A1.2.Appendix_C.pdf

PDF 954 KB Posted

Attached to
Canyon Lake Service Bridge Federal contract opportunity
Solicitation number
W9126G18R0409
Issued by
Department of the Army Corps of Engineers Engineering District Fort Worth

About this file

Appendix C - Existing Conditions & Details

View the file

Other files for this federal contract opportunity

Other files attached to Canyon Lake Service Bridge, newest first.
File Type Posted
G1.W9126G18C0129.pdf PDF
B3.Amendment_2.pdf PDF
A1.2.Appendix_B.pdf PDF
B3.Amendment_1.pdf PDF
A1.2.Appendix_A.pdf PDF
B3.W9126G18R0409.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The U. S. Army Corps of Engineers has provided these spatial data as a representation of the various geographic information gathered from multiple sources. These data should be viewed only as a representation of the provided information and should not be used for any other purpose. No guarantee is made by the U. S. Army Corps of Engineers regarding the accuracy or completeness of the data or their suitability for a particular use.

Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community, Esri, HERE, DeLorme, TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS user community

Canyon Lake

¹ 1 inch = 40 yards

0 110 220 330 44055 Feet

Canyon Dam Canyon Lake

Buoy Line

Placement of buoys around tower is based on Best Practice Manual (BPM) Para 4.1.1

Total of 17 Buoys Signage on Buoys:

Boats Keep Out Buoys will be 300 ft from the sides of the Outlet Works Structure and 300 ft in front of the Outlet Works Structure revised 31 Oct 2016 TB Teaschner

650 ft

650 ft 650 ft

Boat Restriction Zone

Service Bridge

Canyon Lake Outlet Works Structure

Buoys (17 Typical) with signage:

Boats Keep Out

M2PMJMEJ

Text Box Bouys will be located approximately 300 ft from the sides of the Outlet Works Structure and approximately 300 ft in front of the Outlet Works Structure. Buoys will be placed symmetrically around the Outlet Works Structure and Service Bridge as shown.

S. JENKINS

M. JETTON

S-1

PREPARED BY:

CHECKED BY:

SUBMITTED BY:

DATED:

SHEET NO.

SEQ. NO.

NTS

24 Inch

In c h

Anchor Shackle

Thimble

Cable Clamps

Anchor or Quick Links

Connecting Links Cable Clamps

Swivel

Drag Chain

Solar Light

(Typical)

BUOY DETAIL

BOATS

KEEP OUT

Government approved equals.

6) Solar Lights shall be Rolyan Model #B345C15 (Clear 15FPM) or recommendation.

5) All Mooring/Tethering Components shall be installed per manufacturer

Rolyan #B2152 or Government approved equal.

be 3/8" inch chain and attached to a 300# pound concrete anchor, to allow for pool rise; the lower 5 feet of anchorage shall use of stainless steel cabling including 20 feet of slack

4) Buoys shall be swivel equipped and tethered by accordance with manufacturer standards.

cross in the middle and nomenclature "Boats Keep Out"; placed in

3) Buoys shall be marked with a standard diamond symbol with

2) Buoy color, text size and color and striping shall match existing.

approved equals.

1) Buoys shall be Rolyan Model #B2445 or Government

General Notes:

File details come from the government source that posted it.