SEE ADDENDUM
(No Collect Calls)
W9126G18Q0050 14-Aug-2018
b. TELEPHONE NUMBER
817-886-1082
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 27Aug 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
GLORIA GONZALES
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, RM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
(817) 886-6403FAX:
TEL: (817) 886-1077 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$32,500,000
NAICS:
532412
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF56
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9126G18Q0050
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Funded Amt:
Articulation Boom Truck Rental
Furnish all labor, equipment and materials to provide Articulating Boom Truck services at locations in the vicinity of the Fort Worth District area lakes in accordance with the Performance Work Statement.
Period of performance: 15 Sep 2018 - 16 September 2019
NAICS CD: 532412
, FSC CD: W038
000101
Funded Amt:
Funding Cooper Lake
000102
Funding Lavon Lake
000103
Funding Lewisville Lake
000104
Funding Grapevine Lake
000105
Funding Belton lake
000106
Funding O.C. Fisher
1001 1 Job
OPTION Funded Amt:
Articulating Boom Truck Rental
Option Period One Period of performance: 15 September 2019 - 16 September 2020
100101
Funding Ray Roberts Lake
100102
Funding Benbrook Lake
100103
Funding Whitney Lake
100104
Funding Proctor Lake
1002 1 Job
OPTION Funded Amt:
Articulating Boom Truck Rental
Option Period Two Period of performance: 15 September 2020 - 16 September 2021
100201
Funding Lake O' the Pines
100202
Funding Wright Patman Lake
100203
Funding Cooper Lake
100204
100205
Funding Bardwell Lake
100206
Funding Aquilla Lake
100207
Funding Stillhouse Hollow
1003 1 Job
OPTION Funded Amt:
Articulating Boom Truck Rental
Period of performance: 15 September 2021 - 16 September 2022
100301
100302
Funding Navarro Mills Lake
100303
Whitney Lake
100304
Georgetown Lake
100305
Granger Lake
OPTION Funded Amt:
Articulating Boom Truck Rental
Period of performance: 15 September 2022 - 16 September 2023
100401
Cooper Lake
100402
100403
Funding Joe Pool Lake
100404
Funding Waco Lake
100405
Funding Sommerville Lake
100406
Funding Canyon Lake
KO STATEMENT
“Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.”
BID SCHEDULE
ARTICULATING BOOM TRUCK SERVICES
FORT WORTH DISTRICT, TEXAS
CONTRACTOR BID SCHEDULE
BASE CONTRACT, PLUS FOUR OPTION YEARS
Furnish all labor, equipment, materials and traffic control at required locations, to provide Articulating Boom Truck services. Bid pricing will be simplified at the lump sum rate and include all services required to provide the Articulating Boom Truck operation, in support of US Army Corps of Engineers Inspectors at area lake locations in the vicinity of the Fort Worth District in accordance with the Performance Work Statement and Performance Requirements Standards, itemized at each location.
BASE PERIOD CONTRACT
Period of Performance: 15 September 2018 through 16 September 2019.
CLIN Description Qty. U/M Unit Price
Price
0001AA Cooper Lake Boom Truck Services with Traffic Control Package
1 LS
0001AB Lavon Lake Boom Truck Services 1 LS
0001AC Lewisville Boom Truck Services 1 LS
0001AD Grapevine Boom Truck Services 1 LS
0001AE Belton Lake Boom Truck Services 1 LS
0001AF O.C. Fisher Boom Truck Services 1 LS
Base Year - Total
OPTION PERIOD ONE Period of Performance: 15 September 2019 through 16 September 2020.
CLIN Description Qty. U/M Unit Price
Price
1001AA
Ray Roberts Lake Boom Truck Services 1 LS
1001AB Benbrook Lake Boom Truck Services 1 LS
1001AC Whitney Lake Boom Truck Services with Traffic Control Package
1 LS
1001AD Proctor Lake Boom Truck Services 1 LS
Option Year One - Total
OPTION PERIOD TWO
Period of Performance: 15 September 2020 through 16 September 2021.
CLIN Description Qty. U/M Unit Price
Price
2001AA
Lake O’ the Pines Boom Truck Services 1 LS
2001AB
Wright Patman Lake Boom Truck Services 1 LS
2001AC
Cooper Lake Boom Truck Services with Traffic Control Package 1 LS
2001AD
Lavon Lake Boom Truck Services 1 LS
2001AE Bardwell Lake Boom Truck Services 1 LS
2001AF Aquilla Lake Boom Truck Services 1 LS
2001AG
Stillhouse Hollow Boom Truck Services 1 LS
Option Year Two - Total
OPTION YEAR THREE
Period of Performance: 15 September 2021 through 16 September 2022.
CLIN Description Qty. U/M Unit Price
Price
1001AA
Lavon Lake Boom Truck Services 1 LS
1001AB Navarro Mills Lake Boom Truck Services 1 LS
1001AC Whitney Lake Boom Truck Services with Traffic Control Package
1 LS
1001AD Georgetown Lake Boom Truck Services 1 LS
1001AE
Granger Lake Boom Truck Services 1 LS
Option Year Three - Total
OPTION YEAR FOUR
Period of Performance15 September 2022 through 16 September 2023.
CLIN Description Qty. U/M Unit Price
Price
2001AA
Cooper Lake Boom Truck Services with Traffic Control Package 1 LS
2001AB
Lavon Lake Boom Truck Services 1 LS
2001AC
Joe Pool Lake Boom Truck Services 1 LS
2001AD
Waco Lake Boom Truck Services 1 LS
2001AE Sommerville Lake Boom Truck Services 1 LS
2001AF Canyon Lake Boom Truck Services 1 LS
Option Period Four - Total
Summary Total Contract Base Year plus four (4) Option Years
Period of Performance - 15 September 2018 through 16 September 2023
Base Year – Subtotal
Option Year One - Subtotal
Option Year Two - Subtotal
Option Year Three - Subtotal
Option Year Four - Subtotal
Base plus Option Year(s) – Contract Total
Contractor Signature:
Date:
PWS
PERFORMANCE WORK STATEMENT (PWS)
ARTICULATING BOOM TRUCK SERVICES
FORT WORTH DISTRICT
FORT WORTH, TEXAS
1. GENERAL: This is a non-personal services contract providing all management, tools, equipment, materials, transportation and labor required to provide on-site Articulating Boom Truck services with a truck driver and traffic control as described herein. The Government shall not exercise any supervision or control over the Contractor or contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts In addition to complying with the requirements outlined in FAR Part 22.13, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs–VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation–Hiring Our Heros http://www.hiringourheroes.org/ Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf
1.1 Description of Services/Introduction: The Contractor shall provide all truck driver personnel, management, tools, equipment, materials, and transportation to provide on-site Articulating Boom Truck services for US Army Corps of Engineers Bridge Inspectors as described herein. These services will be required at various locations within the Fort Worth District (SWF). Services shall be utilized at approximately twenty one lakes within the Fort Worth District. All service results shall be as defined in this Performance Work Statement (PWS). The Contractor shall be required to perform within the standards of this contract.
1.2 Scope: Provide all truck driver personnel, management, tools, equipment, materials, and transportation to provide on-site Articulating Boom Truck services as described herein. These platform services will assist US Army Corps of Engineers inspection personnel in completing annual scheduled inspections as described in the Performance Requirements Summary (PRS) and coordinated schedules (Technical Exhibit 4, “Schedule Forecast”). The objective of these services shall be to furnish an Articulating Boom Truck with driver, with traffic control where required, to provide a safe and timely operating platform for engineering teams to perform mandatory structural inspections at Fort Worth District flood structure bridges. Inspections at these lakes will be performed on approximately eight structures per year at separate locations, across the Fort Worth District’s area of responsibility.
1.3 Period of Performance: Base Year, plus four one year options. All work shall be executed by the issuance a firm fixed contract with work to be performed within the contract period of performance as designated by the Contracting Officer (KO), or Designated Government Representative, Fort Worth District. The period of performance for each year normally occurs over a five to seven day period once a year during the spring season and barring adverse weather conditions.
1.4 General Information
1.4.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services in the form of a Quality Control Plan (QCP). The QCP is the method the Contractor uses to ensure all work complies with the requirements of the contract. The QCP is to be delivered within 30 calendar days after contract award.
One (1) copy of a comprehensive written QCP shall be submitted for approval by the KO or Designated Government Representative. Any proposed changes to an approved QCP, shall be submitted, in writing to the Designated Government Representative for review and approval.
1.4.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure the Contractor’s quality control program is effective and is performing all work in accordance with the Performance Work Standards in Technical Exhibit 1, “Performance Work Summary” (PRS). The QASP defines how the performance standards will be applied, method of surveillance, and the performance threshold. Inspections will be performed by a Designated Government Representative on behalf of the KO.
1.4.3 Government Holidays: The Contractor shall not be required to perform services on Federal holidays.
This information provided for informational purposes only, observed federal holidays are as follows:
New Year’s Day Labor Day Martin Luther King Jr. Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.4.4 Hours of Operation: Work days and hours of operation are anticipated to be Monday through Friday between 0700 and 1730, with possible carryover to Saturday at some locations, if necessary. Completion of all bridge inspections is anticipated to be accomplished continuously within a 5-8 period, for individual Base and Option periods. The inspection schedule will be coordinated by the Designated Government Representative, with the Contractor, to best serve the inspection team. A specific sequence will be determined and followed to minimize mobility and travel all for all parties. Contractor work hours shall be accomplished as needed to perform tasks within the parameters in regards to the approved schedule and suitable weather conditions. Refer to Technical Exhibit 4, “Schedule Forecast” for the estimated schedule and locations. This schedule may be altered by the Government as necessary in the event of inclement weather or uncontrollable circumstances, construction, etc. with the approval of the KO.
1.4.5 Place of Performance: The work to be performed under this contract will include multiple lakes within the Fort Worth District, Fort Worth, Texas (Technical Exhibit 4, “Schedule Forecast”). These facilities, scheduled within the Base and two Option periods, are located as follows;
a. Aquilla Lake - Located near Hillsboro, Texas, between SH 22 and FM 310, Aquilla, TX
(Managed from the Whitney Lake Project). (254) 622-3332
b. Bardwell Lake - 4000 Observation Dr., Ennis, TX 75119. (972) 875-5711
c. Belton Lake - 3740 FM 1670, Belton, TX 76513 (254) 939-2461
d. Benbrook Lake – 7001 Lakeside Dr. Fort Worth, TX 76114 (817) 732-0761
e. Canyon Lake - 601 USACE Rd., Canyon Lake, TX 78133 (830) 964-3341
f. Cooper Lake - 828CR 4795, Sulphur Springs, TX 75482 (903) 945-2108
g. Georgetown Lake - 500 Lake Overlook Dr., Georgetown, TX 78628 (512) 930-5253
h. Granger Lake - 3100 Granger Lake Rd., Granger, TX 76530 (512) 859-2668
i. Grapevine Lake – 1527 W State Hwy 114, Grapevine, TX 76051 (817) 865-2601
j. Joe Pool Lake - 6399 FM 1382, Dallas, TX 75249 (972) 299-2227
(Managed from the Benbrook Lake Project).
k. Lake O’ Pines Lake - 2669 FM 726, Jefferson, TX 75657 (903) 665-2336
l. Lavon Lake - 3375 Skyview Drive, Wylie, TX 75098 (972) 442-3141
m. Lewisville Lake – 1801 N Mill St., Lewisville, TX 75057 (469) 645-9100
n. Navarro Mills Lake - 1175 FM 726, Purdon, TX 76679 (254) 578-1431
o. O.C. Fisher Lake - 3900 Mercedes Dr., San Angelo TX 76901 (325)625-2322 (Managed from the Hord’s Creek Lake Project).
p. Proctor Lake - 2180 FM 2861, Comanche, TX 76442 (254)879-2424
q. Ray Roberts Lake – 9401 Lake Ray Roberts Dam Rd, Aubrey, TX (469) 645-9100
(Managed from the Lewisville Lake Project).
r. Somerville Lake - 1560 Thornberry Dr., Somerville, TX 77879 (979) 596-1622
s. Stillhouse Hollow Lake – 3740 FM 1670, Belton, TX 76513 (254) 939-2461 (Managed from the Belton Lake Project)
t. Waco Lake Project – 3801 Zoo Park Dr., Waco, TX 76708. (254) 756-5359
u. Whitney Lake Project - 285 CR 3602, Clifton, TX 76634. (254) 622-3332
v. Wright Patman Lake – 64 Clear Springs Park, Texarkana, TX 75501 (903) 838-8781
1.4.6 Type of Contract: The Government will award a Firm Fixed Price contract. Invoices shall be submitted at the completion of each annual inspection cycle and per Technical Exhibit 2, item g.
1.4.7 Security Requirements: All Contractor and all associated Sub-contractors employees shall comply with applicable facility access and local security procedures (provided by Government Representative).
The Contractor shall also provide all information for background checks to meet facility access requirements to be accomplished by the Government organizations Director of Emergency Services or Security Office. Contract workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and /or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility change, the Government may require changes in the Contractor security matters or processes. Contractor and all associated sub-contractors employees shall comply with adjudicated standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available).
1.4.7.1 The Contractor must pre‐screen Candidates using the E‐verify Program (https://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the COR, no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I‐9, Employment Eligibility Verification. This Form and a list of eligible employees will be provided to the KO and shall become part of the official contract file.
Refer to Technical Exhibit 2, Item F.
1.4.7.2 “i-WATCH”, Corps Watch, or See Something, Say Something program. The Contractor and all associated sub-contractors shall receive a brief/training on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the KO, NLT 5 calendar days after the completion of the training. The i-Watch/CORPS watch training video and literature can be found at the following web site. http://www.swf.usace.army.mil/Missions/Antiterrorism-Community- Awareness/AT-OPSEC-for-Contractors/.
1.4.7.3 Key Control: All Government keys provided to Contractors will be issued and controlled IAW Army Regulation 190-51. NOTE: All references to keys include key cads. No keys issued to the Contractor by the Government shall be duplicated without expressed written permission from the KO and with a complete count and inventory of all keys in the Contractor’s possession.
The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the KO. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the KO. All keys shall be forfeited to the Government at the completion, expiration, or termination of this contract.
1.4.7.4 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property during the execution of this contract.
1.4.7.5 Key Control: No keys shall be issued during the execution of this contract.
1.4.7.6 Identification of Contractor Employees: The Contractor shall provide each of its employees who will be involved in the performance of the contract, on a Government facility, with a uniform shirt clearly displaying the company’s name and logo screen printed on the left breast area or on the back or, a photo identification badge while on Government property.
Employees shall wear, in clear view or have photo badges on their person as they perform duties to execute the work items under this contract. The Contracting Officer or Government Representative shall approve the uniform shirt or photo identification badges before the commencement of contract performance. It is the Contractor’s responsibility to ensure that all Contractor personnel wear the uniform shirt or identification badge at all times when performing work under this contract at a Government facility. Contractor shall allow only persons directly involved with accomplishment of the Contractor's operations in facilities serviced by this contract (i.e., no friends, guests, children, or pets).
1.4.7.7 Contractor’s Employee Conduct: The Contractor shall be responsible for insuring employees strictly comply with all Federal, State, and Municipal laws. Any illegal or criminal activity shall result in the removal of the employee/employees and or may result in the termination of the contract. The Contracting Officer or Contracting Officer’s Representative may require the Contractor to immediately remove from work site any employee of the Contractor or Subcontractor, who, in the opinion of the KO or Designated Government Representative endangers persons or property, or whose physical or mental conditions are such that it would impair the employee’s ability to satisfactorily perform work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone and shall be confirmed in writing as soon as possible. No such removal, however, shall reduce the obligation to perform all work required under the contract and immediate replacement shall be made as required. This removal shall not be made the basis of any claim for compensation or damages against the United States or any of its employees, officers, or agents. Employee attire shall meet the requirements of the EM 385-1-1, “Safety and Health Requirements Manual”.
1.4.8 Safety: The Contractor shall develop and execute an effective safety program to ensure all required services are performed safely. The Contractor shall develop and implement procedures to identify, minimize and prevent safety risks in the form of a Safety Plan. The Contractor’s Safety Plan is the means by which he assures safety of personnel in the work place. The Safety Plan is to be delivered with the Contractor’s proposal. One (1) copy of a comprehensive written Safety Plan shall be submitted for approval by the KO or Designated Government Representative. Any proposed changes to an approved plan shall be submitted, in writing, to the KO or Designated Government Representative for review and approval. The Contractor shall exercise all applicable safety rules in accordance with the Occupational Safety and Health Administration (OSHA) and all pertinent provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, most current version. A web based version of this manual may be viewed at; http://publications.usace.army.mil/publications/eng-manuals.
OSHA standards are subject to change and such changes may affect the Contractor in their performance during the contract period and shall be at no additional cost to the Government.
1.4.9 Special Qualifications: The Contractor shall, without additional expense to the Government, be responsible for obtaining any and all necessary licenses, permits, and letters of certification. All current federal, state and county rules and regulations shall be met and maintained throughout the performance of the work specified under this contract.
1.4.10 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Subpart 42.5 of the Federal Acquisition Regulation. The KO or Designated Government Representative, as designated, may periodically meet with the Contractor to review the Contractor's performance. At these meetings the KO or Designated Government Representative will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
These meetings shall be at no additional cost to the Government.
1.4.11 Contracting Officer Representative (COR): In accordance with Federal Acquisition Regulations, the assignment of a COR is not anticipated during the course of this contract action, unless deemed necessary by the KO. If deemed necessary, the COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform specific functions as authorized by the KO. These functions may include but, are not limited to; assuring the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements including Government drawings, designs, specifications. The COR will also monitor Contractor's performance and notify both the KO and Contractor of any deficiencies, coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms, conditions or price of the contract.
1.4.12 Contractor Key Personnel: The following personnel are considered key personnel by the Government: The Contractor, Contractor’s Superintendent/Manager, or Quality Control Inspectors. The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work.
The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the KO or Designated Government Representative. The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
1.4.13 Contractor Travel: Any travel requirement associated with this contract is at the Contractor’s own expense and shall be at no additional cost to the Government.
1.4.14 Data Rights: Not applicable under this contract.
1.4.15 Organizational Conflict of Interest: Contractor and Subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI.
The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.5. GOVERNMENT FURNISHED ITEMS AND SERVICES:
1.5.1 Facilities: No Government facilities will be provided, unless authorized on a temporary basis while on site and authorized by the Lake Manager while in execution of services at the specific lake.
1.5.2 Equipment: No Government owned equipment will be made available for use by the Contractor.
1.5.3 Materials: The Government will provide access to water, restroom facilities, etc. where available.
The Government may provide the required forms for preparation of Job Hazard Analysis and safety inspections. No other supplies or materials shall be provided under this contract.
1.6 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
1.6.1 General: The Contractor shall furnish all supplies, equipment, to include specialized safety equipment, facilities, services, training, certifications, licenses and management required to perform work under this PWS.
1.6.2 Equipment: The Contractor shall provide all equipment necessary to accomplish the services required by this PWS including but, not limited to; Articulating Boom Truck with Operator, Pilot Truck with Operator, traffic or warning signs, traffic cones, etc. The Contractor shall be responsible for providing and insuring the proper use of all Personal Protective Equipment (PPE) required by OSHA regulation, the EM 385-1-1. All equipment must be inspected and approved by the KO or Designated Government Representative prior to use, this inspection will insure strict safety compliance IAW EM 385-1-1 and OSHA standards.
1.6.3 Materials: The Contractor shall provide all materials required by this PWS and to meet any requirements TX Department of Public Safety regulations or laws.
1.7 CONTRACTOR MANAGEMENT REPORTING (CMR): Not applicable under this contract.
1.8 APPLICABLE PUBLICATIONS (CURRENT EDITIONS). The Contractor must abide by all applicable regulations, publications, manuals, State, local and regulations, policies and procedures.
Regarding safety and health standards, the Contractor shall follow the guidelines of OSHA and the Engineer Manual (EM) 385-1-1, entitled "Safety and Health Requirements Manual".
1.9 Attachment/Technical Exhibit List:
1.9.1 Attachment 1/Technical Exhibit 1- Performance Requirements Summary.
1.9.2 Attachment 2/Technical Exhibit 2 - Deliverables Schedule.
1.9.3 Attachment 3/Technical Exhibit 3 - Platform Specifications.
1.9.4 Attachment 4/Technical Exhibit 4 – Schedule Forecast
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
Standard Performance Threshold
Method of Surveillance
PRS #1.
Articulating Boom Truck with qualified driver.
Contractor shall provide an Articulating Boom Truck and driver, on-site at each inspection location.
Articulating Boom Truck will be on site at the designated day and time within the period of performance and coordinated by the Designated Government Representative. Truck shall meet the specifications listed in Technical Exhibit 2, “Platform Specifications”.
100% completion of services, as needed to complete each bridge inspection.
The 100% inspection method will be used to monitor all contract services.
Verification of services will be performed by the Designated Government Representative.
PRS # 2.
Traffic Control.
Contractor shall provide necessary traffic control to insure the safety of the Articulating Boom Truck, driver and inspection team at the necessary public roadway locations.
Traffic control shall meet Manual Uniformed Traffic Control Devices 7, application #10 with Pilot Car.
100% completion of services, as needed to complete each bridge inspection.
The 100% inspection method will be used to monitor all contract services.
Verification of services will be performed by the Designated
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To Item a. The Contractor shall attend a pre-work conference prior to initiation of any work under this contract and, if required, meetings to discuss safety or hazardous activities.
Conference may be in person or by teleconference, as coordinated by the Designated Government Representative. Refer to PWS paragraph 1.4.10.
Contractor shall be required to attend a meeting prior to commencement of initial work or at any time the KO or Designated Government Representative determines performance does not meet the minimum standards of this contract, or issues concerning safety are present.
Submission of a response is required to satisfy all meeting sign in logs or identify corrective actions.
The Contractor shall submit responses by hard copy, fax or electronic, email format to resolve safety issues or provide corrective action plans.
Initial Submission shall be made to the Whitney Project Office, Attn: James Nolen, CR 285 CR 3602, Clifton, TX 76634
Item c. The Contractor shall submit a detailed Safety Plan for review and approval by the KO or Designated Representative. This plan shall describe the Contractor’s method to insure safe operations, emergency accident prevention and response, the nearest emergency medical treatment facility for intended use. Activity Hazard Analysis (AHA), and Personal Protective Equipment needs and uses shall be included in this plan. Refer to PWS paragraph 1.4.8.
Contractor shall submit a Safety Plan prior to the start of operations for review and approval by the Government Representative. All plans and analysis shall be prepared in accordance with OSHA and the U.S.
Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1- 1, latest edition.
One copy required and subject to review and approval by the KO or Designated Representative.
The Contractor shall submit responses by hard copy, fax or electronic, email format to resolve safety issues or provide corrective action plans.
Initial Submission shall be made to the Whitney Project Office, Attn: James Nolen, Item e. Equipment Safety Inspection.
Contractor shall be required to inspect all equipment to be used prior to the start of each duty day. The purpose of this inspection shall be to ensure safe operations and compliance with EM 385-1-1 and OSHA standards. Refer to PWS paragraph 1.6.2.
All equipment shall be inspected at the start of work or anytime equipment has been removed from Government property. A completed inspection form or records shall accompany the vehicle.
A completed equipment inspection form shall be required and subject to review and acceptance by the Designated Representative.
The Contractor shall present equipment records upon request by the Designated Representative.
Initial Submission shall be made to the Whitney Project Office, Attn: James Nolen, Deliverable Frequency # of Copies Medium/Format Submit To
Item g. Contractor shall submit a complete and accurate invoice upon completion of work. The Contractor may submit a request partial payment upon completion of CLINs at each individual lake, or at completion of work for multiple lakes.
Invoices shall include the contract number, the Contractor’s name, address and contact information as registered under the System for Acquisition Management (SAM) and a list of completed CLINs. Prices shall be derived from the contract bid schedule for the appropriate Base or Option Year pricing.
Refer to PWS paragraphs
1.3 and 1.4.5.
One copy at the completion of each annual series of inspections, subject to verification, review and acceptance by the Designated Representative upon completion of work.
Resubmission may be required as needed if corrections are required.
One copy required and subject to review and approval by the KO or Designated
The Contractor shall submit by hard copy, fax or electronic email format. Any noted deficiencies shall be resolved prior to payment being approved and completed.
Invoice submissions shall be made to the Whitney Project Office, Attn: James Nolen, TECHNICAL EXHIBIT 3
PLATFORM SPECIFICATIONS
(Articulating Boom Truck)
Platform Features Requirements Remarks
Horizontal Range 30’
Max Lower Depth 40’
Rotation of Main Turret
270 degrees
Rotation of 2nd Turret-total both sides
280 degrees
1st Boom (length) 11’6
2nd Boom (length) 15’10”
3rd Boom (length) 15’-26’
4th Boom (length) 5’6”
Width of Platform 3 Man Bucket 2 Engineers occupy during inspection procedure
Platform Capacity 600lbs or greater 600 lb. minimum
Overall Width 8’5” Bridge size restrictions
Overall Height 11”6” Bridge size restrictions
Overall Length 41’ Approximate length
Space Restriction 8’ Approximate safe operating space
Weight NTE 40,000 lbs. Bridge weight restrictions
TECHNICAL EXHIBIT 4
SCHEDULE FORECAST
BASE PERIOD CONTRACT
Period of Performance: 01 September 2018 – 31 August 2019.
(All services anticipated to be accomplished within 5-7 days – spring 2019)
Cooper Lake Boom Truck Services (Day 1) Note: Public Bridge-Traffic Control Required
Lavon Lake Boom Truck Services (Day 2)
Lewisville Lake Boom Truck Services (Day 2)
Grapevine Lake Boom Truck Services (Day3)
Belton Lake Boom Truck Services (Day4)
O.C. Fisher Lake Boom Truck Services (Day 5)
OPTION PERIOD ONE
Period of Performance: 01 September 2019 – 31August 2020.
(All services anticipated to be accomplished within 5-7 days - spring 2020)
Ray Roberts Lake Boom Truck Services (Day 1)
Benbrook Lake Boom Truck Services (Day 2)
Whitney Lake Boom Truck Services (Day 3/4) Note: Public Bridge-Traffic Control Required
Proctor Lake Boom Truck Services (Day 5)
OPTION PERIOD TWO
Period of Performance: 01 September 2020 – 31August 2021.
(All services anticipated to be accomplished within 5-7 days – spring 2021)
Lake O’ the Pines Lake Boom Truck Services (Day 1)
Wright Patman Lake Boom Truck Services (Day 1)
Cooper Lake Boom Truck Services (Day 2) Note: Public Bridge-Traffic Control Required
Lavon Lake Boom Truck Services (Day 2)
Bardwell Lake Boom Truck Services (Day 3)
Aquilla Lake Boom Truck Services (Day 4)
Stillhouse Hollow Lake Boom Truck Services (Day 5)
OPTION PERIOD THREE
Period of Performance: 01 September 2021 – 31August 2022.
(All services anticipated to be accomplished within 5-7 days – spring 2022)
Lavon Lake Boom Truck Services (Day 1)
Navarro Mills Lake Boom Truck Services (Day 2)
Whitney Lake Boom Truck Services (Day 3) Note: Public Bridge-Traffic Control Required
Georgetown Lake Boom Truck Services (Day 4)
Granger Lake Boom Truck Services (Day 5)
OPTION PERIOD FOUR
Period of Performance: 01 September 2022 – 31August 2023.
(All services anticipated to be accomplished within 5-7 days – spring 2023)
Cooper Lake Boom Truck Services (Day 1) Note: Public Bridge-Traffic Control Required
Lavon Lake Boom Truck Services (Day 1)
Joe Pool Lake Boom Truck Services (Day 2)
Waco Lake Boom Truck Services (Day 3)
Somerville Lake Boom Truck Services (Day 4)
Canyon Lake Boom Truck Services (Day 5)
QASP
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled, Articulating Boom Truck Services, Fort Worth District. This plan sets forth the procedures and guidelines Designated Staff will use in ensuring the required performance standards or services levels are achieved by the Contractor.
Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards/acceptable quality levels identified in the PWS and the Contractor’s Quality Control Plan (QCP), and to ensure that the government pays only for the level of services received.
This QASP defines the roles and responsibilities of all members of the Integrated Project Team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the Contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the Contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the COR to monitor and manage the Contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved.
Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the Contractor.
Performance management represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints.
The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
Performance Management Strategy The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor’s own Quality Control Program (QCP). QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by Contractor employees or by Subcontractors. The Contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The Contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the Contractor’s QC program.
1.3.2 The Government designated representative(s) will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
ROLES AND RESPONSIBILITIES
The Contracting Officer (KO) The Contracting Officer (KO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer’s Representative (COR) and the Contractor. The KO will designate one full-time COR as the Government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the Contractor’s performance, and must be identified and designated by the KO.
The Contracting Officer’s Representative (COR) The COR is designated in writing by the KO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
2.3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the Performance Requirements Summary (PWS) and in Attachment 1, “Performance Requirements Summary.” If the Contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. If the Contractor the service or performance level, it may be eligible to receive option years for as many as two additional years, if stated in the contract. Failure to meet the required service or performance level may result in a deduction from the monthly amount and the Government may elect not to award additional option years.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate Contractor performance when appropriate. The primary method of surveillance will be;
Periodic Inspection, which shall be performed by the COR or designated Quality Assurance Inspector.
Customer Feedback The Contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the Contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR or KO as opposed to the Contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR or KO.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
Acceptable Quality Levels The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary (PRS) Table, for Contractor performance are structured to allow the Contractor to manage how the work is performed while providing negative incentives for performance shortfalls.