B.08.02 Amended RFQ W9126G20Q0014.pdf

PDF 541 KB Posted

Attached to
Piney Woods Regional Summer Gate Attendant
Solicitation number
W9126G-20-Q-0014
Issued by

View the file

Other files

File Type Posted
B.08.02 RFQ W9126G20Q0014.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is extended to 28FEB2020.

Contract Specialist has changed from Antw ain Burks to Darcel Glenn (Darcel.G.Glenn@usace.army.mil / 817-886-1905).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Feb-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G20Q0014

X 9B. DATED (SEE ITEM 11)

06-Feb-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Feb-2020

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G20Q0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 21-Feb-2020 09:00 AM to 28-Feb-2020 11:00 AM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

The contractor shall provide all labor, materials, supplies and equipment to furnish gate attendant services as outlined in the attached Performance WorkStatements. The Government anticipates award of up to eleven ositions/shifts for Lake O' The Pines and Wright Patman Lakes TX.Incomplete proposals shall be considered nonresponsive and will not be evaluated. If a proposer declines to accept a purchase order for a park, theproposer will not be considered for any other awards offered in the solicitation. Only one offer will be made by the

Government.Point of Contact: Antwain Burks (817)886-1026Email: antwain.r.burks@usace.army.milOnly a warranted Contracting Officer, either a Procuring Contracting Officer (PCO) or an Administrative Contracting

Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the COntracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the

Contracting Officer.

To:

The contractor shall provide all labor, materials, supplies and equipment to furnish gate attendant services as outlined in the attached Performance Work Statements. The Government anticipates award of up to eleven ositions/shifts for Lake O' The Pines and Wright Patman Lakes TX.Incomplete proposals shall be considered nonresponsive and will not be evaluated. If a proposer declines to accept a purchase order for a park, theproposer will not be considered for any other awards offered in the solicitation. Only one offer will be made by the

Government.Point of Contact: Darcel Glenn (817)886-1905Email: Darcel.G.Glenn@usace.army.milOnly a warranted Contracting Officer, either a Procuring Contracting Officer (PCO) or an Administrative Contracting

Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the COntracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the

Contracting Officer.

The following have been modified:

INSTRUCTIONS TO OFFERORS

RFQ

W9126G20Q0014

Piney Woods Regional Project Office

Jefferson, TX 75657

Wright Patman Lake Clear Springs Park Shift 1 Gate Attendant Services

Wright Patman Lake Piney Point Park Summer Shift 2 Gate Attendant Services

Lake O’ Pines – Alley Creek 3 Day Gate Attendant Services

Vendor Information Sheet

IN THE EVENT OF AWARD, ISSUE CONTRACT TO:

COMPANY NAME

POC

(Last, First Middle)

ADDRESS

(Number & Street) (City, State and Zip)

PHONE NUMBER MOBILE

(Area code and number) (Area code and number)

EMAIL ADDRESS___________________________________________

DUNS NUMBER CAGE CODE NUMBER________

SSN/TIN NUMBER or firm’s Tax ID Number (TIN) ______________________________

Vendor’s Online Representation and Certification Application (ORCA) are updated in SAM

Yes

No

Signature Date

Contracting Office: USACE Fort Worth District, P.O. Box 17300, 819 Taylor St, Fort Worth, TX 76102-0300

Solicitation Number: W9126G20Q0014

Place of Performance: Fort Worth District, Piney Woods Region, Wright Patman Lake Project Office, 64 Clear

Springs Road, Texarkana, Texas 75501 and Lake O’ The Pines Lake Project Office, 2669 FM 726, Jefferson, Texas

75657

Closing Response Date: By 28 Feb 20, No Later Than (NLT) 11:00 a.m. CST

Consolidated Gated Attendant Services in Support of the Piney Woods Lake Project Office

1. Overview. This is a combined synopsis/solicitation for commercial items in accordance with

(IAW) Subpart 12.6, The solicitation is being procured IAW commercial services, which includes but not limited to FAR Part 12 and FAR Part 13. The resulting long term contract will be a firm fixed price (FFP) contract for gate attendant services at Wright Patman Lake and Lake O’ The Pines. The solicitation

(W9126G-20-Q-0014) is being issued as a Request for Quotation (RFQ). This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This solicitation document and incorporated provisions and clauses are those in effect through the Federal

Acquisition Regulation (FAR) and Department of Defense FAR Supplement (DFARS).

2. SBA Programs. This acquisition is set-aside 100% for Small Business

3. Classification. The North American Industry Classification System (NAICS) code is

721211, RV Parks and Campground Services. The Size Standard for NAICS code 721211 is

$8 million. PSC G003, Social – Recreational Services

4. Description of services. The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal gate attendant services in the manner, location and frequency set forth in the Performance Work Statement and schedules. Work shall be performed in the USACE Piney Woods Region, Wright Patman Lake

(Clear Springs Shift 1 and Piney Point Shift 2) and Lake O’ The Pines (Alley Creek 3-Day). The

Period of Performance (P.O.P) will be one (12) month base period with an actual Field

Performance of (6) months.

5. Contract Information. This combined solicitation notice is a request for competitive quotations. Therefore, all capability statements or quotations received prior to the RFQ close date will be considered by the FCC.

6. Evaluation Information. The Government intends to award a firm fixed price (FFP) purchase order resulting from this RFQ to the responsible offeror whose offer represents the best value in terms of technical capability and price. All non-price factors (i.e., price and past performance) are approximately equivalent to price.

Offerors must be registered in the System for Award Management (SAM) at https://www.sam.gov, in order to be considered for award.

7. Submittals. Offerors must submit representations and certifications in accordance with the provision at FAR 52.212-3 Alt III Offeror Representations and Certifications—Commercial

Item. (Accessible at https://www.acquisition.gov) or the vendor may verify their Online http://www.sam.gov/ http://www.sam.gov/ https://www.acquisition.gov/

Representation and Certification Application (ORCA) is updated in SAM on the vendor information sheet. Offeror must complete the fill-in information located at Clause number

52.204-26.

Submit the following as separate documents in response to this RFQ (See Instructions to

Offerors for further information):

a. Vendor Information Sheet / Completed Clause 52.204-26

b. Past Performance Questionnaire (PPQ) (See Clause 52.212-2 Evaluation – Commercial Items)

c. Price Quotation (See Bid Schedule, Bid Schedule must be completed. Failure to do so will result in your proposal being considered non-responsive) (See Clause 52.212-2 Evaluation

– Commercial Items)

Offers are due by 28 Feb 20 NLT 11:00 a.m. CST. All questions/inquiries must be submitted to the contract officer via electronic mail (e-mail) not later than 09:00 a.m. CST on 17 Feb 20.

Inquiries submitted via telephone calls will be re-directed to an e-mail submission. Submit offers or any questions to the attention of Darcel Glenn via email to: Darcel.G.Glenn@usace.army.mil.

Offerors who fail to complete and submit the requirements above may be considered non-responsive.

The historical award information may be obtained by researching Contract Numbers W9126G17P0033, W9126G19P0068 and W9126G19P0104 at https://beta.sam.gov.

mailto:Antwain.R.Burks@usace.army.mil https://beta.sam.gov/

Below is a checklist to assist you to ensure all the proper documents are returned for consideration on this solicitation. Only those items checked below as “required” must be returned

Required Contractor Item

1. Annotate unit and total costs on pages 3 thru 6. Example Total Cost Base Year

$100,000 then Unit Price: $100,000 and Amount: $100,000 same process for option year Unit Price and Amount

2. Complete Quote Schedule(s)

BID SCHEDULES (Base-0001)

Signed Amendments if Applicable (Blocks 15a -15c)

CHECK YOUR QUOTES FOR MATHEMATICAL ERRORS

DO NOT ROUND UP OR DOWN

CALCULATE UNIT AND TOTAL COSTS TO THE HUNDRETH POSITION.

3. Complete the vendor information sheet.

Remember to sign AND date.

4. The provisions at 52.212-1, 52.212-2, 52.212-3 Alt I, 52.212-5 and 52.212-5 apply to this acquisition. Confirm vendor’s 52.212-3 Alt I ORCA is updated in SAM on the vendor information sheet.

5. You must have an active SAM registration prior to award

6. Send the Past Performance Questionnaire to a former customer or person who can vouch for your work performance.

7. Scan all documents into a single.pdf file. PDF only authorized format

8. EMAIL your proposal to: CIV-OPS.Proposals@usace.army.mil &

Darcel.G.Glenn@usace.army.mil Subject line of email must include the solicitation number and Company Name.

mailto:CIV-OPS.Proposals@usace.army.mil mailto:Darcel.G.Glenn@usace.army.mil

INSURANCE

Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN: CESWF-CT-S, P.O.

Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office. The

Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:

Submit a copy of Insurance Certificate directly to:

Piney Woods

US Army Corps of Engineers

The Lake O’ The Pines

ATTN: Julie Metcalf

2669 FM 726

Jefferson, Texas 75657

Piney Woods

US Army Corps of Engineers

Wright Patman Lake Project Office

64 Clear Springs Road

Texarkana, Texas 75501

Or email to: Darcel.G.Glenn@usace.army.mil Phone: (817) 886-1905 Fax: (817)886-6508

(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.

(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and

$100,000 per accident for bodily injury and $20,000 per accident for property damage.

(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of

$100,000.00 or in compliance with applicable State statutes.

(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.

NOTE:

(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance

Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.

**Please see clause 52.228-5 Insurance and Insurance MFR for insurance requirements.

mailto:Darcel.G.Glenn@usace.army.mil

ATTACHMENT 1

NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information

Firm name: CAGE Code:

Address: DUNS Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of Project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy)

Explain Differences:

Original Contract Price (Award Amount):

Final contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND

SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED

QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS

QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY

ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER,

QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE

OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO

VERIFY ANY AND ALL INFORMATION ON THIS FORM.

AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil Ensure the former employer references the solicitation number in the email subject line.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the

Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the

Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds many to the

Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets contractual requirements and exceeds many to the

Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per

DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than

Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance meets contractual requirements and exceeds many to the

Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

mailto:CIV-OPS.Proposals@usace.army.mil

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the

Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract

Rating will be neither positive or negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY

a) Quality of technical data/report preparation efforts E VG S M U

N

b) Ability to meet quality standards for technical performance E VG S M U

N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

E VG S M U

N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U

N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U

N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U

N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U

N

d) Overall customer satisfaction E VG S M U

N

4. MANAGEMENT/PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?

E VG S M U

N

b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U

N

c) Government Property Control E VG S M U

N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U

N

e) Utilization of Small Business concerns E VG S M U

N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U

N

g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to

Government changes

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agree price(s)?

E VG S M U

N

b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

c) If this is/was a Government cost type contract, please rate the

Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.

Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

YES NO

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

YES

NO

f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.

YES NO

6. SAFETY/SECURITY

a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U

N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)

b) Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U

N

c) Would you hire or work with this firm again? (If no, please explain below)

YES NO

d) In Summary, provide an overall rating for the work performed by this contractor.

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):

(End of Summary of Changes)

File details come from the government source that posted it. Updated .