B3_Solicitation.pdf

PDF 2 MB Posted

Attached to
Three Rivers Regional Lakes Tree Maintenance Services Federal contract opportunity
Solicitation number
W9126G18Q0031
Issued by
Department of the Army Corps of Engineers Engineering District Fort Worth

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9126G18Q0031 18-Jul-2018

b. TELEPHONE NUMBER

817-886-1082

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 08 Aug 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9126G9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

GLORIA GONZALES

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, RM 2A17

FORT WORTH TX 76102-0300

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 9674CJ 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

THREE RIVERS REGIONAL PROJECT OFFICE

JAMES NOLEN

285 CR 3602

CLIFTON TX 76634

TEL: (254)622-3332 FAX:

(817) 886-6403FAX:

TEL: (817) 886-1077 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$7,500,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF146

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job

Funded Amt:

Base- 3 RIvers Tree Maintenance Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision necessary to perform tree removal, trimming, dead or storm damaged tree removal, stump grinding, boundary fence line clearing in IAW the Performance Work Statement.

Period Of Performance: 31 August 2018 - 1 September 2019

Minimum qurantee applies to the base only. The total value for all years (base plus options) shall not exceed the maximum value.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 Job

OPTION Funded Amt:

Option Yr 1 - 3 Rivers Tree Maintenenace Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision necessary to perform tree removal, trimming, dead or storm damaged tree removal, stump grinding, boundary fence line clearing in IAW the Performance Work Statement.

Period Of Performance: 31 August 2019 - 1 September 2020

The total value for all years (base plus options) shall not exceed the maximum value.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 Job

OPTION Funded Amt:

Option Yr 2 - 3 Rivers Tree Maintenance Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision necessary to perform tree removal, trimming, dead or storm damaged tree removal, stump grinding, boundary fence line clearing in IAW the Performance Work Statement.

Period Of Performance: 31 August 2020 - 1 September 2021

The total value for all years (base plus options) shall not exceed the maximum value.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 Job

OPTION Funded Amt:

Option Yr 3 - 3 Rivers Tree Maintenance Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision necessary to perform tree removal, trimming, dead or storm damaged tree removal, stump grinding, boundary fence line clearing in IAW the Performance Work Statement.

Period Of Performance: 31 August 2021 - 01 September 2022

The total value for all years (base plus options) shall not exceed the maximum value.

KO STATEMENT

“Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.”

INSTRUCTIONS TO OFFERORS

QUOTER DUE DATE/LOCAL TIME: SEE COVER PAGE

POINT OF CONTACT: Gloria Gonzales Phone: (817)-886-1082

Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hands carry, “NO EXCEPTIONS.” EMAIL your proposal to: CIV-OPS.Proposals@usace.army.mil and gloria.gonzales@usace.army.mil. Subject line of email MUST include the solicitation number and your Company Name.

For additional help contact your local Association Procurement Technical Assistance Centers (PTAC). Centers were created by Congress to assist businesses seeking to compete on federal contracts. Services are generally free; however, a small fee may be charged for certain services.

Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.

SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: http://www.sam.gov.

DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business.

DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).

Click here to request your D-U-N-S Number via the Web. The website to obtain your DUNS number:

http://fedgov.dnb.com/webform For technical difficulties, contact govt@dnb.com or phone 866-705-5711.

ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA)

allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Manager (SAM): http://www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM.

WAGE RATES: The Service Contract Act applies (see attached wage rates).

Below is a checklist to assist you to ensure all the proper documents are returned for consideration on this solicitation. Only those items checked below as “required” must be returned

Required Contractor Item

Complete ALL Bid Schedule(s), Sign SF 1449, Sign Amendments (Blocks 15a-15c) (if applicable) and return

CHECK YOUR QUOTES FOR MATHEMATICAL ERRORS

DO NOT ROUND UP OR DOWN

ANNOTATE UNIT AND TOTAL COSTS TO THE HUNDRETH POSITION

Complete vendor information sheet or provide a document with similar information sign AND date.

The provisions at 52.212-1, 52.212-2, 52.212-3 Alt I, 52.212-5 and apply to this acquisition. Confirm vendor’s 52.212-3 Alt I ORCA is updated in SAM on the vendor information sheet.

You must have an active SAM registration prior to award

Submit past performance IAW 52.212-2 Commercial Evaluation Factors.

Ensure former employer returns the form and references the solicitation number and Company Name in the email subject line.

Scan all documents into a single.pdf file. PDF only authorized format

HAND WRITTEN BID SCHEDULES WILL NOT BE ACCEPTED!

EMAIL your proposal to: CIV-OPS.Proposals@usace.army.mil & gloria.gonzales@usace.army.mil Subject line of email must include the solicitation number and Company Name.

**Please see clause 52.228-5 Insurance and Insurance MFR for insurance requirements.

Vendor Information Sheet

IN THE EVENT OF AWARD, ISSUE CONTRACT TO:

COMPANY NAME

POC

(Last, First Middle)

ADDRESS

(Number & Street) (City, State and Zip)

PHONE NUMBER MOBILE

(Area code and number) (Area code and number)

EMAIL ADDRESS___________________________________________

DUNS NUMBER CAGE CODE NUMBER________

SSN/TIN NUMBER or firm’s Tax ID Number (TIN) ______________________________

Vendor’s Online Representation and Certification Application (ORCA) is updated in SAM Yes

No

52.237-1 SITE VIST

FAR 52.237-1- Highly recommend potential offerors attend a site visit. Vendors must confirm their intent to attend a conference with the POC listed below prior to attending the event.

Address: Whitney Project Office 285 County Road 3602 Clifton, TX 76634

POC: James Nolen Contact Info: (254)-622-7406

Email: james.w.nolen@usace.army.mil

Conference: Thursday, 26 Jul 2018 @ 10:00 am CST

PREVIOUS CONTRACT INFORMATION:

Contract #: W9126G-15-D-0013 - $4.5M – Base w/ two options Contractor: Worley’s Tree Services Inc

INSURANCE

Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN: CESWF-CT-S, P.O.

Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office. The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:

Submit a copy of Insurance Certificate directly to:

Whitney Project Office POC: James Nolen 285 County Road 3602 Clifton, TX 76634

Or email to: james.w.nolen@usace.army.mil Phone: (254)-622-7406

(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.

(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $100,000 per accident for bodily injury and $20,000 per accident for property damage.

(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000.00 or in compliance with applicable State statutes.

(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.

NOTE:

(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.

NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm name: CAGE Code:

Address: DUNS Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy) Explain Differences:

Original Contract Price (Award Amount):

Final contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT

RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil and gloria.gonzales@usace.army.mil. Ensure the former employer references the solicitation number in the email subject line.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract

Rating will be neither positive or negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?

E VG S M U N

b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agree price(s)?

E VG S M U N

b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.

Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

YES NO

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are

YES NO

there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.

YES NO

6. SAFETY/SECURITY

a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)

b) Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below)

YES NO

d) In Summary, provide an overall rating for the work performed by this contractor.

AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil and gloria.gonzales@usace.army.mil Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary)

W9126G18Q0031

BID SHEETS

Contractor Bid Sheet

Three Rivers Regional Lakes Tree Maintenance Services

Tree Maintenance Services for Three Rivers Regional Lakes. These lakes include Aquilla, Navarro Mills, Whitney, Waco, Proctor, Hord's Creek and O.C. Fisher Lakes.

Indefinite Delivery/Indefinite Quantity Supplies and Non-Personal Services The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform tree trimming, removal, dead or storm damaged tree removal, stump grinding, boundary fence line clearing and services described herein, at the Three Rivers Regional Lakes of Central and west Texas, these being Navarro Mills, Aquilla, Whitney, Waco, Proctor, Hord’s Creek and OC Fisher Lakes. All services will be performed in accordance with the attached Performance Work Statement and as required by State and Federal regulations.

CONTRACT BASE YEAR

0001 TREE MAINTENANCE SERVICES - THREE RIVERS REGIONAL LAKES

BASE: 31 August 2018, or date of award whichever is later, through 1 September 2019.

ITEM DESCRIPTION EST.QTY U/M

UNIT

PRICE

AMOUNT

0001AA TREE PRUNING/DEAD LIMB REMOVAL,LESS THAN 15', PER TREE 300 EA

0001AB

TREE PRUNING/DEAD LIMB REMOVAL, HIGHER THAN 15', PER

TREE

300 EA

0001AC TREE REMOVAL, LESS THAN EIGHT (8) INCHES 100 EA

0001AD TREE REMOVAL, EIGHT (8) TO FIFTEEN (15) INCHES 100 EA

0001AE TREE REMOVAL, SIXTEEN (16) TO TWENTY FOUR (24) INCHES 120 EA

0001AF TREE REMOVAL, GREATER THAN TWENTY FOUR (24) INCHES 200 EA

0001AG TREE REMOVAL, ALL SIZES, REQUIRED TO BE PIECED DOWN 100 EA

0001AH BOUNDARY LINE CLEARING 20 MI

0001AI STUMP REMOVAL, GRINDING, LESS THAN 24" INCHES 100 EA

0001AJ STUMP REMOVAL, GRINDING, 24" TO 36" INCHES 100 EA

0001AK STUMP REMOVAL, GRINDING, GREATER THAN 36" INCHES 200 EA

0001AL STUMP REMOVAL, GRUBBING, LESS THAN 12" INCHES 10 EA

0001AM STUMP REMOVAL, GRUBBING, 12" TO 20" INCHES 30 EA

0001AN STUMP REMOVAL, GRUBBING, GREATER THAN 20" INCHES 30 EA

SUMMARY - CONTRACT BASE - ITEMS 0001AA THRU 0001AN TOTAL

CONTRACT OPTION YEAR ONE

1001 TREE MAINTENANCE SERVICES - THREE RIVERS REGIONAL LAKES

OPTION YEAR ONE: 31 August 2019, or date of award whichever is later, through 01 September 2020.

ITEM DESCRIPTION EST.QTY U/M

UNIT

PRICE

AMOUNT

1001AA TREE PRUNING/DEAD LIMB REMOVAL,LESS THAN 15', PER TREE 200 EA

1001AB

TREE PRUNING/DEAD LIMB REMOVAL, HIGHER THAN 15', PER

TREE

200 EA

1001AC TREE REMOVAL, LESS THAN EIGHT (8) INCHES 75 EA

1001AD TREE REMOVAL, EIGHT (8) TO FIFTEEN (15) INCHES 75 EA

1001AE TREE REMOVAL, SIXTEEN (16) TO TWENTY FOUR (24) INCHES 100 EA

1001AF TREE REMOVAL, GREATER THAN TWENTY FOUR (24) INCHES 175 EA

1001AG TREE REMOVAL, ALL SIZES, REQUIRED TO BE PIECED DOWN 75 EA

1001AH BOUNDARY LINE CLEARING 15 MI

1001AI STUMP REMOVAL, GRINDING, LESS THAN 24" INCHES 100 EA

1001AJ STUMP REMOVAL, GRINDING, 24" TO 36" INCHES 100 EA

1001AK STUMP REMOVAL, GRINDING, GREATER THAN 36" INCHES 200 EA

1001AL STUMP REMOVAL, GRUBBING, LESS THAN 12" INCHES 10 EA

1001AM STUMP REMOVAL, GRUBBING, 12" TO 20" INCHES 20 EA

1001AN STUMP REMOVAL, GRUBBING, GREATER THAN 20" INCHES 20 EA

SUMMARY - OPTION YEAR ONE - ITEMS 1001AA - 1001AN TOTAL

CONTRACT OPTION YEAR TWO

2001 TREE MAINTENANCE SERVICES - THREE RIVERS REGIONAL LAKES

OPTION YEAR TWO: 31 August 2020, or date of award whichever is later, through 1 September 2021.

ITEM DESCRIPTION EST.QTY U/M

UNIT

PRICE

AMOUNT

2001AA TREE PRUNING/DEAD LIMB REMOVAL,LESS THAN 15', PER TREE 200 EA

2001AB TREE PRUNING/DEAD LIMB REMOVAL, HIGHER THAN 15', PER

TREE

200 EA

2001AC TREE REMOVAL, LESS THAN EIGHT (8) INCHES 75 EA

2001AD TREE REMOVAL, EIGHT (8) TO FIFTEEN (15) INCHES 75 EA

2001AE TREE REMOVAL, SIXTEEN (16) TO TWENTY FOUR (24) INCHES 100 EA

2001AF TREE REMOVAL, GREATER THAN TWENTY FOUR (24) INCHES 175 EA

2001AG TREE REMOVAL, ALL SIZES, REQUIRED TO BE PIECED DOWN 75 EA

2001AH BOUNDARY LINE CLEARING 15 MI

2001AI STUMP REMOVAL, GRINDING, LESS THAN 24" INCHES 125 EA

2001AJ STUMP REMOVAL, GRINDING, 24" TO 36" INCHES 125 EA

2001AK STUMP REMOVAL, GRINDING, GREATER THAN 36" INCHES 125 EA

2001AL STUMP REMOVAL, GRUBBING, LESS THAN 12" INCHES 10 EA

2001AM STUMP REMOVAL, GRUBBING, 12" TO 20" INCHES 20 EA

2001AN STUMP REMOVAL, GRUBBING, GREATER THAN 20" INCHES 20 EA

SUMMARY - OPTION YEAR TWO - ITEMS 2001AA - 2001AN TOTAL

CONTRACT OPTION YEAR THREE

3001 TREE MAINTENANCE SERVICES - THREE RIVERS REGIONAL LAKES

OPTION YEAR THREE: 31 August 2021, or date of award whichever is later, through 01 September 2022.

ITEM DESCRIPTION EST.QTY U/M

UNIT

PRICE

AMOUNT

3001AA TREE PRUNING/DEAD LIMB REMOVAL,LESS THAN 15', PER TREE 200 EA

3001AB TREE PRUNING/DEAD LIMB REMOVAL, HIGHER THAN 15', PER

TREE

200 EA

3001AC TREE REMOVAL, LESS THAN EIGHT (8) INCHES 75 EA

3001AD TREE REMOVAL, EIGHT (8) TO FIFTEEN (15) INCHES 75 EA

3001AE TREE REMOVAL, SIXTEEN (16) TO TWENTY FOUR (24) INCHES 100 EA

3001AF TREE REMOVAL, GREATER THAN TWENTY FOUR (24) INCHES 175 EA

3001AG TREE REMOVAL, ALL SIZES, REQUIRED TO BE PIECED DOWN 75 EA

3001AH BOUNDARY LINE CLEARING 10 MI

3001AI STUMP REMOVAL, GRINDING, LESS THAN 24" INCHES 125 EA

3001AJ STUMP REMOVAL, GRINDING, 24" TO 36" INCHES 125 EA

3001AK STUMP REMOVAL, GRINDING, GREATER THAN 36" INCHES 125 EA

3001AL STUMP REMOVAL, GRUBBING, LESS THAN 12" INCHES 10 EA

3001AM STUMP REMOVAL, GRUBBING, 12" TO 20" INCHES 20 EA

3001AN STUMP REMOVAL, GRUBBING, GREATER THAN 20" INCHES 20 EA

SUMMARY - OPTION YEAR THREE - ITEMS 3001AA - 3001AN TOTAL

BASE YEAR TOTAL (CLIN 0001AA - 0001AN)

OPTION YEAR ONE TOTAL (CLIN 1001AA - 1001AN)

OPTION YEAR TWO TOTAL (CLIN 2001AA - 2001AN)

OPTION YEAR THREE TOTAL (CLIN 3001AA - 3001AN)

BASE AND ALL OPTIONS - CLIN 0001AA-3001AN TOTAL

This Contract Bid Sheet must be signed and dated by the Contractor to be considered a valid submission for the applicable Government Solicitation.

Contractor Signature: Date:

Three Rivers Regional Lakes Tree Maintenance Services

Contractor Bid Sheet – Task Order #1

Tree Maintenance Services for Three Rivers Regional Lakes. These lakes include Aquilla, Navarro Mills, Whitney, Waco, Proctor, Hord's Creek and O.C. Fisher Lakes.

Indefinite Delivery/Indefinite Quantity Supplies and Non-Personal Services The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform tree trimming, removal, dead or storm damaged tree removal, stump grinding, boundary fence line clearing and services described herein, at the Three Rivers Regional Lakes of Central and west Texas, these being Navarro Mills, Aquilla, Whitney, Waco, Proctor, Hord’s Creek and OC Fisher Lakes. All services will be performed in accordance with the attached Performance Work Statement and as required by State and Federal regulations.

TASK ORDER ONE

0001 TREE MAINTENANCE SERVICES – AQUILLA LAKE

Period Of Performance: 15 September 2018 through 31 October 2018.

ITEM DESCRIPTION EST.QTY U/M

UNIT

PRICE

AMOUNT

0001AA TREE PRUNING/DEAD LIMB REMOVAL,LESS THAN 15', PER TREE 0 EA

0001AB

TREE PRUNING/DEAD LIMB REMOVAL, HIGHER THAN 15', PER

TREE

0 EA

0001AC TREE REMOVAL, LESS THAN EIGHT (8) INCHES 0 EA

0001AD TREE REMOVAL, EIGHT (8) TO FIFTEEN (15) INCHES 0 EA

0001AE TREE REMOVAL, SIXTEEN (16) TO TWENTY FOUR (24) INCHES 15 EA

0001AF TREE REMOVAL, GREATER THAN TWENTY FOUR (24) INCHES 0 EA

0001AG TREE REMOVAL, ALL SIZES, REQUIRED TO BE PIECED DOWN 0 EA

0001AH BOUNDARY LINE CLEARING 0 MI

0001AI STUMP REMOVAL, GRINDING, LESS THAN 24" INCHES 0 EA

0001AJ STUMP REMOVAL, GRINDING, 24" TO 36" INCHES 0 EA

0001AK STUMP REMOVAL, GRINDING, GREATER THAN 36" INCHES 0 EA

0001AL STUMP REMOVAL, GRUBBING, LESS THAN 12" INCHES 0 EA

0001AM STUMP REMOVAL, GRUBBING, 12" TO 20" INCHES 0 EA

0001AN STUMP REMOVAL, GRUBBING, GREATER THAN 20" INCHES 0 EA

SUMMARY – TASK ORDER #0001 – AQUILLA LAKE SUBTOTAL

0001 TREE MAINTENANCE SERVICES – HORDS CREEK LAKE

Period Of Performance: 15 September 2018 through 31 October 2018.

ITEM DESCRIPTION EST.QTY U/M

UNIT

PRICE

AMOUNT

1001AA TREE PRUNING/DEAD LIMB REMOVAL,LESS THAN 15', PER TREE 0 EA

1001AB TREE PRUNING/DEAD LIMB REMOVAL, HIGHER THAN 15', PER

TREE

200 EA

1001AC TREE REMOVAL, LESS THAN EIGHT (8) INCHES 0 EA

1001AD TREE REMOVAL, EIGHT (8) TO FIFTEEN (15) INCHES 0 EA

1001AE TREE REMOVAL, SIXTEEN (16) TO TWENTY FOUR (24) INCHES 0 EA

1001AF TREE REMOVAL, GREATER THAN TWENTY FOUR (24) INCHES 0 EA

1001AG TREE REMOVAL, ALL SIZES, REQUIRED TO BE PIECED DOWN 0 EA

1001AH BOUNDARY LINE CLEARING 0 MI

1001AI STUMP REMOVAL, GRINDING, LESS THAN 24" INCHES 0 EA

1001AJ STUMP REMOVAL, GRINDING, 24" TO 36" INCHES 0 EA

1001AK STUMP REMOVAL, GRINDING, GREATER THAN 36" INCHES 0 EA

1001AL STUMP REMOVAL, GRUBBING, LESS THAN 12" INCHES 0 EA

1001AM STUMP REMOVAL, GRUBBING, 12" TO 20" INCHES 0 EA

1001AN STUMP REMOVAL, GRUBBING, GREATER THAN 20" INCHES 0 EA

SUMMARY – TASK ORDER #0001 – HORDS CREEK SUBTOTAL

SUMMARY – TASK ORDER #0001

This Contract Bid Sheet must be signed and dated by the Contractor to be considered a valid submission for the applicable Government Solicitation.

Contractor Signature: Date:

OMBUDSMAN

OMBUDSMAN

Deputy Director of Contracting U.S. Army Corps of Engineering 441 G Street NW Washington DC 20314-1000

IDIQ INFORMATION

IDIQ INFORMATION

This is a FFP IDIQ This is an Indefinite-delivery, indefinite-quantity (ID/IQ) contract utilizing Firm-Fixed-Unit Price contract. Task Orders will be issued IAW with FAR 16.5

The contract will:

Contain Firm-Fixed-Unit prices Task Orders are issued NTE.

QUANTITIES

The tabulated quantities are estimates only and are provided for informational and evaluation purposes only. Task orders may be issued for any quantity for any bid item as long as the cumulative dollar value of all orders under the contract does not exceed the MAXIMUM

CAPACITY.

LINE ITEM QUANITIES

Task order may be issued for any quantity in each line/bid item in any given year as long as the cumulative dollar value of all task orders under this contract does not exceed the maximum dollar amount.

MINIMUM GURANTEE

The guaranteed minimum is $2,500 for the basic period only.

There is no guaranteed minimum for the option periods, if exercised.

Task Order 0001 will satisfy the guaranteed minimum

PAYMENT

The contractor will only receive payment for work performed to the government’s satisfaction.

The price for work not performed will be de-obligated from the task order.

OPTIONS:

The contract options will be exercised annually and are not affected by the quantities ordered.

CONTRACT MIN_MAX QTY

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM QUANTITY MINIMUM AMOUNT MAXIMUM QUANTITY MAXIMUM AMOUNT

$2,500.00 $2,500,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM MINIMUM MAXIMUM MAXIMUM

CLIN QUANTITY AMOUNT QUANTITY AMOUNT

0001 $ $

0002 $ $

0003 $ $

0004 $ $

0005 $ $

DELIVERY_TASK ORDER MIN_MAX

DELIVERY/TASK ORDER

DELIVERY/TASK ORDER MINIMUM/MAXIMUM ORDER VALUE

This contract is dollar based, not quantity based with a base and four one year options.

The guaranteed minimum of $2,500 is for the life of the contract. The maximum Amount is $2,500,000 for the base and all options. Options will be exercised annually. Work shall be issued via task order. Task order may be issued for any quantity in each CLIN in any given year as long as the cumulative dollar value of all orders under the contract does not exceed the maximum dollar amount.

The minimum quantity and order value for each Delivery/Task Order issued shall not be less then the minimum value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum value stated in the following table.

MINIMUM AMOUNT MAXIMUM AMOUNT

$2,500.00 $2,500,000.00

PWS

PERFORMANCE WORK STATEMENT (PWS)

THREE RIVERS REGIONAL LAKES

TREE MAINTENANCE SERVICES

1. GENERAL: This is a non-personal services contract providing all management, tools, equipment, materials, chemicals and labor required to achieve the desired results described herein to perform tree storm damage removal, trimming, dead tree removal, stump grinding and services described herein. The Government shall not exercise any supervision or control over the Contractor or contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform tree removal, trimming, dead or storm damaged tree removal, stump grinding, boundary fence line clearing and services described herein, at the Three Rivers Regional Lakes of Central and West Texas. These services shall be utilized at Aquilla, Hord’s Creek, Navarro Mills, O.C. Fisher, Proctor, Waco and Whitney Lakes. All service results shall be as defined in this Performance Work Statement (PWS). The Contractor shall be required to perform within the standards of this contract.

1.2 Scope: Provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform tree removal, trimming, dead or storm damaged tree removal, stump grinding to achieve the desired results. The objective of these services shall be the removal of hazardous limbs, trees and debris in recreational or public lands, as described herein. The Contractor shall securely transport and dispose of all debris, in an approved area on Government property as determined by the Contracting Officer (KO) or the Contracting Officer’s Representative (COR). If desired, the Contractor may be allowed to retain these materials but, is responsible for the proper disposal or use of the materials and at no time will be allowed to return any portion of the materials or by-product back to Government Property.

1.3 Period of Performance: Base Year, plus three one year options. All work shall be executed by the issuance of specific task orders. Each issued task order will contain specific details of work to be performed and the individual period of performance of the task order as designated by the KO. Except in the event of emergencies, minimum period of performance on any awarded task order shall be no less than 60 calendar days.

1.4 General Information

1.4.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services in the form of a Quality Control Plan (QCP). The QCP is the method the Contractor uses to ensure all work complies with the requirements of the contract. The QCP is to be delivered within 30 calendar days after contract award or with the Contractor’s proposal if it is an evaluation factor. One (1) copy of a comprehensive written QCP shall be submitted for approval by the KO or COR. Any proposed changes to an approved QCP, shall be submitted, in writing to the KO or COR for review and approval.

1.4.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure the Contractor’s quality control program is effective and is performing all work in accordance with the Performance Work Standards in Technical Exhibit 1, “Performance Work Summary” (PRS). The QASP defines how the performance standards will be applied, method of surveillance, and the performance threshold. Inspections will be performed by the COR or his designated Quality Assurance Representative.

1.4.3 Government Holidays: The Contractor shall not perform services on Saturdays, Sundays or Federal holidays, unless a written request is submitted and approved by the KO or COR as authorized due to Quality Assurance and safety oversight requirements. Any request must be submitted a minimum of forty-eight hours in advance of the proposed change. For informational purposes only, observed federal holidays are as follows:

New Year’s Day Labor Day Martin Luther King Jr. Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.4.4 Hours of Operation: Office hours are as noted on Monday through Friday. Lake Office hours are 08:00am to 4:30 pm, Monday through Friday, the Contractor will be notified of any exceptions or lake office specific hours of operations. Contractor work hours shall be accomplished as needed to perform tasks within the parameters suitable weather, severe weather, high winds or unsafe conditions. Exception, in the interest of safety, no work shall be completed before or after the hours of daylight unless approved in writing by the COR.

1.4.5 Place of Performance: The work to be performed under this contract will include; Navarro Mills Lake, Whitney Lake, Aquilla Lake, Waco Lake, Proctor Lake, Hord’s Creek Lake and OC Fisher Lake, Texas. These facilities are located as follows;

a. Navarro Mills Lake Project - The Project Headquarter is located at 1175 FM 667, Purdon, Texas, 76679. Approximately 5 miles east of Dawson, Texas, north of SH 31.

b. Whitney Lake Project - Located at 285 CR 3602, Clifton, Texas, 76634. The office is approximately seven miles Southwest of Whitney, Texas off of Highway 22 in Bosque and Hill counties.

c. Aquilla Lake Project - Located in Hill County, Aquilla Lake is located near Hillsboro, Texas, between SH 22 and FM 310, Aquilla, Texas and is managed from the Whitney Lake Project, reference paragraph b. above.

d. Waco Lake Project – Located on 3801 Zoo Park Dr., Waco, Texas 76708. On the northwest side of the lake, just west the Waco Regional Airport.

e. Proctor Lake Project – Located at 2180, Farm to Market Rd. 2861, Comanche, Texas, 76442.

Location is in Comanche County, 5 miles northeast of Comanche on State Highway 377, Comanche County, Texas.

f. Hord’s Creek Lake Project – Located at 230 Friendship Park Rd., Coleman, Texas, 76834.

Location is approximately 10 miles west of Coleman off of Texas State Highway 153 West, Coleman County, Texas.

g. O.C. Fisher Lake Project – Located on Mercedes Rd., San Angelo, Texas. Location is approximately 5 miles west of San Angelo, off of Texas State Highway 67 West, Tom Green County, Texas. All work and invoices for this location will be managed by the Hord’s Creek Project Office, reference paragraph f. above.

1.4.6 Type of Contract: The government will award a Firm Fixed Price contract. The Contractor shall perform all services specified herein on an as-ordered basis by the Government through the issuance of Task Orders. Task Orders will indicate the line item quantity, location of treatment and period of performance for each Task Order issued. All payments shall be made based on line item pricing for the contract base and any option years, as submitted by the Contractor and accepted at contract award.

Invoices for payment shall be submitted per Technical Exhibit 2, “Deliverables, item g”.

1.4.7 Security Requirements: All Contractor and all associated Sub-contractors employees shall comply with applicable facility access and local security procedures (provided by Government Representative).

The Contractor shall also provide all information for background checks to meet facility access requirements to be accomplished by the Government organizations Director of Emergency Services or Security Office. Contract workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and /or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility change, the Government may require changes in the Contractor security matters or processes. Contractor and all associated sub-contractors employees shall comply with adjudicated standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available).

1.4.7.1 The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR, no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification. This Form and a list of eligible employees will be provided to the KO and shall become part of the official contract file.

Refer to Technical Exhibit 2, Item F.

1.4.7.2 “i-WATCH”, Corps Watch, or See Something, Say Something program. The Contractor and all associated sub-contractors shall receive a brief/training on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the KO, NLT 5 calendar days after the completion of the training. The i-Watch/CORPS watch training video and literature can be found at the following web site. http://www.swf.usace.army.mil/BusinessWithUs/Contracting.aspx.

1.4.7.3 Key Control: All Government keys provided to Contractors will be issued and controlled IAW Army Regulation 190-51. NOTE: All references to keys include key cads. No keys issued to the Contractor by the Government shall be duplicated without expressed written permission from the KO and with a complete count and inventory of all keys in the Contractor’s possession.

The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the KO. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the KO. All keys shall be forfeited to the Government at the completion, expiration, or termination of this contract.

1.4.7.3.1. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the specific performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.4.7.3.2. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s QCP.

1.4.8 Identification of Contractor Employees: The Contractor shall provide each of its employees who will be involved in the performance of the contract, on a Government facility, with a uniform shirt clearly displaying the company’s name and logo screen printed on the left breast area or on the back, or a photo identification badge to all contractor employees. Employees shall wear a company shirt or have photo badges on their person as they perform duties to execute the work items under this contract. The Contracting Officer, COR or Designated Representative shall approve the uniform shirt and photo identification badges before the commencement of contract performance. It is the Contractor’s responsibility to ensure that all Contractor personnel wear the uniform shirt or photo identification at all times when performing work under this contract at a Government facility. The Contractor shall be responsible for providing an up to date list of all employees during the performance of this contract. Refer to Technical Exhibit 2, Item B. The Contractor shall allow only persons directly involved with accomplishment of the Contractor's operations at the locations serviced under this contract (i.e., no friends, guests, children, or pets).

1.4.9 Contractor’s Employee Conduct: The Contractor shall be responsible for insuring employees strictly comply with all Federal, State, and Municipal laws. Any illegal or criminal activity shall result in the removal of the employee/employees and or may result in the termination of the contract. The KO or COR may require the Contractor to immediately remove from work site any employee of the Contractor or Subcontractor, who, in the opinion of the KO or COR, endangers persons or property, or whose physical or mental conditions are such that it would impair the employee’s ability to satisfactorily perform work.

Notification to the Contractor shall be promptly made in writing if time and circumstances permit.

Otherwise, notification shall be verbal or by telephone and shall be confirmed in writing as soon as possible. No such removal, however, shall reduce the obligation to perform all work required under the contract and immediate replacement shall be made as required. This removal shall not be made the basis of any claim for compensation or damages against the United States or any of its employees, officers, or agents.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.