B3_Amend-0003_W9126G18B0019.pdf
PDF 6 MB Posted
- Attached to
- USACE West Fork San Jacinto River Emergency Debris Removal, Harris County, Texas Federal contract opportunity
- Solicitation number
- W9126G18B0019
About this file
Amendment 0003 - BID OPENING DATE REMAINS ON 12 JUN 2018 @ 2:00 P.M. LOCAL TIME.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C1_Revised_ABSTRACT_W9126G18B001-26_Jun_2018.pdf | ||
| C1_ABSTRACT_W9126G18B0019.pdf | ||
| AMEND-0008_W9126G18B0019.pdf | ||
| B3_AMEND-0007_W9126G18B0019.pdf | ||
| B3_Amendment0006_15Jun2018.pdf | ||
| Amend-0005_W9126G18B0019_270_DAYS-12JUN.pdf | ||
| B3_Amendment_0004-8_Jun_2018.pdf | ||
| AMEND-0002_W9126G18B0019.pdf | ||
| B3_Amendment_0001.pdf | ||
| B3_W9126G18B0019-PLANS.pdf | ||
| B3_W9126G18B0019-SPECS.pdf | ||
| B3_W9126G18B0019-SPECS.pdf | ||
| B3_W9126G18B0019-PLANS.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is shown on the pages following:
See pages follow ng:
THE BID OPENING DATE REMAINS ON 12 JUN 2018 @ 2:00 P.M. LOCAL TIME.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G18B0019
X 9B. DATED (SEE ITEM 11)
18-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jun-2018
CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
2000 FORT POINT ROAD
GALVESTON TX 77550-1229
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M3ODXMAN
Typewritten Text
W9126G18B0019
A0003-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. THE SPECIFICATIONS FOR SOLICITATION NO. W9126G18B0019, WEST FORK SAN
JACINTO RIVER IN HARRIS COUNTY, TEXAS, EMERGENCY DEBRIS REMOVAL, ARE
HEREBY AMENDED AS FOLLOWS:
a) Changes by narrative.
(1) SECTION 00 72 00 - CONTRACT CLAUSES - The following have been added by full text:
252.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (DEC 1991)
(a) The Government will pay all costs for the mobilization and demobilization of all of the Contractor's plant and equipment at the contract lump sum price for this item.
(1) 60 percent of the lump sum price upon completion of the contractor's mobilization at the work site.
(2) The remaining 40 percent upon completion of demobilization.
(b) The Contracting Officer may require the Contractor to furnish cost data to justify this portion of the bid if the Contracting Officer believes that the percentages in paragraphs (a) (1) and (2) of this clause do not bear a reasonable relation to the cost of the work in this contract.
(1) Failure to justify such price to the satisfaction of the Contracting Officer will result in payment, as determined by the Contracting Officer, of --
(i) Actual mobilization costs at completion of mobilization;
(ii) Actual demobilization costs at completion of demobilization; and
(iii) The remainder of this item in the final payment under this contract.
(3) The Contracting Officer's determination of the actual costs in paragraph (b)(1) of this clause is not subject to appeal.
b) Specifications.
(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45, entitled BID SCHEDULE, supersedes that issued with this Solicitation.
(2) SECTION 00 73 00.01 45, SPECIAL CONTRACT REQUIREMENTS, STANDARD – The enclosed SECTION 00 73 00.01 45, entitled SPECIAL CONTRACT REQUIREMENTS, STANDARD, supersedes that issued with this Solicitation.
(3) SECTION 01 10 00.00 45, NON-REGULATED SPECIAL CONTRACT REQUIREMENTS
– The enclosed SECTION 01 10 00.00 45, entitled NON-REGULATED SPECIAL CONTRACT REQUIREMENTS, supersedes that issued with this Solicitation.
(4) SECTION 35 20 23.16 45, PIPELINE DREDGING – The enclosed SECTION
A0003-3
W9126G18B0019
35 20 23.16 45, entitled PIPELINE DREDGING, supersedes that issued with this Solicitation.
(5) SECTION 35 20 23.16 45, PIPELINE DREDGING, APPENDIX 1, QUANTITY SUMMARY
TABLE – The enclosed SECTION 35 20 23.16 45, entitled PIPELINE DREDGING, APPENDIX 1, QUANTITY SUMMARY TABLE, supersedes that issued with this Solicitation.
c) Drawings.
(1) DRAWING NOS. G-002, C-103, C-301 THROUGH C-311 - Drawing Nos. G-002, C-103, and C-301 through C-311 supersede those issued with this Solicitation.
(2) DRAWING NO. C-801 - Drawing No. C-801is in addition to that issued with this Solicitation.
2. This amendment shall be attached to and become a part of the solicitation.
7 Encls:
1. SECTION 00 11 00.00 45, BID SCHEDULE
2. SECTION 00 73 00.01 45, SPECIAL CONTRACT REQUIREMENTS, STANDARD
3. SECTION 01 10 00.00 45, NON-REGULATED SPECIAL CONTRACT REQUIREMENTS
4. SECTION 35 20 23.16 45, PIPELINE DREDGING
5. SECTION 35 20 23.16 45, PIPELINE DREDGING, APPENDIX 1, QUANTITY SUMMARY
TABLE
6. DRAWING NOS. G-002, C-103, C-301 THROUGH C-311
7. DRAWING NO. C-801
SWG FILE NO.: HSC 404-19 SOLICITATION NO. W912G18B0019
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
BID SCHEDULE
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
(TO ACCOMPANY AMENDMENT NO. 0003 TO SOLICITATION NO.:W9126G18B0019)
SECTION 00 11 00.00 45
BID SCHEDULE
AMENDMENT NO. 0003
PART 1 GENERAL
1.1 BID SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1
Item No. Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization 1 JOB SUM $___________
0002 Dredging of Sediment Debris - West Fork San Jacinto River
804,700 C.Y. $_________ $___________
0003 General Debris Removal 400 TON $_________ $___________
0004 Pipeline Management 1 JOB SUM $___________
0005 Pre-dredge Hazard Survey 1 JOB SUM $___________
TOTAL SCHEDULE NO. 1 $___________
NOTE: Completion time stated in SECTION 00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.
Contractor that only uses mechanical dredging: place $0 under estimated amount for pipeline management.
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 73 00.01 45
SPECIAL CONTRACT REQUIREMENTS, STANDARD
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) (FAR
52.211-10)
1.2 LIQUIDATED DAMAGES - CONSTRUCTION (SEPT 2000) (FAR 52.211-12)
1.3 PHYSICAL DATA (APR 1984) (FAR 52.236-4)
1.4 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE(MAR 1995)
1.5 (SCR-S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)
1.6 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) (52.236-1)
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
DOCUMENT 00 73 00.01 45 Page 1
SECTION 00 73 00.01 45
SPECIAL CONTRACT REQUIREMENTS, STANDARD
AMENDMENT NO. 0003
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) (FAR
52.211-10)
The Contractor shall be required to:
(a) Commence work under this contract within 5 calendar days after the date the Contractor receives the Notice to Proceed;
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than (AM#3)the dates described in SECTION 01 10 00.00 45 , paragraph entitled DEADLINES FOR COMPLETION OF WORK. The time stated for completion shall include final cleanup of the premises.
1.2 LIQUIDATED DAMAGES - CONSTRUCTION (SEPT 2000) (FAR 52.211-12)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of (AM#3)liquidated damages specified in Section 01 10 00.00 45 , paragraph entitled LIQUIDATED DAMAGES - DEBRIS REMOVAL, DREDGING OF SEDIMENT DEBRIS, AND DEMOBILIZATION, for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
1.3 PHYSICAL DATA (APR 1984) (FAR 52.236-4)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.
(b) Weather Conditions. Under normal conditions, the river water surface elevation is based on Lake Houston backwater. Heavy storm and water release from Lake Houston Dam may increase river current.
(c) Transportation Facilities. The immediate vicinity is served by railroad, highway, and the West Fork San Jacinto River at natural depths. The work site is accessible through boat ramps to accommodate dredging equipment.
DOCUMENT 00 73 00.01 45 Page 2
1.4 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE(MAR 1995)
(a) This special contract requirement does not apply to terminations.
See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the con-tractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region VI. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
NOTE: A copy of EP 1110-1-8, "CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE," is available at the following website:
http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.asp
1.5 (SCR-S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)
The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE
WITH DAVIS-BACON AND RELATED ACT REGULATIONS.
If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations.
When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, DOCUMENT 00 73 00.01 45 Page 3 process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.
The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://rms.usace.army.mil/ ) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data;
ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.
All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.
1.6 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) (52.236-1)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least 65 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Document --
DOCUMENT 00 73 00.01 45 Page 4
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 00.00 45
NON-REGULATED SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)(ER
415-1-15)
1.1.1 General
1.1.1.1 Unusually Severe Weather
1.1.1.2 Completion Delay
1.1.1.3 Strong River Flow Delays
1.2 (AM#3)DEADLINES FOR COMPLETION OF WORK
1.3 (AM#3)LIQUIDATED DAMAGES - DEBRIS REMOVAL, DREDGING OF SEDIMENT
DEBRIS, AND DEMOBILIZATION
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 10 00.00 45 Page 1
SECTION 01 10 00.00 45
NON-REGULATED SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)(ER 415-1-15)
1.1.1 General
This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the CONTRACT CLAUSE entitled DEFAULT (FIXED-PRICE CONSTRUCTION). For the Contracting Officer to award a time extension under this CLAUSE, the following conditions shall be satisfied.
1.1.1.1 Unusually Severe Weather
The weather experienced at the project site during the Contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
1.1.1.2 Completion Delay
The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
1.1.1.3 Strong River Flow Delays
The Contractor should expect to encounter strong river flows during dredging operations due to heavy rainfalls. Contractor's request for additional days due to unusually severe weather delays will only be granted for days when the river flows are reported by the USGS station located at IH 69/US 59 bridge to be 4 miles per hour or greater.
1.2 (AM#3)DEADLINES FOR COMPLETION OF WORK
The Contractor shall be required to:
(a) Complete the Dredging of Sediment Debris - West Fork San Jacinto River and General Debris Removal not later than 180 calendar days after the date the Contractor receives the Notice to Proceed.
(b) Complete demobilization and pipeline removal no later than 30 calendar days after the completion of Dredging of Sediment Debris - West Fork San Jacinto River and General Debris Removal.
1.3 (AM#3)LIQUIDATED DAMAGES - DEBRIS REMOVAL, DREDGING OF SEDIMENT
DEBRIS, AND DEMOBILIZATION
(a) If the Contractor fails to complete the Dredging of Sediment Debris
- West Fork San Jacinto River and General Debris Removal within 180 calendar days after the notice to proceed, the Contractor shall pay
SECTION 01 10 00.00 45 Page 2 liquidated damages to the Government in the amount of $3,431.00 for each calendar day of delay until Dredging of Sediment Debris - West Fork San Jacinto River and General Debris Removal are completed or accepted.
(b) If the Contractor fails to complete demobilization and pipeline removal within 30 calendar days after the completion of Dredging of Sediment Debris - West Fork San Jacinto River and General Debris Removal, the Contractor shall pay liquidated damages to the Government in the amount of $1,849.00 for each calendar day of delay until demobilization and pipeline removal are completed or accepted.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 10 00.00 45 Page 3
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUBMITTALS
1.2 LUMP SUM PAYMENT ITEMS
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.2.2 Pipeline Management
1.2.2.1 Payment
1.2.3 Pre-Dredge Hazard Survey
1.2.3.1 Payment
1.2.3.2 Measurement
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Dredging
1.3.1.1 Payment
1.3.1.2 Dredging Partial Payment
1.3.1.3 Measurement
1.3.1.4 Government Surveys
1.3.1.5 Surveys During Progress of Work
1.3.1.6 Unit of Measurement
1.3.2 Debris Removal
1.3.2.1 Payment
1.3.2.2 Measurement
1.3.2.3 Unit of measure
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 22 00.10 Page 1
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Surveys ; G
1.2 LUMP SUM PAYMENT ITEMS
Payment items for the work of this Contract for which Contract lump sum payments will be made are listed in the BID SCHEDULE and specified below.
All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, will be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed will constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for which separate payment is not otherwise provided.
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
(AM#3)Payment will be made for costs associated with "Mobilization and Demobilization", as defined in SECTION 00 72 00 CONTRACT CLAUSES, and in this paragraph. Mobilization and Demobilization include costs in connection with the plant necessary to perform the work, transportation, and other costs incidental to delivery of the plant, and other equipment, to the general work area in condition ready for operation, and after completion of the work for removal of the plant and equipment from the work site. Mobilization also includes, but is not limited to, the improvement of access to the worksite, tree trimming, boat ramp improvements, and installation of temporary crane mats. Demobilization also includes, but is not limited to, the repair and cleanup as defined in Section 01 57 20.00 45, in the paragraph entitled POST CONSTRUCTION CLEANUP and SECTION 35 20 16.01 45, paragraph entitled Placement Area Payment will be made for costs associated with "Mobilization and Demobilization", as defined in the SECTION 00 72 00 CONTRACT CLAUSES.
Payment for costs in connection with the plant necessary to perform the work, to include transportation and other costs incidental to delivery of the plant and other equipment to the general work area in condition ready for operation, and after completion of the work for removal of the plant
SECTION 01 22 00.10 Page 2 and equipment from the work site. This includes the improvement of access to the worksite, including, but not limited to, tree trimming, boat ramp improvements, and installation of temporary crane mats.
1.2.1.2 Unit of Measure
Unit of measure: Job.
1.2.2 Pipeline Management
1.2.2.1 Payment
Payment for "Pipeline Management" will be made for costs associated with laying, handling of dredge pipelines, from the dredge to the Placement Area, procurement of materials, and for construction of ramps or installation of culvert pipes that may be necessary in connection with placing and removal of pipeline and final clean up of pipeline route.
Monthly partial payments will be based on the estimates of work completed during the period up to 80 percent of the Contract price and the remaining 20 percent will be paid in the first monthly partial payment after removal of the pipeline and the final clean-up of the pipeline route.
1.2.3 Pre-Dredge Hazard Survey
1.2.3.1 Payment
Payment for "Pre-Dredge Hazard Survey", in Schedule No. 1, will include any equipment, labor, materials necessary to conduct surveys to locate uncharted pipeline, cables, obstructions and/or adverse unforeseen subsurface anomalies in the locations the Contractor plans to excavate or dredge within the river.
1.2.3.2 Measurement
Unit of Measure: Job.
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work in this Contract on which the Contract unit price payments will be made are listed in the BID SCHEDULE and specified below. The unit price and payment made for each item listed will constitute full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing the work required for each of the unit price items.
1.3.1 Dredging
1.3.1.1 Payment
Payment for "Dredging of Sediment Debris - West Fork San Jacinto River" in Schedule No. 1, will be made for costs associated with the removal of dredged material, transportation, and placement at the Placement Area.
1.3.1.2 Dredging Partial Payment
Partial payment will be based on approximate quantities determined by fathometer soundings or sweepings taken behind the dredge. The Contractor
SECTION 01 22 00.10 Page 3 may use its own hydrographic surveys to determine quantities for pay requests, but final quantities will be based on Government Before-Dredging and After-Dredging surveys.
1.3.1.3 Measurement
The material removed will be measured by cubic yard in place, by means of soundings taken before and after dredging. The total quantity of dredged material will be the theoretical quantity between the bottom surface shown by fathometer soundings of the last survey made "before-dredging" and the bottom surface shown by the fathometer soundings of a survey made "after-dredging", within the limits of the overdepth and side and end slopes, less deductions that may be required for misplaced material.
1.3.1.4 Government Surveys
The Government will use Real Time Kinematic (RTK) for vertical control.
Differential Global Positioning System (DGPS) will be used for horizontal control.
Processing survey data will be performed with HYPACK 2016 software using the Kingfisher Method (updated 5/6/2016). Volumes will be computed by average end area using cross sectional survey lines. Before and After Dredge cross sections will be run on 100-foot stations and at changes in the template. If the Contractor elects to use HYPACK 2016 software, the Government will provide the survey line files for the Contractor's use.
1.3.1.5 Surveys During Progress of Work
Contract depth will be determined by surveys taken behind the dredge as work progresses. The Contractor shall take progress soundings or sweepings and submit drawings of the surveys.
1.3.1.6 Unit of Measurement
Unit of measure: Cubic yard.
1.3.2 Debris Removal
1.3.2.1 Payment
Payment for "General Debris Removal" in Schedule No. 1, will be made for cost associated with equipment, labor, and material to remove and dispose of general debris.
1.3.2.2 Measurement
Removed general debris shall be measured in short tons of 2,000 pounds each. Certified truck weights will be accepted for determination of the weight of general debris removed from the site. The general debris shall be weighed on standard truck scales by Certified Weighmaster. The Contractor shall have the scales tested in the presence of a Government inspector when directed. The original printed scale ticket or a certified copy prepared in ink or indelible pencil shall be submitted promptly after a truck is weighed. The report of weight for each truckload shall show the gross, tare, and net weight. Erasures or changes on a report shall be explained by a memorandum made on, or attached to, the report and signed by the Weigher. If deemed advisable by the Government, the Government will employ an inspector to observe the weighing and record scale weights
SECTION 01 22 00.10 Page 4 and stenciled light weights on the trucks. Expense of weighing general debris and testing scales shall be borne by the Contractor. Other methods of measurement may be used when approved by the Government.
1.3.2.3 Unit of measure
Unit of Measure: Ton
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 22 00.10 Page 5
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 20.00 45
DREDGING
PART 1 GENERAL
1.1 SUMMARY
1.2 MEASUREMENT AND PAYMENT
1.3 WORK COVERED BY CONTRACT PRICE
1.3.1 Existing Conditions
1.4 REFERENCES
1.5 SUBMITTALS
1.6 CHARACTER OF MATERIAL
1.7 UTILITIES ACROSS THE LIMITS OF DREDGING
1.7.1 Known Pipeline/Utility Crossings
1.8 ORDER OF WORK
1.9 OBSTRUCTION OF RIVER
1.10 NOTIFICATION PRIOR TO COMMENCEMENT OF DREDGING OPERATIONS
1.11 SIGNAL LIGHTS
1.12 PLANT
1.12.1 General Requirements
1.12.2 Capacity
1.13 INSPECTION
1.13.1 Equipment
1.13.2 Transportation
1.14 FINAL EXAMINATION AND ACCEPTANCE
1.14.1 Acceptance
1.15 SHOALS
1.16 UNANTICIPATED SHOALING
1.17 VARIATIONS IN ESTIMATED QUANTITIES - DREDGING
1.18 QUANTITY SURVEYS
1.18.1 General
1.18.2 Dredging Sections
1.18.3 Submittals
1.19 CONTINUITY OF WORK
PART 2 PRODUCTS
2.1 BRIDGE-TO-BRIDGE RADIOTELEPHONE EQUIPMENT
PART 3 EXECUTION
3.1 ESTIMATED QUANTITY OF MATERIAL
3.1.1 Quantity Summary
3.1.2 Required Dredging Prism
3.1.3 Allowable Overdepth
3.1.4 Side And End Slopes
3.1.5 Excessive Dredging
3.2 AREAS TO BE DREDGED
3.3 CONDUCT OF DREDGING WORK
SECTION 35 20 23.16 45 Page 1
3.3.1 Protection of Existing Waterways
3.3.2 Adjacent Property and Structures
3.4 PLACEMENT OF EXCAVATED MATERIAL
3.4.1 Placement Area
3.4.2 General
3.4.2.1 Misplaced Material
3.4.2.2 Placement Operations Inspection
3.4.2.3 Placement Area Drainage
3.5 PRESERVATION OF PUBLIC AND PRIVATE PROPERTY
3.5.1 Damages
3.5.2 Accountability and Restoration
3.6 METHOD OF PLACEMENT
3.6.1 Pipeline Route
3.6.2 Haul Route
3.7 DISPOSAL IN PLACEMENT AREA
3.7.1 Unauthorized Placement of Material
3.8 DREDGE PIPELINES
3.8.1 Submerged Pipeline Lighting Requirements
3.8.2 Floating Pipeline
3.8.3 Pipeline Leaks
3.9 WORK IN THE VICINITY OF OTHER GOVERNMENT CONTRACTORS
3.10 DREDGING AND DREDGE RELATED MARINE WORK (CESWG)
3.11 DREDGE PLANT INSTRUMENTATION
ATTACHMENTS:
Appendix 1 - QUANTITY SUMMARY TABLE
-- End of Section Table of Contents --
SECTION 35 20 23.16 45 Page 2
SECTION 35 20 20.00 45
DREDGING
AMENDMENT NO. 0003
PART 1 GENERAL
1.1 SUMMARY
The work in this Section consists of furnishing plant, labor, materials, and equipment to perform the operations necessary for the removal of sediment debris to the required dimensions shown, satisfactory disposal thereof, and other operations incidental thereto. The Contractor may use either (AM#3)pipeline or mechanical dredge(s) , or combination of both, in performing the work. All dredged materials must be placed in the Placement Areas designated in this Contract.
1.2 MEASUREMENT AND PAYMENT
Measurement and payment for dredging will be paid for in accordance with provisions of the SECTION 01 22 00.10 MEASUREMENT AND PAYMENT.
1.3 WORK COVERED BY CONTRACT PRICE
Base bids on the quantity of dredging indicated. If the total quantity of dredging varies from that specified as the basis for bidding, the Contract price will be adjusted in accordance with the CONTRACT CLAUSE entitled CHANGES. The dredging conditions specified and indicated describe conditions which are known. However, the Contractor is responsible for other conditions encountered which are not unusual when compared to the conditions recognized in the dredging business as usual in dredging activities such as those required under this Contract. The Contract price for dredging will include the cost of removal and placement of the material as specified in the Paragraphs: CHARACTER OF MATERIAL and PLACEMENT OF EXCAVATED MATERIAL. The Contract price for dredging will include the costs for maintenance of dikes and ditches necessary to confine the material within the areas shown.
1.3.1 Existing Conditions
The drawings already prepared as specified in the CONTRACT CLAUSES Paragraph entitled CONTRACT DRAWINGS AND SPECIFICATIONS represent conditions existing as of the date of their preparation using average existing conditions. Survey data has been posted to EM Public website:
http://www.swg.usace.army.mil/Business-With-Us/Emergency-Management-Office/ However, to reflect anticipated shoaling occurring between the dates of preparation of the drawings and the dates of the "before-dredging" sections, the estimated dredging quantities stated in the Bid Schedule have been adjusted accordingly. The depths and elevations shown will be verified and corrected by fathometer soundings taken by the Government before dredging. The Government will normally use a frequency of 200 kHz to conduct hydrographic surveys. If the surveys indicate the presence of fluff in the channel, a frequency of 40 kHz will be used. Determination of quantities removed and the deductions made from them to determine quantities by in-place measurement to be paid for in the area specified, SECTION 35 20 23.16 45 Page 3 after having once been made will not be reopened, except on evidence of collusion, fraud, or obvious error.
1.4 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Notification Prior To Commencement of Dredging Operations ; G
Indicate commencement of dredging operations, and location of dredge(s).
Pre-Dredge Hazard Survey ; G
Prior to commencing dredging activities, perform a hazard survey.
Search for uncharted pipeline, cables, obstruction and/or adverse unforeseen subsurface anomalies. Hazard survey may be supplemented with probing as required to determine depth of uncharted hazards/obstructions. Contractor shall be solely responsible for determining necessary extent and methods of pre-dredge hazard survey.
Provide the results of the pre-dredge hazard survey, to include summary of findings, interpretation of any located anomalies, and impacts to planned dredging.
SD-02 Shop Drawings
Pipeline Route ; G
A detailed pipeline diagram for each Placement Area detailing the pipeline route and anchor locations are to be submitted prior to commencing work on this project.
Haul Route ; G
SD-06 Test Reports
Report to be be submitted as specified.
SECTION 35 20 23.16 45 Page 4
1.6 CHARACTER OF MATERIAL
Sediment debris consists of sandy material which has accumulated as a result of Hurricane Harvey. However, some virgin material may be encountered. Bidders are expected to examine the worksite and after investigation decide for themselves the character of materials.
1.7 UTILITIES ACROSS THE LIMITS OF DREDGING
It is the Contractor's responsibility to investigate the location of utility crossings. The Contractor is to take precautions against damages which can result from dredging operations in the vicinity of the utility crossings. If damage occurs as a result of dredging operations, the Contractor will be required to suspend dredging until the damage is repaired and approved. Costs of these repairs and downtime of the dredge and attendant plant is to be at the Contractor's expense.
1.7.1 Known Pipeline/Utility Crossings
There are pipelines and or utilities which are near or within the work limits. The following pipeline/utilities cross the area(s) to be dredged:
Approximate Location
Permit No. Description Owner
LAT:30.022658,
LONG:-95.222781
774710 One 4.5-inch pipeline
Shell Pipeline Company LP
STA: 616+00 N/A Overhead Powerline Center Point Energy
(AM#3)STA: 580+60 N/A One 8-inch pipeline
Center Point Energy
The list of utility/pipeline crossings may not be all inclusive. It shall be the Contractor's responsibility to review all contract documents and ensure that all utility/pipeline crossings are identified. Furthermore, the Contractor shall perform their due diligence to identify all known pipeline crossings and ensure the work area is cleared for dredging operations prior to commencement of dredging in each particular reach.
The Contractor shall submit evidence to the COR attesting to the Contractor's efforts in locating utility/pipeline crossings.
THE FOLLOWING IS FURNISHED FOR INFORMATION ON VERIFYING PIPELINE
OWNERSHIPS:
Lonestar Notification Center 1-800-545-6005 or online at www.Lonestar811.com
Texas 811 (Dig-Tess) 1-800-344-8377
1.8 ORDER OF WORK
The Contractor may commence dredging in the order desired. The Government reserves the right to change the order of work at any time.
1.9 OBSTRUCTION OF RIVER
The waters to be dredged are not navigable but the Contractor is cautioned
SECTION 35 20 23.16 45 Page 5 of the possible presence of recreational boats in the area. Multiple dredges (AM#3)are allowed on this Contract but be (AM#3)mindful of recreational boats. Upon completion of the work, promptly remove plant, including ranges, buoys, piles, and other marks placed under this Contract.
1.10 NOTIFICATION PRIOR TO COMMENCEMENT OF DREDGING OPERATIONS
Notify the Resident Engineer, Houston, in writing, at least 10 days prior to commencement of dredging operations, the location or locations at which a dredge or dredges will be placed on the work. This information is required in addition to the progress charts and schedule provided for in the CONTRACT CLAUSE entitled SCHEDULE FOR CONSTRUCTION CONTRACTS.
1.11 SIGNAL LIGHTS
Display signal lights and conduct operations in accordance with the General Regulations of the Department of the Army and of the U.S. Coast Guard governing the:
i) lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations;
ii) lights to be displayed on dredge pipe lines;
iii) day signals to be displayed by vessels of more than 65 feet in length moored or anchored in a fairway or channel;
iv) and the passing by other vessels of floating plant working in navigable channels as set forth in United States Coast Guard publication entitled Navigation Rules and Regulations Handbook. Web site location:
http://www.navcen.uscg.gov/?pageName=navRuleChanges
1.12 PLANT
1.12.1 General Requirements
Keep the necessary dredge equipment and attendant plant on the job to meet the requirements of the work. The dredge equipment and attendant plant is to be in satisfactory operating condition and capable of safely and efficiently performing the work as set forth in specifications and be subject to inspection by the Contracting Officer's representative at all times.
1.12.2 Capacity
No reduction in the capacity of the dredge equipment and attendant plant employed to execute the work is to be made except by written direction of the Contracting Officer. The measure of the "Capacity of the Dredge and Attendant Plant" is to be its actual performance on the work to which these specifications apply.
1.13 INSPECTION
The Government will supervise the maintenance of the gages, ranges, location marks, and limit marks in proper order and position; but the presence of the inspector will not relieve the Contractor of responsibility for the proper execution of the work in accordance with the specifications. The Contractor is required to furnish the following items.
SECTION 35 20 23.16 45 Page 6
1.13.1 Equipment
At the request of the Government, the Contractor will furnish the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment and crew of the dredging plant as may be reasonably necessary in inspecting and supervising the work. However, the Contractor will not be required to furnish facilities for the surveys, specified in the Paragraph: FINAL EXAMINATION AND ACCEPTANCE.
1.13.2 Transportation
At the request of the Government, the Contractor shall furnish suitable transportation from all points on shore designated by the Contracting Officer to and from the various pieces of plant, and to and from the Placement Areas. If the Contractor refuses, neglects, or delays compliance with these requirements, the specific facilities may be furnished and maintained by the Contracting Officer, and the cost thereof will be deducted from the amounts due or to become due the Contractor.
1.14 FINAL EXAMINATION AND ACCEPTANCE
As soon as practicable after the completion of the entire work or any section thereof, if the work is divided into sections and in the opinion of the Contracting Officer will not be subject to damage by further operations under this Contract, this work will be thoroughly examined at the expense of the Government by sounding or by sweeping, or both, as directed. If shoals, lumps, or other lack of Contract depth are disclosed by this examination, the Contractor will be required to remove same by dragging the bottom or by dredging at the Contract rate for dredging but, if the bottom is soft and the shoal areas are small and form no material major obstruction to water flow, the removal of the shoal may be waived at the discretion of the Contracting Officer. The Contractor or its authorized representative will be notified when soundings or sweepings are to be made and will be permitted to accompany the survey party. When the area is found to be in a satisfactory condition it will be accepted finally. If more than two sounding or sweeping operations by the Government over an area are necessary, by reason of work for the removal of shoals disclosed at a prior sounding or sweeping, the cost of the third and any subsequent sounding or sweeping operations will be charged against the Contractor at the rate of $6,731.02 per day for each day in which the Government plant is engaged in sounding or sweeping or is enroute to or from the site or held at or near the site for these operations.
1.14.1 Acceptance
Final acceptance of the whole or a part of the work and the deductions or corrections of deductions made thereon will not be reopened after having once been made, except on evidence of collusion, fraud, or obvious error, and the acceptance of a completed section will not change the time of payment of the retained percentages of the whole or any part of the work.
1.15 SHOALS
If, before this Contract is completed, shoals occur in a section previously accepted, redredging at the Contract price, within the limit of available funds, may be done if agreeable to both the Contractor and the Contracting Officer.
SECTION 35 20 23.16 45 Page 7
1.16 UNANTICIPATED SHOALING
During the course of this Contract, unanticipated dredging requirements may develop that require the use of the Contractor and Contractor's plant. The dredging required would be similar in scope to that required under the current contract. Dredging would consist of limited portions of a section of channel, intended to remove critical shoals. If such a need arises, the Contracting Officer may issue a Request for Proposal for the work under the CONTRACT CLAUSE entitled CHANGES, and the work performed upon the execution of a bilateral contract modification.
1.17 VARIATIONS IN ESTIMATED QUANTITIES - DREDGING
Where the quantity of a pay item in this Contract is an estimated quantity and where the actual quantity of material within the required dredging prism varies, an equitable adjustment will be processed in accordance with FAR 52.211-18, VARIATION IN ESTIMATED QUANTITY (April 1984). The equitable adjustment applies only to the quantity within the required dredging prism, which does not include the allowable overdepth.
If the total quantity of material to be paid for and actually removed under this Contract exceeds the limit established by FAR 52.211-18, VARIATION IN ESTIMATED QUANTITY (April 1984), an additional time will be allowed at the rate of 1 calendar day for each (AM#3)6,500 cubic yards in excess of the established limit. The Contractor is not to exceed the estimated quantities in the Contract Line Items without prior authorization and only with a signed modification issued by the Contracting Officer.
1.18 QUANTITY SURVEYS
1.18.1 General
Quantity surveys are to be conducted, and the data derived from these surveys are to be used in computing the quantities of work performed and the actual construction completed and in place.
1.18.2 Dredging Sections
The Government will conduct the original and final surveys and make the computations based on them. The Contractor is to conduct the surveys for the periods when progress payments are requested and make the computations based on these surveys. Surveys conducted by the Contractor will be conducted under the direction of the Contracting Officer, unless the Contracting officer waives this requirement in a specific instance.
1.18.3 Submittals
Promptly upon completing a survey, submit the originals of every field note and other record relating to the survey or to the layout of the work in accordance with the SECTION 01 33 00 SUBMITTAL PROCEDURES. The Contracting Officer will use them as necessary to determine the amount of progress payments. Retain copies of submitted material.
1.19 CONTINUITY OF WORK
No payment will be made for work done in an area designated by the Contracting Officer until the full depth required under this Contract is secured in the whole of this area, unless prevented by ledge rock, nor
SECTION 35 20 23.16 45 Page 8 will payment be made for excavation in an area not adjacent to and in prolongation of areas where full depth has been secured except by decision of the Contracting Officer. If a non-adjacent area is excavated to full depth during the operations carried on under this Contract, payment for the work therein may be deferred until the required depth has been reached in the area intervening. The Contractor may be required to suspend dredging when the gages or ranges cannot be seen or properly followed.
PART 2 PRODUCTS
2.1 BRIDGE-TO-BRIDGE RADIOTELEPHONE EQUIPMENT
Dredge and self-propelled attendant floating plant is to be radiotelephone equipped to comply with the provisions of the Vessel Bridge-to-Bridge Radiotelephone Act (Public Law 92-63). This will require, as a minimum, the radiotelephone equipment capable of transmitting and receiving on
156.65 MHz (Channel 13). Multi-channel equipment will also require 156.8 MHz (Channel 16). Dredge tugs and tenders will be considered towing vessels within the meaning of the Act.
PART 3 EXECUTION
3.1 ESTIMATED QUANTITY OF MATERIAL
Within the limits of available funds, the Contractor will be required to excavate the entire quantity of material necessary to complete the work specified whether the quantities involved are greater or less than those estimated except that the Contractor is not expected to dredge virgin or stiff clay material. The work is to be done in accordance with this Contract and at the Contract price or prices, subject to the provisions of the Paragraph entitled VARIATIONS IN ESTIMATED QUANTITIES - DREDGING.
3.1.1 Quantity Summary
The quantities listed in Appendix 1 - QUANTITY SUMMARY TABLE include the volumes present at the time of the surveys indicated on the Contract drawings, plus anticipated shoaling before dredging begins. For the purpose of acceptance, the dredging work in the Bid Item(s) of the Bidding Schedule are divided into Sections.
3.1.2 Required Dredging Prism
The total estimated amount of material to be removed from within the specified limits, including side and end slopes and including anticipated shoaling occurring prior to the dates of the "before-dredging" surveys but excluding overdepths, in cubic yards is listed in Appendix 1 - QUANTITY SUMMARY TABLE. If virgin or stiff clay materials are encountered, the Contractor shall reduce the depth of dredging such that only sandy material is removed even if the required prism limits have not been reached and the Contracting Officer must be notified immediately.
3.1.3 Allowable Overdepth
To cover unavoidable inaccuracies of the dredging process, material actually removed from the designated areas to be dredged, will be measured and paid for at full Contract price. The maximum amount of allowable overdepth dredging is estimated, including anticipated shoaling occurring prior to the dates of the "before-dredging" surveys in cubic yards is listed in Appendix 1 - QUANTITY SUMMARY TABLE.
SECTION 35 20 23.16 45 Page 9
3.1.4 Side And End Slopes
Dredging of the side and end slopes are to follow, as closely as practicable, the lines indicated or specified. Material actually removed from within the limits as approved, to provide for final side and end slopes as specified, but not in excess of the amounts originally above the limiting side and end slopes will be estimated and paid for, whether dredged in original position or by dredging the…