Amendment 2 W9126G20B0046 J85 Test Pad Specs Update.pdf
PDF 650 KB Posted
- Attached to
- J85 Test Pad, Joint Base San Antonio (JBSA) Federal contract opportunity
- Solicitation number
- W9126G20B0046
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9126G20B0046 Amendment 4 Bid Opening Date.pdf | ||
| Amendment 3 W9126G20B0046.pdf | ||
| Site Visit Sign In Sheets RAFB J85 Engine Test Cell Pad.pdf | ||
| J85 Amendment 1 Bidder Inquiry Key.pdf | ||
| J85-SolicitationSet-RTA-201002.pdf | ||
| J85 Final Solicitation W9126G20B0046.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to clarify bidder inquiries, correct Specification Section 26 42 14.00 10 CATHODIC PROTECTION SYSTEM and Specification Section 33 11 00 WATER UTILITY DISTRIBUTION PIPING.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G20B0046
X 9B. DATED (SEE ITEM 11)
05-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Mar-2021
CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G20B0046
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
25 March 2021
Solicitation Number:
Date of Issue:
Amendment #:
SUBJECT: Amendment # 0002 to Specifications, Solicitation No. W9126G20B0046 J85 Engine Test Cell Pad, Randolph AFB, TX
TO: USACE, Prospective Contractors and Others Concerned
1. The specifications for subject project are hereby modified as follows:
a. SPECIFICATIONS: (Re-issued and Descriptive) a.1 Reference Specification Section 26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE), delete entirely and replace with the attached revised Specification Section 26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE), (Amendment 0002).
Revisions include:
a.1.1 deleted phrase in paragraph 2.1.b.
a.1.2 deleted phrase in paragraph 2.1.c.
a.2 Reference Specification Section 33 11 00 WATER UTILITY DISTRIBUTION PIPING, delete entirely and replace with the attached revised Specification Section 33 11 00 WATER UTILITY DISTRIBUTION PIPING (Amendment 0002). Revisions include:
a.2.1 deleted sentence in paragraph 1.4.1 a.2.2 deleted paragraph 2.1.3.1 a.2.3 deleted phrase in paragraph 2.2.1.3 a.2.4 deleted paragraph 3.2.1.4 a.2.5 deleted sentence in paragraph 3.3.1.1 a.2.6 deleted paragraph 3.3.1.3
b. SUMMARY OF AMENDMENT:
b.1 Amendment issued to clarify bidder inquiries. The remainder of the referenced solicitation remains unchanged.
Attachments:
Re-issued Specifications:
Section 26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE) (Amendment 0002) Section 33 11 00 WATER UTILITY DISTRIBUTION PIPING (Amendment 0002)
Amendment No. 0002, 25 March 2021
1 | P a g e
Randolph Air Force Base J85 Engine Test Cell Pad RA19J85
AMENDMENT NO. 0002
SECTION 26 42 14.00 10
CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
08/09
AMENDMENT NO. 0002
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM B418 (2016) Standard Specification for Cast and Wrought Galvanic Zinc Anodes
ASTM B843 (2018) Standard Specification for Magnesium Alloy Anodes for Cathodic Protection
ASTM D1248 (2012) Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable
NACE INTERNATIONAL (NACE)
NACE SP0169 (2015) Control of External Corrosion on Underground or Submerged Metallic Piping Systems
NACE SP0177 (2014) Mitigation of Alternating Current and Lightning Effects on Metallic Structures and Corrosion Control Systems
NACE SP0188 (1999; R 2006) Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA TC 2 (2013) Standard for Electrical Polyvinyl Chloride (PVC) Conduit
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
SECTION 26 42 14.00 10 Page 1
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 280 Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks (UST)
49 CFR 195 Transportation of Hazardous Liquids by Pipeline
UNDERWRITERS LABORATORIES (UL)
UL 6 (2007; Reprint Nov 2014) Electrical Rigid Metal Conduit-Steel
UL 510 (2017) UL Standard for Safety Polyvinyl Chloride, Polyethylene and Rubber Insulating Tape
UL 514A (2013; Reprint Aug 2017) UL Standard for Safety Metallic Outlet Boxes
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only to the government. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Drawings Contractor's Modifications
SD-03 Product Data
Equipment Spare Parts
SD-06 Test Reports
Tests and Measurements Contractor's Modifications
SD-07 Certificates
Cathodic Protection System Services of "Corrosion Expert"
SD-10 Operation and Maintenance Data
Cathodic Protection System Training Course
1.3 QUALITY ASSURANCE
1.3.1 Services of "Corrosion Expert"
Obtain the services of a "corrosion expert" to supervise, inspect, and test the installation and performance of the cathodic protection system.
SECTION 26 42 14.00 10 Page 2
"Corrosion expert" refers to a person, who by thorough knowledge of the physical sciences and the principles of engineering and mathematics, acquired by professional education and related practical experience, is qualified to engage in the practice of corrosion control of buried or submerged metallic surfaces.
a. Such a person must be accredited or certified by the National Association of Corrosion Engineers (NACE) as a NACE Accredited Corrosion Specialist or a NACE certified Cathodic Protection (CP) Specialist or be a registered professional engineer who has certification or licensing that includes education and experience in corrosion control of buried or submerged metallic piping and tank systems, if such certification or licensing includes 5 years experience in corrosion control on underground metallic surfaces of the type under this contract.
b. The "corrosion expert" shall make at least 3 visits to the project site. The first of these visits shall include obtaining soil resistivity data, acknowledging the type of pipeline coatings to be used and reporting to the Contractor the type of cathodic protection required. Once the submittals are approved and the materials delivered, the "corrosion expert" shall revisit the site the ensure the Contractor understands installation practices and laying out the components. The third visit shall involve testing the installed cathodic protection systems and training applicable personnel on proper maintenance techniques. The "corrosion expert" shall supervise installation and testing of all cathodic protection.
c. Submit evidence of qualifications of the "corrosion expert" including its name and qualifications certified in writing to the Contracting Officer prior to the start of construction. Certification shall be submitted giving the name of the firm, the number of years of experience, and a list of not less than five (5) of the firm's installations, three (3) or more years old, that have been tested and found satisfactory.
1.3.2 Isolators
Isolators are required to insulate the indicated pipes from any other structure. Isolators shall be provided with lightning protection and a test station as shown.
1.3.3 Anode and Bond Wires
A minimum of 5 magnesium anodes with an unpackaged weight of 4.1 pounds shall be provided uniform distances along the metallic pipe lines. A minimum of 1 test station shall be used for these anodes. These anodes shall be in addition to anodes for the pipe under concrete slab and casing requirements. For each cathodic system, the metallic components and structures to be protected shall be made electrically continuous. This shall be accomplished by installing bond wires between the various structures. Bonding of existing buried structures may also be required to preclude detrimental stray current effects and safety hazards. Provisions shall be included to return stray current to its source without damaging structures intercepting the stray current. The electrical isolation of underground facilities in accordance with acceptable industry practice shall be included under this section. All tests shall be witnessed by the Contracting Officer.
SECTION 26 42 14.00 10 Page 3
1.3.4 Surge Protection
Approved zinc grounding cells or sealed weatherproof lightning arrestor devices shall be installed across insulated flanges or fittings installed in underground piping as indicated on the drawings. The arrestor shall be gapless, self-healing, solid state type. Zinc anode composition shall conform to ASTM B418, Type II. Lead wires shall be number 6 AWG copper with high molecular weight polyethylene (HMWPE) insulation. The zinc grounding cells shall not be prepackaged in backfill but shall be installed as detailed on the drawings. Lightning arrestors or zinc grounding cells are not required for insulated flanges on metallic components used on nonmetallic piping systems.
1.3.5 Nonmetallic Pipe System
In the event pipe other than metallic pipe is approved and used in lieu of metallic pipe, all metallic components of this pipe system shall be protected with cathodic protection. Detailed drawings of cathodic protection for each component shall be submitted to the Contracting Officer for approval within 45 days after date of receipt of notice to proceed, and before commencement of any work.
1.3.5.1 Coatings
Coatings for metallic components shall be as required for metallic fittings. Protective covering (coating and taping) shall be completed and tested on each metallic component (such as valves, hydrants and fillings). This covering shall be as required for underground metallic pipe. Each test shall be witnessed by the Contracting Officer. Coatings shall be selected, applied, and inspected as specified in these specifications. The use of nonmetallic pipe does not change other requirements of the specifications. Any deviations due to the use of nonmetallic pipe shall be submitted for approval.
1.3.5.2 Tracer Wire
When a nonmetallic pipe line is used to extend or add to an existing metallic line, an insulated No. 8 AWG copper wire shall be thermit-welded to the existing metallic line and run the length of the new nonmetallic line. This wire shall be used as a locator tracer wire and to maintain continuity to any future extensions of the pipe line.
1.3.6 Drawings
Submit six copies of detail drawings consisting of a complete list of equipment and material including manufacturer's descriptive and technical literature, catalog cuts, results of system design calculations including soil-resistivity, installation instructions and certified test data showing location of anodes and stating the maximum recommended anode current output density. Include in the detail drawings complete wiring and schematic diagrams, insulated fittings, test stations, permanent reference cells, and bonding.and any other details required to demonstrate that the system has been coordinated and will function properly as a unit. Locations shall be referenced to two (2) permanent facilities or mark points.
1.4 DELIVERY, STORAGE, AND HANDLING
Storage area for magnesium anodes will be designated by the Contracting
SECTION 26 42 14.00 10 Page 4
Officer. If anodes are not stored in a building, tarps or similar protection should be used to protect anodes from inclement weather.
Packaged anodes, damaged as a result of improper handling or being exposed to rain, shall be resacked and the required backfill added.
1.5 EXTRA MATERIALS
After approval of shop drawings, and not later than three (3) months prior to the date of beneficial occupancy, furnish spare parts data for each different item of material and equipment specified, after approval of detail drawings and not later than six (6) months prior to the date of beneficial occupancy. The data shall include a complete list of parts, special tools, and supplies, with current unit prices and source of supply. One (1) spare anode of each type shall be furnished. In addition, supply information for material and equipment replacement for all other components of the complete system, including anodes, cables, splice kits and connectors, corrosion test stations, and any other components not listed above.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Provide a complete, operating, sacrificial anode cathodic protection system in complete compliance with NFPA 70 , with all applicable Federal, State, and local regulations and with the minimum requirements of this contract.
a. In addition to the minimum requirements of these specifications, cathodic protection systems shall be in compliance with 49 CFR 195 construction and installation of underground fuel storage tanks and associated cathodic protection system shall be in compliance with
40 CFR 280 .
b. The services required include planning, installation, adjusting and testing of a cathodic protection system, using sacrificial anodes for cathodic protection of the <AM#0002>Fire Protection line and <AM#0002> oil/water holding tank and associated pipe lines, their connectors and lines under the slab or floor foundation. The cathodic protection system shall include anodes, cables, connectors, corrosion protection test stations, and any other equipment required for a complete operating system providing the NACE criteria of protection as specified.
c. Submit an itemized list of equipment and materials including item number, quantity, and manufacturer of each item, within 30 days after receipt of notice to proceed. The list shall be accompanied by a description of procedures for each type of testing and adjustments, including testing of coating for thickness and holidays. Installation of materials and equipment shall not commence until this submittal is approved. Insulators are required whenever needed to insulate the pipes from any other structure. Any pipe crossing the ferrous pipe shall have a test station. The cathodic protection shall be provided on <AM#0002>Fire Protection <AM#0002>ferrous metal oil/water waste pipes.
d. Submit proof that the materials and equipment furnished under this section conform to the specified requirements contained in the referenced standards or publications. The label or listing by the specified agency will be acceptable evidence of such compliance.
SECTION 26 42 14.00 10 Page 5
e. Before final acceptance of the cathodic protection system, submit 6 copies of operating manuals outlining the step-by-step procedures required for system startup, operation, adjustment of current flow, and shutdown. The manuals shall include the manufacturer's name, model number, service manual, parts list, and brief description of all equipment and their basic operating features.
f. Submit 6 copies of maintenance manuals, listing routine maintenance procedures, recommendation for maintenance testing, possible breakdowns and repairs, and troubleshooting guides. The manuals shall include single-line diagrams for the system as installed; instructions in making pipe-to-reference cell and tank-to-reference cell potential measurements and frequency of monitoring; instructions for dielectric connections, interference and sacrificial anode bonds; instructions shall include precautions to ensure safe conditions during repair of pipe or other metallic systems. The instructions shall be neatly bound between permanent covers and titled "Operating and Maintenance Instructions." These instructions shall be submitted for the Contracting Officer's approval. The instructions shall include the following:
(1) As-built drawings, to scale, of the entire system, showing the locations of the piping, location of all anodes and test stations, locations of all insulating joints, and structure-to-soil potential test points as measured during the tests required by paragraph TESTS AND MEASUREMENTS. Each test point shall be given a unique alphanumeric identification that is cross referenced to the data sheets.
(2) Recommendations for maintenance testing, including instructions in making pipe-to-reference cell potential measurements and frequency of testing.
(3) All maintenance and operating instructions and nameplate data shall be in English.
(4) Instructions shall include precautions to insure safe conditions during repair of pipe system.
2.1.1 Contractor's Modifications
The specified system is based on a complete system with magnesium sacrificial anodes. The Contractor may modify the cathodic protection system after review of the project, site verification, and analysis, if the proposed modifications include the anodes specified and will provide better overall system performance.
a. Submit six copies of detail drawings showing proposed changes in location, scope of performance indicating any variations from, additions to, or clarifications of contract drawings. Show proposed changes in anode arrangement, anode size and number, anode materials and layout details, conduit size, wire size, mounting details, wiring diagram, method for electrically-isolating each pipe, and any other pertinent information to proper installation and performance of the system. The modifications shall be fully described, shall be approved by the Contracting Officer, and shall meet the following criteria.
b. The proposed system shall achieve a minimum pipe-to-soil "instant off"
SECTION 26 42 14.00 10 Page 6 potential of minus 850 millivolts with reference to a saturated copper-copper sulfate reference cell on the underground components of the piping or other metallic surface. Take resistivity measurements of the soil in the vicinity of the pipes and ground bed sites. Based upon the measurements taken, the current and voltage shall be required to produce a minimum of minus 850 millivolts "instant off" potential between the structure being tested and the reference cell. This potential shall be obtained over 95 percent of the metallic area. The anode system shall be designed for a life of twenty-five (25) years of continuous operation.
c. Submit final report regarding Contractor's modifications. The report shall include pipe-to-soil measurements throughout the affected area, indicating that the modifications improved the overall conditions, and current measurements for anodes. The following special materials and information are required: taping materials and conductors; zinc grounding cell, installation and testing procedures, and equipment;
coating material; system design calculations for anode number, life, and parameters to achieve protective potential; backfill shield material and installation details showing waterproofing; bonding and waterproofing details; insulated resistance wire; exothermic weld equipment and material.
2.1.2 Summary of Services Required
The scope of services shall include, but shall not be limited to, the following:
a. Close-interval potential surveys.
b. Cathodic Protection Systems.
c. System testing.
d. Casing corrosion control.
e. Interference testing.
f. Training.
g. Operating and maintenance manual.
h. Insulator testing and bonding testing.
i. Coating and holiday testing to be submitted within 45 days of notice to proceed.
2.1.3 Tests of Components
Perform a minimum of four (4) tests at each metallic component in the piping system. Two (2) measurements shall be made directly over the anodes and the other two (2) tests shall be over the outer edge of the component, but at the farthest point from the anodes. Structure and pipes shall be shown with the cathodic protection equipment. All components of the cathodic protection system shall be shown on drawings, showing their relationship to the protected structure or component. A narrative shall describe how the cathodic protection system will work and provide testing at each component. Components requiring cathodic protection shall include but not be limited to the following:
SECTION 26 42 14.00 10 Page 7
a. Pipes under the floor slab or foundations.
b. PIV.
c. Shutoff valves.
d. Metallic pipe extended from aboveground locations.
e. Each connector or change-of-direction device.
f. Any metallic pipe component or section.
g. Backflow preventer.
h. Underground oil/water holding tank (Factory installed anodes must have factory testing documentation attached).
2.1.4 Electrical Potential Measurements
All potential tests shall be made at a minimum of 10 foot intervals witnessed by the Contracting Officer. Submittals shall identify test locations on separate drawing, showing all metal to be protected and all cathodic protection equipment. Test points equipment and protected metal shall be easily distinguished and identified.
2.1.5 Achievement of Criteria for Protection
All conductors, unless otherwise shown, shall be routed to or through the test stations. Each system provided shall achieve a minimum pipe-to-soil "instant off" potential of minus 850 millivolt potentials with reference to a saturated copper-copper-sulfate reference cell on all underground components of the piping. Based upon the measurements taken, the current and voltage of the anodes should be adjusted as required to produce a minimum of minus 850 millivolts "instant off" potential between the structure being tested and the reference cell. This potential should be obtained over 95 percent of the metallic area. This must be achieved without the "instant off" potential exceeding 1150 millivolts. Testing will be witnessed by the Contracting Officer. Provide additional anodes if required to achieve the minus 850 millivolts "instant off". Although acceptance criteria of the cathodic protection systems are defined in NACE SP0169, for this project the "instant off" potential of minus 850 millivolts is the only acceptable criteria.
2.1.6 Metallic Components on Nonmetallic Systems and Typicals
2.1.6.1 Metallic Components
As a minimum, protect each metallic component with two (2) magnesium anodes. This number of anodes is required to achieve minus 850 millivolts "instant off" potential on the metallic area and at the same time not provide overvoltage above 1150 millivolts "instant off." As a minimum, the magnesium anode unpackaged weight shall be 9 pounds . The magnesium anodes shall be located on each side of the metallic component and routed through a test station.
2.1.6.2 Fire Hydrants
Fire hydrant pipe components shall have a minimum of two (2) anodes.
SECTION 26 42 14.00 10 Page 8
These magnesium anodes shall have an unpackaged weight of 17 pounds .
2.1.6.3 Pipe Under Concrete Slab
Pipe under concrete slab shall have a minimum of 2 magnesium anodes.
These magnesium anodes shall have an unpackaged weight of 9 pounds . Pipe under concrete slab shall have 1 permanent reference electrodes located under the slab. One (1) permanent reference electrode shall be located where the pipe enters the concrete slab. All conductors shall be routed to a test station.
2.1.6.4 Valves
Each valve shall be protected with 1 magnesium anodes. The magnesium anode shall have an unpackaged weight of 9 pounds .
2.1.6.5 Metallic Pipe Component or Section
Each section of metallic pipe shall be protected with 2 magnesium anodes.
The magnesium anodes shall have an unpackaged weight of 9 pounds .
2.1.6.6 Connectors or Change-of-Direction Devices
Each change-of-direction device shall be protected with 2 magnesium anodes. The magnesium anode shall have an unpackaged weight of 9 pounds .
2.1.7 Metallic Component Coating
Coatings for metallic components shall be as required for metallic fittings as indicated. This will include fire hydrants, T's, elbows, valves, etc. Coatings shall be selected, applied, and inspected as specified in these specifications. All aboveground pipeline shall be coated as indicated or as approved. The coating shall have a minimum thickness of 7 mil . The pipeline coating shall be in accordance with all applicable Federal, State, and local regulations.
2.2 MAGNESIUM ANODES
Install a minimum of 2 anodes on the Pipe or Tank system. See Paragraph METALLIC COMPONENTS ON NONMETALLIC SYSTEMS AND TYPICALS for additional anodes under slab.
2.2.1 Anode Composition
Anodes shall be of high-potential magnesium alloy, made of primary magnesium obtained from sea water or brine, and not made from scrap metal. Magnesium anodes shall conform to ASTM B843 and to the following analysis (in percents) otherwise indicated:
Aluminum, max. 0.010
Manganese, max. 0.50 to 1.30
Zinc 0.05
Silicon, max. 0.05
SECTION 26 42 14.00 10 Page 9
Copper, max. 0.02
Nickel, max. 0.001
Iron, Max. 0.03
Other impurities, max. 0.05 each or 0.3 max. total
Magnesium Remainder
Furnish spectrographic analysis on samples from each heat or batch of anodes used on this project.
2.2.2 Dimensions and Weights
Dimensions and weights of anodes shall be approximately as follows:
TYPICAL MAGNESIUM ANODE SIZE
(Cross sections may be round, square, or D shaped)
Nominal Weight (lbs)
Approx. Size (inch) Nominal Gross Weight (lbs) Packaged in
Backfill
Nominal Package Dimensions (inch)
3 3 X 3 X 5 8 5-1/4 X 5-1/4 X 8
5 3 X 3 X 8 13 5-1/4 X 5-1/4 X 11-1/4
9 3 X 3 X 14 27 5-1/4 X 20
12 4 X 4 X 12 32 7-1/2 X 18
2.2.3 Packaged Anodes
Provide anodes in packaged form with the anode surrounded by specially-prepared quick-wetting backfill and contained in a water permeable cloth or paper sack. Anodes shall be centered by means of spacers in the backfill material. The backfill material shall have the following composition, unless otherwise indicated:
Material Approximate Percent by Weight
Gypsum 75
Bentonite 20
Sodium Sulphate 5
Total 100
SECTION 26 42 14.00 10 Page 10
2.3 MISCELLANEOUS MATERIALS
2.3.1 Electrical Wire
Wire shall be No. 12 AWG stranded copper wire with NFPA 70 , Type RHW-USE with outer covering, RHW-USE or Polyethylene insulation. Polyethylene insulation shall comply with the requirements of ASTM D1248 and shall be of the following types, classes, and grades:
High-molecular weight polyethylene shall be Type I, Class C, Grade E5.
High-density polyethylene shall be Type III, Class C, Grade E3.
2.3.1.1 Wire Splicing
Connecting wire splicing shall be made with copper compression connectors or exothermic welds, following instructions of the manufacturer. Single split-bolt connections shall not be used. Sheaths for encapsulating electrical wire splices to be buried underground shall fit the insulated wires entering the spliced joints and epoxy potting compound shall be as specified below.
2.3.1.2 Test Wires
Test wires shall be AWG No. 12 stranded copper wire with NFPA 70 , Type TW or RHW-USE with outer covering or polyethylene insulation.
2.3.1.3 Resistance Wire
Resistance wire shall be AWG No. 16 or No. 22 nickel-chromium wire.
2.3.2 Conduit
Rigid galvanized steel conduit and accessories shall conform to UL 6 . Non metallic conduit shall conform to NEMA TC 2.
2.3.3 Test Boxes and Junctions Boxes
Boxes shall be outdoor type conforming to UL 514A .
2.3.4 Joint, Patch, Seal, and Repair Coating
Sealing and dielectric compound shall be a black, rubber based compound that is soft, permanently pliable, tacky, moldable, and unbacked.
Compound shall be applied as recommended by the manufacturer, but not less than 1/2-inch thick. Coating compound shall be hot-applied coal-tar enamel. Pressure-sensitive vinyl plastic electrical tape shall conform to
UL 510 .
2.3.5 Backfill Shields
Shields shall consist of approved pipeline wrapping or fiberglass-reinforced, coal-tar impregnated tape, or plastic weld caps, specifically made for the purpose and installed in accordance with the manufacturer's recommendations. When joint bonds are required, due to the use of mechanical joints, the entire joint shall be protected by the use of a kraft paper joint cover. The joint cover shall be filled with poured-in, hot coat-tar enamel.
SECTION 26 42 14.00 10 Page 11
2.3.6 Epoxy Potting Compound
Compound for encapsulating electrical wire splices to be buried underground shall be a two package system made for the purpose.
2.3.7 Test Stations
Stations shall be of the flush-curb-box type and shall be the standard product of a recognized manufacturer. Test stations shall be complete with an insulated terminal block having the required number of terminals.
The test station shall be provided with a lockable over and shall have an embossed legend, "C.P. Test." A minimum of one (1) test station shall be provided each component of the pipe or tank. A minimum of six (6) terminals shall be provided in each test station. A minimum of two (2) leads are required to the metallic pipe from each test station. Other conductors shall be provided for each anode, other foreign pipe, and reference cells as required. Test stations may be constructed of nonmetallic materials. However, if nonmetallic materials are utilized, as a minimum, the materials shall be resistant to damage from ultraviolet radiation, contain good color retention qualities, contain high strength qualities, and be resistant to accidental or vandalistic impacts that might be normally encountered in the environment for which they are to be installed. The test stations shall be listed for the particular application for which they are to be utilized.
2.3.8 Joint and Continuity Bonds
Bonds shall be provided across all joints in the metallic lines, across any electrically discontinuous connections and all other pipes and structures with other than welded or threaded joints that are included in this cathodic protection system. Unless otherwise specified in the specifications, bonds between structures and across joints in pipe with other than welded or threaded joints shall be No. 8 AWG stranded copper cable with polyethylene insulation. Bonds between structures shall contain sufficient slack for any anticipated movement between structures.
Bonds across pipe joints shall contain a minimum of 4 inch of slack to allow for pipe movement and soil stress. Bonds shall be attached by exothermic welding. Exothermic weld areas shall be insulated with coating compound and approved, and witnessed by the Contracting Officer.
Continuity bonds shall be installed as necessary to reduce stray current interference. Additional joint bondings shall be accomplished where the necessity is discovered during construction or testing or where the Contracting Officer's representative directs that such bonding be done.
Joint bonding shall include all associated excavation and backfilling.
There shall be a minimum of two (2) continuity bonds between each structure and other than welded or threaded joints. Test for electrical continuity across all joints with other than welded or threaded joints and across all metallic portions or components. Provide bonding as required and as specified above until electrical continuity is achieved. Submit bonding test data for approval.
2.3.9 Resistance Bonds
Resistance bonds should be adjusted as outlined in this specification.
Alternate methods may be used if they are approved by the Contracting Officer.
SECTION 26 42 14.00 10 Page 12
2.3.10 Stray Current Measurements
Stray current measurements should be performed at each test station.
Stray currents resulting from lightning or overhead alternating current (AC) power transmission systems shall be mitigated in accordance with
NACE SP0177.
2.3.11 Electrical Isolation of Structures
As a minimum, isolating flanges or unions shall be provided at the following locations:
a. Connection of new metallic piping or components to existing piping.
b. Pressure piping under floor slab to a building.
Isolation shall be provided at metallic connection of all lines to existing system and where connecting to a building. Additionally, isolation shall be provided between every ferrous piping or tank; and foreign pipes that cross the new lines within 10 feet . Isolation fittings, including isolating flanges and couplings, shall be installed aboveground or in a concrete pit.
2.3.11.1 Electrically Isolating Pipe Joints
Electrically isolating pipe joints shall be of a type that is in regular factory production.
2.3.11.2 Electrically Conductive Couplings
Electrically conductive couplings shall be of a type that has a published maximum electrical resistance rating given in the manufacturer's literature. Cradles and seals shall be of a type that is in regular factory production made for the purpose of electrically insulating the carrier pipe from the casing and preventing the incursion of water into the annular space.
2.3.11.3 Insulating Joint Testing
A Model 601 Insulation Checker, as manufactured by "Gas Electronics", or an approved equal, shall be used for insulating joint (flange) electrical testing.
2.3.12 Underground Structure Coating
This coating specification shall take precedence over any other project specification and drawing notes, whether stated or implied, and shall also apply to the pipeline or tank supplier. No variance in coating quality shall be allowed by the Contractor or Base Construction Representative without the written consent of the designer. All underground metallic pipelines and tanks to be cathodically protected shall be afforded a good quality factory-applied coating. This includes all carbon steel, cast-iron and ductile-iron pipelines or vessels. Coatings shall be selected, applied, and inspected as specified. If non-metallic pipelines are installed, all metallic fittings on pipe sections shall be coated in accordance with this specification section.
a. The nominal thickness of the metallic pipe joint or other component coating shall be 8 mils , plus or minus 5 percent.
SECTION 26 42 14.00 10 Page 13
b. Pipe and joint coating for factory applied or field repair material shall be applied as recommended by the manufacturer and shall be one of the following:
(1) Continuously extruded polyethylene and adhesive coating system.
(2) Polyvinyl chloride pressure-sensitive adhesive tape.
(3) High density polyethylene/bituminous rubber compound tape.
(4) Butyl rubber tape.
(5) Coal tar epoxy.
2.3.12.1 Field Joints
All field joints shall be coated with materials compatible with the pipeline coating compound. The joint coating material shall be applied to an equal thickness as the pipeline coating. Unbonded coatings shall not be used on these buried metallic components. This includes the elimination of all unbonded polymer wraps or tubes. Once the pipeline or vessel is set in the trench, an inspection of the coating shall be conducted. This inspection shall include electrical holiday detection.
Any damaged areas of the coating shall be properly repaired. The Contracting Officer shall be asked to witness inspection of the coating and testing using a holiday detector.
2.3.12.2 Inspection of Pipe Coatings
Any damage to the protective covering during transit and handling shall be repaired before installation. After field coating and wrapping has been applied, the entire pipe shall be inspected by an electric holiday detector with impressed current in accordance with NACE SP0188 using a full-ring, spring-type coil electrode. The holiday detector shall be equipped with a bell, buzzer, or other type of audible signal which sounds when a holiday is detected. All holidays in the protective covering shall be repaired immediately upon detection. Occasional checks of holiday detector potential will be made by the Contracting Officer's representative to determine suitability of the detector. All labor, materials, and equipment necessary for conducting the inspection shall be furnished by the Contractor.
2.3.12.2.1 Protective Covering for Aboveground Piping System
Finish painting of metallic pipe shall conform to the applicable paragraph of SECTION: 09 90 00 PAINTS AND COATINGS and as follows:
2.3.12.2.2 Ferrous Surfaces
Shop-primed surfaces shall be touched-up with ferrous metal primer.
Surfaces that have not been shop-primed shall be solvent-cleaned.
Surfaces that contain loose rust, loose mil scale, and other foreign substances shall be mechanically-cleaned by power wire-brushing and primed with ferrous metal primer. Primed surface shall be finished with two (2) coats of exterior oil paint and vinyl paint. Coating for each entire piping service shall be an approved pipe line wrapping having a minimum coating resistance of 50,000 Ohms per square foot .
2.3.13 Resistance Wire
Wire shall be No. 16 or No. 22 nickel-chromium wire with TW insulation.
SECTION 26 42 14.00 10 Page 14
2.3.14 Electrical Connections
Electrical connections shall be done as follows:
a. Exothermic welds shall be "Thermoweld", or an approved equal. Use of this material shall be in strict accordance with the manufacturer's recommendations.
b. Electrical-shielded arc welds shall be approved for use on steel pipe by shop drawing submittal action.
c. Brazing shall be as specified in Paragraph: Lead Wire Connections.
2.3.15 Electrical Tape
Pressure-sensitive vinyl plastic electrical tape shall conform to UL 510 .
2.3.16 Permanent Reference Electrodes
Permanent reference electrodes shall be Cu-CuS04 electrodes suitable for direct burial. Electrodes shall be guaranteed by the supplier for 15 years' service in the environment in which they shall be placed.
Electrodes shall be installed directly beneath pipe, or metallic component.
2.3.17 Casing
Where a pipeline is installed in a casing under a roadway or railway, the pipeline shall be electrically insulated from the casing, and the annular space sealed and filled with an approved corrosion inhibiting product against incursion of water.
PART 3 EXECUTION
3.1 CRITERIA OF PROTECTION
Acceptance criteria for determining the adequacy of protection on a buried underground pipe, tank or metallic component shall be in accordance with NACE SP0169 and as specified below.
3.1.1 Iron and Steel
The following method a. shall be used for testing cathodic protection voltages. If more than one method is required, method b. shall be used.
a. A negative voltage of at least minus 850 millivolts as measured between the underground component and a saturated copper-copper sulphate reference electrode connecting the earth (electrolyte) directly over the underground component. Determination of this voltage shall be made with the cathodic protection system in operation. Voltage drops shall be considered for valid interpretation of this voltage measurement. A minimum of minus 850 millivolts "instant off" potential between the underground component being tested and the reference cell shall be achieved over 95 percent of the area of the structure. Adequate number of measurements shall be obtained over the entire structure, pipe, tank, or other metallic component to verify and record achievement of minus 850 millivolts "instant off."
This potential shall be obtained over 95 percent of the total metallic area without the "instant off" potential exceeding 1200 millivolts.
SECTION 26 42 14.00 10 Page 15
b. A minimum polarization voltage shift of 100 millivolts as measured between the underground component and a saturated copper-copper sulphate reference electrode contacting the earth directly over the underground component. This polarization voltage shift shall be determined by interrupting the protective current and measuring the polarization decay. When the protective current is interrupted, an immediate voltage shift will occur. The voltage reading, after the immediate shift, shall be used as the base reading from which to measure polarization decay. Measurements achieving 100 millivolts decay shall be made over 95 percent of the metallic surface being protected.
c. For any metallic component, a minimum of four (4) measurements shall be made using subparagraph a., above, and achieving the "instant off" potential of minus 850 millivolts. Two (2) measurements shall be made over the anodes and two (2) measurements shall be made at different locations near the component and farthest away from the anode.
3.2 TRENCHING AND BACKFILLING
Perform trenching and backfilling in accordance with Section 31 00 00 EARTHWORK. In the areas of the anode beds, all trees and underbrush shall be cleared and grubbed to the limits shown or indicated. In the event rock is encountered in providing the required depth for anodes, determine an alternate approved location and, if the depth is still not provided, submit an alternate plan to the Contracting Officer. Alternate techniques and depths must be approved prior to implementation.
3.3 INSTALLATION
3.3.1 Anode Installation
Unless otherwise authorized, installation shall not proceed without the presence of the Contracting Officer. Anodes of the size specified shall be installed to the depth indicated and at the locations shown. Locations may be changed to clear obstructions with the approval of the Contracting Officer. Anodes shall be installed in sufficient number and of the required type, size, and spacing to obtain a uniform current distribution over the surface of the structure. The anode system shall e designed for a life of 25 years of continuous operation. Anodes shall be installed as indicated in a dry condition after any plastic or waterproof protective covering has been completely removed from the water permeable, permanent container housing the anode metal. The anode connecting wire shall not be used for lowering the anode into the hole. The annular space around the anode shall be backfilled with fine earth in 6 inch layers and each layer shall be hand tamped. Care must be exercised not to strike the anode or connecting wire with the tamper. Approximately 5 gallons of water shall be applied to each filled hole after anode backfilling and tamping has been completed to a point about 6 inch above the anode. After the water has been absorbed by the earth, backfilling shall be completed to the ground surface level.
3.3.1.1 Single Anodes
Single anodes, spaced as shown, shall be connected connected through a test station to the pipeline, allowing adequate slack in the connecting wire to compensate for movement during backfill operation.
SECTION 26 42 14.00 10 Page 16
3.3.1.2 Groups of Anodes
Groups of anodes, in quantity and location shown, shall be connected to an anode header cable. The anode header cable shall make contact with the structure to be protected only through a test station. Anode lead connection to the anode header cable shall be made by an approved crimp connector or exothermic weld and splice mold kit with appropriate potting compound.
3.3.1.3 Welding Methods
Connections to ferrous pipe and metal tanks shall be made by exothermic weld methods manufactured for the type of pipe or tank supplied. Electric arc welded connections and other types of welded connections to ferrous pipe and structures shall be approved before use.
3.3.2 Anode Placement - General
Packaged anodes shall be installed completely dry, and shall be lowered into holes by rope sling or by grasping the cloth gather. The anode lead wire shall not be used in lowering the anodes. The hole shall be backfilled with fine soil in 6 inch layers and each layer shall be hand-tamped around the anode. Care must be exercised not to strike the anode or lead wire with the tamper. If immediate testing is to be performed, water shall be added only after backfilling and tamping has been completed to a point 6 inch above the anode. Approximately 2 gallons of water may be poured into the hole. After the water has been absorbed by the soil, backfilling and tamping may be completed to the top of the hole. Anodes shall be installed as specified or shown. In the event a rock strata is encountered prior to achieving specified augered-hole depth, anodes may be installed horizontally to a depth at least as deep as the bottom of the pipe, with the approval of the Contracting Officer.
3.3.3 Underground Pipeline
Anodes shall be installed at a minimum of 8 feet and a maximum of 10 feet from the line to be protected.
3.3.4 Installation Details
Details shall conform to the requirements of this specification. Details shown on the drawings are indicative of the general type of material required, and are not intended to restrict selection to material of any particular manufacturer.
3.3.5 Lead Wire Connections
3.3.5.1 Underground Pipeline (Metallic)
To facilitate periodic electrical measurements during the life of the sacrificial anode system and to reduce the output current of the anodes, if required, all anode lead wires shall be connected to a test station and buried a minimum of 24 inch in depth. The cable shall be No. 10 AWG, stranded copper, polyethylene or RHW-USE insulated cable. The cable shall make contact with the structure only through a test station. Resistance wire shall be installed between the cable and the pipe cable, in the test station, to reduce the current output, if required. Anode connections, except in the test station, shall be made with exothermic welding process, and shall be insulated by means of at least three (3) layers of electrical
SECTION 26 42 14.00 10 Page 17 tape; and all lead wire connections shall be installed in a moistureproof splice mold kit and filled with epoxy resin. Lead wire-to-structure connections shall be accomplished by an exothermic welding process. All welds shall be in accordance with the manufacturer's recommendations. A backfill shield filled with a pipeline mastic sealant or material compatible with the coating shall be placed over the weld connection and shall be of such diameter as to cover the exposed metal adequately.
3.3.5.2 Resistance Wire Splices
Resistance wire connections shall be accomplished with silver solder and the solder joints wrapped with a minimum of three (3) layers of pressure-sensitive tape. Lead wire connections shall be installed in a moistureproof splice mold kit and filled with epoxy resin.
3.3.6 Location of Test Stations
Test stations shall be of the type and location shown and shall be curb box mounted. Provide buried insulating joints with test wire connections brought to a test station. Reference all test stations with GPS coordinates. Unless otherwise shown, locate other test stations as follows:
a. At 1,000-foot intervals or less.
b. Where the pipe or conduit crosses any other metal pipe.
c. At both ends of casings under roadways and railways.
d. Where both sides of an insulating joint are not accessible above ground for testing purposes.
3.3.7 Underground Pipe Joint Bonds
Underground pipe having other than welded or threaded coupling joints shall be made electrically continuous by means of a bonding connection installed across the joint.
3.4 ELECTRICAL ISOLATION OF STRUCTURES
3.4.1 Isolation Joints and Fittings
Isolating fittings, including main line isolating flanges and couplings, shall be installed aboveground, or within manholes, wherever possible.
Where isolating joints must be covered with soil, they shall be fitted with a paper joint cover specifically manufactured for covering the particular joint, and the space within the cover filled with hot coal-tar enamel. Isolating fittings in lines entering buildings shall be located at least 12 inch above grade of floor level, when possible. Isolating joints shall be provided with grounding cells to protect against over-voltage surges or approved surge protection devices. The cells shall provide a low resistance across isolating joint without excessive loss of cathodic current.
3.5 TESTS AND MEASUREMENTS
Submit test reports in booklet form tabulating all field tests and measurements performed, upon completion and testing of the installed system and including close interval potential survey, casing and
SECTION 26 42 14.00 10 Page 18 interference tests, final system test verifying protection, insulated joint and bond tests, and holiday coating test.