B3_17_T_0012_TB_Potable_Water_Testing.pdf

PDF 530 KB Posted

Attached to
FY-17 Town Bluff Potable Water Testing Services
Solicitation number
W9126G-17-T-0012
Issued by

About this file

FY-17 Town Bluff Potable Water Solicitation

View the file

Other files

File Type Posted
B3_AMD_0002.pdf PDF
B3_AMD_0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9126G-17-T-0012 18-Nov-2016

b. TELEPHONE NUMBER

817.886.1033

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 19 Dec 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9126G9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TIFFANY COLE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A17

FORT WORTH TX 76102-0300

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 967448 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

SAM RAYBURN PROJECT OFC

CESWF-OD-SR

7696 RR 255 WEST

JASPER TX 75951

TEL: 409 384-5716 FAX: 409-384-9368

817-886-6403FAX:

TEL: 817-886-1043 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$27.5M

NAICS:

221310

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF101

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 12 Months $_________________ $__________________

FY-17 SR Potable Water Systems Testing

Furnish all Equipment, Materials, Supplies,Transportation, and Labor necessary to operate, maintain, and test potable water sytems in Magnolia Ridge and Sandy Creek Parks in accordance with the contract specifications and attachments.

Period of Performance: 01 JANUARY 2017 thru 31

DECEMBER 2017

Mail Invoices to:

Alvin Schriefer Town Bluff Lake Office

5171 FM 92S

Woodville, TX 75979-8637

POC: Tiffany Cole, 817-886-1033 tiffany.cole@usace.army.mil

0002 12 Months $_________________ $__________________

OPTION FY-18 SR Potable Water Systems Testing

Furnish all Equipment, Materials, Supplies,Transportation, and Labor necessary to operate, maintain, and test potable water sytems in Magnolia Ridge and Sandy Creek Parks in accordance with the contract specifications and attachments.

Period of Performance: 01 JANUARY 2018 thru 31

DECEMBER 2018

Mail Invoices to:

Alvin Schriefer Town Bluff Lake Office

5171 FM 92S

Woodville, TX 75979-8637

0003 12 Months $_________________ $__________________

OPTION FY-19 SR Potable Water Systems Testing

Furnish all Equipment, Materials, Supplies,Transportation, and Labor necessary to operate, maintain, and test potable water sytems in Magnolia Ridge and Sandy Creek Parks in accordance with the contract specifications and attachments.

Period of Performance: 01 JANUARY 2019 thru 31

DECEMBER 2019

Mail Invoices to:

Alvin Schriefer Town Bluff Lake Office

5171 FM 92S

Woodville, TX 75979-8637

CONTRACTING OFFICER STATEMENT

Only a warranted Contracting Officer either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.

BID SCHEDLUE

BID SCHEDULE

POTABLE WATER OPERATION, MAINTENANCE, AND TESTING SERVICES– W9126G-17-P-0000

TOWN BLUFF PROJECT, TEXAS

0001 FURNISH ALL EQUIPMENT, MATERIALS, SUPPLIES, TRANSPORTATION, AND LABOR NECESSARY TO OPERATE, MAINTAIN, AND TEST POTABLE WATER SYSTEMS IN MMAGNOLIA RIDGE AND SANDY CREEK PARKS IN

ACCORDANCE WITH THE CONTRACT SPECIFICATIONS AND ATTACHMENTS.

BASE: 1 JANUARY 2017 TO 31 DECEMBER 2017

Item No. Supplies/Services Unit Quantity Unit Price ($) Total Price ($)

0001A Potable Water Systems Operation, Maintenance, and Testing Services mo 12 $ $

BASE YEAR TOTAL $

OPTION YEAR 1: 1 JANUARY 2018 TO 31 DECEMBER 2018

0002A Potable Water Systems Operation, Maintenance, and

YEAR 1 TOTAL $

OPTION YEAR 2: 1 JANAURY 2019 TO 31 DECEMBER 2019

0003A Potable Water Systems Operation, Maintenance, and

______________________________________________________________________________ YEAR 2 TOTAL

TOTAL FOR 3 YEARS $

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS

QUOTER DUE DATE/LOCAL TIME: _ SEE SF1449 BLOCK 8

POINT OF CONTACT: _Tiffany Cole Phone: (817)886-1033 Email address: CIV‐OPS.Proposals@usace.army.mil Furnish Copy To: tiffany.cole@usac.army.mil

Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hands carry, “NO EXCEPTIONS.” EMAIL your proposal to: CIV‐OPS.Proposals@usace.army.mil Subject line of email must include the solicitation number and your Company Name

For additional help contact your local Procurement Technical Assistance Centers (PTAC).

Centers were created by Congress to assist businesses seeking to compete on federal contracts.

Services are generally free; however, a small fee may be charged for certain services. Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.

SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: www.sam.gov.

DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business. DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).

Click here to request your D-U-N-S Number via the Web. The website to obtain your DUNS number:

http://fedgov.dnb.com/webform For technical difficulties, contact govt@dnb.com

ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA)

allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Manager (SAM): www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM.

WAGE RATES: The Service Contract Act applies (see attached wage rates in Section J).

Note: Does not apply to Contractors registered in System for Award Management (SAM) as Sole Proprietorships.

SITE VISIT:

Address: Town Bluff Project Office 5171 FM 92 South Woodville, TX 75979-8637

POC: Alvin Schriefer Contact Info: (409)429-3491 (m) (409)429-4074 Email: alvin.w.schriefer@usace.army.mil

Conference: 29 Nov 16 at 10:00 am CST

Below is a checklist to assist you to ensure all the proper documents are returned for consideration on this solicitation. Only those items checked below as “required” must be returned

Required Contractor Item

Complete page 1 of Solicitation. Block 17a Company Name & Address, Cage Code, Telephone No., Complete Blocks 30a – 30c, Annotate unit and total costs on pages 3 thru 5.

Complete Bid Schedule(s)

Qty of One SCHEDULE

MAX QTY SCHEDULE

Task Order #0001

Include an active email address. You will be notified of your selection by this method!!!

Complete Clauses 52.209-5, 52.212-3 ALT I and 52.219-1 ALT I

52.222-22, 52.222-25, or confirm vendor’s ORCA is updated in SAM Complete Clauses 52.219-28, 252.209-7993 252.247-7022 and return with proposal

You must have an active SAM registration prior to award

Send the Past Performance Questionnaire to a former employer or person who can vouch for your work capability or volunteer work.

Ensure former employer returns the form and references the solicitation number and Company Name in the email subject line. CIV‐OPS.Proposals@usace.army.mil &

Scan all documents into a single.pdf file

EMAIL your proposal to: CIV‐OPS.Proposals@usace.army.mil & tiffany.cole@usace.army.mil Subject line of email must include the solicitation number and Company Name.

**Please see clause 52.228-5 Insurance and Insurance MFR for insurance requirements

INSURANCE

INSURANCE REQUIREMENT

Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN: CESWF-CT-S, P.O. Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office.

The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:

Submit a copy of Insurance Certificate directly to:

Town Bluff Project Office U.S. Army Corps of Engineers ATTN: Lake Manager

5171 FM 92 S

Woodville, TX 75979-8637

Or email to: tiffany.cole@usace.army.mil

(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.

(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $100,000 per accident for bodily injury and $20,000 per accident for property damage.

(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000.00, or in compliance with applicable State statutes.

(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.

NOTE:

(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.

FOREIGN NATIONALS

In accordance with Engineering Regulation, ER 380-1-18, Section 4, foreign nationals who work on Corps of Engineers’ contracts or task orders shall be approved by the HQUSACE Foreign Disclosure Officer or higher before beginning work on the contract/task order. This regulation includes subcontractor employees. The Contractor shall submit, to the COR, the names of all foreign nationals proposed for performance under this contract/task order, along with documentation to verify that he/she was legally admitted into the United States and has authority to work in the U.S. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B or a completed INS form I-9 accompanied by color copies of the supporting documents used to verify the I-9.

Under penalty of law, the Contractor must assure each employee is legally working in the U.S.

PAST PERFORMANCE QUESTIONNAIRE

1. Contractor Information Firm name: CAGE Code:

Address: DUNS Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy) Explain Differences:

Original Contract Price (Award Amount):

Final contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT

RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

AFTER COMPLETION, PLEASE EMAIL TO: CIV‐OPS.Proposals@usace.army.mil Ensure the former employer references the solicitation number in the email subject line.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.

The contractor’s proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is

An Unsatisfactory rating is appropriate when multiple significant not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive or negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY

a) Quality of technical data/report preparation efforts E VG S M U

N

b) Ability to meet quality standards for technical performance E VG S M U

N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

E VG S M U

N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U

N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U

N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U

N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U

N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?

E VG S M U

b) Ability to hire, apply, and retain qualified workforce to this E VG S M U effort N

c) Government Property Control E VG S M U

N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U

N

e) Utilization of Small Business concerns E VG S M U

N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U

N

g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U

N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agree price(s)?

E VG S M U

N

b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.

Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

YES

NO

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

YES

NO

f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.

YES

NO

6. SAFETY/SECURITY

a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U

N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)

b) Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U

N

c) Would you hire or work with this firm again? (If no, please explain below)

YES

NO

d) In Summary, provide an overall rating for the work performed by this contractor.

Please provide responses to the questions above (if appliacable) and/or additional remarks.

Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):

PWS

U.S. ARMY CORPS OF ENGINEERS

FORT WORTH DISTRICT

TOWN BLUFF PROJECT, TEXAS

PERFORMANCE WORK STATEMENT (PWS)

for

POTABLE WATER SYSTEM OPERATION, MAINTENANCE, and TESTING SERVICES

1. GENERAL - This is a non-personal services contract to provide potable water system operation, maintenance, and testing services at Town Bluff Project, Woodville, Texas. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor (KTR), who in turn is responsible to the Government.

1.1 DESCRIPTION OF SERVICES/INTRODUCTION - The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to effectively perform potable water system operation, maintenance, and testing services as defined in this Performance Work Statement except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.

1.2. SCOPE – The Contractor shall perform potable water system operation, maintenance, and testing services at Town Bluff Project. Services include furnishing all contract labor, equipment, vehicles, fuel, materials, supplies, supervision, quality control and non-personal services necessary to operate and maintain a potable water systems at Magnolia Ridge Park in Tyler County and Sandy Creek Park in Jasper County and to provide potable water testing services at the same locations.

1.2.1. WATER TREATMENT PLANTS - The Contractor shall be required to inspect, clean, service, perform operation and maintenance, sample test and report on chlorination units in accordance with the provisions of these specifications. Inspection will include a visual check of all components, pipes, and electrical wiring of the treatment system for leaks, cracks, or other defects. Cleaning will include sweeping the equipment and piping to remove all insects, insect nest, webs, dust and dirt from equipment, doors, walls, ceiling and floor. Service of the chlorination units will include preparation of Contractor furnished chlorine solutions. Calcium hypochlorite (HTH), will not be used in the treatment plant. Operation and maintenance will include making the necessary adjustments in settings for treatment equipment and conducting test-operating procedures to assure that properly tested potable water (meeting applicable TCEQ standards) is provided to the Corps facilities. The Contractor is required to make repairs to or replace the chlorination units as needed.

1.2.1.1. TEST OPERATING PROCEDURES FOR TREATMENT PLANT - The

following minimum steps will be followed when test operating and servicing the treatment plant.

a. Before commencing shut-down, check tank pressure gage.

b. Cut off field service line or lines.

c. Drain settling from all storage tanks.

d. Alternating Flushing the farthest points of supply in the distribution system at each servicing.

1.2.1.2. TREATMENT PLANT OPERATIONS - The following general requirements are provided for proper treatment plant operations.

a. Water systems will be operated so as to provide adequate treatment. Minimum treatment will consist of chlorination with good mixing and a 30-minute contact time.

b. Chlorination equipment will be operated so that continuous and effective disinfection is maintained under required local conditions. Unless TCEQ requirements, bacteriological and other test indicate the need for maintaining higher minimum concentrations of residual chlorine, the following requirements will prevail during normal operations. Maintain a chlorine residual of 0.2 milligrams per liter (mg/l) to .05 mg/l at the four (4) designated testing locations in the distribution system.

c. Every effort will be made to reduce or eliminate all deficiencies in quality by properly operating chlorinators.

d. Contractor’s personnel will be trained in operating procedures and methods of testing water for quality. The test kit used will be a Hach kit, or comparable test kit designed for such testing and acceptable to the TCEQ.

e. After flooding of any portion of the system with non-potable water, the entire system will be considered as unsafe until it has been disinfected and tested.

f. Equipment problems will be reported to the GQAR immediately. Any re-sampling or testing required will be performed by the Contractor and will be included in the original contract price.

1.2.2. WATER SYSTEM TESTING - The water system will be tested for total coliform bacteria and residual chlorine according to frequencies listed in the frequency section. Tests will be alternated between service points within the designated test locations. All samples will be collected at sites located after the point of process, treatment, and filtration.

1.2.3. TOTAL COLIFORM BACTERIOLOGICAL TESTING - Samples will be collected in TCEQ approved containers and will be delivered to a TCEQ approved laboratory for testing. The sample will be delivered for testing as soon as possible but in no case will the time between collection and delivery to the laboratory exceed 24 hours. Samples shall be taken, stored and processed in a manner approved by the TCEQ. If a routine sample is total coliform-positive, the Contractor will collect a set of repeat samples within 24 hours of being notified of the positive result, or as soon as possible if the laboratory is closed. Four (4) repeat samples for each total coliform-positive sample found must be collected in accordance with TCEQ rules. The Contractor is also responsible for notifying the TCEQ and the public of any violations of Maximum Contaminant Levels (MCL) for total coliform and coliform monitoring requirements in accordance with TCEQ rules. The GQAR will also be immediately notified of any violations.

1.2.4. RESIDUAL CHLORINE TESTING - Residual chlorine testing will be performed by the Contractor. The results of these test will be used the Contractor to determine the chlorine dosage requirements as indicated in paragraph 9b of this section. If the results of a residual chlorine test fail the requirements of paragraph 9 and 12 of this specification, corrective action will be taken and the test will be repeated until satisfactory results are obtained. Any additional sampling and testing, if required, will be done by the Contractor at no additional cost to the Government.

1.2.5. PERMITS/COMPLIANCE – The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits and letters of certification. The Contractor shall comply with any applicable Federal, State, County and Municipal laws, codes and regulations in connection with the performance of the work specified under this contract.

1.2.6. SAFETY REQUIREMENTS – The Contractor shall perform all services in full compliance with the safety requirements set forth in the current EM 385-1-1, entitled "Safety and Health Requirements Manual", which is available at the Project Office and at http://www.hq.usace.army.mil (select Safety; and Occupational Health). Consequently, the Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.

1.2.7. DAMAGES

1.2.7.1. PROPERTY – The Contractor will be responsible for damage to private and/or Government property, and injury to any person as a result of the Contractor’s operation. Damage to property will include but not be limited to damage to trees and excessive rutting of the soil. The Contractor shall notify the GQAR immediately of any damages or injuries.

1.2.7.2. FACILITIES - The Contractor shall be responsible for restoring any Government property, facilities, or structures damaged by the Contractor. Signs, traffic delineators, guard post and rails, sewer stub outs, sewer clean- outs, water valve meter boxes and associated plumbing, trees, shrubs, sidewalks, asphalt pavement, culverts, and other items damaged by the Contractor will be repaired or replaced as determined by the Contracting Officer at no cost to the Government.

1.3. PERIOD OF PERFORMANCE: Base 01 January 2017 thru 31 December 2017; Option Year One: 01 January 2018 thru 31 December 2018; Option Year Two: 01 January 2019 thru 31 December 2019.

1.3.1 WORKDAY – Work shall commence no sooner than 6:00 a.m. Services of all parks must be completed by 6:00 p.m. unless a different time is authorized in advance by the lake manager. If for any reason the required services are not completed by the designated time, the Contractor will submit in writing, a list of facilities not completed, the reason the work was not accomplished, and the time the work was finally completed. This explanation must be furnished to the Government Quality Assurance Representative (GQAR) by 9:00 a.m. the following calendar day. Late completion will be considered as a deficiency and deductions in payment will be made in accordance with the agreed reductions, paragraph 1.4.3.6. Repetitive late completions will be grounds for termination of the contract and re-procurement services charged to the Contractor.

1.3.2. WORK SCHEDULE - The purpose of the work schedule is to assure that performance inspections by Government personnel follow closely with the Contractor’s activities. The Contractor will be required to submit a detailed work schedule for the approval of the GQAR at the required pre-work conference. The work schedule will list each work item in order, with the time schedule for the work to be completed.

1.4. GENERAL INFORMATION

1.4.1. CONTRACTOR QUALITY CONTROL – The Contractor is responsible for establishing and maintaining an adequate QC system to satisfactorily inspect and ensure that all work performed by the Contractor’s organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications and maps herein. The Contractor shall designate, in writing, a QC Inspector, whose main duty shall be to verify contract conformance of all work performed and to notify the GQAR of anything requiring immediate attention.

1.4.2 CONTRACTOR QUALITY CONTROL PLAN – Contractor Quality Control will be assured by a detailed Quality Control Plan developed by the Contractor and submitted to the GQAR for approval at the “Pre-work conference” scheduled for approximately ten (10) days prior to beginning any services required by this contract. The Government will monitor and inspect the Contractor’s operation to ensure that the Quality Control Plan is in place and is working, and that the Contractor’s performance meets all contract specifications.

1.4.3 QUALITY ASSURANCE: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The Government reserves the right to alter or change the type of inspection plan at its discretion at any time, and to make deductions accordingly.

1.4.3.1 GENERAL – The Government GQAR will inspect the work in each area as it is completed to ensure all requirements of the contract have been satisfied. The Contractor QCR will be responsible to ensure all work is completed prior to inspection by the Government.

1.4.3.2. PERFORMANCE EVALUATION MEETINGS – The Contractor, his superintendent, QC inspector, or all, shall meet with the GQAR, periodically as determined necessary by the GQAR, in order to discuss performance. However, a meeting shall be held not later than one normal workday after a Contract Deficiency Report (CDR) is issued. Mutual effort will be made to resolve any and all problems identified.

1.4.3.3. INSPECTION/ACCEPTANCE - All work must be inspected and accepted by the GQAR before payment for the work can be made. Unscheduled inspections will be made by the GQAR after work is completed and will be documented by standardized inspection forms signed by the inspector and Contractor when available. Both the Government and the Contractor will receive a copy of each inspection form.

Unscheduled Inspections consist of impromptu evaluations of contract requirements and are conducted whenever the inspector determines. Any work that is rejected by the GQAR shall be re-performed by the Contractor at the Contractor's expense.

1.4.3.4. DEDUCTIONS - The KO may require that all work which fails to provide the desired results be repeated at the Contractor’s expense, or may reduce the contract price to equal the reduced value of the service. The Contractor will ensure that these defects do not recur. If the Contractor fails to rework the rejected areas or the defects are recurring, the Government may:

a. Reduce the contract price to equal the reduced value of the service (see REDUCTIONS, 1.4.3.5)

b. Perform the required services, by contract or otherwise, and deduct any costs incurred by the Government that is directly related to the performance of such services from the Contractor’s invoice

c. Terminate the contract for default. See 52.212-4

1.4.3.5. REDUCTIONS – Contract Percents are the percentages of the total invoice amount assigned to each job element. The Allowable Deviation is the allowable margin of error allowed the Contractor under the unscheduled inspection method. If observed total number of defects per inspection period (invoice period) is greater than the allowable deviation level, the services will be considered unsatisfactory.

The following valuations will apply for all respective reduction actions:

Contract Element Contract Percents Allowable Deviation

Cleaning 10 2

Test Operating 30 2 Water System Testing 60 2

Example: a. Total monthly invoice amount for a contract is $1000.00

b. Inspection item is job element item 1

c. Allowable deviation is two inspector warnings

d. Contractor is still (a third time during invoice period) not cleaning the equipment.

e. Contract percent for job element is 10%.

f. Deduction from monthly invoice will be 10% of $1000.000 or $100.00.

1.4.4 GOVERNMENT HOLIDAYS: The Contractor is not required to perform services on Federal Holidays. Government Holidays are listed below:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.4.5 HOURS OF OPERATION: Town Bluff Project office hours are Monday through Friday, 8:00 am to 4:30 pm.

1.4.6. PLACE OF PERFORMANCE - The work to be performed under this agreement will be performed at B.A. Steinhagen Lake, Sandy Creek Park, located in Jasper County, at114 Pvt. Rd. 5045. Jasper, Texas, 75951. Magnolia Ridge Park located at 1376 Magnolia, Woodville, Texas 75979. (Town Bluff Project Phone: 409-429-3491.)

1.4.7 TYPE OF CONTRACT: The government will award a Firm Fixed Price contract.

1.4.8 SECURITY REQUIREMENTS:

1.4.8.1 PHYSICAL SEQURITY: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.4.8.2. KEY CONTROL - The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. All Government keys and or key cards will be issued and controlled in accordance with AR190-51. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.4.8.2.1. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.4.8.2.2. Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.4.8.3 ANTITERRORISM/OPERATION SECURITY REQUIREMENTS:

1.4.8.3.1. CorpsWatch / iWatch Training: The contractor and all associated sub‐contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT five (5) calendar days after the completion of the training.

1.4.8.3.2. Pre-Screening of Candidates Using E-Verify Program: The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.uscis.gov/e‐verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

1.4.8.3.3. Access and General Protection/Security Policy and Procedures: All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.4.9. SPECIAL QUALIFICATIONS: The prime Contractor, or his authorized representative, must have at least a class “C” water treatment certificate with at least one individual in each work crew having a class “D” certificate at a minimum. The Contractor shall provide the GQAR with a list of employees that will be performing work under this contract and indicating their various skills and qualifications. The Contractor will supply an updated list as needed when personnel change. The Contractor will provide the GQAR with verification of the class “C” and “D” certificates in the form of a copy of the certificates or other acceptable verification.

1.4.10. POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Quality Assurance Representative (GQAR), and/or other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

These meetings shall be at no additional cost to the Government.

1.4.11. CONTRACTING OFFICER REPRESENTATIVE (COR): If applicable, the COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:

maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor

Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract (or task order).

1.4.12 CONTRACTOR KEY PERSONNEL: The following personnel are considered key personnel by the Government: foreman/superintendent, alternate foreman/superintendent. The Contractor shall provide a foreman/superintendent who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the foreman/superintendent is absent shall be designated in writing to the Contracting Officer. The foreman/superintendent or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.

1.4.13 IDENTIFICATION OF CONTRACTOR EMPLOYEES: All contract personnel working at the project will be required to wear name tags or shirts with identifying logo.

1.4.14 CONTRACTOR TRAVEL: N/A

1.4.15 DATA RIGHTS: N/A

1.4.16 ORGANIZATIONAL CONFLICT OF INTEREST: N/A

1.4.17 TYPICAL LOCATION DRAWINGS – N/A

1.4.18 AWARD OF OTHER CONTRACTS – The services provided under this contract shall be independent of all services provided under other contracts at this project or any other project, at which the Contractor may receive award.

1.4.19 PAYMENT – Payment will be made monthly for work satisfactorily performed during the month on the basis of the lump sum price submitted on the bid form. In the event the Contractor fails to satisfactorily perform all the work required within the time specified and in the absence of an acceptable justification, reductions will be made to the payment. Actual payment authorized will be based on a ratio or percentage of the required work that was acceptably accomplished during the pay period. No payment shall be made until the work is completed, inspected by the GQAR, properly invoiced to the appropriate project office, and approved by the On-Site Manager. The proper invoice shall include the Contractor’s name, address, contract number, payment period dates, and total price.

1.4.20. POINT OF CONTACT REQUIREMENTS – The Contractor shall provide to the

GQAR a local telephone number and a point of contact on a twenty-four (24) hour basis for discussion of any contractual matters.

1.4.21 COMMUNICATION – The Contractor is required to provide mobile cellular telephones for communication purposes with Government personnel under this contract.

1.4.22 OTHER CONTRACTS - The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another Contractor, or by Government employees.

1.4.23 AREAS OF SERVICE – Sandy Creek Park has one water well that is 375 feet deep. The method of treatment is chlorine with a total of 80 connections. There is currently no unpressurized storage on site.

The potable water system has a 2” main and the pressure plane/pump-station is a compressed air force system with tanks. Magnolia Ridge Park has one water well that is 339 feet deep. The method of treatment is chlorine with a total of 48 connections. There is currently no unpressurized storage on site. The potable water system has a 2” main and the pressure plane/pump-station is a compressed air force system with tanks.

1.4.24 FREQUENCY OF SERVICE -

1.4.24.1. WEEKLY SERVICE – The water treatment plants will be inspected, cleaned, serviced and maintained not less than one (1) time each week, on either the first or second weekday immediately following a weekend. Residual chlorine sampling and testing will be performed on the water system not less than one time per week on either the first or second weekday immediately following a weekend alternating the sampling locations within the parks. Weekly metered water (in gallons) will also be logged and reported. GQAR will provide sample locations.

1.4.24.2. MONTHLY SERVICE - Total coliform bacteriological sampling and testing will be performed on the water systems not less than one (1) time each month alternating sampling locations within the parks. GQAR will provide sample locations.

1.4.24.3. CHANGES TO SERVICE FREQUENCIES - It may become necessary for the Contracting Officer to decrease or increase service frequencies in any or all parks or portions of parks. It may become necessary at any time during the execution of this contract for the Contracting Officer to close any park or portion of a park and delete any subsequent service in the closed park area. The Contractor will be given a minimum of (7) seven days notice prior to changes in frequencies.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .