Amendment 2 to the Solicitation.

View the file

Other files

File Type Posted
Amendment_3.pdf PDF
1ABCT_Site_Visit_Roster.pdf PDF
Amendment_1_05302018.pdf PDF
B3_Drawings_Solicitation_Updated_.pdf PDF
B3_FINAL_W9126G18R0025.pdf PDF
B3_Solicitation_735_1ABCT_Updated.pdf PDF
B3_Drawings_Solicitation_Updated_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Solicitation for SSA 1 ABCT at Fort Hood, is amended as follows:

See SF30 Continuation Sheet(s)

NOTE: Proposal Receipt date is changed from 14 June 2018, 2:00 p.m., CST, to 19 June 2018, 2:00 pm.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G18R0025

X 9B. DATED (SEE ITEM 11)

08-May-2018

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jun-2018

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

x 1

W9126G18R0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO THE SPECIFICATIONS

1. New Sections - Add the following accompanying new sections, each bearing the notation W9126G18R0025- 0002.

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 52 00.00 44 GOVERNMENT FIELD OFFICE

01 56 00.00 44 DUST CONTROL

01 57 20.00 10 ENVIRONMENTAL PROTECTION

04 20 00 UNIT MASONRY

05 30 00 STEEL DECKS

07 22 00 ROOF AND DECK INSULATION

2. Replacement Sections: Replace the following section with the accompanying new section of the same number and title bearing the notation W9126G18R0025-0002:

01 45 00.00 10 QUALITY CONTROL

01 58 00 CHEMICAL TERMITE CONTROL

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 61 16.00 20 HORIZONTAL FALL PROTECTION

08 33 23 OVERHEAD COILING DOORS

08 71 00 DOOR HARDWARE

09 06 00 SCHEDULES FOR FINISHES

10 22 13 WIRE MESH PARTITIONS

10 71 13 EXTERIOR SUN CONTROL DEVICE

13 34 19 METAL BUILDING SYSTEMS

CHANGES TO THE DRAWINGS

4. Replacement Drawings.- Replace the drawings listed below with the attached new drawings(s) of the same number, bearing the notation “W9126G18R0025-0002

AE120

AE121

AE122

AE411

AE430

AE431

AE500

AE501

AE502

AE530

AE570

AE600

AE610

C-100 C-509 C-512

CG101

W9126G18R0025

CP304

CP305

CP306

CP307

CP308

E-002

EP102

ES102

ES103

ET102

ET502

ET601

FA601

S-401

End of Summary of Changes

SSA 1 ABCT FHSSA1ABCT

SECTION 01 50 00

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

<AMENDMENT 0002>

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA C511 (2007) Standard for Reduced-Pressure Principle Backflow Prevention Assembly

FOUNDATION FOR CROSS-CONNECTION CONTROL AND HYDRAULIC RESEARCH

(FCCCHR)

FCCCHR List (continuously updated) List of Approved Backflow Prevention Assemblies

FCCCHR Manual (10th Edition) Manual of Cross-Connection Control

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 241 (2013; Errata 2015) Standard for Safeguarding Construction,Alteration, and Demolition Operations

NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014) National Electrical Code

U.S. FEDERAL AVIATION ADMINISTRATION (FAA)

FAA AC 70/7460-1 (2015; Rev L) Obstruction Marking and Lighting

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

MUTCD (2009) Manual on Uniform Traffic Control Devices

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with

SECTION 01 50 00 Page 1

W9126G18R0025, AMENDMENT 0002

Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Construction Site Plan; G

Traffic Control Plan; G

SD-06 Test Reports

Backflow Preventer Tests

SD-07 Certificates

Backflow Tester Certification

Backflow Preventers Certificate of Full Approval

1.3 CONSTRUCTION SITE PLAN

Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, designated smoking areas, workers break areas, concrete washout areas and worker parking areas.

1.4 BACKFLOW PREVENTERS CERTIFICATE

Certificate of Full Approval from FCCCHR List, University of Southern California, attesting that the design, size and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evaluation for the respective level of approval. Certificate of Provisional Approval will not be acceptable.

1.4.1 Backflow Tester Certificate

Prior to testing, submit to the Contracting Officer certification issued by the State or local regulatory agency attesting that the backflow tester has successfully completed a certification course sponsored by the regulatory agency. Tester must not be affiliated with any company participating in any other phase of this Contract.

1.4.2 Backflow Prevention Training Certificate

Submit a certificate recognized by the State or local authority that states the Contractor has completed at least 10 hours of training in backflow preventer installations. The certificate must be current.

SECTION 01 50 00 Page 2

PART 2 PRODUCTS

2.1 TEMPORARY SIGNAGE

2.1.1 Bulletin Board

Immediately upon beginning of work, provide a weatherproof glass-covered bulletin board not less than 36 by 48 inches in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, and other information approved by the Contracting Officer.

2.1.2 Project and Safety Signs

The requirements for the signs, their content, and location are as specified in Section 01 58 00 PROJECT IDENTIFICATION. Erect signs within 15 days after receipt of the notice to proceed. Correct the data required by the safety sign daily, with light colored metallic or non-metallic numerals.

2.2 TEMPORARY TRAFFIC CONTROL

2.2.1 Haul Roads

Construct access and haul roads necessary for proper prosecution of the work under this contract. Construct with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic are be avoided. Provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic. The method of dust control, although optional, must be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction and hauling roads are subject to approval by the Contracting Officer. Lighting must be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations.

2.2.2 Barricades

Erect and maintain temporary barricades to limit public access to hazardous areas. Whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic barricades will be required. Securely place barricades clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.

2.2.3 Fencing

Provide fencing along the construction site at all open excavations and tunnels to control access by unauthorized people.

a. The safety fencing must be a high visibility orange colored, high density polyethylene grid or approved equal, a minimum of 48 inches high and maximum mesh size of 2 inches, supported and tightly secured to steel posts located on maximum 10 foot centers, constructed at the approved location. Install fencing to be able to restrain a force of at least 250 pounds against it.

2.2.4 Temporary Wiring

Provide temporary wiring in accordance with NFPA 241 and NFPA 70. Include

SECTION 01 50 00 Page 3 frequent inspection of all equipment and apparatus.

2.2.5 Backflow Preventers

Reduced pressure principle type conforming to the applicable requirements AWWA C511. Provide backflow preventers complete with 150 pound flanged cast iron, bronze or brass mounted gate valve and strainer, stainless steel or bronze, internal parts. The particular make, model/design, and size of backflow preventers to be installed must be included in the latest edition of the List of Approved Backflow Prevention Assemblies issued by the FCCCHR List and be accompanied by a Certificate of Full Approval from FCCCHR List. After installation conduct Backflow Preventer Tests and provide test reports verifying that the installation meets the FCCCHR Manual Standards.

PART 3 EXECUTION

3.1 EMPLOYEE PARKING

Contractor employees will park privately owned vehicles in an area designated by the Contracting Officer. This area will be within reasonable walking distance of the construction site. Contractor employee parking must not interfere with existing and established parking requirements of the government installation.

3.2 TEMPORARY BULLETIN BOARD

Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.

3.3 AVAILABILITY AND USE OF UTILITY SERVICES

3.3.1 Temporary Utilities

Provide temporary utilities required for construction. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.

3.3.2 Payment for Utility Services

a. The Government will make all reasonably required utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed will be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. Carefully conserve any utilities furnished without charge.

b. Reasonable amounts of the following utilities will be made available to the Contractor at the prevailing rates.

c. The point at which the Government will deliver such utilities or services and the quantity available is as indicated. Pay all costs incurred in connecting, converting, and transferring the utilities to the work. Make connections, including providing backflow-preventing devices on connections to domestic water lines; and providing transformers; and make disconnections.

SECTION 01 50 00 Page 4

3.3.3 Meters and Temporary Connections

At the Contractors expense and in a manner satisfactory to the Contracting Officer, provide and maintain necessary temporary connections, distribution lines, and meter bases (Government will provide meters) required to measure the amount of each utility used for the purpose of determining charges.

Notify the Contracting Officer, in writing, 5 working days before final electrical connection is desired so that a utilities contract can be established. The Government will provide a meter and make the final hot connection after inspection and approval of the Contractor's temporary wiring installation. The Contractor will not make the final electrical connection.

3.3.4 Advance Deposit

An advance deposit for utilities consisting of an estimated month's usage or a minimum of $50.00 will be required. The last monthly bills for the fiscal year will normally be offset by the deposit and adjustments will be billed or returned as appropriate. Services to be rendered for the next fiscal year, beginning 1 October, will require a new deposit. Notification of the due date for this deposit will be mailed to the Contractor prior to the end of the current fiscal year.

3.3.5 Final Meter Reading

Before completion of the work and final acceptance of the work by the Government, notify the Contracting Officer, in writing, 5 working days before termination is desired. The Government will take a final meter reading, disconnect service, and remove the meters. Then remove all the temporary distribution lines, meter bases, and associated paraphernalia.

Pay all outstanding utility bills before final acceptance of the work by the Government.

3.3.6 Sanitation

a. Provide and maintain within the construction area minimum field-type sanitary facilities approved by the Contracting Officer and periodically empty wastes into a municipal, district, or station sanitary sewage system, or remove waste to a commercial facility.

Obtain approval from the system owner prior to discharge into any municipal, district, or commercial sanitary sewer system. Any penalties and / or fines associated with improper discharge will be the responsibility of the Contractor. Coordinate with the Contracting Officer and follow station regulations and procedures when discharging into the station sanitary sewer system. Maintain these conveniences at all times without nuisance. Include provisions for pest control and elimination of odors. Government toilet facilities will not be available to Contractor's personnel.

3.3.7 Telephone

Make arrangements and pay all costs for telephone facilities desired.

3.3.8 Obstruction Lighting of Cranes

Provide a minimum of 2 aviation red or high intensity white obstruction lights on temporary structures (including cranes) over 100 feet above ground level. Light construction and installation must comply with FAA AC 70/7460-1. Lights must be operational during periods of reduced

SECTION 01 50 00 Page 5 visibility, darkness, and as directed by the Contracting Officer.

3.3.9 Fire Protection

Provide temporary fire protection equipment for the protection of personnel and property during construction. Remove debris and flammable materials daily to minimize potential hazards.

3.4 TRAFFIC PROVISIONS

3.4.1 Maintenance of Traffic

a. Conduct operations in a manner that will not close any thoroughfare or interfere in any way with traffic on railways or highways except with written permission of the Contracting Officer at least 15 calendar days prior to the proposed modification date, and provide a Traffic Control Plan detailing the proposed controls to traffic movement for approval.

The plan must be in accordance with State and local regulations and the MUTCD, Part VI. Make all notifications and obtain any permits required for modification to traffic movements outside Station's jurisdiction..

Contractor may move oversized and slow-moving vehicles to the worksite provided requirements of the highway authority have been met.

b. Conduct work so as to minimize obstruction of traffic, and maintain traffic on at least half of the roadway width at all times. Obtain approval from the Contracting Officer prior to starting any activity that will obstruct traffic.

c. Provide, erect, and maintain, at contractors expense, lights, barriers, signals, passageways, detours, and other items, that may be required by the Life Safety Signage, overhead protection authority having jurisdiction.

3.4.2 Protection of Traffic

Maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment the work, and the erection and maintenance of adequate warning, danger, and direction signs, will be as required by the State and local authorities having jurisdiction. Protect the traveling public from damage to person and property. Minimize the interference with public traffic on roads selected for hauling material to and from the site. Investigate the adequacy of existing roads and their allowable load limit. Contractor is responsible for the repair of any damage to roads caused by construction operations.

3.4.3 Rush Hour Restrictions

Do not interfere with the peak traffic flows preceding and during normal operations without notification to and approval by the Contracting Officer.

3.4.4 Dust Control

Dust control methods and procedures must be approved by the Contracting Officer. Treat dust abatement on access roads with applications of calcium chloride, water sprinklers, or similar methods or treatment.

SECTION 01 50 00 Page 6

3.5 CONTRACTOR'S TEMPORARY FACILITIES

3.5.1 Safety

Protect the integrity of any installed safety systems or personnel safety devices. If entrance into systems serving safety devices is required, the Contractor must obtain prior approval from the Contracting Officer. If it is temporarily necessary to remove or disable personnel safety devices in order to accomplish contract requirements, provide alternative means of protection prior to removing or disabling any permanently installed safety devices or equipment and obtain approval from the Contracting Officer.

3.5.2 Administrative Field Offices

Provide and maintain administrative field office facilities within the construction area at the designated site. Government office and warehouse facilities will not be available to the Contractor's personnel.

3.5.3 Storage Area

Construct a temporary 6 foot high chain link fence around trailers and materials. Include plastic strip inserts, colored brown, so that visibility through the fence is obstructed. Fence posts may be driven, in lieu of concrete bases, where soil conditions permit. Do not place or store Trailers, materials, or equipment outside the fenced area unless such trailers, materials, or equipment are assigned a separate and distinct storage area by the Contracting Officer away from the vicinity of the construction site but within the installation boundaries. Trailers, equipment, or materials must not be open to public view with the exception of those items which are in support of ongoing work on any given day. Do not stockpile materials outside the fence in preparation for the next day's work. Park mobile equipment, such as tractors, wheeled lifting equipment, cranes, trucks, and like equipment within the fenced area at the end of each work day.

3.5.4 Supplemental Storage Area

Upon Contractor's request, the Contracting Officer will designate another or supplemental area for the Contractor's use and storage of trailers, equipment, and materials. This area may not be in close proximity of the construction site but will be within the installation boundaries. Fencing of materials or equipment will not be required at this site; however, the Contractor is responsible for cleanliness and orderliness of the area used and for the security of any material or equipment stored in this area.

Utilities will not be provided to this area by the Government.

3.5.5 Appearance of Trailers

a. Trailers utilized by the Contractor for administrative or material storage purposes must present a clean and neat exterior appearance and be in a state of good repair. Trailers which, in the opinion of the Contracting Officer, require exterior painting or maintenance will not be allowed on installation property.

b. Paint using suitable paint and maintain the temporary facilities.

Failure to do so will be sufficient reason to require their removal.

SECTION 01 50 00 Page 7

3.5.6 Maintenance of Storage Area

a. Keep fencing in a state of good repair and proper alignment. Grassed or unpaved areas, which are not established roadways, will be covered with a layer of gravel as necessary to prevent rutting and the tracking of mud onto paved or established roadways, should the Contractor elect to traverse them with construction equipment or other vehicles; gravel gradation will be at the Contractor's discretion. Mow and maintain grass located within the boundaries of the construction site for the duration of the project. Grass and vegetation along fences, buildings, under trailers, and in areas not accessible to mowers will be edged or trimmed neatly.

3.5.7 New Building

In the event a new building is constructed for the temporary project field office, it will be a minimum 12 feet in width, 16 feet in length and have a minimum of 7 feet headroom. Equip the building with approved electrical wiring, at least one double convenience outlet and the required switches and fuses to provide 110-120 volt power. Provide a work table with stool, desk with chair, two additional chairs, and one legal size file cabinet that can be locked. The building must be waterproof, supplied with a heater, have a minimum of two doors, electric lights, a telephone, a battery operated smoke detector alarm, a sufficient number of adjustable windows for adequate light and ventilation, and a supply of approved drinking water. Approved sanitary facilities must be furnished. Screen the windows and doors and provide the doors with dead bolt type locking devices or a padlock and heavy duty hasp bolted to the door. Door hinge pins will be non-removable. Arrange the windows to open and to be securely fastened from the inside. Protect glass panels in windows by bars or heavy mesh screens to prevent easy access. In warm weather, furnish air conditioning capable of maintaining the office at 50 percent relative humidity and a room temperature 20 degrees F below the outside temperature when the outside temperature is 95 degrees F. Any new building erected for a temporary field office must be maintained by the Contractor during the life of the contract and upon completion and acceptance of the work become the property of the Contractor and removed from the site.

3.5.8 Security Provisions

Provide adequate outside security lighting at the Contractor's temporary facilities. The Contractor will be responsible for the security of its own equipment; in addition, the Contractor will notify the appropriate law enforcement agency requesting periodic security checks of the temporary project field office.

3.5.9 Weather Protection of Temporary Facilities and Stored Materials

Take necessary precautions to ensure that roof openings and other critical openings in the building are monitored carefully. Take immediate actions required to seal off such openings when rain or other detrimental weather is imminent, and at the end of each workday. Ensure that the openings are completely sealed off to protect materials and equipment in the building from damage.

3.5.9.1 Building and Site Storm Protection

When a warning of gale force winds is issued, take precautions to minimize danger to persons, and protect the work and nearby Government property.

SECTION 01 50 00 Page 8

Precautions must include, but are not limited to, closing openings;

removing loose materials, tools and equipment from exposed locations; and removing or securing scaffolding and other temporary work. Close openings in the work when storms of lesser intensity pose a threat to the work or any nearby Government property.

3.6 PLANT COMMUNICATION

Whenever the Contractor has the individual elements of its plant so located that operation by normal voice between these elements is not satisfactory, the Contractor must install a satisfactory means of communication, such as telephone or other suitable devices and made available for use by Government personnel.

3.7 TEMPORARY PROJECT SAFETY FENCING

As soon as practicable, but not later than 15 days after the date established for commencement of work, furnish and erect temporary project safety fencing at the work site. Maintain the safety fencing during the life of the contract and, upon completion and acceptance of the work, will become the property of the Contractor and be removed from the work site.

3.8 CLEANUP

Remove construction debris, waste materials, packaging material and the like from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways must be cleaned away. Store any salvageable materials resulting from demolition activities within the fenced area described above or at the supplemental storage area. Neatly stack stored materials not in trailers, whether new or salvaged.

3.9 RESTORATION OF STORAGE AREA

Upon completion of the project remove the bulletin board, signs, barricades, haul roads, and any other temporary products from the site.

After removal of trailers, materials, and equipment from within the fenced area, remove the fence that will become the property of the Contractor.

Restore areas used by the Contractor for the storage of equipment or material, or other use to the original or better condition. Remove gravel used to traverse grassed areas and restore the area to its original condition, including top soil and seeding as necessary.

-- End of Section --

SECTION 01 50 00 Page 9

SECTION 01 52 00.00 44

GOVERNMENT FIELD OFFICE

<AMENDMENT 0002>

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROICEDURES:

SD-03 Product Data

Government Field Office; G.

Provide manufacturer catalog data, specifications, and shop drawings for approval, verifying all dimensions, fixtures and equipment. Note all deviations on drawings.

1.2 ANCILLARY RESPONSIBILITY

All work in this Section is considered as an ancillary responsibility of the Contractor and no separate payment will be made for it.

PART 2 PRODUCTS

2.1 GOVERNMENT FIELD OFFICE

The Contractor shall provide the Government Resident Engineer with an office, approximately 200 square feet in floor area, located where directed and providing space heat, electric light and power, and toilet facilities consisting of one lavatory and one water closet complete with connections to water and sewer mains. A mail slot in the door or a lockable mail box mounted on the surface of the door shall be provided. A refrigerator, microwave, coffee pot, water cooler, desk and chairs shall be provided. At completion of the project, the office shall remain the property of the Contractor and shall be removed from the site. Utilities shall be connected and disconnected in accordance with local codes and to the satisfaction of the Contracting Officer.

The Contractor may, at the Contractor's option, furnish and maintain a trailer-type mobile office acceptable to the Contracting Officer and providing as a minimum the facilities specified above. The trailer shall be securely anchored to the ground at all four corners to guard against movement during high winds.

Facsimile machines and copier machines shall also be new and covered by manufacturer's standard warranty plus a service/repair contract for the duration of this contract.

SECTION 01 52 00.00 44 Page 1

2.1.1 Manufacturer

Manufacturer shall be regularly engaged in the construction and on-site erection of relocatable modular buildings or trailers, if a trailer is provided.

2.1.2 Utilities

Exterior utilities shall be permanently installed to the modular unit and connected with existing utilities. Exposed utilities shall be insulated to prevent freezing. Utilities shall be connected and disconnected in accordance with local codes and to the satisfaction of the Contracting Officer. Contractor shall be responsible for the cost of all utility usage except telephone. The Contractor is responsible for payment of all utility usage, to include electric, water, sewer, and internet service. The Government will provide the telephone equipment and service to the Government Field Office.

2.1.3 Vehicular Access and Parking

The Contractor shall provide graveled access road and parking area for 5 vehicles adjacent to the Government Field Office.

PART 3 EXECUTION

3.1 ERECTION

Erect the building in accordance with building manufacturer's written recommendations at a location designated by the Contracting Officer.

Securely anchor trailer(s) to the ground at all four corners to guard against movement during high winds. Water and weather proof the unit and make ready for use within 15 days after Contract Notice to Proceed.

3.2 JANITORIAL SERVICES

Provide daily janitorial services, trash collection, and building maintenance during the life of the Contract.

3.3 MAINTENANCE AND REPAIR

The Contractor shall be responsible for maintenance and repair of the office during the life of the Contract.

3.4 RELOCATION

The Contractor shall be responsible for relocating the Government Field Office should it be required to accommodate the sequence of construction.

The relocation will be at no expense to the Government.

3.5 OWNERSHIP AND DISPOSITION

See paragraph entitled "Government Field Office" above.

-- End of Section --

SECTION 01 52 00.00 44 Page 2

SECTION 01 56 00.00 44

DUST CONTROL

<AMENDMENT 0002>

PART 1 GENERAL

1.1 SUMMARY

The work covered by this section consists of furnishing all labor, materials and equipment and performing all work required for the control and prevention of fugitive dust during and as the result of construction operations under this contract except for those measures set forth in other Technical Provisions of these specifications. For the purpose of this specification, fugitive dust entails the generation of solid particles by the forces of wind or machinery acting upon exposed materials. Provisions of this specification shall prevent fugitive dust from adversely affecting human health or welfare; unfavorably altering ecological balances of importance to human life; affecting other species of importance to man; or degrading the utility of the environment for aesthetic and recreational purposes. Dust Control is a requirement in the EPA and state pollutant discharge elimination system or permit for discharging storm water during construction.

1.2 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referenced in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Dust Control; G.

Products and Procedures; G

Prior to commencement of the work, submit in writing a proposal to the Contracting Officer for implementing the provisions of this section for fugitive dust control. Address the plans, and the products to be used, to prevent and control fugitive dust through specific mitigative and preventative measures, . The effectiveness of the dust control program shall be periodically checked and reviewed. Revisions to the dust control plan shall be

SECTION 01 56 00.00 44 Page 1 submitted to the Contracting Officer as changes are necessary during the duration of this contract.

Material Safety Data Sheets; G.

- Material Safety Data Sheets include those for soil stabilization products.

Sandblasting; G.

SD-02 Shop Drawings

Recordkeeping;.

- Maintain and furnish records in accordance with PART 1 paragraph RECORDKEEPING.

1.4 IMPLEMENTATION MEETING

Prior to commencement of the work the Contractor shall meet with representatives of the Contracting Officer to develop mutual understandings relative to compliance with these provisions and administration of the dust control program in accordance with Section 01 31 19.00 44 PROJECT MEETINGS.

1.5 APPLICABLE REGULATIONS

In order to prevent and to provide control of pollution arising from the construction activities of the Contractor and his subcontractors in the performance of this contract, all applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement, and all applicable provisions of the EM 385-1-1 as well as the specific requirements stated in this section and elsewhere in the contract specifications. Compliance with the provisions of this section by subcontractors will be the responsibility of the Contractor.

1.6 NOTIFICATION OF NON-COMPLIANCE

The Contracting Officer will notify the Contractor in writing of any observed non-compliance with the foregoing provisions. The Contractor shall, after receipt of such notice, immediately take corrective action.

Such notice, when delivered to the Contractor or his authorized representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor unless it was later determined that the Contractor was in compliance.

1.7 RECORDKEEPING

The Contractor shall, at a minimum, maintain records indicating dust control measures taken. Information provided shall be sufficient to answer any questions regarding control methods utilized, products used, application rates, inspections performed. Additional information to be recorded, but not limited to reporting, includes treated area, operator, date and time of treatment, meteorological conditions and inspection and monitoring reports. Records shall be submitted every 30 days to the

SECTION 01 56 00.00 44 Page 2

Contracting Officer.

PART 2 PRODUCTS

2.1 PRODUCTS AND PROCEDURES

Products and procedures used in controlling particulates and dust shall be in accordance with the Contractor's Environmental Protection Plan and the dust control plan required by this Section. Material Safety Data Sheets for soil binders for use in dust control shall be approved prior to application. Soil binders containing cancinogenic substances (e.g.

acrylamides) are prohibited.

PART 3 EXECUTION

3.1 DUST CONTROL

Control techniques for fugitive dust sources shall involve watering. For arid regions and dusty work areas, dust control shall include water application with soil binders that is environmental sustainable and non-toxic. The methods utilized shall be cost effective, water conservation, and appropriate for the size and scope of the fugitive dust source. Methods and controls shall not have an adverse effects on plant and animal life, ecosystem, and facility air intakes, or contaminate the treated material.

Repeat methods at such intervals as to keep all parts of the disturbed area(s) treated at all times. Have sufficient competent equipment on the job to accomplish control techniques. Products shall provide a method to reduce dust-related environmental concerns and aid in complying with applicable regulations. Products shall not in any form produce any adverse environmental effects through their use and shall provide an effective, clean, safe control of airborne dust and protection against soil erosion.

3.1.1 Preventative Techniques

The reduction of source extent, the incorporation of process modifications, or adjusted work practices, which reduce the amount of dust-generation, are preventative techniques for the control of fugitive dust emissions. These techniques include the elimination of mud and dirt carry-out onto paved roads at construction sites.

3.1.2 Mitigative Techniques

Mitigative measures entail the periodic removal of dust-producing material. Examples of mitigative control measures include clean-up of spillage on paved or unpaved travel surfaces and clean-up of material spillage at transfer points.

3.2 MATERIALS HANDLING

The Contractor shall take the following minimum precautions to limit fugitive dust emissions from material handling and transportation to achieve control of dust emissions to the extent practicable:

a. Stockpiles

SECTION 01 56 00.00 44 Page 3

Apply water with an approved soil binder. Other alternatives include laydown top soil with organic matters that are removed from the disturbed area or placing a compouded fiber erosion control blanket to cover material stockpiles and other surfaces which can create airborne dust. BMP perimeter controls around the stockpile shall be placed at least 10 feet away from the toe of stockpiled material.

b. Transportation

At a minimum, complete covering, maintain a minimum 12 inch free-board space, and moistening of materials hauled from the construction site. Open truck beds, since they create airborne particulate matter, are prohibited.

Additional application of water with approved soil binder shall be required if additional controls are considered necessary by the Contracting Officer.

c. Off-Site Tracking

Perform dust control as the work proceeds to minimize vehicle off-site tracking of sediment and generation of dust. Provide every effort, such as temporary paved roadways, to keep vehicles from tracking soils from the construction site. Gravel construction access roadways shall be at least 80 feet long and 30 feet wide for construction sites 5 acres or larger. The access roadway gravel blanket shall be 6-inch minimum in depth with gravel size of 3-inch minimum. Overlay gravel blankets on two layers of 0.015 mm 6-mil thick geotextile fabric or a single layer of 10-mil thick geotextile fabric. Control dust generation by water sprinkling. For water conservation, water may be applied with an approved soil binder.

3.3 CONSTRUCTION AND DEMOLITION

Control dust resulting from demolition and construction activities. No person may cause, suffer, allow, or permit a structure, road, street, alley, or parking area to be constructed, altered, repaired, or demolished, or land to be cleared without taking minimum precautions to achieve control of dust emissions.

3.3.1 Demolition

Control the amount of dust resulting from demolition to prevent the spread of dust to occupied portions of the construction site and to avoid creation of a nuisance in the surrounding area. The use of water, oil, or chemical treatment for control of dust in the demolition of structures, in construction operations, in work performed on a road, parking area, or in the clearing of land is required.

3.3.2 Sandblasting

Utilize adequate methods, including enclosure of work areas and debris, to prevent airborne particulate matter during sandblasting of painted and non-paintedstructures or other similar operations. Blast media and containment systems shall be approved prior to use.

3.4 ACCESS ROADS AND PARKING LOTS

No person may cause, suffer, allow, or permit any public, industrial, commercial, or private road, street, or alley to be used without taking precautions to achieve control of dust emissions.

In addition to mitigation and control techniques, the removal of soil or

SECTION 01 56 00.00 44 Page 4 other materials shall be periodically performed by mechanical sweepers or their equivalent. Spot clean dirty roadways and parking lots. These activities shall be performed as deemed necessary. Remove sand which is applied for the specific purpose of snow or ice control as soon as such control is no longer necessary.

3.4.1 Access Roads

The use of temporary asphalt pavement is required for major access roadways at extensive development sites (10 acres or larger) and/or construction periods longer than 3 months. Alternative method of dust control for access roads with uniform gravel cover (and geotextile fabric beneath gravel cover) is acceptable for site less than 10 acres of total disturbed area, and if construction period is shorter than 3 months.

Site access roads may use uniform gravel cover (with geotextile fabric beneath gravel cover) and water sprinkling with soil binders for dust control.

The use of temporary asphalt or uniform gravel cover , as described above for control of Off-Site Tracking, with wheel wash is an acceptable method of dust control for roads leading to and from areas of construction activity.

3.4.2 Parking Lots

Parking surfaces with more than five parking spaces shall be paved.

Temporary parking area(s) to be used 30 calendar days or more for the Contractor's equipment or personal vehicles shall be paved with temporary asphalt. Temporary lots used for less than one month may use uniform gravel, if required by Corps Area Office Contracting Officer (AOCO), applying water with approved soil binder may be necessary.

3.5 CONTROL STRUCTURES

Activities performed under this Contract shall conform with the specifications described herein along with other technical specifications, particularly Sections 01 57 20.00 10 ENVIRONMENTAL PROTECTION and

01 57 24.01 44 STORM WATER POLLUTION PREVENTION.

If the Contractor proposes to construct temporary structures, he shall submit the proposal for approval at least ten (10) days prior to the scheduled start of such temporary work. Modification of the Contractor's plans shall be made only with the written approval of the Contracting Officer.

3.6 MAINTENANCE

During the life of this contract, the Contractor shall maintain all facilities constructed for pollution control under this Contract as long as the operations creating the particular pollutant are being carried out or until the material concerned has become stabilized to the extent that pollution is no longer being created. Re-application of water by sprinking or approved soil binder with water shall be required when the disturbed areas are not stabilized.

During the construction period the Contractor shall conduct frequent training courses for his maintenance personnel. The curricula shall

SECTION 01 56 00.00 44 Page 5 include methods of dust control, familiarity with pollution standards, and care of controls and measures to prevent and correct fugitive dust pollution.

The Contractor shall furnish daily services for the temporary control measures at the project site and perform any required maintenance as deemed necessary by and to the satisfaction of the Corps AOCO during the entire life of the Contract. Services shall be performed at such a time and in such a manner to least interfere with the operations.

The Contractor's designated Site Inspector shall inspect all pollution prevention measures in accordance with Sections 01 57 24.01 44 STORM WATER POLLUTION PREVENTION PLAN and 01 57 25.00 44 SWPP PLAN INSPECTION AND MAINTENANCE REPORT FORM or at the Contracting Officer's request.

Application of soil binder with water is an acceptable temporary stabilization protocol when approved by the Contracting Officer.

-- End of Section --

SECTION 01 56 00.00 44 Page 6

SECTION 01 57 20.00 10

ENVIRONMENTAL PROTECTION

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY (DA)

DA AR 200-1 (2007) Environmental Protection and Enhancement

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

WETLANDS DELINEATION MANUAL (1987) Corps of Engineers Wetlands Delineation Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

33 CFR 328 Definitions of Waters of the United States

40 CFR 150 - 189 Pesticide Programs

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 279 Standards for the Management of Used Oil

40 CFR 302 Designation, Reportable Quantities, and Notification

40 CFR 355 Emergency Planning and Notification

40 CFR 68 Chemical Accident Prevention Provisions

49 CFR 171 - 178 Hazardous Materials Regulations

1.2 DEFINITIONS

1.2.1 Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or

SECTION 01 57 20.00 10 Page 1 welfare; unfavorably alter ecological balances of importance to human life;

affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.

1.2.2 Environmental Protection

Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

1.2.3 Contractor Generated Hazardous Waste

Contractor generated hazardous waste means materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners,excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water. The Contractor is responsible to contain and dispose all brought on-site materials and products by recycling or reuse through manufacturer, local vendors or charitable organizations. Disposal at construction site is prohibited.

Disposal to landfill or other disposal facility shall be pre-approved. The Contractor is responsible to provide MSDS of all products or construction material brought on-site for review and approval by the DPW-Environmental Office, Hazardous Waste Materials Program Management.

1.2.4 Installation Pest Management Coordinator

Installation Pest Management Coordinator (IPMC) is the individual officially designated by the Installation Commander to oversee the Installation Pest Management Program and the Installation Pest Management Plan.

1.2.5 Project Pesticide Coordinator

The Project Pesticide Coordinator (PPC) is an individual that resides at a Civil Works Project office and that is responsible for oversight of pesticide application on Project grounds.

1.2.6 Land Application for Discharge Water

The term "Land Application" for discharge water implies that the Contractor must discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" shall occur. Land Application must be in compliance with all applicable Federal, State, and local laws and regulations. The construction site storm water discharge shall have an EPA or state permit.

The Contractor shall routinely assess non-storm water discharge to be in accordance with Section 01 57 24.01 44 STORM WATER POLLUTION PREVENTION

PLAN.

SECTION 01 57 20.00 10 Page 2

1.2.7 Pesticide

Pesticide is defined as any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.

1.2.8 Pests

The term "pests" means arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the…