SOLICITATION DOCUMENT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B3_AM01_Solicitation_W9126G-17-T-0086_CENTX_Emb_Mowing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9126G-17-T-0086 07-Jun-2017
b. TELEPHONE NUMBER
817-886-1073
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 07 Jul 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SANDRA K JUSTMAN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
817-886-6403FAX:
TEL: 817-886-1043 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7.5M
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF117
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Funded Amt:
Base YR: Central Tx Embankment Mowing
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services to perform embankment and facility mowings in accordance with the attached Performance Work Statement.
Minimum Guarantee for base year only is $2,500.00 Period of Performance: 1 Aug 2017 thru 31 July 2018 POC: Sandy Justman 817-886-1073, sandra.justman@usace.army.mil
NAICS CD: 561730
, FSC CD: S208
Funded Amt:
Option YR 1: CENTX Embankment Mowing
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services to perform embankment and facility mowings in accordance with the attached Performance Work Statement.
Period of Performance: 1 Aug 2018 thru 31 July 2019
Funded Amt:
Option YR 2: CENTX Embankment Mowing
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services to perform embankment and facility mowings in accordance with the attached Performance Work Statement.
Period of Performance: 1 Aug 2019 thru 31 July 2020
Funded Amt:
Option YR 3: CENTX Embankment Mowing
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services to perform embankment and facility mowings in accordance with the attached Performance Work Statement.
Period of Performance: 1 Aug 2020 thru 31 July 2021
CONTRACTING OFFICE STATEMENT
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
INSTRUCTIONS FOR OFFERORS
QUOTE DUE DATE/LOCAL TIME: see block 8, SF 1449 Central Time POINT OF CONTACT: Sandy Justman, Contract Specialist Phone: 817-886-1073 EMAIL your QUOTE to: CIV-OPS.Proposals@usace.army.mil
Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hand carry, “NO EXCEPTIONS.” Subject line of email must include the solicitation number and your Compnay Name.
For additional help contact your local Procurement Technical Assistance Centers (PTAC). Centers were created by Congress to assist businesses seeking to compete on federal contracts. Services are generally free;
however, a small fee may be charged for certain services. Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.
SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: www.sam.gov.
DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business. DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below). The website to obtain your DUNS number:
http://fedgov.dnb.com/webform for technical difficulties, contact govt@dnb.com
ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA) allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Manager (SAM): www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM.
WAGE RATES: The Service Contract Act applies (see attached wage rates).
Below is a checklist to assist you to ensure all the proper documents are returned for consideration on this solicitation. Only those items checked below as “required” must be returned.
Required Contractor Item
Complete page 1 of Solicitation (SF 1449- Block 17a Company Name & Address, Cage Code, Telephone No., and Complete Blocks 30a – 30c
(this applies to any amendments).
Equipment slope certification in accordance with section 1.6.2 of the Performance Work Statement. Shall be submitted as part of Contractor’s proposal for the quote to be considered for award.
Complete Quote Schedule(s): 1) Quantity 1 Quote Schedule Base & Option Years, and 2) Task Order #0001 Quote Schedule.
Complete Contractor Information Sheet below: Include your SSN or firm’s Tax ID Number (TIN and active email address.)
You will be notified of your selection by this method!!!
Offerors shall complete electronically ORCA profile online in SAMS:
www.sam.gov Clause 52.212-3 (Section K- Representation, Certifications and Other Statements of Offerors), paragraph (b) of solicitation AND submit complete ORCA profile.
Offerors shall submit an active SAM registration (Attach a screenshot of the first page). The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of CCR/FedReg, ORCA and EPLS. Website:
www.sam.gov
Provide Past Performance Questionnaires (PPQ) completed by employer or reference who can vouch for your work capability or volunteer work, and have them send the PPQ’s to CIV-OPS.Proposals@usace.army.mil
Please ensure that references submit the form to the specified email addresses and make sure they reference the solicitation number in the email subject line. PPQ forms must be submitted by proposal due date to be considered for evaluation.
Scan all documents into a SINGLE pdf file. (For Help with your proposals please contact http://www.aptac-us.org/new/ PTAC SBA
EMAIL your quote to: CIV-OPS.Proposals@usace.army.mil, Subject line of email must include the solicitation number and your company name
**You are highly encouraged to attend a SITE VISIT for questions!
Location: Whitney Project Office 285 County Road 3602 Clifton, Texas 76634 (Located in Laguna Park-Clifton, for GPS at Whitney Lake Dam)
Date: 22 June 2017 Time: 10:00 A.M Point of Contact: James Nolen (254-622-7406) or (254-622-3332)
** Please submit all solicitation inquiries through ProjNet, instructions can be found below:
SUBMISSION OF OFFEROR'S QUESTIONS AND COMMENTS THROUGH PROJNET
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
From this page you may view all bidder inquiries or add inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W9126G-17-T-0086 The Bidder Inquiry Key is: C5AXUR-YDM2T6
The Bidder Inquiry System will be unavailable for new inquires 7 calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals
Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
CONTRACTOR INFORMATION SHEET
IN THE EVENT OF AWARD, ISSUE CONTRACT TO:
COMPANY NAME______________________________________________________________
POC
(Last, First Middle)
ADDRESS
(Number & Street) (City, State and Zip)
HOME PHONE NUMBER MOBILE
(Area code and number) (Area code and number)
EMAIL ADDRESS_
DUNS NUMBER CAGE CODE NUMBER
SSN/TIN Tax ID NUMBER
Is Vendor’s Online Representation and Certification Application (ORCA) updated in
SAM? _____YES _____NO
INSURANCE
**Please see FAR Clause 52.228-5 and below Insurance Document REQUIREMENT
Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN:
CESWF-CT-S, P.O. Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office. The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:
Submit a copy of Insurance Certificate directly to:
Three Rivers Region US Army Corp of Engineers Whitney Project Office 285 County Road 3602 Clifton, Texas 76634 ATTN: James Nolan
Or email to: sandra.justman@usace.army.mil Phone: (817) 886-1073 Fax: (817)886-6403
(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.
(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $100,000 per accident for bodily injury and $20,000 per accident for property damage.
(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000.00 or in compliance with applicable State statutes.
(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.
NOTE:
(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.
NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm name: CAGE Code:
Address: DUNS Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy) Explain Differences:
Original Contract Price (Award Amount):
Final contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
AFTER COMPLETION ALONG WITH RATINGS, PLEASE EMAIL TO: CIV-
OPS.Proposals@usace.army.mil Ensure the former employer references the solicitation number in the email subject line.
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract
Rating will be neither positive or negative.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR
EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E
VG
S
M
U
N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?
E VG S M U N
b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines
E VG S M U N
g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agree price(s)? E VG S M U N
b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.
Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
YES NO
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
YES
NO
f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.
YES NO
6. SAFETY/SECURITY
a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
YES NO
d) In Summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
AFTER COMPLETION, PLEASE EMAIL TO: CIV‐OPS.Proposals@usace.army.mil
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):
QUOTE SCHEDULE BASE & OPTIONS
Three Rivers Flood Control Embankment and Levee
Mowing Services
Regional Lakes of Aquilla, Navarro Mills, Waco and Whitney Lakes
Indefinate Delivery/Indefinate Quantity Supplies and Non-Personal Services
Contractor Quantity One (1) Quote Schedule Contractor shall provide all labor, equipment, materials, supplies, management, and supervision to perform embankment and levee mowing services on Embankment and Levee areas at Aquilla, Navarro Mills, Waco and Whitney lakes, US Army Corps of Engineers, Three Rivers Region, Fort Worth District, Texas. All services will be performed in accordance with the attached Performance Work Statement and as required by State and Federal regulations.
CONTRACT BASE YEAR
1 August 2017 through 31 July 2018.
CLIN 0001 AQUILLA LAKE - EMBANKMENT MOWING
ITEM DESCRIPTION EST.QTY U/
M
UNIT
PRICE
AMOUNT
0001AA EMBANKMENT (SLOPE AREA) 1 AC
0001AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
AQUILLA LAKE - MOWING - ITEMS 0001AA THRU 0001AB TOTAL
CLIN 0002 NAVARRO MILLS LAKE - EMBANKMENT MOWING
ITEM DESCRIPTION EST.QTY U/
M
UNIT
PRICE
AMOUNT
0002AA EMBANKMENT AND SPILLWAY (SLOPE AREA) 1 AC
0002AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
NAVARRO MILLS LAKE - MOWING ITEMS 0002AA THRU 0002AB TOTAL
CLIN 0003 WACO LAKE - EMBANKMENT/LEVEE MOWING
M
UNIT
PRICE
AMOUNT
0003AA EMBANKMENT (SLOPE AREA) 1 AC
0003AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
0003AC AIRPORT LEVEE (NON-SLOPE AREA) 1 AC
WACO LAKE - MOWING ITEMS 0003AA THRU 0003AC TOTAL
CLIN 0004 WHITNEY LAKE - EMBANKMENT/LEVEE MOWING
M
UNIT
PRICE
AMOUNT
0004AA EMBANKMENT (SLOPE AREA) 1 AC
0004AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
0004AC DAM EXTENSION - HIGHWAY 22 (SLOPE AREA) 1 AC
0004AD DAM EXTENSION - HIGHWAY 22 (NON-SLOPE AREA) 1 AC
0004AE HIGHWAY 22 DIKE (LEVEE SLOPE AREA) 1 AC
0004AF HIGHWAY 22 DIKE (LEVEE NON-SLOPE AREA) 1 AC
0004AG KOPPERL LEVEE (SLOPE AREA) 1 AC
0004AH KOPPERL LEVEE (NON-SLOPE AREA) 1 AC
WHITNEY LAKE - MOWING ITEMS 0003AA THRU 0004AH TOTAL
CONTRACT BASE YEAR SUMMARY - 1 August 2017 through 31 July 2018.
AQUILLA LAKE - EMBANKMENT / LEVEE MOWING ITEMS 0001AA - 0001AB
NAVARRO MILLS LAKE - EMBANKMENT / LEVEE
MOWING
ITEMS 0002AA - 0002AB
WACO LAKE - EMBANKMENT / LEVEE MOWING ITEMS 0003AA - 0003AC
WHITNEY LAKE - EMBANKMENT / LEVEE MOWING ITEMS 0004AA - 0004AH
CONTRACT (BASE YEAR)
TOTAL
ITEMS 0001AA - 0004AH
CONTRACT OPTION YEAR ONE
1 August 2018 through 31 July 2019
CLIN 1001 AQUILLA LAKE - EMBANKMENT/LEVEE MOWING
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
1001AA EMBANKMENT (SLOPE AREA) 1 AC
1001AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
CLIN 1002 NAVARRO MILLS LAKE - EMBANKMENT/LEVEE MOWING
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
1002AA EMBANKMENT (SLOPE AREA) 1 AC
1002AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
CLIN 1003 WACO LAKE - EMBANKMENT/LEVEE MOWING
PRICE
AMOUNT
1003AA EMBANKMENT (SLOPE AREA) 1 AC
1003AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
1003AC AIRPORT LEVEE (NON-SLOPE AREA) 1 AC
CLIN 1004 WHITNEY LAKE - EMBANKMENT/LEVEE MOWING
PRICE
AMOUNT
1004AA EMBANKMENT (SLOPE AREA) 1 AC
1004AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
1004AC DAM EXTENSION - HIGHWAY 22 (SLOPE AREA) 1 AC
1004AD DAM EXTENSION - HIGHWAY 22 (NON-SLOPE AREA) 1 AC
1004AE HIGHWAY 22 DIKE (LEVEE SLOPE AREA) 1 AC
1004AF HIGHWAY 22 DIKE (LEVEE NON-SLOPE AREA) 1 AC
1004AG KOPPERL LEVEE (SLOPE AREA) 1 AC
1004AH KOPPERL LEVEE (NON-SLOPE AREA) 1 AC
CONTRACT BASE YEAR
SUMMARY - 1 August 2018 through 31 July 2019.
AQUILLA LAKE - EMBANKMENT / LEVEE MOWING ITEMS 1001AA - 1001AB
NAVARRO MILLS LAKE - EMBANKMENT / LEVEE MOWING ITEMS 1002AA - 1002AB
WACO LAKE - EMBANKMENT / LEVEE MOWING ITEMS 1003AA - 1003AC
WHITNEY LAKE - EMBANKMENT / LEVEE MOWING ITEMS 1004AA - 1004AH
CONTRACT (OPTION YEAR ONE)
ITEMS 1001AA - 1004AH
CONTRACT OPTION YEAR TWO
1 August 2019 through 31 July 2020
CLIN 2001 AQUILLA LAKE - EMBANKMENT/LEVEE MOWING
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
2001AA EMBANKMENT (SLOPE AREA) 1 AC
2001AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
AQUILLA LAKE - MOWING - ITEMS 2001AA THRU 2001AB TOTAL
CLIN 2002 NAVARRO MILLS LAKE - EMBANKMENT/LEVEE MOWING
PRICE
AMOUNT
2002AA EMBANKMENT (SLOPE AREA) 1 AC
2002AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
NAVARRO MILLS LAKE - MOWING ITEMS 2002AA THRU 2002AB TOTAL
CLIN 2003 WACO LAKE - EMBANKMENT/LEVEE MOWING
PRICE
AMOUNT
2003AA EMBANKMENT (SLOPE AREA) 1 AC
2003AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
2003AC AIRPORT LEVEE (NON-SLOPE AREA) 1 AC
WACO LAKE - MOWING ITEMS 2003AA THRU 2003AC TOTAL
CLIN 2004 WHITNEY LAKE - EMBANKMENT/LEVEE MOWING
PRICE
AMOUNT
2004AA EMBANKMENT (SLOPE AREA) 1 AC
2004AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
2004AC DAM EXTENSION - HIGHWAY 22 (SLOPE AREA) 1 AC
2004AD DAM EXTENSION - HIGHWAY 22 (NON-SLOPE AREA) 1 AC
2004AE HIGHWAY 22 DIKE (LEVEE SLOPE AREA) 1 AC
2004AF HIGHWAY 22 DIKE (LEVEE NON-SLOPE AREA) 1 AC
2004AG KOPPERL LEVEE (SLOPE AREA) 1 AC
2004AH KOPPERL LEVEE (NON-SLOPE AREA) 1 AC
WHITNEY LAKE - MOWING ITEMS 2004AA THRU 2004AH TOTAL
SUMMARY - OPTION YEAR TWO: 1 August 2019 through 31 July 2020.
AQUILLA LAKE - EMBANKMENT MOWING ITEMS 2001AA - 2001AB
NAVARRO MILLS LAKE - EMBANKMENT MOWING ITEMS 2002AA - 2002AB
WACO LAKE - EMBANKMENT / LEVEE MOWING ITEMS 2003AA - 2003AC
WHITNEY LAKE - EMBANKMENT / LEVEE MOWING ITEMS 2004AA - 2004AH
CONTRACT (OPTION YEAR TWO)
ITEMS 2001AA - 2004AH
CONTRACT OPTION YEAR THREE
1 August 2020 through 31 May 2021
CLIN 3001 AQUILLA LAKE - EMBANKMENT/LEVEE MOWING
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
3001AA EMBANKMENT (SLOPE AREA) 1 AC
3001AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
AQUILLA LAKE - MOWING - ITEMS 3001AA THRU3001AB TOTAL
CLIN 3002 NAVARRO MILLS LAKE - EMBANKMENT/LEVEE MOWING
PRICE
AMOUNT
3002AA EMBANKMENT (SLOPE AREA) 1 AC
3002AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
NAVARRO MILLS LAKE - MOWING ITEMS 3002AA THRU 3002AB TOTAL
CLIN 3003 WACO LAKE - EMBANKMENT/LEVEE MOWING
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
3003AA EMBANKMENT (SLOPE AREA) 1 AC
3003AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
3003AC AIRPORT LEVEE (NON-SLOPE AREA) 1 AC
WACO LAKE - MOWING ITEMS 3003AA THRU 3003AC TOTAL
CLIN 3004 WHITNEY LAKE - EMBANKMENT/LEVEE MOWING
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
3004AA EMBANKMENT (SLOPE AREA) 1 AC
3004AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 1 AC
3004AC DAM EXTENSION - HIGHWAY 22 (SLOPE AREA) 1 AC
3004AD DAM EXTENSION - HIGHWAY 22 (NON-SLOPE AREA) 1 AC
3004AE HIGHWAY 22 DIKE (LEVEE SLOPE AREA) 1 AC
3004AF HIGHWAY 22 DIKE (LEVEE NON-SLOPE AREA) 1 AC
3004AG KOPPERL LEVEE (SLOPE AREA) 1 AC
3004AH KOPPERL LEVEE (NON-SLOPE AREA) 1 AC
WHITNEY LAKE - MOWING ITEMS 3004AA THRU 3004AH TOTAL
SUMMARY - OPTION YEAR THREE: 1 August 2020 through 31 May 2021.
AQUILLA LAKE - EMBANKMENT MOWING ITEMS 3001AA - 3001AB
NAVARRO MILLS LAKE - EMBANKMENT MOWING ITEMS 3002AA - 3002AB
WACO LAKE - EMBANKMENT / LEVEE MOWING ITEMS 3003AA - 3003AC
WHITNEY LAKE - EMBANKMENT / LEVEE MOWING ITEMS 3004AA - 3004AH
CONTRACT (OPTION YEAR THREE) TOTAL ITEMS 3001AA - 3004AH
BASE YEAR (CLIN 0001AA - 0004AH) TOTAL
OPTION YEAR ONE (CLIN 1001AA - 1004AH) TOTAL
OPTION YEAR TWO (CLIN 2001AA - 2004AH) TOTAL
OPTION YEAR THREE (CLIN 3001AA - 3004AH) TOTAL
BASE AND ALL OPTIONS - CLIN 0001AA-3004AH
This Contract Bid Sheet must be signed and dated by the Contractor to be considered a valid submission for the applicable Government Solicitation.
Contractor Signature: Date:
TASK ORDER QUOTE SCHEDULE
Three Rivers Flood Control Embankment and Levee
Mowing Services for the Regional Lakes of Aquilla, Navarro Mills, Waco and Whitney Lakes
Indefinite Delivery/Indefinite Quantity Supplies and Non-Personal Services
Contractor Certified Bid Schedule
Contractor shall provide all labor, equipment, materials, supplies, management, and supervision to perform embankment and levee mowing services on Embankment and Levee areas at Aquilla, Navarro Mills, Waco and Whitney lakes, US Army Corps of Engineers, Three Rivers Region, Fort Worth District, Texas. All services will be performed in accordance with the attached Performance Work Statement and as required by State and Federal regulations.
CONTRACT TASK ORDER #0001
7 August 2017 through 29 September 2017
CLIN 0001 AQUILLA LAKE - EMBANKMENT MOWING
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
0001AA EMBANKMENT (SLOPE AREA) 45 AC
0001AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 8 AC
CLIN 0002 NAVARRO MILLS LAKE - EMBANKMENT MOWING
PRICE
AMOUNT
0002AA EMBANKMENT AND SPILLWAY (SLOPE AREA) 27 AC
0002AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 15 AC
CLIN 0003 WACO LAKE - EMBANKMENT/LEVEE MOWING
PRICE
AMOUNT
0003AA EMBANKMENT (SLOPE AREA) 49 AC
0003AB EMBANKMENT INSTRUMENTATION AREA (NON-SLOPE) 141 AC
0003AC AIRPORT LEVEE (NON-SLOPE AREA) 10 AC
CLIN 0004 WHITNEY LAKE - EMBANKMENT/LEVEE MOWING
PRICE
AMOUNT
0004AA EMBANKMENT (SLOPE AREA) 14 AC
0004AB EMBANKMENT INSTRUMENTATION AREA (NON-
SLOPE)
6 AC
0004AC DAM EXTENSION - HIGHWAY 22 (SLOPE AREA) 3 AC
0004AD DAM EXTENSION - HIGHWAY 22 (NON-SLOPE) 4 AC
0004AE HIGHWAY 22 LEVEE - DAM "B" (SLOPE AREA) 8 AC
0004AF HIGHWAY 22 LEVEE - DAM "B" (NON-
SLOPE)
6 AC
0004AG KOPPERL LEVEE (SLOPE AREA) 10 AC
0004AH KOPPERL LEVEE (NON-
SLOPE)
14 AC
CONTRACT BASE YEAR- TASK ORDER #0001
SUMMARY - 7 August 2017 through 29 September 2017.
AQUILLA LAKE - EMBANKMENT / LEVEE MOWING ITEMS 0001AA - 0001AB
NAVARRO MILLS LAKE - EMBANKMENT / LEVEE
MOWING
ITEMS 0002AA - 0002AB
WACO LAKE - EMBANKMENT / LEVEE MOWING ITEMS 0003AA - 0003AC
WHITNEY LAKE - EMBANKMENT / LEVEE MOWING ITEMS 0004AA - 0004AH
CONTRACT BASE YEAR - TASK ORDER#0001
TOTAL
ITEMS 0001AA - 0004AH
This Contract Bid Sheet must be signed and dated by the Contractor to be considered a valid submission for the applicable Government Solicitation.
Contractor Signature: Date:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
CENTRAL TEXAS EMBANKMENT MOWING SERVICES
THREE RIVERS REGIONAL LAKES
1. GENERAL: This is a non-personal services contract to provide all management, tools, equipment, materials, and labor necessary to ensure that services for flood control embankment and levee mowing and trimming are performed at Aquilla, Navarro Mills, Waco and Whitney Lakes located within the Three Rivers Region, Texas. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform flood control embankment and levee mowing and trimming as defined in this Performance Work Statement except for those items specified as Government furnished property and services. The Contractor shall be required to perform to the standards in this contract.
1.2 Scope: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and trimming on Flood Control Embankments at Three Rivers Regional lakes, Texas. These lakes include Aquilla, Navarro Mills, Waco, Whitney lakes and flood control levees. Services include embankment mowing and trimming around various instrumentation equipment on these earthen structures, refer to Performance Requirements Summary (PRS) Technical Exhibit 1, “PRS#1 and PRS#2”. The Contractor shall accomplish all operations safely and according to IAW EM 385-1-1. A listing of all acreages may be found in Technical Exhibit 3, Appendix B, “Mowing Tabulations” and Appendix C, “Embankment and Levee Mowing Maps”.
1.3 Period of Performance: Base Year, plus three possible Option Years, 12 months each.
1.4 General Information
1.4.1 Award of Other Contracts: The services provided under this contract shall be independent of all services provided under other contracts, at this work site or any other work site, at which the Contractor may receive awards. The Contractor shall be responsible for meeting any and all deadlines for services specified under this contract.
1.4.2 Cooperation with Other Contractors: The Government may undertake or award other contracts for additional work not related to the contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit, direct, lead or permit any acts that will interfere with the performance of work by another Contractor, or by Government employees.
1.4.3 Task Orders: Services to be performed will be specified herein on an as-ordered basis. Orders under Contract shall be made through issuance of task orders. Each task order is an independent order.
1.4.3.1 Unit of Measure (UM): For the purpose of this contract, Flood Control Embankment mowing and the associated trimming will be bid per acre.
1.4.3.2 Preferred Sequence: The Contractor will be furnished a preferred sequence of areas to be mowed with each Task Order. All mowing and trimming required on embankments areas or levees shall be completed and inspected and approved by the Government Representative prior to moving all equipment and beginning work in another area. As a minimum, sufficient equipment to remedy any deficiency found shall remain in un-inspected areas until mowing has been accepted by the Government.
1.4.3.3 Maps: Maps for the areas in which the work will be accomplished are included in Technical Exhibit 3 Appendix C “Embankment and Levee Mowing Maps". Embankment and Levee maps indicate the approximate areas to be mowed by appropriate legend or note.
1.4.4 Time Limitations: The Contractor shall be allowed ten (10) working days per lake exclusive of Saturdays, Sundays, Federal Holidays and any rain days, as determined by the Contracting Officer (KO) to accomplish work items specified in task orders. Work shall not be accomplished on Saturdays, Sundays or Federal Holidays unless requested in writing and approved by the KO. Federal Holidays are listed in Section 1.4.13 of this PWS. Work shall commence on the start date specified by the task order and completed by close of business on date specified by the task order. The Contractor shall promptly submit in writing a proposed revised schedule to the KO if the Contractor cannot comply with specified start date.
Delay of the start date shall not release the Contractor from his obligation to complete all work by the date specified on the task order. The Contractor shall be required to re-accomplish work until it is performed as stated in this PWS, failure to do so may result in payment deduction.
1.4.5 Rain Days: Rain days are delays in service requiring an extension to the completion date, on mowing task orders, due to inclement weather or conditions beyond the Contractor’s control. They may only be allowed with concurrence and approval of the KO. The Contractor is responsible to notify the KO on days when weather or poor ground working conditions prohibit performance of services. The Contractor shall ascertain if the work day is considered a rain day by KO. In no instance may the Contractor operate equipment during conditions that will result in damage to turf or ground surfaces on Government property.
Any damages caused by Contractor operations shall be reconciled in accordance with Technical Exhibit 3, Appendix A, “Damage Reconciliation”.
1.4.6 Obstructed or Construction Areas: In the event of an area obstructed by storm debris, flood water or a designated construction area, the Contractor will notify the KO of any area unable to be mowed. If the area cannot be mowed, the Contractor will immediately record the acreage on a written list of acreage not completed. The list must be kept current and maintained so that if a unit is checked which has not been serviced and rejected by the Government’s Quality Assurance Representative (QAR), it can be checked against the list of non-serviced units that shall be submitted to the QAR on a daily basis. Non-serviced units will be deducted from Task Order invoice.
1.4.7 Payment: Payment for completed and accepted work will be done upon completion of task order and receipt of an accurate invoice submitted by the Contractor. Refer to Technical Exhibit 2, Item H.
1.4.8 Post Award Orientation: The Contractor agrees to attend any post award orientation convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5; “This orientation aids the Government and Contractor personnel to (1) achieve a clear and mutual understanding of all contract requirements, and (2) identify and resolve any potential problems.
However, it’s not a substitute for the Contractor’s fully understanding the work requirements at the time offers are submitted, nor is it to be used to alter the final agreement arrived at in any negotiations leading to contract award. These meetings shall be at no additional cost to the Government. Refer to Technical Exhibit 2, Item A.
1.4.9 Performance Evaluation Progress Meetings: The Contractor, Contractor’s superintendent, and Quality Control Inspector(s) shall meet with the KO and/or a QAR once a quarter or as required to discuss performance or any issues of concern. During these meetings the KO will apprise the Contractor of the Government’s evaluation results of the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. However, a meeting shall not be held later than two working days after a Contract Deficiency Report (CDR) is issued. A mutual effort will be made to resolve any and all problems identified by the team. Written minutes of these meetings shall be prepared and signed by the QAR, Contractor and their respective employees. These meetings shall be at no additional cost to the Government. Refer to Technical Exhibit 2, Item A.
1.4.10 Performance of Work Outside of Scope of this Contract: If the Contractor performs work above and beyond the scope of a task order (e.g. mows more than required/ordered under the task order) the Government shall not be liable for additional cost. Only the Contracting Officer is authorized to authorize and make legal modifications to any signed contract, including any changes to work scope or negotiated price changes.
1.4.11 Quality Control: The Contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS and all work complies with the requirements of the contract. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The QCP is to be delivered within 30 calendar days after contract award or with the Contractor’s proposal, if it is an evaluation factor. Two (2) copies of a comprehensive written QCP shall be submitted for approval by the KO. Any proposed changes to an approved QCP, shall be submitted, in writing, to the KO for review and approval. Refer to Technical Exhibit 2, Item D.
1.4.11.1 Quality Control Reports: The Contractor shall be required to submit a detailed Quality Control Report, indicating the work has been accomplished and is ready for inspection as required for Government inspection and acceptance. Refer to Technical Exhibit 2, Item E.
1.4.12 Quality Assurance: The Government shall evaluate the Contractor’s quality control program under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.4.13 Government Holidays:
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.4.14 Hours of Operation: The Lake Office’s normal office hours are 08:00am to 4:30 pm but, may vary slightly between these lakes. The Contractor work hours shall be 8:00 am to 4:30 pm. The Lake Office shall be closed on Federal holidays. The Contractor shall be required to submit a work schedule for review and approval by the KO.
1.4.15 Place of Performance: The work to be performed under this contract will be performed at the four central Texas lakes listed in Section 1, “General”, Three Rivers Region, Texas.
1.4.16 Type of Contract: The Government will award a Firm Fixed Price contract. Work request under this Contract shall be made through issuance of Task Orders (TO). The Contractor shall perform all services specified herein on an as-ordered basis.
1.4.17 Safety: The Contractor shall develop and execute an effective safety program to ensure all required services are performed safely. The Contractor shall develop and implement procedures to identify, minimize and prevent safety risks in the form of a Safety Plan. The Contractor’s Safety Plan is the means by which he assures safety of personnel in the work place. The Safety Plan is to be delivered within 15 working days of the Contractor’s proposal and before any work is started. Two (2) copies of a comprehensive written Safety Plan shall be submitted for approval by the KO. Any proposed changes to an approved plan shall be submitted, in writing, to the KO for review and approval. The Contractor shall exercise all applicable safety rules in accordance with the OSHA and all pertinent provisions of the U.S.
Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, 15 September 2008 or most current version. OSHA standards are subject to change and such changes may affect the Contractor in their performance during the contract period and shall be at no additional cost to the Government. Refer to Technical Exhibit 2, Item C.
1.4.18 Special Qualifications: The Contractor shall, without additional expense to the Government, be responsible for obtaining any and all necessary licenses, permits, and letters of certification. All current federal, state and county rules and regulations shall be met and maintained throughout the performance of the work specified under this contract. Refer to Technical Exhibit 2, Item G
1.4.19 Contracting Officer Representative (COR): The COR will be assigned and identified by separate letter upon approval by the KO. The COR monitors all technical aspects of the contract and assists in contract administration as designated by the KO. The COR is authorized to perform the following functions; assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract or signed task order.
1.4.20 Contractor Key Personnel: The following personnel are considered key personnel by the Government; The Contractor, Contractor’s Superintendent/Manager, or Quality Control Inspectors. The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work.
The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the KO. The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
1.4.21 Security Requirements: All Contractor and all associated Sub-contractors employees shall comply with applicable facility access and local security procedures (provided by Government Representative).
The Contractor shall also provide all information for background checks to meet facility access requirements to be accomplished by the Government organizations Director of Emergency Services or Security Office. Contract workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and /or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility change, the Government may require changes in the Contractor security matters or processes. Contractor and all associated sub-contractors employees shall comply with adjudicated standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available).
1.4.21.1 The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the COR, no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I‐9, Employment Eligibility Verification.
This Form and a list of eligible employees will be provided to the KO and shall become part of the official contract file. Refer to Technical Exhibit 2, Item F.
1.4.21.2 “i-WATCH”, Corps Watch, or See Something, Say Something…
This is the start of the file's text. The full file is on GovTribe.