This announcement is for a solicitation from the United States Army Corps of Engineers (USACE) Fort Worth District seeking bids for the Joe Pool Lake Slide Repair project. The contractor will be required to remove slide material from upstream and downstream slopes of Joe Pool Dam, bench cut into undisturbed embankment on both sides of the slides, excavate material at the toe beneath the slope, replace embankment and foundation material with lime-treated material, and repave the repaired section of the crest. The solicitation number is W9126G21B0005 and bids are due by June 3, 2021 with a public bid opening. A firm-fixed price contract is anticipated to be awarded using invitation for bid procedures with an estimated value between $1,000,000 and $5,000,000. The period of performance is 150 days after notice to proceed. This will be a total small business set-aside managed by the USACE Fort Worth District.

View the file

Other files

File Type Posted
B.08 21B0005 - AM#04.pdf PDF
B.08 21B0005 - AM#04.pdf PDF
B.03 21B0005 - AM#03.pdf PDF
B.08 21B0005 - AM#01.pdf PDF
B.08_Released Drawings W9126G21B0005.pdf PDF
B.08_Released RFP W9126G21B0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Solicitation for Joe Pool Slide 9 Repairs, Grand Prairie, Texas is amended as follows:

The purpose of this amendment is to instruct the Offerors to complete block 14 of the SF 1442.

See SF30 Continuation Sheet(s)

NOTE: Bid Receipt date is 3 June 2021; at 9:00 a.m.,CT, and Bid Opening date is 3 June 2021; at 1:00 p.m., CT as previously announced.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126-17-R-0093

X 9B. DATED (SEE ITEM 11)

28-Apr-2021

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21 -May-2021

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W9126G21B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO SOLICITATION W9126G21B0005

CHANGES TO CLIN SCHEDULE

1. CLIN Schedule Notes: Replace the CLIN Schedule Notes in their entirety, each page bearing the notation W9126G21B0005-0002.

CHANGES TO DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

2. Section 00 73 00 SPECIAL CONTRACT REQUIREMENTS is being replaced in its enterity bearing the notation W9126G21B0005-0002.

End of Summary of Changes

Section: 00 11 00 W9126GB0005

Joe Pool Lake Slide #9 Repairs Grand Prairie, Texas

CONTRACT LINE ITEM SCHEDULE

NOTES:

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable

NOTE NO. 3. All the extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

NOTE NO. 4. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.

NOTE NO. 5. The Army will procure this facility through a design and cost competition in accordance with the provisions set forth in this Request for Proposals (RFP). When awarded, it will be a "Firm Fixed Price Contract."

NOTE NO. 6. Any proposal that is materially unbalanced as to prices for the Base Schedule may be rejected. An unbalanced proposal is one that is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work and can also exist where only overpricing or underpricing exists.

NOTE NO. 7. ABBREVIATIONS

For the purpose of this solicitation, the units of measure are represented as follows:

a. CY – Cubic Yards

b. AC – Acres

c. LF – Linear Feet

NOTE NO. 8. Profit will not be paid on bonds or insurance.

END OF CLIN SCHEDULE

<AM#0002>

<AM#0002>

W9126G21B0005-0002 m2ecold9 Cross-Out

W9126G21B0005

Section 00 73 00 - Special Contract Requirements

CLAUSES INCORPORATED BY REFERENCE

52.211-18 Variation in Estimated Quantity APR 1984

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 after notice to proceed (NTP). The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of <AM0002> $479.10 TBD <AM0002> for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

W9126G21B0005-0002 m2ecold9 Cross-Out

AMENDMENT 0002
SUMMARY OF CHANGES
CHANGES TO CLIN SCHEDULE
CLIN SCHEDULE NOTES
CHANGES TO DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 73 00 - SPECIAL CONTRACT REQUIREMENTS

File details come from the government source that posted it. Updated .