANES TO REDUCE
SUBMITTED DOCUMENTING COMPLIANCE.
RECOMMENDED BY THE EQUIPMENT MANUFACTURER. SCALED DRAWINGS SHALL BE
PROVIDE A DEDICATED CLEAR SPACE FOR MAINTENANCE AND SERVICING AS
8. THE ARRANGEMENT AND INSTALLATION OF EQUIPMENT, PIPING AND DUCTWORK SHALL
USED. ALL DUCTING IS EXTERNALLY WRAPPED INSULATION
7. DUCT DIMENSIONS SHOWN ARE CLEAR INSIDE DIMENSIONS. DUCT LINER SHALL NOT BE
6. PROVIDE PIPING EXPANSION JOINTS WHERE PIPING CROSSES BUILDING EXPANSION JOINTS.
AND DRAINAGE REQUIREMENTS.
COORDINATE MECHANICAL ROOM FLOOR DRAIN LOCATIONS WITH EQUIPMENT LOCATIONS 5.
WITH LONG "FLOPPY" LENGTHS OF FLEXIBLE CONDUIT.
ELECTRICAL CONNECTIONS TO MOTORS OR MOTOR POWERED EQUIPMENT SHALL BE MADE 4.
3. CU-1 SHALL BE MOUNTED ON NEOPRENE PADS.
FIRE STOPPING IN FIRE WALLS.
NON-HARDENING CAULKING COMPOUND AT BOTH WALL SURFACES OR AS REQUIRED FOR
FIBROUS FILLER MATERIAL AND SEALED WITH A FIRE RATED UL OR FM LISTED
REST ON THE SLEEVE. THE CLEARANCE SPACE SHALL BE FILLED WITH FIRE RESISTANT
PIPE SHALL BE SUPPORTED ON EITHER SIDE OF THE WALL SO THAT THE PIPE DOES NOT
WITH A 1" CLEARANCE BETWEEN THE PIPE AND PIPE SLEEVE INSTALLED IN THE WALL. THE
PIPES PASSING THROUGH THE MECHANICAL EQUIPMENT ROOM WALLS SHALL BE PROVIDE 2.
WILL BE UTILIZED.
MOUNTING SYSTEM. BEYOND THE THIRD PIPE SUPPORT A STATIC DEFLECTION OF 1/4" TO 1/2"
STATIC DEFLECTION EQUAL TO ONE HALF OF THE STATIC DEFLECTION OF THE EQUIPMENT
NEOPRENE IN SERIES) THE FIRST 3 HANGERS NEXT TO THE EQUIPMENT SHALL HAVE A MIN.
CEILING HANGERS OR FROM FLOOR-MOUNTED RESILIENT SUPPORTS. (SPRING AND
ALL PIPING THAT IS CONNECTED TO EQUIPMENT SHALL BE SUPPORTED FROM RESILIENT 1.
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
F O
R T W
O R
T H D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
A S
C h e c k e d b y
US Army Corps of
Engineers ®
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
E N
G
IN
E E
R
IN
G
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G B
R A
N C
H
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
J U
L Y
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B L
D G
R
E N
O V
A T
IO
N
P N
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
N E
W M
E X
IC
O
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
T
A Y
L O
R S
T
C H
IE
F
M
IL
IT
A R
Y D
E S
IG
N S
E C
T
IO
N
C H
R
IS
S
T R
U N
K P .E
W
G
B
NOTES
GRILLE,DIFFUSER,
M-4
A
M-13M-10
REGISTER DESIGNATION
SIZE-CFM-MARK
SECTION IS SHOWN
SHEET NUMBER WHERE
DETAIL IS SHOWN
SHEET NUMBER WHERE
NUMBER
DETAIL
LETTER
SECTION
MISCELLANEOUS
A
SECTION IS TAKEN
SHEET NUMBER WHERE
AXIAL FLOW
CENTRIFUGAL
ROOF VENT,INTAKE
ROOF VENT,EXHAUST
ROOF VENT,LOUVERED
UNIT HEATER(HORIZONTAL)
DIRECTION OF FLOW
DUCT SIZE,FIRST FIGURE
IS SIDE SHOWN
DUCT SECTION,SUPPLY
DUCT SECTION,RETURN
DUCT SUPPLY,DOWN
DUCT RETURN,DOWN
FLEXIBLE CONNECTION
FLEXIBLE DUCT
CHANGE OF ELEVATION
RISE(R) OR DROP(D)
ACCESS DOOR,VERTICAL
OR HORIZONTAL
TERMINAL UNIT,VARIABLE
VOLUME
TERMINAL UNIT,MIXING
TERMINAL UNIT,REHEAT
SRV-1
ERV-1
12/20
20/12
20/12
RH-1
VAV
TU
TU
M-1C H
AD
MBD
AD
R
(OR)
TU1
DUCTWORK
FANS
FIRST FIGURE IS SIDE SHOWN
FIRST FIGURE IS SIDE SHOWN
MANUAL BRANCH DAMPER
SUPPLY OUTLET
EXHAUST INLET(RETURN AIR)
LOUVER & SCREEN
TG 12/12
A
A
MBD
A
MVD
MANUAL VOLUME DAMPER
SIDEWALL
GRILLE OR REGISTER,
FIXTURE COMBINATION
DIFFUSER & LIGHT
ASSEMBLY
TRANSFER GRILLE
DIFFUSER
SUPPLY AIR,CEILING
OR BY CFM
DIFFUSER,BY SCHEDULE
SUPPLY AIR,CEILING
CEILING GRILLE
RETURN OR EXHAUST AIR,
OR BY CFM
CEILING GRILLE,BY SCHEDULE
RETURN OR EXHAUST AIR,
OR BY CFM
DIFFUSER, BY SCHEDULE
SUPPLY AIR, CEILING SLOT
GRILLES,REGISTER,& DIFFUSERS
DAMPERS
A
CFM
100 CFM
A
100 CFM
CFM
L-10
L-10
ABOVE FINISHED GRADE
APPROXIMATE
ARCHITECTURAL
BELOW FINISHED FLOOR
BRAKE HORSE POWER
CUBIC FEET
CUBIC FEET PER MINUTE
CUBIC INCH
DETAIL
DIAMETER
DIAMETER,INSIDE
DIAMETER,OUTSIDE
DISCHARGE
DOWN
ELECTRICAL
ENTERING
FAHRENHEIT
FEET OR FOOT
FEET PER MINUTE
GALLONS
GALLONS PER MINUTE
GAUGE OR GAGE
HEATING/VENTILATION UNIT
HUMIDITY,RELATIVE
HIGH OR HEIGHT
LONG
MANHOLE
MECHANICAL
MOUNTING
NORMALLY OPEN
NOT TO SCALE
NUMBER
POUNDS
PRESSURE
RADIUS
REVOLUTION PER MINUTE
ROOM
ROUND
SHEET
SPECIFICATION
SQUARE
STANDARD
STATION
STATIC PRESSURE
STRUCTURAL
THICK(NESS)
AFG
ARCH
BFF
BHP
BTUH
CU FT
CFM
CU IN
DTL
ID
OD
DISCH
D
DN
ELEC
ENT
F
FT
FPM
GAL
GPM
GA
HVU
RH
H
LG
MH
MAX
MECH
MIN
MTG
NO
NC
NTS
LBS
PRESS
R
REF
RPM
RM
RD
SCHEDULE SCH
SHT
SPEC
SQ
STD
STA
SP
STRUCT
THK
BBD
FUEL OIL SUPPLY FOS
SOFTWATER SW
SOFTWATER BACKWASH SWB
BRITISH THERMAL UNITS PER HOUR
CHEMICAL FEED-AMINE
CHEMICAL FEED-PHOSPHATE
CHEMICAL FEED-SULPHATE
CFA
CFP
CFS
BOILER BLOWDOWN
APPROX
MAXIMUM
REFERENCE
FAN COIL UNIT FCU
LINEAL FEET LF
EXHAUST EXH
SIMILAR SIM
NORMALLY CLOSED
PUMP, CONDENSER WATER
PUMP, CIRCULATING WATER
PUMP, DUAL TEMPERATURE SYSTEM
PUMP, HEATING WATER
PUMP, SUMP
BUILDING BLDG
CP
CWP
HWP
SP
DTP
MA
OUTSIDE AIR OA
AIR FLOW MEASURING STATION AFMS
GALVANIZED IRON GI
IAWIN ACCORDANCE WITH
AIR HANDLING UNIT AHU
AMSLABOVE MEAN SEA LEVEL
CHARACTERISTICS CHAR
CENTRIFUGAL CENTR
CAPACITY CAP
CONTINUOUS BOILER BLOWDOWN CBD
CONTCONTINUATION
CONSTRUCTION CONST
CHILLER WATER CHW
DRY BULB DB
EXHAUST AIR EA
EXTERNAL EXT
HEATING/VENTILATION/
AIR CONDITIONING HVAC
HERTZ OR CYCLES PER SECOND HZ
HORSEPOWER HP
HRHOUR
INVERT INV
INCHES IN
LEAVING LVG
KILOWATTS KW
MINIMUM OR MINUTE
NOMINAL NOM
NOISE CRITERIA LEVEL NC
PSI GAUGE PSIG
PRESSURE DROP OR DIFFERENCE PD
POUNDS PER SQUARE INCH PSI
PWRPOWER
RETURN AIR RA
RETURN RTN
SUPPLY AIR SA
SUPPLY SUP
TEMPERATURE TEMP
TERMINAL VELOCITY TV
NBR
HEATING HTG
HEATING WATER HW
DRAWING DWG
DOMESTIC WATER DW
OPPOSED BLADE DAMPER OBD
PHASE
FLOOR CLEANOUT FCO
DOUBLE CHECK BACKFLOW PREVENTER BFP
RPBFP PREVENTER
REDUCED PRESSURE BACKFLOW
CYCLES PER MINUTE CPM
SCFMSTANDARD CUBIC FEET PER MINUTE
SAFE WASTE CONNECTION SWC
MAKE-UP OR MIXED AIR
BODBOTTOM OF DUCT
TRANSFER AIR TA
TOTAL
TYPICAL
UTILITY
UNIT HEATER
VARIABLE AIR VOLUME
VENT THRU ROOF
TOT
TYP
UTIL
UH
VAV
VTR
VERT
VC
WITH W/
VERTICAL
VERTICAL CONDUCTOR
UNLESS NOTED OTHERWISE UNO
VERTICAL LEADER VL
VVOLTAGE
WIDTH OR WIDE WD
WBWET BULB
WATER PROOF(ING) WP
WGWATER GAGE
WALL CLEANOUT WCO
TRAP PRIMER TP
TRANSFER AIR TA
AIR FLOW MEASURING STATION
DIA OR Ø
DIFFERENTIAL PRESSURE DP
dpDEW POINT
BOTTOM OF PIPE BOP
TU
VOLUME OR BLOWER COIL
TERMINAL UNIT,VARIABLE AIR
VAV/BC
ABOVE FINISHED FLOOR AFF
CLEANOUT CO
ABBREVIATIONS (CONT.)ABBREVIATIONSHEATING, VENTILATION & AIR CONDITIONING
DUCT SILENCER
BRANCH CONNECTION (45º) OR (90º)
PLACES PLCS
PH
SPECIALTY ITEMS
EPO
(WALL MOUNTED)
EMERGENCY POWER OFF SWITCH
M E
C H
A N
IC
A L L
E G
E N
D S S
Y M
B O
L S
M-002
E R
IC
S
L A
T E
R P .E
M
O R
N E
L A
S
M
O R
N E
L A
S
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
F O
R T W
O R
T H D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
A S
C h e c k e d b y
US Army Corps of
Engineers ®
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
E N
G
IN
E E
R
IN
G
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G B
R A
N C
H
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
J U
L Y
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B L
D G
R
E N
O V
A T
IO
N
P N
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
N E
W M
E X
IC
O
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
T
A Y
L O
R S
T
C H
IE
F
M
IL
IT
A R
Y D
E S
IG
N S
E C
T
IO
N
C H
R
IS
S
T R
U N
K P .E
W
G
B
A
A
0 8'4' 16'
SCALE IN FEET
24'
1 MECHANICAL FLOOR PLAN DEMO
MD101
MD101
M E
C H
A N
IC
A L F
L O
O R P
L A
N D
E M
O
E S
L A
T E
R P .E
M
O R
N E
L A
S
M
O R
N E
L A
S
OFFICE
110A
STORAGE
RESTROOM
WOMENS
KEYED NOTES:
REPAIRED PER ARCHITECTURAL DETAILS.
DROPS THROUGH ROOF. HOLES TO BE INSULATED AND
REMOVE EQUIPMENT DUCTING AND ALL SUPPLY DIFFUSERS AND
MOUNTED SUPPLY DUCTING FROM EVAPORATIVE COOLER.
COOLING DUCTING SERVING ROOMS 110, 112 AND 114 IS ROOF
REPAIRED PER ARCHITECTURAL DETAILS.
DROPS THROUGH ROOF. HOLES TO BE INSULATED AND
REMOVE EQUIPMENT DUCTING AND ALL SUPPLY DIFFUSERS AND
MOUNTED SUPPLY DUCTING FROM EVAPORATIVE COOLER.
COOLING DUCTING SERVING ROOMS 111, 111A AND 113 IS ROOF
111A
RESTROOM
MENS
101 103
117 116
115A
105A
OFFICE
LOBBY
WOMEN
MEN
PLAY AREA
106A
ADMIN AREA
122K 122D
122A 122B
122C
122E
122I122J
THROUGH THIS ROOM FROM BASEMENT UP TO ABOVE CEILING.
ROOM 122C, REMOVE ALL UNUSED HYDRONIC PIPING PASSING
SUPPLY PIPING IN BASEMENT BELOW.
INOPERABLE. DISCONNECT AND REMOVE ALL UNUSED PIPING
ROOM 122A AND 122B WAS AN OLD RESTROOM AND CURRENLTY
FROM OLD EQUIPMENT.
PIPING, GAS PIPING FROM RANGES AND INDIRECT DRAIN LINES
RETURN TO OWNER. REMOVE ALL UNUSED PIPING WATER SUPPLY
REMOVE ISLAND HOOD SUSPENDED IN CENTER OF ROOM AND
PIPING BELOW EQUIPMENT BACK TO WALL ROUGH-IN.
REMOVE SCULLERY SINK IN POT WASH AREA AND ALL SUPPLY
TO WALL ROUGH-IN.
OWNER. REMOVE ALL UNUSED PIPING UNDER RACK WASHER BACK
ROOM 122, REMOVE RACK WASHER ASSEMBLY AND RETURN TO
TILE OR WINGNUT TYPE REMOVABLE PLUGS IN ALL DRAINS.
PROVIDE THREADED PLUGS OR CAPS IN WALL ROUGH-IN IN GLAZED
SUPPLY, GAS PIPING, AND INDIRECT WASTE LINE IN THIS ROOM.
ROOM 122K WAS ONCE A SERVING LINE. REMOVE ALL WATER
AND 123 AND RETURN TO OWNER.
REMOVE DOORS FOR COOLER/FREEZER IN ROOMS 122I, 122H, 122G,
UNITS AND REFRIGERATION PIPING.
REMOVE WALK-IN COOLER FREEZER ROOF MOUNTED CONDENSING
HOODS ARE TO BE DISCONNECTED AND RETURNED TO OWNER.
WASHER, SCULLERY SINK ITEMS AND SUSPENDED EXHAUST
SERVICE PERMANATLY. STAINLESS STEEL PORTION OF RACK
OF THE EQUIPMENTIS TO BE DISCONNECTED AND TAKEN OUT OF
AND NEW FREEZE PROTECTION UNIT HEATERS. THE REMAINDER
KITCHEN AREA IS ONLY IN THE SCOPE OF WORK FOR DEMOLITION
NEW EQUIPMENT.
TO MINIMIZE ROOF REPAIRS IF POSSIBLE. COORDINATE WITH
AS REQUIRED FOR A NEW UNIT TO INSTALLED IN SAME LOCATION
DROPS THROUGH ROOF. CURB TO BE REUSED OR MODIFIED
EQUIPMENT AND ALL SUPPLY DIFFUSERS, DUCTING AND
106J IS ROOF MOUNTED PACKAGED EQUIPMENT. REMOVE
COOLING/HEATING DUCTING SERVING ROOMS 106 THROUGH
FANS WILL BE CEILING MOUNTED DUCTED TO NEW ROOF CAPS.
REMOVE EXHAUST FAN IN ROOMS 111A, 112, 107, AND 108. NEW
DETAILS.
HOLES TO BE INSULATED AND REPAIRED PER ARCHITECTURAL
REMOVE ALL SUPPLY DIFFUSERS AND DROPS THROUGH ROOF.
ROOF MOUNTED SUPPLY DUCTING FROM PACKAGED EQUIPMENT.
COOLING/HEATING DUCTING SERVING ROOMS 106, 107, AND 108 IS
STAILESS STEEL HOOD TO OWNER.
ALL DUCTING THROUGH ROOF AND FAN EQUIPMENT. RETURN
REMOVE THE EXISTING COOKING HOOD IN ROOM 105A COMPLETE,
ARE WATER TIGHT AND LEAK FREE.
CONTRACTOR TO ENSURE ALL ROOF SEALS AND CURB FLASHINGS
EXHAUST FANS SERVING ROOMS 119 AND 120 WILL BE REUSED.
INSTALLATION OF NEW PIPING.
ROOM 117. THESE CIRCUITS ARE TO BE DEMOLISHED TO ALLOW
CIRCUITS FOR THE TWO LARGE UNITS ABOVE ROOM 115 AND
EXISTING DRAWINGS INDICATE INDEPENDENT HHWS AND HHWR
122H 122G
122F
106F 106G 106H 106I
106J
106B 106C 106D 106E
WOMEN
MEN
4 4 4
4 4
4 4
5 6
6 6
9 9
15 15
16 16
21 21
CEILING. REFER TO MD-102 FOR UNIT LOCATIONS
COMPLETE WITH ALL DUCTING THROUGH ROOF AND ABOVE
REMOVE THE TWO LARGE UNITS ABOVE ROOMS 115 AND 117
117. REFER TO MD-102 FOR RELIEF HOOD LOCATIONS.
SERVING THE GREAT ROOM ABOVE ROOM 101 THROUGH
REMOVE ALL OF THE ROOF RELIEF HOODS AND DUCTING
DETAILS.
THROUGH ROOF. PATCH ROOF PENATRATION PER ARCHITECTURAL
SYSTEM INCLUDING THERMOSTAT AND REFRIGERANT PIPING
UNIT ON ROOF AND A FAN COIL INSIDE. REMOVE COMPLETE
OFFICE 102 HAS DUCTLESS SPLIT SYSTEM REMNANTS CONDESING
ARCHITECTURAL DETAILS.
THROUGH ROOF. HOLES TO BE INSULATED AND REPAIRED PER
EQUIPMENT DUCTING AND ALL SUPPLY DIFFUSERS AND DROPS
SERVED BY A ROOF MOUNTED DUCT FURNACE. REMOVE
LOBBY AREA, CORRIDOR AND ROOMS 100 THROUGH 114 ARE
ARCHITECTURAL DETAILS.
THROUGH ROOF. HOLES TO BE INSULATED AND REPAIRED PER
EQUIPMENT DUCTING AND ALL SUPPLY DIFFUSERS AND DROPS
SUPPLY DUCTING FROM EVAPORATIVE COOLER. REMOVE
COOLING DUCTING SERVING ROOMS 109 IS ROOF MOUNTED
GENERAL NOTES:
FIELD VERIFY LOCATION OF DUCTING.
GRID, DUCT CONNECTIONS AND GRILLS. CONTRACTOR SHALL
CONTRACTOR SHALL REMOVE ALL DUCTING ABOVE CIELING
N
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
F O
R T W
O R
T H D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
A S
C h e c k e d b y
US Army Corps of
Engineers ®
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
E N
G
IN
E E
R
IN
G
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G B
R A
N C
H
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
J U
L Y
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B L
D G
R
E N
O V
A T
IO
N
P N
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
N E
W M
E X
IC
O
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
T
A Y
L O
R S
T
C H
IE
F
M
IL
IT
A R
Y D
E S
IG
N S
E C
T
IO
N
C H
R
IS
S
T R
U N
K P .E
W
G
B
POOL
GENERAL NOTES:
KEYED NOTES:
MD102
M E
C H
A N
IC
A L R
O O
F P
L A
N D
E M
O
E S
L A
T E
R P .E
M
O R
N E
L A
S
M
O R
N E
L A
S
MD101
1 MECHANICAL ROOF PLAN DEMOLITION
EC
EC
EC
EC
EC
EC
RH
RH
RH
RH
RH
RH
CU
CU
CU
CU
CU
EF
EF
EF
EF
EF
HU HU
EF
EXISTING CHIMINEY OPENING
BUILDING EXTERIOR EDGE UPPER LEVEL
BUILDING EXTERIOR EDGE UPPER LEVEL
SOLAR PIPE HOOD
DO NOT REMOVE EXISTING EXHAUST HOOD
FIXED ACCESS LADDER
SOLAR PANELS
REMOVE UNUSED PIPING.
SOLAR PANELS AND SOLAR LINES TO BASEMENT TO REMAIN.
REMOVE ALL AIR CONDENSING UNITS (CU) FROM ROOF.
REMOVE ALL AIR HANDLING UNITS (AHU) FROM ROOF.
REMOVE ALL HEATING UNITS (HU) FROM ROOF.
REMOVE ALL RELIEF HOODS (RH) FROM ROOF.
REMOVE ALL LABELED EXHAUST FANS (EF) FROM ROOF.
REMOVE ALL EVAPORATIVE COOLERS (EC) FROM ROOF.
REMOVE ALL HEATING VENTILATING UNITS (HVU) FROM ROOF.
EXISTING DUCT
EXISTING DUCT
EXISTING DUCT
EXISTING DUCT
EXISTING EXHAUST FAN
EXISTING EXHAUST FAN
EXISTING EXHUAST FANS TO REMAIN IN PLACE.4.
ARCHITECTURAL DETAILS.
REMOVE DUCTING SUPPORTS AND PATCH PER 3.
AND GAS LINES/CONNECTIONS.
REMOVE DUCTING THROUGH ROOF, WATER SUPPLY, 2.
EQUIPMENT SHOWN NEEDED TO BE REMOVED.1.
0 8'4' 16'
SCALE IN FEET
24'
HVU
HVU
AHU
AHU
EXISTING CHIMNEY
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
F O
R T W
O R
T H D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
A S
C h e c k e d b y
US Army Corps of
Engineers ®
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
E N
G
IN
E E
R
IN
G
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G B
R A
N C
H
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
J U
L Y
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B L
D G
R
E N
O V
A T
IO
N
P N
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
N E
W M
E X
IC
O
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
T
A Y
L O
R S
T
C H
IE
F
M
IL
IT
A R
Y D
E S
IG
N S
E C
T
IO
N
C H
R
IS
S
T R
U N
K P .E
W
G
B
HW STORAGE TANK
HEAT EXCHANGER
EXPANSION TANK
HW STORAGE TANK
SUMP PIT
SUMP LID
FLOOR DRAIN
FLOOR DRAIN
EXISTING BOILERS
UTILITY MANHOLE
BASEMENT DEMOLITION PLAN
MD103
E S
L A
T E
R P .E
MD103
B A
S E
M E
N T D
E M
O L
IT
IO
N P
L A
N
M
O R
N E
L A
S
M
O R
N E
L A
S
GENERAL NOTES:
SOURCE.
REMOVE ALL UNUSED PIPING IN BOILER ROOM BACK TO3.
WITH SYSTEM IF COME INTO CONTACT MAY VOID WARRENTY.
SOLAR HOT WATER SYSTEM FOR ALL ITEMS ASSOCIATED
SYSTEM. CONTACT AND VERIFY WITH LEASE HOLDER OF
VERIFY ALL PIPING CONNECTING TO SOLAR HOT WATER2.
SOURCE.
ALL PIPING ASSOCIATED TO EXISTING BOILERS BACK TO
EXISTING BOILERS LOCATED ON HOUSEKEEPING PAD AND
TO HIGH EFFICIENCY CONDENSING BOILERS. REMOVE ALL
EXISTING BOILER ROOM TO BE TOTALLY RECONFIGURED1.
KEYED NOTES:
BACK TO SOURCE.
ASSOCIATED TO DOMESTIC WATER HEATERS COMPLETE
REMOVE DOMESTIC WATER HEATERS AND ALL PIPING
FLOOR SINK TO FINISHED FLOOR LEVEL.
AT ELECTRICAL PANELS. REMOVE HOUSEKEEPING PAD
REMOVE HOUSEKEEPING PAD TO ELIMINATE TRIP HAZARD
FLOOR COMPLETE BACK TO SOURCE.
REMOVE ALL UNUSED PIPING PENETRATING THROUGH
0 2'1'
SCALE IN FEET
4' 6'
PAD
HOUSEKEEPING
REMOVE
DOMESTIC WATER HEATER STEAM HEAT EXCHANGER 3
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
F O
R T W
O R
T H D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
A S
C h e c k e d b y
US Army Corps of
Engineers ®
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
E N
G
IN
E E
R
IN
G
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G B
R A
N C
H
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
J U
L Y
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B L
D G
R
E N
O V
A T
IO
N
P N
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
N E
W M
E X
IC
O
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
T
A Y
L O
R S
T
C H
IE
F
M
IL
IT
A R
Y D
E S
IG
N S
E C
T
IO
N
C H
R
IS
S
T R
U N
K P .E
W
G
B
D14
GENERAL NOTES:
M-101
M E
C H
A N
IC
A L F
L O
O R P
L A
N
E R
IC
S
L A
T E
R P .E
M
O R
N E
L A
S
M
O R
N E
L A
S
MECHANICAL FLOOR PLAN
MEN
CFM
A
CFM
CFM
A
A
111A
8"Ø
8"Ø
12"Ø
"Ø
"Ø
8"Ø 12"Ø
"Ø
CFM
A
CFM
A
CFM
A
CFM
A
CFM
A
6"Ø 6"Ø
6"Ø6"Ø
6"Ø
"Ø
"Ø
"Ø
CFM
14"Ø RA
CFM
A 8"Ø
CFM
A
"Ø
CFM
A
"Ø
12"Ø SA
CFM
A
CFM
CFM
AA
8"Ø
8"Ø
"Ø
14"Ø SA
WOMEN
110A
STORAGE
OFFICE
LOBBY
OFFICE
CFM
A
26/12 RA
20/12 SA
O .C S
A
CFM
200 8"Ø
"Ø
CFM
CFM
CFM
CFM
A A
A A
8"Ø 8"Ø
8"Ø 8"Ø
"Ø
"Ø
"Ø8 "Ø
CFM
/1
R
A
"Ø 8"Ø
8"Ø
8"Ø
"Ø
8"Ø
CFM
A
CFM
A
CFM
A
"Ø R
A
CFM
CFM
103101
101A
/1
S
A
12/12 SA
/1
S
A
CFM
CFM
150 CFM
CFM
CFM
CFM
CFM
150 CFM
A
A
A
A
A
A
A
A
/1
"Ø
"Ø
"Ø
8"Ø 8"Ø
CFM
B
CFM
B8"Ø
8" Ø
MENWOMEN
CFM
A
CFM
A
"Ø
"Ø
CFM
A CFM
A
CFM
/1
R
A /1
R
A
CFM
A
CFM
A
CFM
A
CFM
A
6"Ø
6"Ø
6"Ø
6"Ø8"Ø
6"Ø 6"Ø
6"Ø6"Ø
"Ø
"Ø
8"Ø
10"Ø
"Ø
8"Ø
CFM
200D
CFM
A
CFM
A
OFFICE
CFM
B
CFM
B
CFM
B
CFM
B
CFM
B
CFM
B
CFM
B
CFM
B
CFM
B
115A
CFM
1000 20/12 RA
/1
R
A
/1
S
A
CFM
20/12 RA
10"Ø
8"Ø
8"Ø
8"Ø
8"Ø
8"Ø
8"Ø
8"Ø
8" Ø
"Ø
"Ø
14"Ø 14"Ø
/1
R
A
/3
R
A
"Ø
"Ø
"Ø
12"Ø SA
105A
8"Ø
/1
S
A /1
S
A
10"Ø 10"Ø
CFM
300C
CFM
C
CFM
CFM
CFM
B
CFM
B
CFM
B
CFM
50012"Ø
10"Ø
10"Ø 10"Ø
10"Ø
10"Ø
8"Ø
8"Ø
8"Ø
8"Ø
ADMIN AREA
106A
CFM
A
CFM
A
CFM
A
CFM
A
/1
S
A /1
/1
S
A "Ø
"Ø1 "Ø
WOMEN
MEN
CFM
C
CFM
C
CFM
B
CFM
200 B
CFM
B
CFM
B
108A
106F 106G
OFFICE
OFFICE
CFM
CFM
CFM
CFM
106H
106I
106J
OFFICE
OFFICEOFFICEOFFICE
106D 106E106C
106B
CLOSET
ELEC.
ROOM
STORAGE
122K
122J 122I
122D
122C
122B 122A
CFM
B
B
CFM
B
CFM
250 B
CFM
CFM
B B B C
CFM
A
"Ø
"Ø
"Ø
"Ø
"Ø
"Ø 8 "Ø
"Ø
"Ø
"Ø
"Ø
8"Ø
10"Ø
12"Ø SA
12/12 SA 20/12 SA
10"Ø
"Ø CFM
CFM
CFM
CFM
175CFM
POOL
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
RTU
RTU
RTU
28/12 RA
EF
(E)
EF
(E)
EF
EF_
EF_
EF_
D
D
D D
10"Ø
10"Ø
C
CFM
C
CFM
E
E
E
E
CFM
225 CFM
CFM
D
D D
8"Ø 10"Ø 12"Ø RA
C
D
D
"Ø
"Ø
D
D
D
CONSTRUCT DUCTING PER SPECIFICATIONS.
4. VERIFY DUCT RATING CLASS WITH AHU S.P. IN SCHEDULES AND
PROVIDE ACCESS PANEL IN THE MECHANICAL ROOM.
RATED ASSEMBLIES. USE FIRE CAULKING PER SPECIFICATIONS.
3. PROVIDE FIRE DAMPERS AT DUCT PENETRATIONS THROUGH
2. DUCT SHALL BE INSTALLED AT HEIGHT INDICATED ON PLAN.
THAN 12" IN LENGTH.
1. PROVIDE SWAY BRACING ON DUCT SUPPORT RODS GREATHER
UH
UH
KEY NOTES:
CU
122H 122G
122F 122E
DUCT
OVER
UP AND
DUCT
OVER
UP AND
DUCT
OVER
UP AND
M-101
78/12 RA
78/12 RA
32/12 RA
PLAY AREA
A
0 8'4' 16'
SCALE IN FEET
24'
FCU
LOCATE NEW DDC CONTROL PANEL IN COMM ROOM.
NEAR ENTRY.
EMERGENCY POWER OFF, EPO ATFP KILL SWITCH LOCATED
ROOM. INSTALL ON WALL SHOWN ON DRAWINGS.
INSTALL NEW FAN COIL UNIT IN ROOM 115A COMMUNICATIONS
DETAILS.
PAD. CONNECT ALL ELECTRICAL WIRES PER ELECTRICAL
INSTALL NEW CONDENSING UNIT ON NEW CONCRETE
EQUIPMENT IN FUTURE RENOVATION.
IN OLD KITCHEN AREA. WILL BE USED FOR ROOF MOUNTED
UH-2 AND UH-3 ARE FOR TEMPERARY FREEZE PROTECTION
122 AT LOCATION DRAWN.
INSTALL NEW UH-2 AND UH-3 ON EXISTING CEILING IN ROOM
EPO
EPO
8"Ø
8"Ø
8"Ø
D
D
CFM
8"Ø
A
A
E
CFM
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
F O
R T W
O R
T H D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
A S
C h e c k e d b y
US Army Corps of
Engineers ®
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
E N
G
IN
E E
R
IN
G
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G B
R A
N C
H
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
J U
L Y
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B L
D G
R
E N
O V
A T
IO
N
P N
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
N E
W M
E X
IC
O
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
T
A Y
L O
R S
T
C H
IE
F
M
IL
IT
A R
Y D
E S
IG
N S
E C
T
IO
N
C H
R
IS
S
T R
U N
K P .E
W
G
B
POOL
M-102
M E
C H
A N
IC
A L R
O O
F P
L A
N
M
O R
N E
L A
S
M
O R
N E
L A
S
E R
IC
S
L A
T E
R P .E
MECHANICAL ROOF PLAN
M-102
NOT TO SCALE
GENERAL NOTES:
KEYED NOTES:
RTU
RTU
CU
4 4
SOLAR PANELS
RTU
5 5
EXHAUST FANS
EXISTING ROOF MOUNTED EXHAUST FANS
EXISTING ROOF MOUNTED
ARCHITECTURAL DETIALS.
PATCH UNOCCUPIED CURBS OF EXISTING EQUIPMENT PER2.
WITH EXISTING CONDITIONS.
ROOF PLAN FOR EXACT EQUIPMENT LOCATIONS. COORDINATE
PER MANUFACTURERS GUIDELINES. REFER TO STRUCTURAL
ALL NEW RTU EQUIPMENT SHOWN NEEDED TO BE INSTALLED 1.
PATCH RELIEF HOOD PER ARCHITECTURAL DETAILS.
AND ALL EXHAUST FANS OPENINGS.
PER ARCHITECTURAL DETAILS. PATCH ALL DUCTING OPENINGS
PATCH ALL UNUSED CURBS FROM EXISTING EQUIPMENTS
WALL.
DETAILS. MOUNT DISCONNECT AND SERVICE OUTLET ON
PAD. CONNECT ALL ELECTRICAL WIRES PER ELECTRICAL
INSTALL NEW CONDENSING UNIT ON NEW CONCRETE
M-101 FOR EXHAUST FAN LOCATION.
EXHAUST FANS ARE CEILING MOUNTED. REFER TO
CLEARANCE OF 10 FT FROM EDGE OF BUILDING.
INSTALL NEW RELIEF HOODS ON ROOF A MINIMUM
CLEARANCE PER MANUFACTURERS SPECIFICATIONS.
SUPPLY AND RETURN DUCTING MAINTAIN APPROPRIATE
EXISTING ROOF CURB TO ALLIGN NEW EQUIPMENT SO
EQUIPMENT. PROVIDE NEW ROOF CURB OR ADJUST
VERIFY EQUIPMENT CURB IS ACCEPTABLE WITH NEW
INSTALL NEW RTU'S IN EXISTING CURB OPENINGS.
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
F O
R T W
O R
T H D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
A S
C h e c k e d b y
US Army Corps of
Engineers ®
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
E N
G
IN
E E
R
IN
G
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G B
R A
N C
H
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
J U
L Y
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B L
D G
R
E N
O V
A T
IO
N
P N
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
N E
W M
E X
IC
O
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
T
A Y
L O
R S
T
C H
IE
F
M
IL
IT
A R
Y D
E S
IG
N S
E C
T
IO
N
C H
R
IS
S
T R
U N
K P .E
W
G
B
FLOOR DRAIN
OLD BOILER STACK
MECHANICAL BASEMENT PLAN
M-103
E S
L A
T E
R P .E
M-103
M E
C H
A N
IC
A L B
A S
E M
E N
T P
L A
N
M
O R
N E
L A
S
M
O R
N E
L A
S
KEYED NOTES:
0 2'1'
SCALE IN FEET
4' 6'
B-1B-2
ET
NEUTRALIZER
CONDENSATE
AIR SEPARATOR
EXISTING
HW STORAGE TANK
EXISTING
HEAT EXCHANGER
EXISTING
HW STORAGE TANK
EXISTING
SUMP PIT
HWP
HWP
HWP
THROUGH FLOOR
HHWR/HHWS
1-
M-501
M-501
UP TO CEILING
UH
GENERAL NOTES:
2. PATCH HOLE WHERE PIPING CIRCUITS WERE REMOVED.
1. PROVIDE HOUSEKEEPING PAD BELOW EQUIPMENT.
EPO
PANEL
ELECTRICAL
MOP SINK
GAS LINEGAS LINE
HEATER.
SO THAT IT BLOWS HEAT TO HOT WATER PUMPS AND WATER
PLACE IN LOCATION SHOWN ON SHEET. ORIENT UNIT HEATER
INSTALL NEW UNIT HEATER AND ATTACH TO EXISTING JOIST.
CONTRACTOR MUST VERIFY IF PIPE CAN FIT.
BOILER STACK. SUPPORT AT TOP AND BOTTOM OF STACK.
ROUTE INTAKE AND EXHAUST FLUE UP THROUGH THE EXISTING
SKID PACKAGE
CONTROLLER
SWITCH
KILL
BOILER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
F O
R T W
O R
T H D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
A S
C h e c k e d b y
US Army Corps of
Engineers ®
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
E N
G
IN
E E
R
IN
G
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G B
R A
N C
H
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
J U
L Y
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B L
D G
R
E N
O V
A T
IO
N
P N
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
N E
W M
E X
IC
O
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
T
A Y
L O
R S
T
C H
IE
F
M
IL
IT
A R
Y D
E S
IG
N S
E C
T
IO
N
C H
R
IS
S
T R
U N
K P .E
W
G
B
E R
IC
S
L A
T E
R P .E
M-105
SUMP PIT
PUMP PACKAGE
SKID MOUNTED
HWP
HWP
HWP
ET
B
B-
BP
BP
EACH BOILER
NEUTRALIZER ONE
CONDESATE
CONDESATE DRAIN
AS
BOILER (TYP)
CONTROLLED BY
BOILER PUMP
/2 " H
HW
S
1/ 2" H
HW
R
" M
AX
" M
AX
SOUTH
W
ALL
M-104
E R
IC
S
L A
T E
R P .E
M
IG
U E
L O
R N
E L
A S
DISCONNECT
PUMP
DISCONNECT
WATER HEATER
TO UNIT HEATER
1/2" HHWR
1/2" HHWS
BUILDING
UP TO MAIN
2 1/2" HWS
THE SOLAR COLLECTORS TO REMAIN IN PLACE
STORAGE TANKS AND HEAT EXCHANGER FOR
IN NEW LOCATION SHOWN
RECONFIGURE PIPING TO CONNECT NEW WH-1
M-501
M-502
B A
S E
M E
N T B
O
IL
E R P
IP
IN
G I S
O M
E T
R
IC
BASEMENT BOILER PIPING (N.T.S)
SHEETS
PLUMBING
REFER TO
CONTROLLER
PUMP
ABOVE
FROM
2 1/2" HWR
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
F O
R T W
O R
T H D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
A S
C h e c k e d b y
US Army Corps of
Engineers ®
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
E N
G
IN
E E
R
IN
G
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G B
R A
N C
H
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
J U
L Y
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B L
D G
R
E N
O V
A T
IO
N
P N
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
N E
W M
E X
IC
O
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
T
A Y
L O
R S
T
C H
IE
F
M
IL
IT
A R
Y D
E S
IG
N S
E C
T
IO
N
C H
R
IS
S
T R
U N
K P .E
W
G
B
M-201
M E
C H
A N
IC
A L H
Y D
R O
N
IC
S
E R
IC
S
L A
T E
R P .E
M
O R
N E
L A
S
M
O R
N E
L A
S
VAV
VAV
VAV109
VAV
VAV
VAV
VAV_
VAV105
VAV_
VAV
VAV
VAV
VAV
VAV
RTU
RTU
RTU
1/2" HHWR 3/4" HHWR 1" HHWR
1 1/4" HHWR
1 1/4" HHWR
1 1/2" HHWR
2 1/2" HHWR
1/2" HHWR
3/4" HHWR 1" HHWR
1 1/4" HHWR
1 1/4" HHWR
1 1/4" HHWR
1 1/4" HHWR
2" HHWR
1/2" HHWS 3/4" HHWS 1" HHWS
1 1/2" HHWS
1 1/4" HHWS
1 1/2" HHWS
1 1/2" HHWR
2 1/2" HHWS
1 1/4" HHWS
1/2" HHWS
3/4" HHWS 1" HHWS
1 1/4" HHWS
2" HHWS
1 1/4" HHWS
1 1/4" HHWS
1 1/4" HHWS
2 1/2" HHWR
2 1/2" HHWS
UH
UH
1 1/4" HHWR
1 1/4" HHWS
GENERAL NOTES:
BASEMENT ROOM
PIPE DROP DOWN TO
0 8'4' 16'
SCALE IN FEET
24'
MECHANICAL HYDRONICS
M-201
T
T
T
T
T
T
T
T
T
T T
T
T
T
5. HYDRONIC SYSTEM SHALL BE 30% P.G.
UNIT.
TOP HEATING IN FUTURE RENOVATION. TEMP SENSOR MOUNTED ON
4. UNIT HEATER FOR FREEZE PROTECTION USE FOR ROOF
3. PROVIDE AIR ELIMINATOR AT ALL HIGH POINT LOCATIONS.
TO EQUIPMENT SCHEDULES FOR FLOW RATE.
2. ALL PIPING SHALL BE INSULATED PER MECHANICAL SPECS. REFER
SPECIFICATIONS.
LOCATIONS INDICATED AND SPACING HANGERS PER MECHANICAL
1. PIPE SHALL BE ROUTED IN JOIST SPACE. USE PIPE HANGER ON
VAV-6
VAV-5
VAV-9
VAV-112VAV-111
VAV-107
VAV-108
VAV-113
VAV-114
VAV-103
VAV-102
VAV-101
T
VAV-10
T
UH-2
T
UH-3
RTU-3
UNIT THEN REDUCE TO UH SIZING
PROVIDE 1 1/2 TEES FOR FUTURE AC
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
F O
R T W
O R
T H D
IS
T R
IC
T
F O
R T W
O R
T H T
E X
A S
C h e c k e d b y
US Army Corps of
Engineers ®
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
E N
G
IN
E E
R
IN
G
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G B
R A
N C
H
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
J U
L Y
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B L
D G
R
E N
O V
A T
IO
N
P N
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
N E
W M
E X
IC
O
W H
IT
E S
A N
D S M
IS
S
IL
E R
A N
G E
T
A Y
L O
R S
T
C H
IE
F
M
IL
IT
A R
Y D
E S
IG
N S
E C
T
IO
N
C H
R
IS
S
T R
U N
K P .E
W
G
B
M
O R
N E
L A
S
M
O R
N E
L A
S
E R
IC
S
L A
T E
R P .
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .