SHEET

# of 24

DWG.

NO. TITLE

GENERAL

1 G-001 COVER SHEET

2 G-002 LOCATION PLAN AND INDEX OF DRAWINGS

3 G-003 LEGEND, GENERAL NOTES, ALIGNMENT AND CONTROL TABLES

CIVIL-SITE

4 C-001 PROJECT PLAN SAN JACINTO RIVER, WEST FORK

5 C-101 PLAN STA. 640+00 TO STA. 693+00

6 C-102 PLAN STA. 590+00 TO STA. 640+00

7 C-103 PLAN STA. 572+00 TO STA. 590+00

8 C-104 PLAN PLACEMENT AREA NO. 1

9 C-105 PLAN PLACEMENT AREA NO. 2

10 C-201 PLAN AND PROFILE STA. 572+00 TO STA. 694+00

11 C-301 CROSS SECTIONS STA. 574+00 TO STA. 584+00

12 C-302 CROSS SECTIONS STA. 586+00 TO STA. 596+00

13 C-303 CROSS SECTIONS STA. 598+00 TO STA. 608+00

14 C-304 CROSS SECTIONS STA. 610+00 TO STA. 620+00

15 C-305 CROSS SECTIONS STA. 622+00 TO STA. 632+00

16 C-306 CROSS SECTIONS STA. 634+00 TO STA. 644+00

17 C-307 CROSS SECTIONS STA. 646+00 TO STA. 656+00

18 C-308 CROSS SECTIONS STA. 658+00 TO STA. 668+00

19 C-309 CROSS SECTIONS STA. 670+00 TO STA. 680+00

20 C-310 CROSS SECTIONS STA. 682+00 TO STA. 692+00

21 C-311 CROSS SECTIONS STA. 694+00 TO STA. 694+00

22 C-312 CROSS SECTIONS PLACEMENT AREA NO. 1 STA. 1+00 TO STA. 6+00

23 C-313 CROSS SECTIONS PLACEMENT AREA NO. 1 STA. 7+00 TO STA. 12+00

24 C-901 PROJECT PHOTOS

24 24 -- Total Number of Drawings

INDEX OF DRAWINGS

CURVE NO. POINT STATION NORTHING EASTING RADIUS LENGTH DELTA DIRECTION

POB 551+29.06 13,942,229.492 3,180,951.833

P.C. 566+95.60 13,941,741.060 3,179,463.385

1 P.I. 567+94.35 13,941,710.269 3,179,369.553 1,400.00 197.18 8°04'11.35" Left

CC 13,940,410.849 3,179,899.892

P.T. 568+92.78 13,941,666.611 3,179,280.973 P.C. 577+13.83 13,941,303.636 3,178,544.512

2 P.I. 583+36.75 13,941,028.254 3,177,985.773 1,400.00 1,172.19 47°58'20.56" Left

CC 13,940,047.874 3,179,163.431

P.T. 588+86.02 13,940,428.846 3,177,816.263 P.C. 596+79.89 13,939,664.930 3,177,600.232

3 P.I. 603+45.75 13,939,024.202 3,177,419.037 1,200.00 1,215.80 58°03'00.00" Right

CC 13,939,991.477 3,176,445.517

P.T. 608+95.69 13,938,838.887 3,176,779.489 P.C. 611+97.59 13,938,754.865 3,176,489.515

4 P.I. 613+97.40 13,938,699.255 3,176,297.598 1,000.00 394.43 22°35'56.58" Right

CC 13,939,715.356 3,176,211.205

P.T. 615+92.02 13,938,721.666 3,176,099.048 P.C. 643+08.81 13,939,026.373 3,173,399.399

5 P.I. 644+45.41 13,939,041.694 3,173,263.658 1,000.00 271.52 15°33'26.03" Right

CC 13,940,020.063 3,173,511.556

P.T. 645+80.34 13,939,092.859 3,173,136.999 P.C. 651+42.75 13,939,303.517 3,172,615.522

6 P.I. 652+57.25 13,939,346.403 3,172,509.359 500.00 225.12 25°47'46.88" Right

CC 13,939,767.119 3,172,802.800

P.T. 653+67.87 13,939,431.215 3,172,432.438 P.C. 658+09.04 13,939,758.003 3,172,136.055

7 P.I. 662+89.12 13,940,113.605 3,171,813.538 1,200.00 913.34 43°36'31.76" Left

CC 13,938,951.833 3,171,247.184

P.T. 667+22.38 13,940,148.634 3,171,334.745 P.C. 675+06.13 13,940,205.822 3,170,553.087

8 P.I. 675+91.08 13,940,212.021 3,170,468.362 500.00 168.30 19°17'07.74" Left

CC 13,939,707.155 3,170,516.604

P.T. 676+74.43 13,940,189.889 3,170,386.343

POE 694+00.00 13,939,740.339 3,168,720.358

CHANNEL HORIZONTAL ALIGNMENT DATA

HORIZONTAL DATUM: TEXAS SOUTH-CENTRAL ZONE, NAD83, U.S. SURVEY FEET

SAN JACINTO RIVER, WEST FORK

POINT STATION

ELEVATION

SCHEDULE

NO. 1

NORTHING EASTING

POB 551+29.06 31.60 13,942,229.490 3,180,951.832

PVI 561+50.00 23.60 13,941,911.170 3,179,981.785

PVI 570+50.00 21.00 13,941,597.110 3,179,139.951

PVI 579+25.00 21.00 13,941,196.380 3,178,362.845

PVI 582+00.00 24.70 13,941,018.040 3,178,154.089

PVI 590+50.00 24.70 13,940,271.050 3,177,771.640

PVI 598+90.00 28.00 13,939,468.780 3,177,525.695

PVI 607+25.00 29.00 13,938,897.870 3,176,939.510

PVI 615+50.00 29.60 13,938,717.830 3,176,140.889

PVI 631+75.00 30.60 13,938,899.210 3,174,526.056

PVI 650+00.00 28.60 13,939,250.050 3,172,747.885

PVI 668+50.00 30.00 13,940,157.950 3,171,207.468

PVI 687+00.00 30.60 13,939,922.710 3,169,396.185

POE 694+00.00 30.60 13,939,740.340 3,168,720.358

CHANNEL VERTICAL ALIGNMENT

SAN JACINTO RIVER, WEST FORK

HORIZ. DATUM: TEXAS SOUTH-CENTRAL ZONE, NAD83, U.S. SURVEY FEET

NAME PID EASTING (X)

NAD-83 TX-SC

NORTHING (Y)

NAD-83 TX-SC

ELEV

(NAVD88)

TIDE

(MLLW)

San Jacinto River, West Fork

HCFCD - 070183 NA 3,178,589.450 13,942,011.920 57.86 NA

HCFCD - 070190 NA 3,168,068.290 13,941,701.180 47.89 NA

HORIZONTAL CONTROL MONUMENTS

NAD83, TEXAS SOUTH-CENTRAL ZONE, US SURVEY FEET

W9126G18B0019-PLANS
GENERAL
1 G-001 COVER SHEET
2 G-002 LOCATION PLAN AND INDEX OF DRAWINGS
3 G-003 LEGEND, GENERAL NOTES, ALIGNMENT AND CONTROL TABLES
CIVIL-SITE
4 C-001 PROJECT PLAN SAN JACINTO RIVER, WEST FORK
5 C-101 PLAN STA. 640+00 TO STA. 693+00
6 C-102 PLAN STA. 590+00 TO STA. 640+00
7 C-103 PLAN STA. 572+00 TO STA. 590+00
8 C-104 PLAN PLACEMENT AREA NO. 1
9 C-105 PLAN PLACEMENT AREA NO. 2
10 C-201 PLAN AND PROFILE STA. 572+00 TO STA. 694+00
11 C-302 CROSS SECTIONS STA. 574+00 TO STA. 584+00
12 C-303 CROSS SECTIONS STA. 586+00 TO STA. 596+00
13 C-304 CROSS SECTIONS STA. 598+00 TO STA. 608+00
14 C-305 CROSS SECTIONS STA. 610+00 TO STA. 620+00
15 C-306 CROSS SECTIONS STA. 622+00 TO STA. 632+00
16 C-307 CROSS SECTIONS STA. 634+00 TO STA. 644+00
17 C-308 CROSS SECTIONS STA. 646+00 TO STA. 656+00
18 C-309 CROSS SECTIONS STA. 658+00 TO STA. 668+00
19 C-310 CROSS SECTIONS STA. 670+00 TO STA. 680+00
20 C-311 CROSS SECTIONS STA. 682+00 TO STA. 692+00
21 C-312 CROSS SECTIONS STA. 694+00 TO STA. 694+00
22 C-313 CROSS SECTIONS PLACEMENT AREA NO. 1 STA. 1+00 TO STA. 6+00
23 C-314 CROSS SECTIONS PLACEMENT AREA NO. 1 STA. 7+00 TO STA. 12+00
24 C-901 PROJECT PHOTOS