B3_17_R_0058_FY17_TB_FAC_CLNG_MWG.pdf
PDF 689 KB Posted
- Solicitation number
- W9126G-17-R-0058
About this file
FY17 & FY18 Town Bluff Facility Cleaning and Mowing Solicitation
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9126G-17-R-0058 13-Jan-2017
b. TELEPHONE NUMBER
(817) 886-1077
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 13 Feb 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JAMAUH D WINSTON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 967423 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
TOWN BLUFF PROJECT OFFICE
PATRICK ATWELL
890 FM 92
WOODVILLE TX 75979-9631
TEL: (409)429-3491 FAX: 409-429-3188
817-886-6403FAX:
TEL: 817-886-1043 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
561720
NAICS:
561720
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF140
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9126G-17-R-0058
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job $_________________ $__________________
FY17 & 18 Town Bluff Cleaning & Mowing
The contractor shall provide all personnel, equipment, supplies, transportation, materials, supervision, and non-personal services necessary to perform Park Cleaning and Facility Mowing Services as defined in the PWS.
Period of Performance: 1 Mar 17 thru 28 Feb 18
Mail Invoices To:
B.A Steinhagen/Town Bluff Dam ATTN: Patrick Atwell
5171 FM 92 S.
Woodville, TX 75979 (409)429-3491
Administrator: Jamauh Winston at (817)886-1077 Email: jamauh.d.winston@usace.army.mil
1001 1 Job $_________________ $__________________
OPTION FY18 & 19 Town Bluff Cleaning & Mowing
The contractor shall provide all personnel, equipment, supplies, transportation, materials, supervision, and non-personal services necessary to perform Park Cleaning and Facility Mowing Services as defined in the PWS.
Period of Performance: 1 Mar 18 thru 28 Feb 19
Mail Invoices To:
B.A Steinhagen/Town Bluff Dam ATTN: Patrick Atwell
5171 FM 92 S.
Woodville, TX 75979 (409)429-3491
1002 1 Job $_________________ $__________________
OPTION FY19 & 20 Town Bluff Cleaning & Mowing
The contractor shall provide all personnel, equipment, supplies, transportation, materials, supervision, and non-personal services necessary to perform Park Cleaning and Facility Mowing Services as defined in the PWS.
Period of Performance: 1 Mar 19 thru 28 Feb 20
Mail Invoices To:
B.A Steinhagen/Town Bluff Dam ATTN: Patrick Atwell
5171 FM 92 S.
Woodville, TX 75979 (409)429-3491
1003 1 Job $_________________ $__________________
OPTION FY20 & 21 Town Bluff Cleaning & Mowing
The contractor shall provide all personnel, equipment, supplies, transportation, materials, supervision, and non-personal services necessary to perform Park Cleaning and Facility Mowing Services as defined in the PWS.
Period of Performance: 1 Mar 20 thru 28 Feb 21
Mail Invoices To:
B.A Steinhagen/Town Bluff Dam ATTN: Patrick Atwell
5171 FM 92 S.
Woodville, TX 75979 (409)429-3491
CONTRACTING OFFICER STATEMENT
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
BASE YR BID SCHEDULE
BID SCHEDULE
FURNISH ALL EQUIPMENT, MATERIALS, AND LABOR NECESSARY TO PERFORM CLEANING
AND MOWING SERVICES AT TOWN BLUFF DAM/B. A. STEINHAGEN LAKE, WOODVILLE,
TEXAS, IAW THE ATTACHED PERFORMANCE WORK STATEMENT.
0001 BASE YEAR - 1 MAR 17 THRU 28 FEB 18
ITEM DESCRIPTION
UNIT
OF
ISSUE QTY
COST PER
Pick-UP TOTAL COST
0001AA PARK CLEANING FACILITY SERVICES
Cleaning Peak Months (Mar - Nov) MO 9 $___________ $___________
Cleaning Non-Peak Months (Dec - Feb) MO 3 $___________ $___________
0001AB
PARK FACILITY MOWING
SERVICES
Mowing Peak Months (Mar - Nov) MO 9 $___________ $___________
Mowing Non-Peak Months (Dec - Feb) MO 3 $___________ $___________
TOTAL BASE YEAR ITEMS 0001AA THRU 0001AB $___________
OPT YR I BID SCHEDULE
1001 OPTION YEAR 1 - 1 MAR 18 THRU
28 FEB 19
FURNISH ALL EQUIPMENT, MATERIALS, AND LABOR NECESSARY TO PERFORM CLEANING
AND MOWING SERVICES AT TOWN BLUFF DAM/B. A. STEINHAGEN LAKE, WOODVILLE,
TEXAS, IAW THE ATTACHED PERFORMANCE WORK STATEMENT.
ITEM DESCRIPTION
UNIT
OF
ISSUE QTY
1001AA PARK CLEANING FACILITY SERVICES
Cleaning Non-Peak Months (Dec - Feb) MO 3 $___________ $___________
1001AB
PARK FACILITY MOWING
SERVICES
Mowing Peak Months (Mar - Nov) MO 9 $___________ $___________
Mowing Non-Peak Months (Dec - Feb) MO 3 $___________ $___________
TOTAL BASE YEAR ITEMS 1001AA THRU 1001AB $___________
OPT YR II BID SCHEDULE
1002 OPTION YEAR 1 - 1 MAR 19 THRU
28 FEB 20
FURNISH ALL EQUIPMENT, MATERIALS, AND LABOR NECESSARY TO PERFORM CLEANING
AND MOWING SERVICES AT TOWN BLUFF DAM/B. A. STEINHAGEN LAKE, WOODVILLE,
TEXAS, IAW THE ATTACHED PERFORMANCE WORK STATEMENT.
ITEM DESCRIPTION
UNIT
OF
ISSUE QTY
1002AA PARK CLEANING FACILITY SERVICES
Cleaning Non-Peak Months (Dec - Feb) MO 3 $___________ $___________
1002AB
PARK FACILITY MOWING
SERVICES
Mowing Peak Months (Mar - Nov) MO 9 $___________ $___________
Mowing Non-Peak Months (Dec - Feb) MO 3 $___________ $___________
TOTAL BASE YEAR ITEMS 1002AA THRU 1002AB $___________
OPT YR III BID SCHEDULE
1003 OPTION YEAR 3 - 1 MAR 20 THRU
28 FEB 21
FURNISH ALL EQUIPMENT, MATERIALS, AND LABOR NECESSARY TO PERFORM CLEANING
AND MOWING SERVICES AT TOWN BLUFF DAM/B. A. STEINHAGEN LAKE, WOODVILLE,
TEXAS, IAW THE ATTACHED PERFORMANCE WORK STATEMENT.
ITEM DESCRIPTION
UNIT
OF
ISSUE QTY
1003AA PARK CLEANING FACILITY SERVICES
Cleaning Non-Peak Months (Dec - Feb) MO 3 $___________ $___________
1003AB
PARK FACILITY MOWING
SERVICES
Mowing Peak Months (Mar - Nov) MO 9 $___________ $___________
Mowing Non-Peak Months (Dec - Feb) MO 3 $___________ $___________
TOTAL BASE YEAR ITEMS 1003AA THRU 1003AB $___________
GRAND TOTAL (BASE YEAR + THREE OPTION YEARS) $
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
QUOTER DUE DATE/LOCAL TIME: _ SEE SF1449 BLOCK 8
POINT OF CONTACT: _Jamauh Winston_ Phone: (817)886-1077 Email address: CIV‐OPS.Proposals@usace.army.mil Furnish Copy To: jamauh.d.winston@usace.army.mil
Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hands carry, “NO EXCEPTIONS.” EMAIL your proposal to: CIV‐OPS.Proposals@usace.army.mil Subject line of email must include the solicitation number and your Company Name
For additional help contact your local Procurement Technical Assistance Centers (PTAC).
Centers were created by Congress to assist businesses seeking to compete on federal contracts.
Services are generally free; however, a small fee may be charged for certain services. Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.
SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: www.sam.gov.
DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business. DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).
Click here to request your D-U-N-S Number via the Web. The website to obtain your DUNS number:
http://fedgov.dnb.com/webform For technical difficulties, contact govt@dnb.com
ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA)
allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Manager (SAM): www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM.
WAGE RATES: The Service Contract Act applies (see attached wage rates ). Note: Does not apply to Contractors registered in System for Award Management (SAM) as Sole Proprietorships.
Below is a checklist to assist you to ensure all the proper documents are returned for consideration on this solicitation. Only those items checked below as “required” must be returned
Required Contractor Item
Complete page 1 of Solicitation. Block 17a Company Name & Address, Cage Code, Telephone No., Complete Blocks 30a – 30c, Annotate unit and total costs on pages 3 thru 5.
Complete Bid Schedule(s)
MAX QTY SCHEDULE
Complete vendor information sheet or provide a document with similar information
Complete Clauses 52.209-5 52.209-11 52.212-3 ALT I and 52.219-1 ALT I , 52.219-28 52.222-22, and 52.222-25 or confirm vendor’s ORCA is updated in SAM.
You must have an active SAM registration prior to award
Send the Past Performance Questionnaire to a former employer or person who can vouch for your work capability or volunteer work.
Ensure former employer returns the form and references the solicitation number and Company Name in the email subject line. CIV‐OPS.Proposals@usace.army.mil & jamauh.d.winston@usace.army.mil
Scan all documents into a single.pdf file. PDF only authorized format
EMAIL your proposal to: CIV‐OPS.Proposals@usace.army.mil & jamauh.d.winston@usace.army.mil Subject line of email must include the solicitation number and Company Name.
**Please see clause 52.228-5 Insurance and Insurance MFR for insurance requirements
Vendor Information Sheet
IN THE EVENT OF AWARD, ISSUE CONTRACT TO:
COMPANY NAME
POC
(Last, First Middle)
ADDRESS
(Number & Street) (City, State and Zip)
PHONE NUMBER MOBILE
(Area code and number) (Area code and number)
EMAIL ADDRESS___________________________________________
DUNS NUMBER CAGE CODE NUMBER________
SSN/TIN NUMBER or firm’s Tax ID Number (TIN) ______________________________
52.237-1 SITE VIST
FAR 52.237-1 highly recommends potential offerors attend a site visit. Vendors must confirm their intent to attend a conference with one of the POCs listed below prior to attending the event.
Address: BA Steinhagen Lake & Town Bluff Dam 5171 FM 92 South Woodville, TX 75979
POC: Patrick Atwell Contact Info: (409)429-3491 Email: patrick.c.atwell@usace.army.mil
POC: Floyd Boyett Contact Info (409) 429-3491 Email: floyd.e.boyett@usace.army.mil
Conference: 25 Jan 17 at 1:00 pm CDT
INSURANCE
Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN: CESWF-CT-S, P.O.
Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office. The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:
Submit a copy of Insurance Certificate directly to:
Piney Woods Region US Army Corp of Engineers B.A. Steinhagen/Town Bluff Dam ATTN: Patrick Atwell 5171 FM 92 South Woodville, TX 75979-8637
Or email to: jamauh.d.winston@usace.army.mil Phone: (817) 886-1077 Fax: (817)886-6403
(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.
(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $100,000 per accident for bodily injury and $20,000 per accident for property damage.
(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000.00 or in compliance with applicable State statutes.
(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.
NOTE:
(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.
NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm name: CAGE Code:
Address: DUNS Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy) Explain Differences:
Original Contract Price (Award Amount):
Final contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
AFTER COMPLETION, PLEASE EMAIL TO: CIV‐OPS.Proposals@usace.army.mil Ensure the former employer references the solicitation number in the email subject line.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
serious problem for which the contractor has not yet identified corrective actions.
The contractor’s proposed actions appear only marginally effective or were not fully implemented.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive or negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E VG S M U
N
b) Ability to meet quality standards for technical performance E VG S M U
N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E VG S M U
N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U
N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U
N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U
N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U
N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?
E VG S M U
N
b) Ability to hire, apply, and retain qualified workforce to this effort
E VG S M U
N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U
e) Utilization of Small Business concerns E VG S M U
f) Ability to simultaneously manage multiple projects with multiple disciplines
E VG S M U
N
g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U
N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agree price(s)?
E VG S M U
N
b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.
Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
YES
NO
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
YES
NO
f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.
YES
NO
6. SAFETY/SECURITY
a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U
N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
b) Compliance with contractual terms/provisions (explain if E VG S M U specific issues) N
c) Would you hire or work with this firm again? (If no, please explain below)
YES
NO
d) In Summary, provide an overall rating for the work performed by this contractor.
AFTER COMPLETION, PLEASE EMAIL TO: CIV‐OPS.Proposals@usace.army.mil
Please provide responses to the questions above (if applicable) and/or additional remarks.
Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):
PWS
PERFORMANCE WORK STATEMENT (PWS)
For
PARK CLEANING AND FACILITY MOWING SERVICES
At
Town Bluff Project / B.A. Steinhagen Lake
1. GENERAL: This is a non-personal services contract to provide Park Cleaning and Facility Mowing Services.
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, transportation, materials, supervision, and non-personal services necessary to perform Park Cleaning and Facility Mowing Services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract. Period of Performance for this contract shall be 1 March 2017 – 28 February 2020 (consisting of Base Year and 2 Option Years – please refer to Bid Sheet).
1.2 Scope: The contractor shall provide all contract labor, equipment, vehicles, fuel, materials, supplies, supervision, quality control, and non-personal services required to perform specified Park Cleaning (Section 1.3) and Facility Mowing (Section 1.4) Services at Town Bluff Project. Contractor's work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, and management necessary to accomplish the required specified services.
Contractor shall assure that all work is accomplished in accordance with the contract, all applicable laws, municipal codes, regulations and/or written directives issued by the Contracting Officer or their Representative.
1.3 Park Cleaning: The types of services to be performed include cleaning of park facilities such as waterborne restrooms, showers, vault restrooms, picnic/camping units, screened shelters, pavilions, dump stations, refuse/garbage receptacles, incidental areas, and other pack facilities described below. The contractor shall accomplish the following:
1.3.1 Frequency of Service: The required frequency of service for each item is provided in Appendix B for the Peak Season (Mar-Nov) and Appendix C for the Off-Peak Season (Dec-Feb).
1.3.2 Restroom Buildings (All Types): All fixtures, floors, inside walls, partitions, ceilings, benches, showers, and toilet stalls shall be cleaned, deodorized, disinfected, and rinsed, using appropriate soaps, detergents, disinfectants, deodorizers, and cleaning solutions. Fixtures shall include, but not be limited to, sinks, commodes (lids and risers), urinals, hand dryers, mirrors, water fountains, etc. Prior to cleaning each facility, an appropriate, professionally-made, approved sign shall be placed at the entrances warning the public of wet floors, etc.
1.3.2.1 General: These units are constructed of masonry, metal, or wood frame with finished and unfinished (exposed studs) interior walls. A "typical unit" consists of a men's side restroom/shower and women's side restroom/shower. These facilities are listed in Appendix A, "Tabulation of Park Areas and Facilities", as one (1) unit even though they may be separate structures. All facilities will be thoroughly cleaned inside and outside each scheduled cleaning day to obtain the results specified in paragraph 1.3.10 below.
Units will be left fully stocked with toilet tissue and other supplies as described in paragraphs a, b, c, and d below. Unless otherwise noted, all consumable supplies and materials, including but not limited to cleaning supplies, toilet tissue, trash bags, and light bulbs, shall be provided by the contractor at no additional cost to the Government.
a. Refuse/waste receptacles shall be supplied by the Government and maintained by the
Contractor for each restroom area. Refuse/ Garbage shall be emptied each scheduled cleaning of the facility at which they are located, and a new plastic bag shall be placed in the container each time refuse/garbage can is serviced. Bags (containing refuse/garbage) shall be tied and deposited in the nearest bulk refuse/garbage receptacle in the park. Waste receptacles shall be cleaned and disinfected as needed.
b. A minimum of one (1) deodorant cake will be maintained in all urinals.
c. An adequate supply of rolls of toilet tissue shall be maintained in each facility to assure that the supply will not become depleted between cleanings.
d. Replacement light bulbs shall be furnished and installed by the Contractor. Bulbs must be energy saving and meet the specifications as required by the light fixture.
Light covers shall be provided by the government, and shall be installed by the Contractor.
1.3.2.2 Obstructions: If toilets or urinals are not functioning properly, the Contractor shall remove any obstruction by the use of plungers, blunt probes, or by grasping devices. No chemicals or sewer rods will be used. If the problem cannot be corrected, the Contractor shall close or lock the facility/stall and shall notify the Contracting Officer or designated representative as soon as possible, but no later than one hour after closing the facility. A COR approved "Out of Order" sign furnished by the Contractor shall be attached to the closed/locked door.
1.3.2.3 Vault Restrooms: Disinfectants, waste cleaning water, or any substance which may be harmful to bacterial action will not be dumped or allowed to enter the vaults through toilets, urinals, or floor drains
1.3.3 Camping/Picnic Units (Including Screened Camping Shelters): All facilities, structures, amenities, and grounds surrounding each unit will be cleaned by any other means necessary to achieve the results stated in paragraph 1.3.10.
1.3.3.1 General: A "typical unit" is defined as a camping or picnic site with a natural ground or aggregate pad (impact area), concrete slab, table, table shelter, benches, fire rings, cookers, vehicle/camper pads, and detailed ground cleaning areas surrounding each of these facilities as described in paragraph 1.3.8 below. All facilities will be cleaned each scheduled cleaning day to obtain the results specified in paragraph 1.3.10 below. (NOTE:
Some picnic/camping units do not have all the items listed for a "typical unit." The Government reserves the right to upgrade any or all of these non-typical sites at any time without incurring additional costs for cleaning.)
1.3.3.2 Screened Camping Shelters: There are a limited number of campsites (presently three
(3)) that have a screened-in shelter in addition to the other standard campsite amenities.
These units will be thoroughly cleaned by any means necessary to achieve the results specified in paragraph 1.3.10 below.
1.3.4 Group Shelters/Pavilions: All structures, amenities, and grounds surrounding each facility will be cleaned any means necessary as required to achieve the results stated in paragraph 1.3.10.
1.3.4.1 General: A "typical unit" consists of the grounds and entire structure, including the ceiling, floor, tables, cookers, fireplaces, recesses, eaves, supports, retaining walls, fans, and light fixtures. Detailed grounds cleaning will be performed as described in paragraph
1.3.8 below. A general litter pick-up will be done on all other ground areas within the delineated limits of the facility (such as fences, roads, edges of parking lots, or other physical features obviously constructed to separate the shelters from the remainder of the park). If no physical separation is present, then a fifty (50) foot perimeter from the edges of the structure shall be used as a delineated limit. All facilities will be cleaned each scheduled day to obtain the specified results in paragraph 1.3.10 below.
a. Each time shelters are cleaned; the tables shall also be cleaned, and positioned neatly in rows under the shelter. Tables which have been removed or re-arranged by the public shall be returned to shelters and properly positioned. All staples, nails, tacks, tape, or any other residue from methods used to secure temporary table coverings shall also be removed each scheduled cleaning.
b. Light bulbs shall be inspected for working order and replaced if burned-out. Light covers that are damaged will be reported on the daily activity report.
c. Cleaning of these facilities shall be accomplished at such a time as to avoid conflict with the public.
1.3.5 Trailer Dump Stations: A "typical unit" will consist of a slab, waste drain, water faucet/arm, driveway, and detailed ground cleaning area surrounding each of these facilities. Thoroughly clean the slab, drain cover, hose, and rinse with clean water. All spilled sewage from trailer holding tanks will be washed into drain. Remove all foreign matter from the dump station, drain, and surrounding area. Cleaning must satisfactorily remove all insects, insect nests, webs, dirt, organic and inorganic material, stains, markings and sewage odors from surfaces. Cleaning must not result in obstructed drain openings, or spread spilled sewage from trailer holding tanks to adjoining parking, soil, or graveled areas.
1.3.6 Bulk Refuse/Garbage Receptacle Area: A "typical unit" will consist of the bulk refuse/garbage receptacle pad of various type construction, and detailed ground cleaning areas surrounding each of these facilities.
1.3.7 Magnolia Ridge Kids Fishing Pond: For facility cleaning and mowing purposes, the Magnolia
Ridge Kids Fishing Pond includes all grounds and amenities adjacent to the pond, including but not limited to, picnic tables, group picnic shelter, garbage / trash receptacles, utility tables, benches, sidewalks, parking areas, pipe rail fencing, water and electric utility poles, signs, and the perimeter of the pond itself. All facilities and amenities will be cleaned each scheduled cleaning day to obtain the results specified in paragraph 1.3.10 below.
1.3.8 Detailed Grounds Cleaning: Detailed grounds cleaning will be performed within twenty (20) feet on all sides of each facility described in Section 1.3 including all sub-sections and “typical unit” descriptions. This cleaning will be performed each scheduled cleaning day using any acceptable method to remove cigarette butts, glass, broken glass, bottle caps, paper, food scraps, can tabs, and any other litter to obtain the results in paragraph 1.3.10 below. All litter shall be removed and properly disposed of in bulk refuse/garbage receptacles.
1.3.8.1 Exceptions: The Contractor will not be required to clean up fallen trees resulting from wind storms, nor is there a requirement to remove timber or other natural drift deposited ashore during high water or by high winds.
1.3.8.2 Large Non-Compactable Items: Large items of refuse/garbage such as abandoned appliances, barrels, washing machines, refrigerators, etc., will be picked up from around the park areas and roads and placed adjacent to the bulk refuse/garbage receptacles for removal by the refuse/garbage disposal crews or Project personnel.
1.3.9 Exceptions to Cleaning: Every reasonable effort shall be made to clean each facility according to the required frequency and approved cleaning schedule.
1.3.9.1 Exceptions to Cleaning (Campsites and Pavilions): If an individually reservable facility, such as a campsite or day use pavilion, is occupied by the public at the time of the scheduled cleaning, the Contractor will ask permission to service the facility. If the public objects to the performance of the service, the Contractor will immediately record the facility (by park and number) on the daily activity report as a non-serviced unit. The report must be kept current and maintained by the cleaning crew so that a unit which is found dirty and rejected by the Government's Quality Assurance Representative (GQAR) can be checked against the cleaning crew's report for occupied sites. The facility shall be cleaned as required on the next scheduled cleaning day in which it is found unoccupied.
1.3.9.2 Exceptions to Cleaning (Restrooms): If a restroom, or any other facility generally open to all park visitors, is occupied at the time of the scheduled cleaning, the contractor is to restrict entrance to that facility by other members of the public by use of signs and verbal requests. When the facility becomes unoccupied, the Contractor will then clean the unit as required.
1.3.10 Results: The Contractor's cleaning services for all of the areas and facilities listed in Section 1.3
Park Cleaning, must result in all areas and facilities being left in proper working condition, adequately supplied (to include replacing burned out bulbs), and free of insects, insect nests, webs, dust, dirt, debris, grime, scum, grease, gum, fecal and organic matter, stains, markings, graffiti, garbage, litter, standing water, and any other material, so that the park and facilities are in a clean and sanitary condition, and free from unpleasant odors.
1.4 Facility Mowing: The work shall consist of furnishing all labor, materials, and equipment necessary to perform Park and Project Facility Mowing. Services involve mowing and trimming grass, weeds, and tree/brush sprouts in the public use areas and around park and project facilities including but not limited to all park buildings, camping and picnic units, playgrounds, pavilions, docks, piers, sidewalks, boat ramps, parking areas, and dump stations.
1.4.1 Facility Mowing Frequency: Mowing and trimming will be required any time the grass, weeds, or other herbaceous vegetation exceeds three and one half inches (3½”) in height.
1.4.1.1 Mowing Frequency Exception (Bahia Grass): Bahia grass is common throughout the area. This grass forms a stalk and seed head that grow very rapidly during the growing season. For purposes of the 3½” mowing requirement, the Bahia stalks and seed heads will not be considered. Grass will be measured according to the height of the turf.
1.4.1.2 Mowing Frequency Exception (Occupied Sites): If an occupied campsite exceeds the three and one half inch (3½”) threshold, requiring it to be mowed, the Contractor will request permission from the occupant to mow and trim the site. If the site occupant objects to the performance of the service, the Contractor will immediately record the facility (by park and site number) on the daily activity report. When the facility becomes unoccupied, the Contractor will then mow and trim the site as required, noting completion on the daily activity report. The report must be kept current and maintained by the mowing crew.
1.4.2 Mowing and Trimming Requirements: Cut, mow, and trim grass to a height of not more than three inches (3”) or less than one and one half inches (1½”) in the area adjacent to each facility described in Sections 1.3 and 1.4 (including all sub-sections). Detailed mowing and trimming will be accomplished for a fifteen foot (15’) wide area on all sides of all facilities, and around all amenities within each facility. The Contractor will be required to trim around all trees, posts, culverts, parking areas, RV pads, and site amenities; including fire rings, lantern posts, signs, tables, slabs, utilities service posts, and any other natural or manmade objects within the designated facility mowing area. All mowing and trimming activities should be uniform in cut;
with smooth transitions between different mowing equipment areas. Grass shall be mowed evenly throughout the mowing area, maintaining the required height. All rocks, branches, grass, dirt, or other debris resulting from mowing or trimming operations must be removed from all developed surfaces, including but not limited to sidewalks, impacts sites, picnic table slabs, etc. Care should be exercised when mowing and trimming around trees and shrubs to avoid damage to the plants.
The Government is not responsible for the condition of the mowing area (grass height, rocks, etc.)
at the time the contract becomes effective.
1.4.3 Special Mowing and Trimming Requirements: Mowing with large tractor-mounted mowers and cutters will not be permitted within twenty (20) feet of any people, building, picnic/camping unit, camper hook-up, or under trees with low hanging limbs. Mowing in these areas shall be accomplished with riding mowers (such as zero-turn mowers), small lawn tractors, push mowers, trimmers, or other equipment approved by the Contracting Officer Representative (COR). If a camping/picnic unit is occupied by the public at the time of the scheduled mowing and trimming of camping/picnic unit areas, the contractor will inform the occupants of safety measures which need to be followed by the occupants to prevent any personal injury or damage to personal property. See paragraph 1.4.1.2 above for additional guidance related to occupied sites.
1.4.4 Facilities to be Mowed: Detailed mowing and trimming will be accomplished for a fifteen foot
(15’) wide area around all sides of all park facilities including, but not limited to, all restrooms, showers, playgrounds, campsites including site amenities, RV pads, picnic tables, table covers, slabs, cookers, group shelters, trailer dump stations, water supply facilities, sewer lift stations, fences, boat ramps, walkways, trash containers, water faucets, and electrical hook-ups
1.4.4.1 “Typical Units (Campsites)”: A “typical unit” campsite includes the paved RV/trailer pad, picnic table, table slab and cover, fire ring or cooker, lantern pole(s), utility table, site number sign post, and water and electrical utility supply posts.
1.4.4.2 “Typical Units (Restrooms)”: A “typical unit” restroom (all types) includes the actual building structure, plus all connecting sidewalks, parking areas, benches, and any other amenity directly associated with the restroom facility.
1.4.4.3 Areas Between Facilities: If mowing the required fifteen foot (15’) wide area around one or more facilities will result in an unmowed area less than fifteen feet (15’) wide, then the entire area shall be mowed. There should not be any unmowed strips less than fifteen feet (15’) wide around a facility or between adjacent facilities.
1.4.4.4 Magnolia Ridge Kids Fishing Pond: For facility mowing and cleaning purposes, the
Magnolia Ridge Kids Fishing Pond includes all grounds and amenities adjacent to the pond, including but not limited to, picnic tables, group picnic shelter, garbage / trash receptacles, utility tables, benches, sidewalks, parking areas, pipe rail fencing, water and electric utility poles, signs, and the perimeter of the pond itself.
1.4.5 Traffic Control: It shall be the contractor’s responsibility to furnish, maintain, and deploy all necessary traffic control barricades, warning and detour signs, and flagmen needed to caution and/or restrict vehicular traffic while performing mowing operations. The contractor will conform to all traffic and other regulations as found in Section 327, Chapter III, Title 36 of the Code of Federal Regulations, available from the COR or Government Quality Assurance Representative (GQAR). Should the contractor use a developed camp area for overnight occupancy, all applicable regulations will be adhered to. Vehicles and trailers will be parked in designated parking areas when not in use, and off road travel by vehicles other than mowers will be limited to loading/ unloading and repair work.
1.5 Damage Responsibility: The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of performance. The Contractor shall survey the park or area and submit a report of all damage or vandalism to the Government Quality Assurance Representative (GQAR) prior to commencement of mowing or cleaning in each area. Any damage found thereafter by the Government's inspector that has not been previously reported by the Contractor shall be assumed to be damage caused by the Contractor's operation, and shall be repaired, replaced, or deducted from the invoice, as determined by the GQAR at no cost to the Government. The Contractor shall also be responsible for any damage to private property and injury to any person as a result of performance. The contractor will notify the Con-tracting Officer immediately of damage to Government and private property and injury to any person resulting from performance of work. Mowers must have slides or wheels, which will prevent tearing or plowing into the turf. Mowing with farm-type tractors will not be permitted when the ground is so wet or boggy that the mowing operations will cause wheel rutting. Contractor may be held accountable for re-turfing if equipment causes gouging or plowing. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. Signs, traffic delineators, guard posts and rails, sewer stub outs, sewer cleanouts, water valve meter boxes and associated plumbing, trees, shrubs, sidewalks, asphalt pavement, culverts and other facilities damaged by the contractor will be repaired or replaced as determined by the Contracting Officer at no cost to the government.
1.5.1 Damage to Trees: Damages will be collected for trees that are injured by mowers or trimming crews. Damage will be collected in accordance with the amounts given in Table A, Landscape and Native Trees Values. Injury to a tree's bark and cambium layer will be expressed as a percent of injury to the circumference of the tree. However, if more than fifty percent of the cambium, expressed in terms of circumference, is injured, the tree will be considered a total loss.
Table A – Landscape and Native Tree Values. Value of landscape and native trees, used for assessing and collecting damages resulting from contracted mowing activities.
Tree Diameter (Inches)
Value ($) (Landscape Trees1)
Value ($) (Native Trees2)
Measured at 12” Above Ground
< 2 120.00 30.00 2 160.00 40.00 3 260.00 70.00 4 380.00 100.00 5 520.00 140.00 6 680.00 180.00 7 860.00 230.00
Measured at 4.5’ Above Ground
8 1,000.00 280.00 9 1,200.00 330.00 10 1,450.00 380.00 11 1,750.00 430.00 12 2,100.00 510.00 13 2,500.00 600.00 14 2,950.00 710.00 15 3,450.00 830.00 16 4,000.00 970.00
1 Landscape trees are trees that have been planted or preserved to serve a specific landscape purpose such as screening, shade, flowering, fruiting, noise abatement, or visual aesthetics.
2 Native trees are trees within the mowing area that have not been planted or preserved to serve a specific purpose.
1.6 Safety Requirements: Contractor shall develop and submit written detailed safety and hazard analysis plans within fifteen (15) days after award and prior to beginning work. This plan must indicate in detail the general policies and procedures for safe operation in the accomplishment of this contract. The plan shall show how the Contractor intends to perform facility cleaning and mowing services in full compliance with the safety requirements set forth in the current EM 385-1-1, entitled "Safety and Health Requirements Manual", copies of which are available at the Town Bluff Project Office.
1.6.1 Safety Program: Work shall be accomplished in accordance with applicable provisions of the
Occupational Safety and Health Act (OSHA), EM 385-1-1 General Safety and Health Manual of the U.S. Army Corps of Engineers and SWFOM-385-1-10, Fort Worth District Safety Program.
The contractor’s program shall include hazard analysis and employees responsibility for providing a safe work place. The program shall also address indoctrination and training of employees responsible for providing and maintaining public safety during performance of work and responsibilities of employers for implementation of the program.
1.6.2 Safety Meetings: The Contractor shall hold a safety meeting with all employees at least weekly, at a minimum, and will notify the Government Quality Assurance Representative (GQAR) of location and time of each meeting. When a new employee is hired, the Contractor will thoroughly brief that person in all safety procedures and requirements. Any Contractor employee who persists in unsafe performance will be removed from the job at the request of the GQAR.
1.6.3 Personal Safety Equipment: The contractor shall ensure that all personnel have access to, and are required to utilize, all necessary personal safety equipment as required by EM 385-1-1. All safety equipment shall meet all safety requirements as set forth in EM 385-1-1, Safety and Health Requirements Manual and shall be maintained in accordance with manufacturers recommendations at all times.
1.7 Contracting Officer Representative: If applicable, the Contracting Officer Representative (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .