About this file

Amendment 0002 - THE BID OPENIND DATE IS EXTENDED TO 17 SEP 2018 AT 2:00 P.M. LOCAL TIME.

View the file

Other files

File Type Posted
C1_Final_Abstract_W9126G18B0016.pdf PDF
B3_AMEND-0001_W9126G18B0016.pdf PDF
B3_W9126G18R0016-Plans.pdf PDF
B3_W9126G18B0016-Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W45VAK80392821

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of the amendment is stated below and on the follow ing pages:

THE BID OPENING DATE IS EXTENDED TO 17 SEP 2018 AT 2:00 P.M. LOCAL TIME.

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G18B0016

X 9B. DATED (SEE ITEM 11)

13-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Sep-2018

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

2000 FORT POINT ROAD

GALVESTON TX 77550-1229

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M3ODXMAN

Typewritten Text

W9126G18B0016

A0002-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. The specifications for Solicitation No. W9126G18B0016, Sabine-Neches Waterway, Texas, SNWW Maintenance Dredging, in Jefferson and Orange Counties, Texas, are hereby amended as follows:

THE REQUIRED RESPONSE DATE/TIME HAS CHANGED FROM 12-SEP-2018 02:00 PM TO

17-SEP-2018 02:00 PM.

a) Specifications.

(1) SECTION 35 20 23.17 45, PIPELINE DREDGING, APPENDIX 1 – QUANTITY

SUMMARY TABLE – The enclosed section 35 20 23.17 45 entitled PIPELINE DREDGING, APPENDIX 1, QUANTITY SUMMARY TABLE, supersedes that issued with this Solicitation.

b) Drawings.

(1) None..

2. This amendment shall be attached to and become a part of the solicitation.

1 Encl:

1. SECTION 35 20 23.17 45, PIPELINE DREDGING, APPENDIX 1 – QUANTITY SUMMARY

TABLE

SWG FILE NO.:SN 105-216 SOLICITATION NO.: W9126G18B0016

Section No.

From Station

To Station

Length of Station (Feet)

Required Depth

(CY)

Allowable Overdepth

(CY)

Total Estimated

(CY)

1 150+00.00 100+00.00 5,000 115,000 25,000 140,000 16 2 100+00.00 50+00.00 5,000 172,000 43,000 215,000 13 3 50+00.00 0+00.00 5,000 473,000 92,000 565,000 13

15,000 760,000 160,000 920,000

4 593+68.50 550+00.00 4,369 161,000 36,000 197,000 12 5 550+00.00 510+00.00 4,000 134,000 29,000 163,000 12 6 510+00.00 470+00.00 4,000 135,000 29,000 164,000 12

12,369 430,000 94,000 524,000

27,369 1,190,000 254,000 1,444,000

7 200+00.00 184+00.00 1,600 117,000 10,000 127,000 8 1,600 117,000 10,000 127,000

28,969 1,307,000 264,000 1,571,000

8 34+50.00 0+00.00 3,450 98,000 18,000 116,000 8 3,450 98,000 18,000 116,000

32,419 1,405,000 282,000 1,687,000

9 40+00.00 0+00.00 4,000 226,000 39,000 265,000 8 10A 326+24.50 279+59.00 4,666 509,000 58,000 567,000 8 10B 326+24.50 279+59.00 4,666 262,000 52,000 314,000 8

13,332 997,000 149,000 1,146,000

45,751 2,402,000 431,000 2,833,000

QUANTITY SUMMARY TABLE

SECTIONS

PORT OF PORT ARTHUR DOCK- OPTION NO. 2

The term “Required Depth” is synonymous with the term “Prescribed Depth” and “Required Dredging Prism” used elsewhere in the specifications.

SABINE NECHES CANAL TURNING BASIN - OPTION NO. 1

SUBTOTAL, OPTION NO. 1

SUBTOTAL, SCHEDULE NO. 1

SABINE-NECHES CANAL - SCHEDULE NO. 1

TOTAL, SCHEDULE NO. 1

SUBTOTAL, SCHEDULE NO. 1

AND OPTION NO. 1

SUBTOTAL, SCHEDULE NO. 1

AND OPTIONS NO. 1 AND 2

SUBTOTAL, SCHEDULE NO. 1

AND OPTIONS NO. 1, 2, AND 3

Includes anticipated shoaling.

SUBTOTAL, SCHEDULE NO. 1

QUANTITIES

SUBTOTAL, OPTION NO. 2

LOWER REACH NECHES RIVER - SCHEDULE NO. 1

Placement Area

Distribution

SUBTOTAL, OPTION NO. 3

PORT ARTHUR CANAL JUNCTION AREA - OPTION NO. 3

Section 35 20 23.17 45 - APPENDIX 2 - QUANTITY SUMMARY TABLE - Page 1

(TO ACCOMPANY AMENDMENT NO. 0002 TO SOLICITATION NO. W9126G18B0016)

SF30-AMEND-0002_W9126G18B0016
Amend 0002 page-2
QtySummaryTableFY18MaintRevAmedn#2

File details come from the government source that posted it.