Amendment#01 includes Lake O' the Pines Johnson Creek 4-Day Gate Attendant Solicitation and the Revision of the Insurance Requirement Information on the Solicitation. Proposal Due Date remains unchanged: 16 February2017 12:00PM . Email ALL QUOTES To: CIV-OPS.Proposals@usace.army.mil POC: tiffany.cole@usace.army.mil
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD_6.pdf | ||
| AMD__04.pdf | ||
| A7_AMD_02.pdf | ||
| B3_17_T_0019_Piney_Woods_GA.pdf | ||
| B3_Draft_17_T_0019_Piney_Woods_GA-2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment #01 is to add Lake O'the Pines Johnson 4-DAY Gate Attendant to this Solicitation and to Revise the Insurance Requirement information.
Proposal Due Date remains unchanged: DUE-16 February 2017 12:00PM. Email ALL QUOTES TO:
Civ-Ops.Proposals@usace.army.mil
Point of Contact: Tiffany Cole, (817) 886-1033, tiffany.cole@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jan-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-17-T-0019
X 9B. DATED (SEE ITEM 11)
17-Jan-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Jan-2017
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G-17-T-0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
JOHNSON CREEK BID SCHEDULE
BID SCHEDULE
LAKE O’ THE PINES - JOHNSON CREEK CAMPGROUND
4-DAY GATE ATTENDANT
ITEM
NO
DESCRIPTION
Contract Gate Attendant Services
Quantity
Unit Price Per Day
TOTAL
Base Period:
01 March 2017 to 28 February 2018
209 Days
Option Period:
01 March 2018 to 28 February 2019
208 Days
Option Period:
01 March 2019 to 29 February 2020
208 Days
TOTAL AMOUNT :
JOHNSON CREEK LOP APPENDICES
APPENDENCES PERFORMANCE WORK STATEMENT (PWS)
CAMPGROUND GATE ATTENDANT SERVICES
LAKE O’ THE PINES
1. GENERAL: This is a non-personal services contract to provide Gate Attendant services at Lake O’ the Pines.
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. Parties interested in submitting on this solicitation are informed that the U.S. Army Corps of Engineers, Fort Worth District, is currently seeking and anticipating entering into a Corporate Joint Management agreement with a nonprofit organization to assume certain activities in the management of Lake O’ the Pines. As such, gate attendant contracts are under consideration. If an agreement becomes imminent the Gate Attendant will be notified. If the Corporate Joint Management agreement is awarded the Gate Attendant's contract with the U.S. Army Corps of Engineers, Fort Worth District, will be terminated for convenience.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Gate Attendant Services as defined in the SWF District Performance Work Statement, Appendices PWS for Lake O’ the Pines and Gate Attendant Handbook except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2. Scope: Gate Attendant services as described in the Lake O’ the Pines Appendices, Section 1.10, Work to be Performed, and the Fort Worth District Gate Attendant Services PWS.
1.3: Period of Performance: Estimated deliverables for gate attendants in Johnson Creek Campground.
Positions Number
Days Surveillance
Hours Gate House
Hours Availability
Hours Johnson Creek 4-Day Shift Annual Shift Base (1 March 2017 – 28 February 2018)
209 2299 2299 2717
Johnson Creek 4-Day Shift Annual Shift Option Year 1 (1 March 2018 – 28 February 2019)
208 2288 2288 2704
Johnson Creek 4-Day Shift Annual Shift Option Year 2 (1 March 2019 – 29 February 2020)
208 2288 2288 2704
The Lake O’ the Pines summer campground gate attendants working the Johnson Creek Campground 4-Day shift work Monday through Thursday with days off from Friday through Sunday. All gate attendants will be required to close the exit gates at the end of their shifts. The base year of the contract for Johnson Creek
Campground will start March 1, 2017, and end February 28, 2017. There will be two option years with this contract. The option year contracts will begin on March 1, and end on February 28 or February 29, as previously specified.
1.4 General Information
1.4.1 Quality Control: Not applicable.
1.4.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.4.3 Government Holidays: The Contractor will work the holidays that fall on their shift.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.4.4 Hours of Operation: Contractors will maintain adequate staffing of the gatehouse during the following specified park hours of operation: 9:00 a.m. through 8:00 p.m. (0900 hours to 2000 hours) each day of the week during the contract period. Contractors will maintain adequate staffing on site in the park during the remaining hours of the shift to support contractual requirements to include: 8:00 p.m. through 9:00 a.m. (2000 hours to 0900 hours) each day of the week during the contract period. The contractor shall be considered available for emergency duty should it be necessary to assist park visitors or to meet other contract specifications throughout the duration of their shift.
Contractor Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Johnson Creek 4-Day Gate Attendant Shift
Surveillance Hours Gate House Hours Availability Hours
0900-2000
2000-0900
OFF
1.4.5 Place of Performance: The work to be performed under this contract will be performed at Johnson Creek, and Brushy Creek Campgrounds at Lake O’ the Pines.
1.4.5.1 Johnson Creek Campground: Located at Lake O’ the Pines in northeast Texas, Johnson Creek Park is a highly developed multi-use park located near the Crestwood Community on the north shore of the lake, just off of FM 729. The park provides day-use, group and overnight camping facilities. There are 63 RV campsites and 22 tent campsites within the campground and 12 campsites within the group camping area. The group camping area also has a pavilion with its own restroom/shower facility. Amenities within the campground include: beach, boat launch, dump station, playground, and restrooms/showers. The day-use area provides an amphitheater, beach, boat launch with courtesy dock, fishing dock, picnic area, restroom, rentable pavilion with electricity and grill, and a volleyball court.
1.4.6 Type of Contract: The government will award a Firm Fixed Price contract.
1.4.7 Security Requirements: Not applicable.
1.4.7.1 Physical Security: The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.4.7.2 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.
(a) The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor and team member. The Contractor shall prohibit the opening of locked areas by persons other than the Contractor and team member.
(b) Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.
1.4.8 Special Qualifications: Not applicable.
1.4.9 Pre-Work Conference: The Contractor will be required to attend a pre-work conference at no additional cost to the government to be conducted by the Lake Manager or their representative, at the Lake O’ the Pines Project Office or other agreed upon location. This meeting will cover the policies outlined in the Fort Worth District PWS and this lake appendix. The pre-work conference is normally held the week before the Contractor begins providing the services.
1.4.10 Contracting Officer Representative (COR): Not required per DFAR 201-602-2, PGI 201-602-2.
1.4.11 Contractor Key Personnel: Not applicable.
1.4.12 Identification of Contractor Employees: Not applicable.
1.4.13 Contractor Travel: Not applicable.
1.4.14 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.4.15 Organizational Conflict of Interest: Not applicable.
1.5. GOVERNMENT-FURNISHED ITEMS AND SERVICES:
1.5.1 Facilities: The Government will provide a gate house for the contractor to work from at the parks, a campsite, and a storage building. Each park has designated gate attendant campsites at or near the park entrance and gate house where the on-site contract gate attendants are required to reside. The 3-day shift gate attendants will occupy the campsite to the right of the gatehouse or inbound side. The 4-day shift gate attendants will occupy the campsite to the left of the gatehouse or outbound side.
1.5.2 Equipment: The Government will provide computer, computer monitors, printers, telephone and radio communication equipment.
1.5.3 Materials: The Government will provide in the gate house forms, maps, brochures, handouts, light bulbs, air conditioner filters, computer paper, staplers, staples, china markers, water hose and sprinklers.
The Government will also supply the Fort Worth District Use Fee Program SOP, and the Lake O’ the Pines Gate Attendant Handbook.
1.6 CONTRACTOR-FURNISHED ITEMS AND RESPONSIBILITIES:
1.6.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 1.5 of this PWS.
1.6.2 Equipment: The Contractor shall provide a transportation vehicle, which can be operated independently of the RV free of leaks and in good mechanical condition for use in performing the requirements of the contract. Minimum state required liability insurance must be carried. Proof of liability insurance will be submitted to the Lake Manager prior to work start date
1.6.3. Materials: The Contractor shall furnish all materials, excluding those furnished by government as specified above, needed to operate the gatehouse. This list includes, but is not limited to, hi-liters, color markers, notepads, pens, pencils, tape, trash bags, cleaning supplies, restroom supplies and any other items that may be necessary to operate the gatehouse.
1.6.4. Personnel: Minimum of two (2) person team over 21 years of age shall remain in the park during the entire work shift as specified by the Lake Manager.
1.7 CONTRACTOR MANAGEMENT REPORTING (CMR): Not applicable.
1.8 APPLICABLE PUBLICATIONS (CURRENT EDITIONS):
1.8.1 The Contractor must abide by all applicable State, Federal and Local Laws and regulations, publications, manuals, and local policies and procedures, including the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, the Fort Worth District Use Fee Program SOP, and the Lake o’ the Pines Gate Attendant Handbook.
1.9 Attachment/Technical Exhibit List:
1.9.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary.
TECHNICAL EXHIBIT 1
Performance Requirements Summary: The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required—usually a shall statement) Standard
Performance Threshold (This is the maximum error rate. It could possibly be
“Zero deviation from standard”)
Method of Surveillance
PRS # 1
The Contractor shall collect User Fees, SWF PWS 1.11.1 and Lake PWS 1.10.2
The Contractor Completed Financial Statements and Deposit Statements for User Fees must agree.
Zero (0) deviation from standard
100% inspection
PRS # 2
The Contractor shall operate park entrance and exit gates. Gate Operations Lake PWS1.10.3
The Contractor operated entrance and exit gates during operational hours.
Zero (0) deviation from standard.
100% Inspection.
PRS # 3
The Contractor shall inspect parks.
Park Inspections Lake PWS 1.10.5
The Contractor completed daily inspections during contract specified times.
Allowable deviation: 1 incomplete daily inspection per quarter.
100% Inspection
PRS # 4
The Contractor shall cooperate with customers, Government personnel, and other Contractors. SWF PWS Cooperation with Others 1.12.
Contractor cooperated with customers, other Contractors, and Government personnel according to SWF and Lake policy.
Zero (0) deviations from validated complaints
100% Inspection
1.9.2 Technical Exhibit 2 – Deliverables Schedule
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Daily Report Within one day of completing shift
1 original Hard Copy
Lake O’ the Pines Project Office, ATTN:
Robert Henderson, 2669 FM 726, Jefferson, Texas, 75657
Financial Statements Within one day of completing shifts
Original and two (2) copies
Hard Copy
Lake O’ the Pines Project Office, ATTN: Robert
Henderson, 2669 FM 726, Jefferson, Texas, 75657
Deposit Statements Within one day of completing shift
Original and two (2) copies
Hard Copy
Lake O’ the Pines Project Office, ATTN: Robert
Henderson, 2669 FM 726, Jefferson, Texas, 75657
1.10 Work to be Performed:
1.10.1 Compliance: Contractor is responsible for following procedures and requirements specified in a comprehensive Lake O’ the Pines Gate Attendant Handbook issued by the Lake Office. Gate Attendants may receive performance evaluations as specified by the Lake Manager.
1.10.2 User Fees: The contractor will collect all user fees in accordance with the Fort Worth District Use Fee Program SOP. User fees will be collected through the operation of a computer and the National Recreation Reservation System (NRRS), Outdoor Recreation Management System (ORMS), cash register or User Fee Permit Books. Additional user fees in nearby park areas may also be collected from honor vaults as required by the Lake Manager. Monies, fee books, annual day use fee passes, credit vouchers, credit card receipts, America the Beautiful Senior Pass, America the Beautiful Access Pass and user fee permits will be stored in a permanently installed vault or safe provided by the Government, or as directed by the Lake Manager. User fees and user fee documents will be collected from the Gate Attendants at the gatehouses by a Park Ranger or contract fee collection personnel, or the Gate Attendants may be required to turn in user fee documents to Park Ranger at the Lake Office or contract fee collector at their main office.
1.10.3 Gate Operations: Gate Attendants shall operate automatic gate arms as required by the Lake Manager. In the event of power failure, Gate Attendants shall secure automatic gate arms in open position and return automatic gate arms to normal operation when power is restored.
1.10.4 Camping Status: The Contractors camping status will match the reservation arrival reports. The Contractor will make sure that the individuals that are on the reservation arrival reports are current and in agreement with NRRS, ORMS (Outdoor Recreation Management System) or the ORMS reservation reports. Contractor shall perform the duty of changing campsite status markers in accordance with established policies of the Lake Manager. In the event all electrical and/or non-electrical campsites are occupied, Contractor will maintain a waiting list and notify those individuals, in order of placement on the waiting lists, whenever a campsite becomes vacant.
1.10.5 Park Inspections: The Contractor shall inspect the entire park a minimum of four (4) times daily.
The Contractor shall inform park visitors and campers of any violation of rules, regulations, and policies in a friendly, informative manner and ask for compliance. The Contractor shall keep a patrol inspection report in a neat and timely manner. The Contractor shall check all restroom lights and guard lights at least once during the hours of darkness each day to insure that they are working properly. The Lake Office will be notified of any guard lights that are inoperative during the first scheduled workday after discovering them inoperative. During cold weather, the Contractor will monitor drinking fountains, water hydrants and park facilities to prevent freezing. Water hydrants and water cutoffs will be turned on and off as required by the Lake Manager.
1.10.6 Group Shelters: If group shelters in the park are rented, Gate Attendants will unlock electric panels and entrance gates for the renter. Upon departure of a renter, Gate Attendant will conduct an inspection of the group shelter, barbecue pit and associated items. Gate Attendant will advise renter if additional cleaning is required. Park Ranger will be notified if renter fails to properly clean group shelter, barbecue pit, or associated items. Gate Attendant will complete required inspection reports and turn in the reports to the Lake Manager or designated representative a minimum of once per week.
1.10.7 Lost and Found: The Contractor will maintain a lost and found department in the gatehouse. Any items not picked up after two (2) weeks will be turned in to a Park Ranger. The Contractor will prepare a lost and found report on all lost and found property. The Contractor will ensure that proper identification is obtained from individuals before release of any lost and found property.
1.10.8 Gate House and Landscape Maintenance: The Contractor will maintain the gatehouse, both inside and outside, in a clean, orderly and sanitary condition at all times.
1.10.8.1 The gatehouse will be thoroughly cleaned at the end of each shift to the Lake Manager or designated representative’s satisfaction to include the following:
(a) Toilet facilities
(b) Carpet - vacuumed
(c) Floors - swept and mopped
(d) Windows - washed
(e) Entire interior building surfaces - dusted and cleaned if necessary
(f) Outside building and walking surfaces - seventy-five (75) feet perimeter of gatehouse will be free of litter
(g) All trash cans - emptied
Gate Attendants will provide all equipment, tools, supplies and materials necessary to clean the gatehouse.
1.10.8.2 Gate Attendant shall water the lawn, flowers, trees, and shrubs in the immediate area of the gatehouse and/or trailer site as instructed by lake personnel. The Government will provide hose and sprinklers.
1.10.9 Other Requirements: Contractors will complete reports as required by the Lake Manager. The reports include; but are not limited to: Daily Activity Reports, Inspection Reports, Incident Reports and Lost and Found Reports. Gate Attendants will be required to perform additional duties as required in the Lake O’ the Pines Gate Attendant Handbook. Gate Attendants shall be required to sign a form indicating their understanding of the Lake O’ the Pines Gate Attendant Handbook. A copy of the Lake O’ the Pines Gate Attendant Handbook will be available at the Lake O’ the Pines Project Office for review by prospective bidders.
The following have been modified:
INSURANCE
INSURANCE
Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN: CESWF-CT-S, P.O.
Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office. The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:
Submit a copy of Insurance Certificate directly to:
Piney Woods Region US Army Corp of Engineers Lake O’ the Pines Project Office ATTN: Cynthia Mcintosh
2669 FM 726
Jefferson, TX 75657-4635
Or email to: tiffany.cole@usace.army.mil Phone: (817) 886-1033 Fax: (817)886-6403
(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.
(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $100,000 per accident for bodily injury and $20,000 per accident for property damage.
(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000.00 or in compliance with applicable State statutes.
(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.
NOTE:
(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.
Amd#01 REQUIREDINSURANCE– In accordancewithFAR52.228-5 Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the lake office. The Contractor shall maintain, during the entire period of his performance under this contract, the minimum insurance requirements of the State of Texas: $30,000 for each injured person, up to a total of $60,000 per accident, and $25,000 for property damage per accident. This basic coverage is called 30/60/25 coverage. /Amd#01
(End of Summary of Changes)
File details come from the government source that posted it. Updated .