W9126G-21-B-0021 - Amendment 0001.pdf

PDF 2 MB Posted

Attached to
FSH National Cemetery Road Repair and Restroom Construction
Solicitation number
W9126G21B0012
Issued by

About this file

This solicitation package seeks proposals for the Fort Sam Houston National Cemetery Road Repairs and Restroom Construction project. The scope of work includes providing all labor, materials, equipment and supervision to complete road repairs and construct a new restroom building at the Fort Sam Houston National Cemetery located at Joint Base San Antonio, Texas. The estimated contract value is between $1 million and $5 million. Proposals are due by April 19, 2021 at 10:00 AM Central Time. The NAICS code for this project is 237310 with a small business size standard of $39.5 million. The point of contact for any questions is Jeffrey M. Haubenreiser of the U.S. Army Corps of Engineers Fort Worth District at 817-886-1459 or jeffrey.m.haubenreiser@usace.army.mil. The project is to be completed within 280 calendar days of notice to proceed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Solicitation for National Cemetery Road Repair and Restroom Facility; Fort Hood, Texas is amended as follows.

See SF30 Continuation Sheet(s)

NOTE: Proposal Receipt date is 19 April 2021; at 10:00 a.m.,CT.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G21B0012

X 9B. DATED (SEE ITEM 11)

19-Mar-2021

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

5 -April-2021

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G21B0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO SOLICITATION W9126G21B0012

CHANGES TO TABLE OF CONTENTS

1. Table of Contents: The table of contents has been updated to reflect the specs that have been removed from the

RFP.

CHANGES TO THE DRAWINGS

2. Replacement Drawings.- Replace the drawings listed below with the attached new drawings(s) of the same number, bearing the notation W9126G21B0012 - 0001.

A-201 WEST AND NORTH ELEVATIONS

A-202 EAST AND SOUTH ELEVATIONS

A-301 BUILDING SECTIONS

End of Summary of Changes

Fort Sam Houston National Cemetery Road Repair and Restroom FSH19VAR

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 11 00.01 SOLICITATION, OFFER AND AWARD, SF-1442

00 11 00.02 CONTRACT LINE ITEM SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 CONTRACT CLAUSES

00 73 00 SPECIAL CONTRACT REQUIREMENTS

00 73 46 WAGE DETERMINATION SCHEDULE

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 44 CONSTRUCTION SCHEDULE

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 13.01 44 SPECIAL PROJECT PROCEDURES FOR JOINT BASE SAN

ANTONIO/FORT SAM HOUSTON [AND CAMP BULLIS]

01 35 13.02 44 ISSUANCE OF ACCESS TO NON-COMMON ACCESS CARD CONTRACTORS,

VENDORS, AND NON-DOD CIVILIANS

01 35 13.03 44 TECHNICAL SUPPLEMENT TO THE DESIGN GUIDE FOR JOINT BASE

SAN ANTONIO/FORT SAM HOUSTON

01 35 13.10 00 SPECIAL PROJECT PROCEDURES - SURVEYING

01 35 13.20 00 SPECIAL PROJECT PROCEDURES - CAD

01 35 13.30 00 SPECIAL PROJECT PROCEDURES - GIS

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 56 39 TREE PROTECTION, REMOVAL AND PRUNING

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 24.01 44 STORM WATER POLLUTION PREVENTION PLAN (TEXAS)

01 57 25.00 44 SWPP PLAN INSPECTION AND MAINTENANCE REPORT FORM

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00 COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND SITE CLEARING

DIVISION 03 - CONCRETE

03 30 53 (SHORT-FORM) CAST-IN-PLACE CONCRETE

03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 04 - MASONRY

04 05 13 MASONRY MORTARING

04 05 16 MASONRY GROUTING

04 20 00 UNIT MASONRY

PROJECT TABLE OF CONTENTS Page 1

<AM#0001> </AM#0001>

W9126G21B0012 - 0001 m2ecdcwn Cross-Out

04 43 00 NATURAL STONE VENEER

04 72 00 CAST STONE MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL FRAMING

05 40 00 COLD-FORMED METAL FRAMING

05 50 00 METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 16 63 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 65 10 SOLID SURFACE FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 BITUMINOUS DAMPPROOFING

07 21 13 THERMAL INSULATION

07 27 00 AIR BARRIERS

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 SPRAY FOAM AIR BARRIERS

07 41 13 STANDING SEAM METAL ROOF

07 46 46 FIBER CEMENT SIDING

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 HOLLOW METAL DOORS AND FRAMES

08 14 00 INTERIOR WOOD DOORS

08 31 13 ACCESS DOORS AND FRAMES

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 71 00 DOOR HARDWARE

08 71 13.11 LOW ENERGY POWER ASSIST DOOR OPERATORS

08 80 00 GLAZING

08 90 00 LOUVERS AND VENTS

DIVISION 09 - FINISHES

09 06 00 SCHEDULE FOR FINISHES

09 22 16 NON STRUCTURAL METAL FRAMING

09 29 00 GYPSUM BOARD

09 30 13 PORCELAIN TILING

09 65 13 RESILIENT BASE AND ACCESSORIES

09 91 00 PAINTING

09 97 05 FIBER REINFORCED PLASTIC

DIVISION 10 - SPECIALTIES

10 14 00 SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 00 TOILET ACCESSORIES

10 44 13 FIRE EXTINGUISHER CABINETS

DIVISION 22 - PLUMBING

PROJECT TABLE OF CONTENTS Page 2

W9126G21B0012 - 0001

22 05 11 COMMON WORK RESULTS FOR PLUMBING

22 05 12 GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

22 05 19 METERS AND GAGES FOR PLUMBING PIPING

22 05 23 GENERAL-DUTY VALVES FOR PLUMBING PIPINGG

22 07 11 PLUMBING INSULATION

22 08 00 COMMISSIONING OF PLUMBING SYSTEMS

22 11 00 FACILITY WATER DISTRIBUTION

22 13 00 FACILITY SANITARY AND VENT PIPING

22 33 00 ELECTRIC DOMESTIC WATER HEATERS

22 40 00 PLUMBING FIXTURES

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 11 COMMON WORK RESULTS FOR HVAC

23 05 12 GENERAL MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23 05 41 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 11 HVAC AND BOILER PLANT INSULATION

23 08 00 COMMISSIONING OF HVAC SYSTEMS

DIVISION 26 - ELECTRICAL

26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

26 05 21 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600

VOLTS AND BELOW)

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION

26 24 16 PANELBOARDS

26 27 26 WIRING DEVICES

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 00 FIRE DETECTION AND ALARM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 11 23 AGGREGATE BASE COURSE

32 11 29 LIME-STABILIZED SUBGRADE

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 23.00 20 PAVEMENT MARKINGS

32 30 00 SITE FURNISHINGS

32 84 00 PLANTING IRRIGATION

32 90 00 PLANTING

PROJECT TABLE OF CONTENTS Page 3

<AM#0001> </AM#0001>

<AM#0001> </AM#0001>

W9126G21B0012 - 0001 m2ecdcwn Cross-Out m2ecdcwn Cross-Out

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 12 33.00 30 WATER METERS

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

01_FFE

0"

A-301

1 2 3 41.1 3.1

SOFFIT 10'-4"

T.O. CAST STONE 3'-9"

T.O.M. 3'-4"

T.O. CAST STONE 7'-8"

T.O.M. 7'-4"

STOREFRONT WINDOWSSTOREFRONT DOOR AND FRAME

PRE-FINISHED

METAL FASCIA

FIBER CEMENT SIDING

FIBER CEMENT TRIM

STANDING SEAM METAL ROOF

LIMESTONE VENEER

INTEGRAL COLORED SINGLE

SCORE GROUND FACE CMU AT

COLUMNS

INTEGRAL COLORED

SMOOTH-FACE CMU

A-311

T.O.S. 10'-8"

A-501

A-501

CAST STONE

PROFILE C

D6

A-501

01_FFE

0"

BE D AF 2

A-301

PRE-FINISHED

METAL FASCIA

FIBER CEMENT SIDING

FIBER CEMENT TRIM

ALUMINUM WINDOW

STANDING SEAM METAL ROOF

LIMESTONE VENEER

INTEGRAL COLORED SINGLE

SCORE GROUND FACE CMU AT

COLUMNS

FIBER CEMENT BOARD

BEAM ENCLOSURE

SOFFIT 10'-4"

T.O. CAST STONE 7'-8"

T.O.M. 7'-4"

T.O.M. 3'-4"

T.O. CAST STONE 3'-9"

INTEGRAL COLORED

SMOOTH-FACE CMU

CC.1D.8

T.O.S. 10'-8"

D.6

CAST STONE PROFILE C

A-501

A-501

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

US ARMY CORPS OF ENGINEERS

FORT WORTH DISTRICT

ENGINEERING / CONSTRUCTION DIVISION

DESIGN BRANCH

Revisions: Date: SOLICITATION NUMBER: W9126G-21-B0012

C :\R ev it_

P ro je ct s\ V

A C em et er y

R ev it C on ce pt

_M 2E

C D

S A

W .r vt 3/

/2

2:

:2

P M

A-201

WEST AND NORTH ELEVATIONS FSH NATIONAL CEMETERY ROAD

REPAIR AND RESTROOM

FACILITY

SAN ANTONIO, TX

846CM3036

N/A

MARCH 5, 2021 M.P. S.W.

BD SUBMITTAL

NOT FOR CONSTRUCTION

3/8" = 1'-0"1 WEST ELEVATION

3/8" = 1'-0"3 NORTH ELEVATION

2 ENTRY PERSPECTIVE

aa a a a a

2 APR 2021AM#0001 - MODIFIED NOTES

W9126G21B0012 a

A-301

1234 1.13.1

PRE-FINISHED METAL FASCIA

FIBER CEMENT SIDING

FIBER CEMENT TRIM

STANDING SEAM METAL ROOF

SOFFIT 10'-4"

T.O. CAST STONE 7'-8"

T.O.M. 7'-4"

INTEGRAL COLORED

SMOOTH-FACE CMU

METAL GATE

01_FFE

0"

B EDA F

A-301

T.O.M. 7'-4"

T.O. CAST STONE 7'-8"

SOFFIT 10'-4"

INTEGRAL COLORED

SMOOTH-FACE CMU

PRE-FINISHED METAL FASCIA

FIBER CEMENT SIDING

FIBER CEMENT TRIM

ALUMINUM WINDOW

STANDING SEAM METAL ROOF

LIMESTONE VENEER

T.O.M. 3'-4"

T.O. CAST STONE 3'-9"

INTEGRAL COLORED SINGLE SCORE

SPLIT FACE CMU AT COLUMNS

FIBER CEMENT BOARD

BEAM ENCLOSURE

C C.1 D.8D.6

CAST STONE PROFILE C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

US ARMY CORPS OF ENGINEERS

FORT WORTH DISTRICT

ENGINEERING / CONSTRUCTION DIVISION

DESIGN BRANCH

Revisions: Date: SOLICITATION NUMBER: W9126G-21-B0012

C :\R ev it_

P ro je ct s\ V

A C em et er y

R ev it C on ce pt

_M 2E

C D

S A

W .r vt 3/

/2

2:

:5

P M

A-202

EAST AND SOUTH ELEVATIONS FSH NATIONAL CEMETERY ROAD

REPAIR AND RESTROOM

FACILITY

SAN ANTONIO, TX

846CM3036

N/A

MARCH 5, 2021 M.P. S.W.

BD SUBMITTAL

NOT FOR CONSTRUCTION

3/8" = 1'-0"1 EAST ELEVATION

3/8" = 1'-0"3 SOUTH ELEVATION

2 REAR VIEW

a a a

1 APR 2021AM#0001 - MODIFIED NOTEa

A-301

1 2 3 41.1 3.1

FAMILY

WOMEN

MEN

-1 1/2" STANDING SEAM METAL ROOF

-ROOF UNDERLAYMENT

-5/8" TREATED PLYWOOD DECKING

-R-24 RIGID INSULATION

-5/8" PLYWOOD SHEATHING

-PREFAB METAL TRUSSES

T.O.M. 7'-4"

T.O. CAST STONE 7'-8"

SOFFIT 10'-4"

-4"(NOMINAL) CMU VENEER

-AIR SPACE

-R-12 RIGID INSULATION

-1/2" GLASSMAT SHEATHING

-4" METAL STUD W/BATT INSUL.

-5/8" GYP. BD.

FINISH GRADE

CONCRETE FOUNDATION

RE: STRUCT.

ALUMINUM WINDOW

-FIBER CEMENT SIDING

-1/2" TREATED PLYWOOD SHEATHING

-R-12 RIGID INSULATION

-1/2" GLASSMAT SHEATHING

-4" METAL STUD W/ BATT INSUL.

-5/8" GYP. BD.

A-311

T.O.S. 10'-8"

TRUSS DESIGN TO ACCOMODATE MECHANICAL

DUCTWORK DESIGN, SEE MECHANICAL SHEETS

FOR DUCT LAYOUT

A-521

01_FFE

0"

B EDA F

A-301

ALCOVE

FAMILY

JANITOR

ELEC

SOFFIT 10'-4"

T.O.M. 7'-4"

-1 1/2" STANDING SEAM METAL ROOF

-ROOF UNDERLAYMENT

-5/8" TREATED PLYWOOD DECKING

-R-24 RIGID INSULATION

-5/8" PLYWOOD SHEATHING

-PREFAB METAL TRUSSES

GYP. BD. CEILING

PRE-FINISHED METAL SOFFIT

FIBER CEMENT BOARD BEAM ENCLOSURE

SIDEWALK

RE: CIVIL

LIMESTONE VENEER

CAST STONE PROFILE C

INTEGRAL COLORED SINGLE SCORE

GROUND FACE CMU AT COLUMNS

PRE-FINISHED METAL FASCIA

CONCRETE SLAB

RE: STRUCT.

CAST STONE CAP

PROFILE B

METAL GATE

C

A-311

C.1 D.8

T.O.S. 10'-8"

TRUSS DESIGN TO ACCOMODATE MECHANICAL

DUCTWORK DESIGN, SEE MECHANICAL SHEETS

FOR DUCT LAYOUT

D.6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

US ARMY CORPS OF ENGINEERS

FORT WORTH DISTRICT

ENGINEERING / CONSTRUCTION DIVISION

DESIGN BRANCH

Revisions: Date: SOLICITATION NUMBER: W9126G-21-B0012

C :\R ev it_

P ro je ct s\ V

A C em et er y

R ev it C on ce pt

_M 2E

C D

S A

W .r vt 3/

/2

2:

:2

P M

A-301

BUILDING SECTIONS FSH NATIONAL CEMETERY ROAD

REPAIR AND RESTROOM

FACILITY

SAN ANTONIO, TX

846CM3036

N/A

MARCH 5, 2021 M.P. S.W.

BD SUBMITTAL

NOT FOR CONSTRUCTION

3/8" = 1'-0"2 BUILDING SECTION - TRANSVERSE

3/8" = 1'-0"1 BUILDING SECTION - LONGITUDINAL

aa a

1 APR 2021AM#0001 - MODIFIED NOTEa

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
SUMMARY OF CHANGES
PROJECT TABLE OF CONTENTS
DRAWINGS
A-201 - WEST AND NORTH ELEVATIONS
A-202 - EAST AND SOUTH ELEVATIONS
A-301 - BUILDING SECTIONS

File details come from the government source that posted it. Updated .