W9126G18Q3841 19-Jun-2018
b. TELEPHONE NUMBER
817-886-1082
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 09 Jul 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
GLORIA GONZALES
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, RM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 9674CJ 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
THREE RIVERS REGIONAL PROJECT OFFICE
JEFF BOUTWELL
285 CR 3602
CLIFTON TX 76634
TEL: 254-622-7411 FAX:
(817) 886-6403FAX:
TEL: (817) 886-1077 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$18,000,000
NAICS:
561720
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF157
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Job
Funded Amt:
BASE_Waco Consolidated Services Provide all labor, equipment, materials, supplies, management, and supervision for Consolidated Services that include Facility & Park Cleaning, Portable Toilet Facilities, Refuse Collection and Disposal, Beach Water Sample Services at Waco Lakes in accordance with attached Performance Work Specifications (PWS).
Period of Performance: 1 August 2018 - 31 July 2019
Minimum qurantee applies to the base only. The total value for all years (base plus options) shall not exceed the maximum value.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Job
OPTION Funded Amt:
Option Yr 1_Waco Consolidated Services Provide all labor, equipment, materials, supplies, management, and supervision for Consolidated Services that include Facility & Park Cleaning, Portable Toilet Facilities, Refuse Collection and Disposal, Beach Water Sample Services at Waco Lakes in accordance with attached Performance Work Specifications (PWS).
Period of Performance: 1 August 2019 - 31 July 2020
The total value for all years (base plus options) shall not exceed the maximum value.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 Job
OPTION Funded Amt:
Option Yr 2_Waco Consolidated Services Provide all labor, equipment, materials, supplies, management, and supervision for Consolidated Services that include Facility & Park Cleaning, Portable Toilet Facilities, Refuse Collection and Disposal, Beach Water Sample Services at Waco Lakes in accordance with attached Performance Work Specifications (PWS).
Period of Performance: 1 August 2020 - 31 July 2021
The total value for all years (base plus options) shall not exceed the maximum value.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 Job
OPTION Funded Amt:
Option Yr 3_Waco Consolidated Services Provide all labor, equipment, materials, supplies, management, and supervision for Consolidated Services that include Facility & Park Cleaning, Portable Toilet Facilities, Refuse Collection and Disposal, Beach Water Sample Services at Waco Lakes in accordance with attached Performance Work Specifications (PWS).
Period of Performance: 1 August 2021 - 31 July 2022
The total value for all years (base plus options) shall not exceed the maximum value.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 Job
OPTION Funded Amt:
Option Yr 4_Waco Consolidated Services Provide all labor, equipment, materials, supplies, management, and supervision for Consolidated Services that include Facility & Park Cleaning, Portable Toilet Facilities, Refuse Collection and Disposal, Beach Water Sample Services at Waco Lakes in accordance with attached Performance Work Specifications (PWS).
Period of Performance: 1 August 2022 - 31 July 2023
The total value for all years (base plus options) shall not exceed the maximum value.
KO STATEMENT
“Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.”
BID SHEETS
Waco Consolidated Services Estimated Quantities
BID SHEET
SUPPLIES OR SERVICES AND PRICES/COST Provide all labor, equipment, materials, supplies, management, and supervision for Consolidated Services Contract to perform Facility & Park Cleaning, Portable Toilet Facilities, Refuse Collection and Disposal, Beach Water Sample Services at Waco Lakes in accordance with attached Performance Work Specifications (PWS)
Period of Performance : 01 August 2018 through 31 July 2019
0001 FACILITY & PARK CLEANING
ITEM DESCRIPTION QTY U/M UNIT PRICE AMOUNT
0001AA PICNIC/CAMPING UNIT
CLEANING
24960 EA
0001AB GENERAL GROUNDS
CLEANUP
17080 ACRE
0001AC RESTROOM/SHOWER
FACILITY CLEANING
2340 EA
0001AD GROUP PAVILLION 104 EA
0001AE GROUP CAMPGROUND
AND SHELTER
52 EA
0001AF GATE COMPLEX AREAS 50 EA
0001AG DUMP STATIONS 181 EA
0001AH PLAYGROUNDS AND PLAY
AMMINITIES
140 EA
0001AJ PIERS & DOCKS 54 EA
0001AK SCREENED SHELTERS 1000 EA
0001AL AMPHITHEATERS
CLEANING
12 EA
0001AM TRAIL ENTRANCE/TRAIL
CLEANING
208 AC
0001AN BEACH AREAS 159 EA
0001AP BEACH WATER
SAMPLING/TESTING
15 EA
0001AQ ACCESS POINT GROUNDS
CLEANING
30 EA
0001AR UNSCHEDULED CLEANING
FACILITY & PARK CLEANING - TOTAL
0002 PORTABLE TOILET FACILITY
ITEM DESCRIPTION QTY U/M UNIT PRICE AMOUNT
0002AA PORTABLE TOILET
FACILITY – STANDARD ( to include delivery, pick up and servicing)
20 EA
PORTABLE TOILET FACILITY – TOTAL
0003 REFUSE DISPOSAL AND COLLECTION
0003AA REFUSE COLLECTION AND
DISPOSAL
2949 EA
0003AB 30 YD -ROLL OFF
DUMPSTERS- DAILY FEE
365 EA
0003AC 30 YD ROLL OFF
DUMPSTERS- DELIVERY
FEE
12 EA
0003AD 30 YD ROLL OFF
DUMPSTERS- PICK UP AND
DISPOSAL FEE
12 EA
REFUSE DISPOSAL AND COLLECTION -TOTAL
TOTAL BASE YEAR
(OPTION YEAR 1)
SUPPLIES OR SERVICES AND PRICES/COST Provide all labor, equipment, materials, supplies, management, and supervision for Consolidated Services Contract to perform Facility & Park Cleaning, Portable Toilet Facilities, Refuse Collection and Disposal, and Beach Water Sample Services at Waco Lake in accordance with attached Performance Work Specifications (PWS)
Period of Performance : 01 August 2019 through 31 July 2020
1001 FACILITY & PARK CLEANING
ITEM DESCRIPTION QTY U/M UNIT PRICE AMOUNT
1001AA PICNIC/CAMPING UNIT
CLEANING
24960 EA
1001AB GENERAL GROUNDS
CLEANUP
17080 ACRE
1001AC RESTROOM/SHOWER
FACILITY CLEANING
2340 EA
1001AD GROUP PAVILLION 104 EA
1001AE GROUP CAMPGROUND
AND SHELTER
52 EA
1001AF GATE COMPLEX AREAS 50 EA
1001AG DUMP STATIONS 181 EA
1001AH PLAYGROUNDS AND PLAY
AMMINITIES
140 EA
1001AJ PIERS & DOCKS 54 EA
1001AK SCREENED SHELTERS 1000 EA
1001AL AMPHITHEATERS
CLEANING
12 EA
1001AM TRAIL ENTRANCE/TRAIL
CLEANING
208 AC
1001AN BEACH AREAS 159 AC
1001AP BEACH WATER
SAMPLING/TESTING
15 EA
1001AQ ACCESS POINT GROUNDS
CLEANING
30 EA
1001AR UNSCHEDULED CLEANING %
FACILITY & PARK CLEANING - TOTAL
1002 PORTABLE TOILET FACILITY
ITEM DESCRIPTION QTY U/M UNIT PRICE AMOUNT
1002AA PORTABLE TOILET
FACILITY – STANDARD ( to include delivery, pick up and servicing).
10 EA
PORTABLE TOILET FACILITY - TOTAL
1003 REFUSE DISPOSAL AND COLLECTION
1003AA REFUSE COLLECTION AND
DISPOSAL
2949 EA
1003AB 30 YD -ROLL OFF
DUMPSTERS- DAILY FEE
365 EA
1003AC 30 YD ROLL OFF
DUMPSTERS- DELIVERY
FEE
12 EA
1003AD 30 YD ROLL OFF
DUMPSTERS- PICK UP AND
DISPOSAL FEE
12 EA
TOTAL OPTION YEAR 1
(OPTION YEAR 2)
SUPPLIES OR SERVICES AND PRICES/COST Provide all labor, equipment, materials, supplies, management, and supervision for Consolidated Services Contract to perform Facility & Park Cleaning, Portable Toilet Facilities, Refuse Collection and Disposal, at Waco Lakes in accordance with attached Performance Work Specifications (PWS)
Period of Performance : 01 August 2020 through 31 July 2021
2001 FACILITY & PARK CLEANING
ITEM DESCRIPTION QTY U/M UNIT PRICE AMOUNT
2001AA PICNIC/CAMPING UNIT
CLEANING
24960 EA
2001AB GENERAL GROUNDS
CLEANUP
17080 ACRE
2001AC RESTROOM/SHOWER
FACILITY CLEANING
2340 EA
2001AD GROUP PAVILLION 104 EA
2001AE GROUP CAMPGROUND
AND SHELTER
52 EA
2001AF GATE COMPLEX AREAS 50 EA
2001AG DUMP STATIONS 181 EA
2001AH PLAYGROUNDS AND PLAY
AMMINITIES
140 EA
2001AJ PIERS & DOCKS 54 EA
2001AK SCREENED SHELTERS 1000 EA
2001AL AMPHITHEATERS
CLEANING
12 EA
2001AM TRAIL ENTRANCE/TRAIL
CLEANING
208 AC
2001AN BEACH AREAS 159 EA
2001AP BEACH WATER
SAMPLING/TESTING
15 EA
2001AQ ACCESS POINT GROUNDS
CLEANING
30 EA
2001AR UNSCHEDULED CLEANING %
FACILITY & PARK CLEANING – TOTAL
2002 PORTABLE TOILET FACILITY
ITEM DESCRIPTION QTY U/M UNIT PRICE AMOUNT
2002AA PORTABLE TOILET
FACILITY – STANDARD ( to include delivery, pick up and servicing).
2003 REFUSE DISPOSAL AND COLLECTION
2003AA REFUSE COLLECTION AND
DISPOSAL
2949 EA
2003AB 30 YD -ROLL OFF
DUMPSTERS- DAILY FEE
365 EA
2003AC 30 YD ROLL OFF
DUMPSTERS- DELIVERY
FEE
12 EA
2003AD 30 YD ROLL OFF
DUMPSTERS- PICK UP AND
DISPOSAL FEE
12 EA
TOTAL OPTION YEAR 3
SUPPLIES OR SERVICES AND PRICES/COST Provide all labor, equipment, materials, supplies, management, and supervision for Consolidated Services Contract to perform Facility & Park Cleaning, Portable Toilet Facilities, Refuse Collection and Disposal, at Waco Lakes in accordance with attached Performance Work Specifications (PWS)
Period of Performance : 01 August 2021 through 31 July 2022
3001 FACILITY & PARK CLEANING
ITEM DESCRIPTION QTY U/M UNIT PRICE AMOUNT
3001AA PICNIC/CAMPING UNIT
CLEANING
24960 EA
3001AB GENERAL GROUNDS
CLEANUP
17080 ACRE
3001AC RESTROOM/SHOWER
FACILITY CLEANING
2340 EA
3001AD GROUP PAVILLION 104 EA
3001AE GROUP CAMPGROUND
AND SHELTER
52 EA
3001AF GATE COMPLEX AREAS 50 EA
2001AG DUMP STATIONS 181 EA
3001AH PLAYGROUNDS AND PLAY
AMMINITIES
140 EA
3001AJ PIERS & DOCKS 54 EA
3001AK SCREENED SHELTERS 1000 EA
3001AL AMPHITHEATERS
CLEANING
12 EA
3001AM TRAIL ENTRANCE/TRAIL
CLEANING
208 AC
3001AN BEACH AREAS 159 EA
3001AP BEACH WATER
SAMPLING/TESTING
15 EA
3001AQ ACCESS POINT GROUNDS
CLEANING
30 EA
3001AR UNSCHEDULED CLEANING %
FACILITY & PARK CLEANING – TOTAL
3002 PORTABLE TOILET FACILITY
ITEM DESCRIPTION QTY U/M UNIT PRICE AMOUNT
3002AA PORTABLE TOILET
FACILITY – STANDARD ( to include delivery, pick up and servicing).
3003 REFUSE DISPOSAL AND COLLECTION
3003AA REFUSE COLLECTION AND
DISPOSAL
2949 EA
3003AB 30 YD -ROLL OFF
DUMPSTERS- DAILY FEE
365 EA
3003AC 30 YD ROLL OFF
DUMPSTERS- DELIVERY
FEE
12 EA
3003AD 30 YD ROLL OFF
DUMPSTERS- PICK UP AND
DISPOSAL FEE
12 EA
TOTAL OPTION YEAR 3
(OPTION YEAR 4)
SUPPLIES OR SERVICES AND PRICES/COST Provide all labor, equipment, materials, supplies, management, and supervision for Consolidated Services Contract to perform Facility & Park Cleaning, Portable Toilet Facilities, Refuse Collection and Disposal, at Waco Lakes in accordance with attached Performance Work Specifications (PWS)
Period of Performance : 01 August 2022 through 31 July 2023
4001 FACILITY & PARK CLEANING
ITEM DESCRIPTION QTY U/M UNIT PRICE AMOUNT
4001AA PICNIC/CAMPING UNIT
CLEANING
24960 EA
4001AB GENERAL GROUNDS
CLEANUP
17080 ACRE
4001AC RESTROOM/SHOWER
FACILITY CLEANING
2340 EA
4001AD GROUP PAVILLION 104 EA
4001AE GROUP CAMPGROUND
AND SHELTER
52 EA
4001AF GATE COMPLEX AREAS 50 EA
4001AG DUMP STATIONS 181 EA
4001AH PLAYGROUNDS AND PLAY
AMMINITIES
140 EA
4001AJ PIERS & DOCKS 54 EA
4001AK SCREENED SHELTERS 1000 EA
4001AL AMPHITHEATERS
CLEANING
12 EA
4001AM TRAIL ENTRANCE/TRAIL
CLEANING
208 AC
4001AN BEACH AREAS 159 EA
4001AP BEACH WATER
SAMPLING/TESTING
15 EA
4001AQ ACCESS POINT GROUNDS
CLEANING
30 EA
4001AR UNSCHEDULED CLEANING %
FACILITY & PARK CLEANING – TOTAL
4002 PORTABLE TOILET FACILITY
ITEM DESCRIPTION QTY U/M UNIT PRICE AMOUNT
4002AA PORTABLE TOILET
FACILITY – STANDARD ( to include delivery, pick up and servicing).
4003 REFUSE DISPOSAL AND COLLECTION
4003AA REFUSE COLLECTION AND
DISPOSAL
2949 EA
4003AB 30 YD -ROLL OFF
DUMPSTERS- DAILY FEE
365 EA
4003AC 30 YD ROLL OFF
DUMPSTERS- DELIVERY
FEE
12 EA
4003AD 30 YD ROLL OFF
DUMPSTERS- PICK UP AND
DISPOSAL FEE
12 EA
REFUSE DISPOSAL AND COLLECTION -TOTAL
TOTAL OPTION YEAR 4
TOTAL BASE YEAR
TOTAL OPTION YEAR 1
TOTAL OPTION YEAR 2
TOTAL OPTION YEAR 3
TOTAL OPTION YEAR 4
TOTAL CONTRACT PRICE
BID SHEET- TASK ORDER
Waco Consolidated Services Task Order No.0001
Bid Sheet
Furnish all labor, equipment, materials, supplies, management, and supervision to accomplish Recreational Park Consolidated Services; recreational park and facilities cleaning, portable toilet units, refuse collection and disposal and beach water sample services at Waco Lake in accordance with attached Performance Work Statement and Requirements Summary specifications.
Task Order No.0001: Period of Peformance 01 August 2018 through 31 October 2018
RECREATIONAL PARK CLEANING ITEMS
ITEM DESCRIPTION EST.QTY U/M UNIT PRICE AMOUNT
0001AA PICNIC/CAMPING UNIT CLEANING 8132 EA
0001AB GENERAL GROUNDS CLEANUP 5643 ACRE
0001AC RESTROOM/SHOWER FACILITY
CLEANING
812 EA
0001AD GROUP PAVILLION 16 EA
0001AE GROUP CAMPGROUND AND
SHELTER
13 EA
0001AF GATE COMPLEX AREAS 0 EA
0001AG DUMP STATIONS 121 EA
0001AH PLAYGROUNDS AND PLAY
AMMINITIES
47 EA
0001AJ PIERS & DOCKS 13 EA
0001AK SCREENED SHELTERS 260 EA
0001AL AMPHITHEATERS CLEANING 0 EA
0001AM TRAIL ENTRANCE/TRAIL
CLEANING
39 AC
0001AN BEACH AREAS 93 EA
0001AP BEACH WATER
SAMPLING/TESTING
0 EA
0001AQ ACCESS POINT GROUNDS
CLEANING
5 EA
0001AR UNSCHEDULED CLEANING 2 %
RECREATIONAL PARK CLEANING ITEMS TOTAL
PORTABLE TOILET UNITS
ITEM DESCRIPTION EST.QTY U/M UNIT PRICE AMOUNT
0002AA PORTABLE TOILET FACILITY-STANDARD EA
PORTABLE TOILET UNITS TOTAL
REFUSE DISPOSAL AND COLLECTION
ITEM DESCRIPTION EST.QTY U/M UNIT PRICE AMOUNT
0003AA PARK REFUSE COLLECTION AND
DISPOSAL
880 EA
0003AB 30 YD -ROLL OFF DUMPSTERS- DAILY FEE EA
0003AC 30 YD ROLL OFF DUMPSTERS- DELIVERY FEE EA
0003AD 30 YD ROLL OFF DUMPSTERS- PICK UP AND DISPOSAL
FEE
EA
REFUSE DISPOSAL AND COLLECTION TOTAL
Task Order No.0001: Period of Peformance 01 August 2018 through 31 October 2018
TOTAL Task Order No.0001
INSTRUCTION TO OFFERORS
INSTRUCTIONS TO OFFERORS
QUOTER DUE DATE/LOCAL TIME: SEE COVER PAGE
POINT OF CONTACT: Gloria Gonzales Phone: (817)-886-1082
Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hands carry, “NO EXCEPTIONS.” EMAIL your proposal to: CIV-OPS.Proposals@usace.army.mil and gloria.gonzales@usace.army.mil. Subject line of email MUST include the solicitation number and your Company Name.
For additional help contact your local Association Procurement Technical Assistance Centers (PTAC). Centers were created by Congress to assist businesses seeking to compete on federal contracts. Services are generally free; however, a small fee may be charged for certain services.
Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.
SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: http://www.sam.gov.
DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business.
DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).
Click here to request your D-U-N-S Number via the Web. The website to obtain your DUNS number:
http://fedgov.dnb.com/webform For technical difficulties, contact govt@dnb.com or phone 866-705- 5711.
ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA)
allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Manager (SAM): http://www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM.
WAGE RATES: The Service Contract Act applies (see attached wage rates).
Below is a checklist to assist you to ensure all the proper documents are returned for consideration on this solicitation. Only those items checked below as “required” must be returned
Required Contractor Item
Complete Bid Schedule(s), Sign SF 1449, Sign Amendments (if applicable) and return
CHECK YOUR QUOTES FOR MATHEMATICAL ERRORS
DO NOT ROUND UP OR DOWN
ANNOTATE UNIT AND TOTAL COSTS TO THE HUNDRETH POSITION
Complete vendor information sheet or provide a document with similar information
The provisions at 52.212-1, 52.212-3 Alt I, 52.212-5 and apply to this acquisition. Confirm vendor’s 52.212-3 Alt I ORCA is updated in SAM on the vendor information sheet.
You must have an active SAM registration prior to award
Submit past performance and technical approach and understanding documentation IAW Instructions to Offerors.
Ensure former employer returns the form and references the solicitation number and Company Name in the email subject line.
Scan all documents into a single.pdf file. PDF only authorized format
EMAIL your proposal to: CIV-OPS.Proposals@usace.army.mil & gloria.gonzales@usace.army.mil Subject line of email must include the solicitation number and Company Name.
**Please see clause 52.228-5 Insurance and Insurance MFR for insurance requirements.
Vendor Information Sheet
IN THE EVENT OF AWARD, ISSUE CONTRACT TO:
COMPANY NAME
POC
(Last, First Middle)
ADDRESS
(Number & Street) (City, State and Zip)
PHONE NUMBER MOBILE
(Area code and number) (Area code and number)
EMAIL ADDRESS___________________________________________
DUNS NUMBER CAGE CODE NUMBER________
SSN/TIN NUMBER or firm’s Tax ID Number (TIN) ______________________________
Vendor’s Online Representation and Certification Application (ORCA) is updated in SAM Yes
No
52.237-1 SITE VIST
FAR 52.237-1- Highly recommend potential offerors attend a site visit. Vendors must confirm their intent to attend a conference with the POC listed below prior to attending the event.
Address: Waco Lake Project Office 3801 Zoo Park Dr.
Waco, TX 76708
POC: Jeff Boutwell Contact Info: (254)-622-7411
(254)-218-2493
Email: jeff.t.boutwell@usace.army.mil
Conference: Thursday, 28 Jun 2018 @ 10:00 am CST
PREVIOUS CONTRACT INFORMATION:
Contract #: W9126G-17-D-0044 - $657K – Base and 2 options Contractor: Genesis Janitorial Services LLC
INSURANCE
Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN: CESWF-CT-S, P.O.
Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office. The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:
Submit a copy of Insurance Certificate directly to:
Waco Lake Project Office POC: Jeff T. Boutwell 3801 Zoo Park Dr.
Waco, TX 76708
Or email to: jeff.t.boutwell@usace.army.mil Phone: (254)-622-7411
(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.
(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $100,000 per accident for bodily injury and $20,000 per accident for property damage.
(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000.00 or in compliance with applicable State statutes.
(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.
NOTE:
(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.
NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm name: CAGE Code:
Address: DUNS Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy) Explain Differences:
Original Contract Price (Award Amount):
Final contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil and gloria.gonzales@usace.army.mil. Ensure the former employer references the solicitation number in the email subject line.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract
Rating will be neither positive or negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?
E VG S M U N
b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agree price(s)?
E VG S M U N
b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.
Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
YES NO
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are
YES NO
there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.
YES NO
6. SAFETY/SECURITY
a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
YES NO
d) In Summary, provide an overall rating for the work performed by this contractor.
AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil and gloria.gonzales@usace.army.mil Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary)
W9126G18Q3841
QASP
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Park Cleaning Services at Waco Lake. This plan sets forth the procedures and guidelines Waco Lake Office Staff will use in ensuring the required performance standards or services levels are achieved by the Contractor.
Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards/quality levels identified in the PWS and the Contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the Contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the
Contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the COR to monitor and manage the Contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the Contractor.
Performance management represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
Performance Management Strategy The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the
Contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by Contractor employees or by Subcontractors. The Contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS.
The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The Contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the Contractor’s QC program.
1.3.2 The Government representative(s) will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
ROLES AND RESPONSIBILITIES
The Contracting Officer (KO) The Contracting Officer (KO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer’s Representative (COR) and the Contractor. The KO will designate one full-time COR as the Government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the Contractor’s performance, and must be identified and designated by the KO.
The Contracting Officer’s Representative (COR) The COR is designated in writing by the KO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
2.3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the Contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. If the Contractor the service or performance level, it may be eligible to receive option years for as many as two additional years, if stated in the contract. Failure to meet the required service or performance level may result in a deduction from the monthly amount and the Government may elect not to award additional option years.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate Contractor performance when appropriate. The primary method of surveillance will be;
Periodic Inspection, which shall be performed by the COR or designated Quality Assurance Inspector.
Customer Feedback The Contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the Contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR or KO as opposed to the Contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR or KO.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
Acceptable Quality Levels The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary (PRS) Table, for Contractor performance are structured to allow the Contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For Contractor services not meeting performance work specifications such as those summarized in the PRS, the Government may require re-performance, re-inspections fee or the right to procure services from another source at the Contractor’s expense.
QUALITY ASSURANCE DOCUMENTATION
The Performance Management Feedback Loop The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and these are assessed using the performance monitoring techniques shown in Attachment 1, “Performance Requirements Summary”.
Monitoring Forms The Government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachment 2. The forms, when completed, will document the Government’s assessment of the Contractor’s performance under the contract to ensure that the required results for janitorial services are being achieved.
The COR will retain a copy of all completed QA surveillance forms for review.
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
Determining Performance Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet the AQL may result in a deduction from the monthly payment, using the deduction methods shown in Attachment 1, “Performance Requirements Summary”.
Reporting At the end of each month, the COR will prepare a written report for summarizing the overall results of the quality assurance surveillance of the Contractor’s performance. This written report, which includes the Contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the Government to demonstrate whether the Contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
Reviews and Resolution The COR may require the Contractor’s project manager, or a designated alternate, to meet with the KO and other
Government personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the Contractor, including appropriate self-assessments by the Contractor;
however, if the need arises, the Contractor will meet with the COR as often as required or per the Contractor’s request. The agenda of the reviews may include:
Monthly performance assessment data and trend analysis
Issues and concerns of both parties
Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
Recommendations for improved efficiency and/or effectiveness
The COR must coordinate and communicate with the Contractor and the KO to resolve issues and concerns regarding marginal or unacceptable performance.
The COR and Contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification issued by the KO.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
Required Services (Tasks)
Performance Standards
Acceptable Quality Levels
Methods of
Surveillance
Incentive (Positive and/or Negative)
(Impact on Contractor Payments)
PRS # 1.
PICNIC/CAMPING
UNIT CLEANING
The Contractor shall furnish all labor, equipment, and materials to shall clean and disinfect all surfaces on picnic/campsite table and benches, table slab, shelter, fire ring and pedestal cooker.
Contractor shall remove all debris and trash from impact zone and rake and level.
The Contractor's cleaning shall result in all surfaces of the table benches, table slab, shelter, fire ring and pedestal shall be free of deposits, dirt, debris, stains, grease, film, markings, streaks, standing water and odors. Shelter shall be free of insects, insect nest, mud, dirt, stains, markings, and graffiti.Any debris removable from ground level, with a standard six foot ladder, broom or other means shall be removed fromt eh shelter top. At no time shall an employee be over six foot high on a ladder or on top of the shelter roof.
Any hazardous debris on top of shelter tops shall be reported to the COR, QAR or DI as soon as possible. Cookers and or fire rings and the surrounding ground shall be free food remnants, foil, grease, burnt wood, charcoal, coals and ashes.
Impact areas shall be level and free of vegetation and debris.
No trash shall remain on the ground within 25 feet of table slab or the perimeter of impact zone (whichever is farthest) and 25 feet from the edge of campsite pullout/pull through.
Scores 85% a minimum on all inspections for the month or 30 calendar day period.
Inspection by Periodic Inspections by the COR, DI or QAR.
In the event the Contractor fails to satisfactorily perform all of the work required as specified, within the time specified and according to schedule, a reduction shall be made in the payment. If the services are not performed, the government reserves the right to require the Contractor to re-perform the service or re-procure services outside of this contract and deduct the cost from the Contractor’s invoice.
PRS#2
GENERAL
GROUNDS
CLEANING
The Contractor shall furnish all labor, equipment, and materials to collect and dispose of litter.
The Contractor grounds cleaning shall result in removal of all litter from the entire park area to the water’s edge as specified by maps in Technical Exhibit 3, Item A, and 50 feet from the center line of park roads, and/or to existing mow lines, and /or to tree lines or vehicles barriers, whichever is furthest from centerline of road.
Contractor/Employees are not required to enter the woods or into the tree line to retrieve trash or debris. All items may be disposed of in Government refuse containers. Limbs and animal/fish remains will be disposed of off Government property and accordance with federal, state and local laws.
Larger items (e.g. tires, appliances, furniture) will be removed from the park areas and placed adjacent to bulk refuse containers or in areas designated by the QAR. The Contractor will not be required to clean up fallen trees resulting from major storms, nor will the Contractor be required to remove timber or natural drift deposited ashore during high water. The Contractor shall be responsible for notifying the QAR and request instructions when such conditions exist. The Contractor shall be responsible for a general ground cleaning after the larger debris has been removed by others.
Scores 85% a minimum on all inspections for the month or 30 calendar day period
Inspection by Periodic Inspections by the COR, DI or QAR.
In the event the Contractor fails to satisfactorily perform all of the work required as specified, within the time specified and according to schedule, a reduction shall be made in the payment. If the services are not performed, the government reserves the right to require the Contractor to re-perform the service or re-procure services outside of this contract and deduct the cost from the Contractor’s
PRS # 3
RESTROOM/ SHOWER
FACILITIES CLEANING
The Contractor shall furnish all labor, equipment, and materials to clean and disinfect all interior and exterior surfaces of restroom/shower facility.
Contractor’s cleaning shall result in surfaces, receptacles and drains shall be free of deposits, dirt, debris, streaks and odors. All surfaces of sinks, toilet bowls, urinals and showers partitions, stalls, stall doors, benches and adjacent walls shall be cleaned and disinfected. All windows, sky lights and or screened louvers shall be free of dirt, dust, insects and insect nest. Windows shall be clean and free of drips, streaks and deposits. All toilets stalls shall be stocked with an adequate supply of rolls of toilet paper (white, two-ply unglazed, clean and dry) to assure supply will not become depleted between cleanings. Rolls with less than ¾ of inch of tissue and rolls that have become wet shall be removed and replaced with new rolls. All toilet paper rolls shall be secured in designated dispensers. All urinals shall contain a fully functional deodorant cake Deodorant cake shall be 100% paradichlorobenzene free, perfumed, and firmly pressured into a hard cake without hanger.
Container/holders shall be required to prevent frequent replacement and blockages in the urinal drain .
After de-scaling, surfaces should be free from streaks, stains, scale, scum, urine deposits, hair and rust stains. All bright work shall be free of streaks. Floor surfaces shall be free from litter, dirt, dust, and debris. Floors shall be uniform in appearance free from streaks, swirl marks detergent residue, or any evidence of soil, stain, film or standing water.