B3_W126G20Q0043_Bardwell Lake Herbicide.pdf
PDF 2 MB Posted
- Attached to
- Bardwell Lake Herbicide
- Solicitation number
- W9126G20Q0043
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3 Questions and answers.pdf | ||
| W9126G20Q00430002 Amendment.pdf | ||
| W9126G20Q00430001.pdf | ||
| B3_W126G20Q0043_Bardwell Lake Herbicide.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Quotes (RFQ)
Solicitation Number: W9126G20Q0043
This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
This solicitation document and incorporated provisions and clauses are those in effect through the Federal Acquisition Regulation (FAR) and Department of Defense FAR Supplement
(DFARS).
This acquisition is SET ASIDE 100% for Service-Disabled Veteran-Owned Small Business
(SDVOSB)
NAICS CODE: 561710
SIZE STANDARD: $11.0 Million
Offers for this solicitation are due on March 12, 2020 by 10:00 AM CST
Email all quotes to:
Samuela.Y.Adams@usace.army.mil
CIV-OPS.Proposals@usace.army.mil
This Solicitation is issued by:
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
mailto:CIV-OPS.Proposals@usace.army.mil
W9126G20Q0043
Section SF 30 - BLOCK 14 CONTINUATION PAGE
PWS
PERFORMANCE WORK STATEMENT (PWS)
Herbicide Services
Bardwell Lake, Ellis County, TEXAS
1. GENERAL: This is a non-personal services contract to provide herbicide services at Bardwell Lake. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, permits, supervision, and other items and non-personal services necessary to perform herbicide and pesticide services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2. Scope: Contractor shall provide all labor, permits, tools, equipment, materials, and chemicals required to mix, transport, and apply herbicides and pesticides as specified in this contract. Services include spraying/applying herbicides and pesticides and shall be performed as specified, to the limits shown on project maps (See Section 1.9.3 Technical Exhibit 3). In general, herbicide services shall be applied at various locations throughout the government property boundaries surrounding the locations identified below (including, but not limited to flood control prime facilities/dam embankments and recreation/park facilities). The Contractor shall possess a valid State of Texas Commercial Applicator’s License and shall comply with the conditions specified in the sub-paragraph 3-3e and 3-4 in ER 1130- 2-540. A copy of the Contractor’s Applicator License must be provided to the Contracting Officer (KO) before an award will be made. The Contractor shall ensure that a certified applicator is on the job at all times to supervise all contract operations. The Contractor shall give, in writing, any such supervisor, authority to act in his/her behalf. The Contractor or the designated supervisor, while supervising the work will at all times be in possession of a copy of this contract and a copy of their individual Commercial Applicator’s License.
1.2.1 Payment: All work must be inspected and accepted by the Lake Manager, or Contracting Officer’s Representative (COR), as applicable, or designated Quality Assurance (QA) Inspector before any payment can be made. Inspections will be made by the Lake Manager, COR, as applicable, or QA Inspector after each application is completed. No payment will be made until the areas treated have been inspected and accepted by the inspector. Inspections may take up to two weeks after the completion of any service so results can be seen. Any work that is rejected as unsatisfactory by the inspector (less than 90% kill) will be redone by the Contractor at the Contractor’s expense.
1.2.1.1 Deductions - The Lake Manager, or COR, as applicable, may require that all work which fails to provide the desired results be repeated at the contractor’s expense, or may reduce the contract price to equal the reduced value of the service. The contractor will ensure that these defects do not recur. If the contractor fails to rework the rejected areas or the defects are recurring, the Government may:
a. Reduce the contract price to equal the reduced value of the service.
b. Perform the required services, by contract or otherwise, and deduct any costs incurred by the Government that is directly related to the performance of such services from the contractor’s invoice.
c. Terminate the contract for default.
1.2.2 Application Treatment Specifications: Applications will be done at a time when, according to the label, satisfactory results can be expected. The type of herbicide will be determined by the Contractor; colored dye will be added to the herbicide to show coverage of application. The herbicide applications will be for herbaceous (annual and perennial grasses, broadleaf weeds), and woody vegetation. Normally, two applications will be performed annually: spring and fall applications (dependent on lake elevations and park closures). The exact date of when an application will be performed will be determined by weather conditions.
When conditions such as excessive moisture, potential rainfall, wind speed, or other factors prevail to such an extent that satisfactory results cannot be obtained, no applications should be made. Work should resume only when desired results can be obtained. Delays in service requiring an extension to the completion date due to inclement weather or conditions beyond the Contractor’s control may only be allowed with the written authorization of the Lake Manager, or COR, as applicable. The specifications are split into 3 major categories and relate directly to the legend on the maps.
1.2.2.1 Herbicide (Paved)
1.2.2.1.1 Roads and Road Shoulders - This application treatment will be for an area a minimum of three-foot (3’) wide along each edge of the roadway, boat ramp, parking lot, pullout, or pull-through. Any vegetation that is growing up in between the edges shall also be treated.
Maps are included to show these areas in further detail.
1.2.2.1.2 Boat Ramp Rip-Rap - This application treatment of
herbicide will occur on all rip-rap associated with the boat ramps.
1.2.2.1.3 Stilling Basin Steps and Fishing Platform - This
application shall cover a minimum of three-foot (3’) wide strip along the steps and platform.
1.2.2.2 Herbicide (Area)
1.2.2.2.1 This application treatment of herbicide will occur on all rip-rap associated with the dam (upstream of the dam, around stilling basin), on the outlet works to include u-channels, weep-holes, and at other areas related to dam operation. Maps are included to show these areas in further detail. This would include both broad application and spot treatment.
1.2.2.2.2 This also includes a miscellaneous line for non-routine spraying. This would primarily be an application to target specific invasive or noxious broadleaf or woody plants.
1.2.2.3 Herbicide applications shall not result in contamination of non-target species of plants and organisms. Any non-target vegetation damaged by the Contractor will be replaced by the Contractor at his own expense. The Contractor will be responsible for all accidents or damages to persons or properties incurred during any application, when said accidents and/or injuries are a result of the Contractor’s inappropriate actions or errors. The Contractor will be responsible for cleanup of any refuse or litter resulting from the execution of any application. No payment will be made until work sites have been returned to their original condition.
The Contractor will make sure that the disposal of excess pesticides (containers, contaminated clothing, remaining chemicals, etc.) involved in the transport, mixing, application, and cleanup operations are removed from government lands and waters and disposed of in an approved municipal, State, or EPA approved disposal site.
1.2.2.4 A comprehensive application record will be provided to the Lake Manager, COR, as applicable, or QA Inspector at the end of each service.
1.2.3 Safety: The Contractor shall submit “SAFETY DATA SHEETS (SDS)” to the Lake Manager, or COR as applicable, for all herbicides and pesticides that will be used on this contract. The Contractor shall also have a copy of the SDS sheets on the job at all times when work is in progress.
1.2.3.1 Within 15 days of contract award and prior to beginning any work, the Contractor shall develop a SAFETY AND ENVIRONMENTAL PLAN which addresses spills, environmental hazards, storage and disposal of herbicide and pesticide containers, and protection of park users. In addition to the Safety Plan, the Contractor must provide an Activity Hazard Analysis for each employee before they may apply herbicides or pesticides.
1.2.3.2 Safety Meetings - The contractor shall hold a safety meeting with all his employees prior to each application, and will notify the Lake Manager or COR as applicable, of location and time of each meeting.
When a new employee is hired, the contractor will thoroughly brief that person in all safety procedures and requirements. Any contractor employee who persists in unsafe performance will be removed from the job at the request of the Lake Manager, COR as applicable, or designated representative. A copy of the safety meeting report shall be submitted to the Lake Manager, or COR as applicable, with the weekly QC report.
1.2.3.3 Accidents – The contractor shall immediately notify the Lake Manager, or COR as applicable, of any accident occurring during the operation of the contract on government property.
1.3 Period of Performance: This contract is set up with a base year and two option years.
Base Year (01 May 2020 – 30 April 2021) Option Year 1 (01 May 2021 – 30 April 2022) Option Year 2 (01 May 2022 – 30 April 2023)
The number of days for the period of performance shall not exceed sixty (60) calendar days. The Lake Manager, or COR, if applicable, reserves the right to approve the application method or methods of treatment. Applications will be done at a time when according to the label, satisfactory results can be expected, typically in Spring and late Summer. The exact date of when an application will be performed will be determined by weather conditions, as agreed to by the contractor and lake staff. When conditions such as excessive moisture, potential rainfall, wind speed, or other factors prevail to such an extent that satisfactory results cannot be obtained, no applications should be made. Work should resume only when desired results can be obtained. Delays in service requiring an extension to the completion date of any delivery due to inclement weather or conditions beyond the Contractor’s control may only be allowed with the written authorization of the Lake Manager, or COR, if applicable.
1.4 General Information
1.4.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. Contractor must submit a comprehensive written Quality Control Plan (QCP) to the Lake Manager, or COR as applicable, within 10 working days and when changes are made thereafter. After acceptance of the QCP, the contractor shall receive the Lake Manager’s or COR’s acceptance in writing of any proposed change to the QCP.
1.4.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.4.3 Special Instructions:
1.4.3.1 The contractor shall provide a list of names and addresses of all employees who will be working for the contractor.
1.4.3.2 The contractor shall provide a list of vehicles and license plate numbers that will be used within the contract area.
1.4.3.3 The contractor shall provide an example of the vehicle identification.
Each vehicle should be clearly marked either front and back or on both sides with the company name or logo.
1.4.3.4 The contractor shall provide a certificate of insurance to the Contracting Officer.
1.4.3.5 The contractor shall provide a written statement listing the name, address, and telephone number of the authorized supervisor.
1.4.3.6 The contractor shall provide a written statement designating the Quality Control Representative(s).
1.4.3.7 The contractor shall provide a list of all equipment to be used at the work sites including applicable model and serial numbers
1.4.3.8 The contractor shall provide Quality Control Reports of completed work to the QA Inspector by the first Monday of the week following the work being completed. This report may be brought by the office in hard copy or sent via email.
1.4.3.9 The contractor shall provide Daily Activity Reports on the first work day of the week for the previous week’s work. This report may be brought by the office in hard copy or sent via email.
1.4.3.10 The contractor shall immediately report to the QA Inspector any unusual or potentially hazardous conditions which are observed during the performance of work. This shall include such items which may constitute fire hazards, damage to buildings or grounds, or other things that might cause a life/health/safety hazard
1.4.4 Government Holidays: The contractor shall not perform services on the following holidays.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.4.5 Hours of Operation: All contract work shall be performed between the normal operating hours of the project, Monday through Friday 0800-1600 hours unless a request to work is received 72 hours prior and approved, in advance, by the Lake Manager, or COR, as applicable.
1.4.6 Places of Performance: The work to be performed under this contract will be performed at Bardwell Lake, Ellis County, Texas.
1.4.5.1 Bardwell Lake is located in Ellis County. The Project Headquarters is located at 4000 Observation Drive Ennis, Texas, 75119;
phone 972-875-5711. When leaving Ennis, Texas on Highway 34 West, exit left on Ensign Road, go 2.8 miles and turn right on Observation Drive, go about 1 mile to the Project Office.
1.4.7 Type of Contract: The government will award an indefinite delivery, indefinite quantity contract. Schedule of services will be typically in Spring and late Summer.
1.4.8 Security Requirements: Contractor personnel performing work under this contract must be aware of their surroundings and take precautions to safeguard personnel and property from security risks.
1.4.8.1 Physical Security: The contractor shall be responsible for safeguarding all Government equipment, information, and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.4.8.2 AT/OPSEC
1.4.8.2.1 All contractor and all associated sub-contractors
employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.4.8.2.2 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.4.8.2.3 The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.4.8.2.4 All contract employees, including subcontractor
employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.4.8.2.5 The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
1.4.8.3 Key Control: The Contractor shall establish and implement methods of ensuring all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.
NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicated keys to the KO. The Contractor will be required to return all Government keys issued to perform the work on the last day of the contract.
1.4.8.3.1 The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the KO.
1.4.8.3.2 Lock Combinations: (If applicable) The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know. These procedures shall be included in the Contractor’s Quality Control Plan.
1.4.8.4 “Identification of Contractor Employees in the Federal Workplace (Aug 2008):
(a) The contractor shall provide each of its employees who will be involved in the performance of the contract, on a Government facility, with an identification (ID) badge. The ID badge shall clearly display the contractor’s name and the employee’s name and color photograph. The KO or his/her designee shall approve the ID badge before the commencement of contract performance. It is the contractor’s responsibility to ensure that all contractor personnel wear the ID badge at all times when performing work under this contract at a Government facility.
Unless otherwise specified in the contract, each contractor employee shall wear the ID badge in a conspicuous place on the front of their clothing and above their waist, except when safety or health reasons prohibit such placement. This requirement is in addition to any Government facility security provisions that require that a Government-issued security badge also be worn.
(b) Contractor personnel shall clearly identify themselves to all attendees as a contractor employee before the commencement of meetings with Government or other contractor personnel. Contractor personnel shall clearly and immediately identify themselves as a contractor employee when placing, answering or participating in telephone/VTC conversations with Government or other contractor personnel.
(c) When contractor personnel send e-mail messages from or to a Government-owned computer, they shall include a signature block that includes their employer’s name and the employee’s full name and e-mail address.
(d) Each of the requirements set forth in paragraphs a-c above, must be included in all subcontracts at any tier.”
(e) All vehicles and equipment utilized under this contract must be identified with the company name or logo conspicuously displayed on each side of the vehicle.
1.4.8.5 AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. Proposed language: "All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum."
1.4.9 Special Qualifications: The Contractor shall possess a valid State of Texas Commercial Applicator’s License and shall comply with the conditions specified in the sub-paragraph 3-3e and 3-4 in ER 1130-2-540. A copy of the Contractor’s Applicator License must be provided to the KO before an award will be made. The Contractor shall ensure that a certified applicator is on the job at all times to supervise all contract operations.
1.4.10 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.4.11 Contracting Officer Representative (COR): The COR, if needed, will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor contractor's performance and notifies both the (KO) and contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.
1.4.12 Lake Manager(s): The Lake Manager is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The Lake Manager is responsible for ensuring proper Government surveillance of the contractor’s performance, coordination and communication with the contractor and the KO, and for receiving required contractual documents, such as the QCP and safety plan. The Lake Manager assists the KO by providing local supervision of the contract, the contractor’s performance, and QA oversight, and resolves issues that may arise. For unresolved issues, the Lake Manager will document the issues and forward to the KO for resolution.
1.4.13 Quality Assurance Inspector: The QA Inspector is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The QA Inspector is the primary point of contact between the Government and contractor for day-to-day operations. The QA Inspector will evaluate the contractor’s performance against the standards outlined in the PWS, conduct routine inspections and re-inspections for deficiencies, receive routine reports (such as completion reports, safety meetings, maintenance issues, etc.), and routine coordination and communication for scheduled and unscheduled maintenance repairs.
1.4.14 Contractor Key Personnel: The following personnel are considered key personnel by the Government: The Contractor or the designated supervisor shall closely supervise all contractor employees. All employees shall be thoroughly trained and instructed in the application of each herbicide and pesticide to ensure proper and safe application. The Contractor shall report, in writing, all injuries and accidents to the COR by the end of the day on which the accident or injury occurs. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the KO. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.4.16 Contractor Travel : Not Applicable.
1.4.16 Data Rights : Not Applicable.
1.4.17 Organizational Conflict of Interest: Not Applicable.
1.5. GOVERNMENT FURNISHED ITEMS AND SERVICES:
1.5.1 Facilities: The Government will provide no facilities.
1.5.2 Equipment: The Government will provide no equipment.
1.5.3 Materials: The Government will provide no materials.
1.6 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
1.6.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 1.5 of this PWS.
1.6.2 Equipment. The Contractor shall provide all equipment necessary to mix, transport, and apply herbicides and pesticides as specified in this contract.
Services include spraying or spreading of herbicides and pesticides and shall be performed as specified, to the limits shown on the contract for that treatment, or by Lake Manager, or COR, as applicable, and project maps (See Section 1.9.3 Technical Exhibit 3). An equipment list including all application equipment, personal protection equipment, and vehicles to be used in contract work shall be submitted during the pre-award period for approval by the Lake Manager, or
COR, as applicable. Some areas may require treatment on steep slopes or without access available at all. Any self-propelled equipment used on embankment and levee slopes or other steep areas must be certified by the manufacturer as being able to perform safely on such slopes. All equipment to be used in the performance of this contract shall be of the type that will allow proper and safe application of the pesticides. No aerial applications will be allowed. Prior to the commencement of work the Lake Manager, COR as applicable, or a designated representative shall perform a review of the contractor’s equipment safety inspection. A copy of the completed inspection form will be made available for inclusion in the government contract folder.
When new or different equipment is brought onto the job-site, it shall be the Contractor's responsibility to notify the Lake Manager, or COR as applicable, in order that the equipment inspected for the safety features specified in this contract can be verified and a copy of the inspection form placed within the government’s contract folder. No equipment shall be used on the project prior to this inspection.
1.6.3. Materials. The Contractor shall provide all materials, and chemicals required for mixing, transporting, and the application of pesticides as specified in this contract. Services include spraying or spreading of herbicides and pesticides and shall be performed as specified, to the limits shown on the provided project maps, or in accordance with Lake Manager, or COR when applicable.
1.7 CONTRACTOR MANAGEMENT REPORTING (CMR) (RESERVED)
1.8 APPLICABLE PUBLICATIONS (CURRENT EDITIONS) The Contractor shall follow all applicable Safety and Health Requirements in the U.S. Army Corps of Engineers Manual EM 385-1-1 and adhere to all safety precautions and instructions specified on the herbicide and pesticide labels. This includes, but is not limited to, wearing the proper protective clothing, protective masks, and eye protection. The Contractor shall have on the job site a copy of the label and other information pertaining to first aid treatment that may be needed in relation to the product being used.
1.8.1 The Contractor must abide by all Federal, State, and local laws, applicable regulations, publications, manuals, and local policies and procedures.
1.9 Attachment/Technical Exhibit List:
1.9.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
1.9.2 Attachment 2/Technical Exhibit 2 – Deliverables
1.9.3 Attachment 3/Technical Exhibit 3 – Maps
TECHNICAL EXHIBIT 1
Performance Requirements Summary
Performance Objective
Standard PERFORMANCE
THRESHOLD
Method of Surveillance
PRS # 1.
The contractor shall provide herbicide and pesticide treatment services, IAW PWS Sections 1.2 and 1.6 .
Appropriately apply herbicide and pesticide at all designated locations/facilities in accordance with the contract.
90% Eradication or better
File review, planned sampling, random sampling
TECHNICAL EXHIBIT 2
Deliverable Schedule
DELIVERABLE FREQUENCY
# OF COPIES
MEDIUM /
FORMAT SUBMIT TO
Commercial Applicator License IAW
PWS,
paragraphs 1.2 and 1.4.9
Must be submitted with the bid proposal.
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive Fort Worth, TX 76132
Insurance Certificate IAW
PWS,
paragraph 1.4.3.4
Submit within ten days of award of contract
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive Fort Worth, TX 76132
Quality Control Plan (QCP)
IAW PWS,
paragraph 1.4.1
Submit within ten days of award of contract
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive Fort Worth, TX 76132
Name of Quality Control Inspector IAW
PWS,
paragraph 1.4.3.6
Submit within ten days of award of contract
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive Fort Worth, TX 76132
Name of Foreman / Superintendent
IAW PWS,
paragraph 1.4.3.5
Submit within ten days of award of contract
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive Fort Worth, TX 76132
FORMAT SUBMIT TO
Point of contact and local telephone number (24 hour basis)
IAW PWS,
paragraph 1.4.3.1
Submit within ten days of award of contract
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive Fort Worth, TX 76132
Safety Plan
IAW PWS,
paragraph 1.2.3 and 1.4.1
Submit within 15 days after award and prior to beginning work
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive Fort Worth, TX 76132
Activity Hazard Analysis (AHA)
IAW PWS,
paragraph 1.2.3.1
Submit within 15 days after award and prior to beginning work.
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive Fort Worth, TX 76132
Environmental Plan IAW PWS, paragraph 1.2.3.1
Submit within 15 days after award and prior to beginning work.
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive Fort Worth, TX 76132
Daily Activity Reports IAW
PWS,
paragraph 1.4.3.9
Submit on the first work day of the week for the previous week’s work along with the Weekly QC report
One for each crew
Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive
FORMAT SUBMIT TO
Weekly QC Report IAW
PWS,
paragraph 1.4.3.8
Submit on the first work day of the week for the previous week’s work
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive Fort Worth, TX 76132
Application Record IAW
PWS,
paragraph 1.2.2.4
Submit the first work day following completion of service
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive Fort Worth, TX 76132
Invoice IAW
PWS,
paragraph 1.2.1
Submit upon completion of work
One Hard copy or email
COR
(Martin.K.Underwo od@usace.army,m il), Trinity Project 7001 Lakeside Drive
TECHNICAL EXHIBIT 3
Maps
See Maps in Contract Package
MAPS
BID SCHEDULE
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Funded Amt:
BASE YEAR - DATE OF AWARD THROUGH A 12
MONTH PERIOD
0001AA
Funded Amt:
HERBICIDE - AT FLOOD CONTROL PRIME
FACILITES AND OFFICE COMPOUNDS SEE MAPS, EXHIBIT A
NAICS CD: 561710
, FSC CD: 6840
0001AB
Funded Amt:
HERBICIDE - ALL ROADS ON USACE PROPERTY,
AT PRIME FACILITIES AND PARKS ALL ROADS, BOAT RAMPS,
PARKING LOTS, PULL-OUTS, PULL-THROUGHS. SEE MAPS, EXHIBIT B
OPTION Funded Amt:
OPTION YEAR 1
0002AA
Funded Amt:
0002AB
Funded Amt:
HERBICIDE - ALL ROADS ON USACE
PROPERTY, AT PRIME FACILITIES AND PARKS ALL ROADS, BOAT
RAMPS, PARKING LOTS, PULL-OUTS, PULL-THROUGHS. SEE MAPS,
EXHIBIT B
OPTION Funded Amt:
OPTION YEAR 2
0003AA
Funded Amt:
0003AB
Funded Amt:
HERBICIDE - ALL ROADS ON USACE
PROPERTY, AT PRIME FACILITIES AND PARKS ALL ROADS, BOAT
RAMPS, PARKING LOTS, PULL-OUTS, PULL-THROUGHS. SEE MAPS,
EXHIBIT B
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A N/A 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 0002 N/A N/A N/A N/A 0002AA Destination Government Destination Government 0002AB Destination Government Destination Government 0003 N/A N/A N/A N/A 0003AA Destination Government Destination Government 0003AB Destination Government Destination Government
Section I - Contract Clauses
52.237-1 SITE VISIT
52.237-1 SITE VISIT (APR 1984)
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
- To indicate your firm’s interest in attending a Site Visit, please email the point of contact below, providing the information required:
Name: Samuela Adams Email: Samuela.Y.Adams@usace.army.mil Phone: 817-886-1168
Site visit attendees must provide the following information:
1) Solicitation Number;
2) Project Title;
3) Names of individuals who will attend the site visit;
4) Name of company represented;
5) Phone number of company being represented.
Date: 18 Feb 2020 Time: 0900 Location: Bardwell Lake Office, 4000 Observation Dr., Ennis, Texas 75119
(End of provision)
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2019
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.211-13 Time Extensions SEP 2000 52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.213-2 Invoices APR 1984 52.216-21 Requirements OCT 1995 52.217-2 Cancellation Under Multiyear Contracts OCT 1997 52.217-5 Evaluation Of Options JUL 1990 52.217-6 Option For Increased Quantity MAR 1989 52.217-8 Option To Extend Services NOV 1999 52.217-9 Option To Extend The Term Of The Contract MAR 2000 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011
52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside
OCT 2019
52.222-3 Convict Labor JUN 2003 52.222-26 Equal Opportunity SEP 2016 52.222-26 Equal Opportunity SEP 2016 52.222-41 Service Contract Labor Standards AUG 2018 52.222-43 Fair Labor Standards Act And Service Contract Labor
Standards - Price Adjustment (Multiple Year And Option Contracts)
AUG 2018
52.222-50 Combating Trafficking in Persons JAN 2019 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.236-23 Responsibility of the Architect-Engineer Contractor APR 1984 252.225-7051 Prohibition on Acquisition of Certain Foreign Commercial
Satellite Services.
DEC 2018
252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (OCT 2018)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation.
Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers:
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.
Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.
(i) Availability of requirements documents cited in the solicitation. (1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA Federal Supply Service Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC 20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.
(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.
Additional copies will be issued for a fee.
(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(i) ASSIST (https://assist.dla.mil/online/start/).
(ii) Quick Search (http://quicksearch.dla.mil/).
(iii) ASSISTdocs.com (http://assistdocs.com).
(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--
(i) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);
(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone
(215) 697-2667/2179, Facsimile (215) 697-1462.
(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.
(j) Unique entity identifier. (Applies to all offers exceeding $3,500, and offers of $3,500 or less if the solicitation requires the Contractor to be registered in the System for Award Management (SAM).) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address. The Offeror also shall enter its Electronic Funds Transfer (EFT) indicator, if applicable. The EFT indicator is a four-character suffix to the https://assist.dla.mil/online/start/ http://quicksearch.dla.mil/ http://assistdocs.com/ https://assist.dla.mil/wizard/index.cfm unique entity identifier. The suffix is assigned at the discretion of the Offeror to establish additional SAM records for identifying alternative EFT accounts (see subpart 32.11) for the same entity. If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Offeror should indicate that it is an offeror for a Government contract when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.
(k) Reserved.
(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(1) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.
(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(3) The overall ranking of all offerors, when any ranking…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .