Request For Proposal
8(a) $30M Multiple Award Task Order Contract (MATOC) for Horizontal Construction Services in support of Fort Polk, Louisiana.
Fort Polk, LA
W9126G-17-R-0050 May 2017
US Army Corps of Engineers Fort Worth District
Horizontal Construction MATOC; FY17 FP16HCM
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00.01 SOLICITATION, OFFER AND AWARD, SF-1442
00 11 00.02 CONTRACT LINE ITEM SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
00 22 10 PHASE 1 DESIGN-BUILD SELECTION PROCEDURES
00 22 20 PHASE 2 DESIGN-BUILD SELECTION PROCEDURES AND BASIS FOR
AWARD
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
00 90 00 DESCRIPTION/SPECS/WORK STATEMENT
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 44 CONSTRUCTION SCHEDULE
01 10 00 STATEMENT OF WORK
01 31 19.00 44 PROJECT MEETINGS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 16 DESIGN AFTER AWARD
01 35 12.00 44 SPECIAL PROJECT PROCEDURES FOR FORT POLK
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 56 00.00 44 DUST CONTROL
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT IDENTIFICATION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 71 23.00 44 SURVEY, LAYOUT, AND OTHER DATA
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
PROJECT TITLE: 8(a) $30M MATOC for Horizonal Construction Services (DB, DBB) in Support of Fort Polk, Louisiana.
THIS IS A SET-ASIDE FOR A COMPETITIVE 8(a). NOTE: It has been determined that competition w ill be limited to 8(a) firms located w ithin the geographical areas serviced by the Louisiana District Office or the Dallas/Fort Worth District Off ice, and other 8(a) construction f irms w ith a bona f ide place of business w ithin the geographical competitive area, and the assigned NAICS code. All other 8(a) BD Participants are deemed ineligible to submit an offer. (See DFARS Clause 252.219-7010 Notif ication of Competition Limited to Eligible 8(a) Concerns—Partnership Agreement.)
NAICS: 236220, Size Standard: $36.5M
Offeror must be registered in the System for Aw ard Management (SAM) to be eligible for aw ard.
**Blocks 11 and 12: As specified per Task Order.
**Block 13B: A Bid Guarantee is not required until Phase 2 of this solicitation. See Section 00 21 00, Contract Clause 52.228-1, Bid Guarantee.
NOTE: Phase 1 Proposal Receipt Date is 24 July 2017, 12:00 PM (CST).
CHRISTOPHER A AINSWORTH 817-886-1084
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
22-Jun-2017
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Task Order
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________24 Jul 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
W9126G
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
12:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
817-886-6403FAX:TEL: 817-886-1043 TEL: FAX:
W9126G-17-R-0050 76
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 11 00 - Standard Form (SF) 1442 and CLIN Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Funded Amt:
Base Yr-Fort Polk 8(a) Horizontal MATOC
Fort Polk 8(a) Horizontal Construction Services MATOC: This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), for a BASE PERIOD of 1 year. (See next contract line items for option year details).
NAICS CD: 237310
, FSC CD: Y1LB
Funded Amt:
Opt Yr 1-Fort Polk 8(a) Horizontal MATOC
Fort Polk 8(a) Horizontal Construction Services MATOC: This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC). Option Year 1 will extend the contract for 1 year after expiration of the base period.
Funded Amt:
Opt Yr 2-Fort Polk 8(a) Horizontal MATOC
Fort Polk 8(a) Horizontal Construction Services MATOC: This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC). Option Year 2 will extend the contract for 1 year after expiration of option year 1.
Funded Amt:
Opt Yr 3-Fort Polk 8(a) Horizontal MATOC
Fort Polk 8(a) Horizontal Construction Services MATOC: This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC). Option Year 3 will extend the contract for 1 year after expiration of option year 2.
Funded Amt:
Opt Yr 4-Fort Polk 8(a) Horizontal MATOC
Fort Polk 8(a) Horizontal Construction Services MATOC: This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC). Option Year 4 will extend the contract for 1 year after expiration of option year 3.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
1001 N/A N/A N/A N/A
2001 N/A N/A N/A N/A
3001 N/A N/A N/A N/A
4001 N/A N/A N/A N/A
Section 00 21 00 - Instructions, Conditions and Notices to Offerors
INSTRUCTIONS, CONDITIONS & NOT
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 CONTRACT COST LIMITATION FOR DESIGN AND CONTRUCTION
COSTS
1.3 GOVERNMENT CORRESPONDANCE SECURITY REQUIREMENTS
1.4 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.5 OFFEROR'S QUESTIONS AND COMMENTS
2.0 SMALL BUSINESS SIZE STANDARD/NAICS CODE
3.0 PROPOSAL FORMAT & GENERAL INSTRUCTIONS
3.1 ACCURACY IN PROPOSALS
3.2 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
3.3 PROPOSAL SUBMITTAL
4.0 JOINT VENTURE PROPOSAL REQUIREMENTS
5.0 BID GUARANTEE (PHASE 2 ONLY)
6.0 CONTRACT PRICES - BIDDING SCHEDULE (PHASE 2 ONLY)
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
The Fort Worth District intends to award at least two (2) and up to a target of five
(5) IDIQ contracts under a new MATOC contract to be designated as the 8(a) $30M Multiple Award Task Order Contract (MATOC) for Horizontal Construction Services in support of Fort Polk, Louisiana. The maximum task order limitation is $8M and the minimum task order limitation is $2.5K.
The Government may exceed the stated maximum task order limitation upon mutual agreement of all parties. The solicitation will be a negotiated acquisition;
there will be no public bid opening. All contracts will be awarded based upon an evaluation of the overall Best Value to the Government.
General Description of Work: Scope of Work includes, but is not limited to, a wide variety of horizontal construction services such as new construction, minor construction, sustainment, restoration and/or modernization services for military projects to include the following:
Abutment construction Asphalt and concrete paving Airfield paving Bridge construction Culverts Curbs and street gutters Elevated highway construction Overpass construction Road and street surfacing Trestle construction Construction of water and sewer lines Mains Pumping stations Treatment plants and storage tanks Anchored earth retention Breakwater, spillway, floodwater, bulkhead wall or embankment Channel, canal, dams, cofferdam, dikes and other flood control structures Drainage projects and other earth work related projects Repair, maintain, and build marine related structures, levees, flood control and jetties Anti-terrorism and force protection Outdoor recreation facilities Park and recreational open space improvement
Other construction activities as appropriate under NAICS code 237310 under the resultant MATOC contracts
Note: The work this MATOC contract will cover includes two other NAICS codes, 237110, “Water and Sewer Line and Related Structures Construction” and 237990, “Other Heavy and Civil Engineering Construction”. However, the bulk of the work, 65%, will be under NAICS code 237310.
A detailed scope of work for the seed project task order will be provided in Phase 2.
1.2 CONTRACT COST CEILING LIMITATION FOR DESIGN AND
CONSTRUCTION COSTS
The Contract Cost Limitation (CCL) will be provided with the Request for Proposals (RFPs) for each Task Order. It is the Government's intent to award at full scope within the CCL. The Magnitude of Construction for 100% designed projects will be stated on each Task Order in accordance with DFARS 236.204.
1.3 GOVERNMENT CORRESPONDANCE SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail inquiries are sent to the Fort Worth District, U.S. Army Corps of Engineers, relating to either pre-contract or post-contract award. A return mailing address is required on the outside of the envelope, package, box, etc. All mail must be addressed to the Contracting office as specified below (no exceptions):
U.S. Army Corps of Engineer Fort Worth District Attn: Mr. Christopher A. Ainsworth 819 Taylor Street, Room 2A17 Fort Worth, TX, 76102
All Federal Express/UPS/etc. packages are required to have Offeror’s physical address and the above contracting office address including room number, contract specialist’s name and telephone number for proper delivery.
1.4 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and all amendments are available by INTERNET ACCESS ONLY. All solicitation documents and amendments will be posted on Federal Business Opportunities (FBO) website at http://www.fbo.gov/ and offerors can access the solicitation documents by solicitation number without dashes (W9126G17R0050).
It is solely the Contractor’s responsibility to check the fbo.gov website for the solicitation and any amendments prior to the RFP closing date. The Offeror shall submit in its proposal all requested information as specified in Section 3.0 below of this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
Additional information regarding this solicitation and potential offerors (i.e., interested vendors list) and/or subcontractors will be available on the fbo.gov website under the solicitation number.
1.5 OFFEROR'S QUESTIONS AND COMMENTS
1.5.1 Bidder Inquiry
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
The Solicitation Number is: W9126G-17-R-0050
The Bidder Inquiry Key is: U2HW7J-XUZ8I6
1.5.1.1 To submit and review bidder inquiries, bidders will need to be a current registered user or self-register into the ProjNet system. To self-register go to web page at http://www.projnet.org/projnet, click the BID tab, select Bidder Inquiry, select agency USACE, enter the Key for this RFP (listed above) and your e-mail address, and click login. Fill in all required information and click create user. Verify that the information on the next screen is correct and click to continue.
1.1.1.1 From this page you may view all bidder inquiries or add an inquiry.
Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. Only one question will be allowed per inquiry. If multiple questions are included in a single inquiry, only the first question will be answered. All others will remain unanswered until entered in as a single inquiry.
1.5.1.3 Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
1.5.1.4 The Bidder Inquiry System will be unavailable for new inquires 7 calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the RFP, if necessary.
1.5.1.5 The bidder call center operates weekdays from 8am to 5pm U.S.
Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
2.0 SMALL BUSINESS SIZE STANDARD/NAICS CODE
As referenced in Section 00 45 00, the Small Business Size is $36.5M and the NAICS Code is 237310.
3.0 PROPOSAL FORMAT & GENERAL INSTRUCTIONS
3.1 ACCURACY IN PROPOSALS
Proposals must set forth with full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.1001.
3.2 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay as a direct charge any costs incurred by the Offeror in the preparation and submission of its proposal or revisions. A stipend is not authorized for unsuccessful offerors.
3.3 PROPOSAL SUBMITTALS
3.3.1 Submit only the electronic documents. Submit only the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages shall be numbered.
3.3.2 Hard copies will not be accepted.
3.3.3 Searchable PDF pages shall be formatted to print on 8 ½ by 11 inch paper, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Spreadsheets and presentation drawings must fit to 11” x 14” or 11” x 17” paper size unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers of the solicitation, project title and company.
3.3.4 “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal.
Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR Clause (P) 52.215-1, Instructions to Offerors -- Competitive Acquisition, paragraph (e), Restriction on disclosure and use of data.
3.3.5 In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.
3.3.6 In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically using the AMRDEC SAFE website located at:
https://safe.amrdec.army.mil/safe/.
3.3.6.1 At the AMRDEC SAFE website, select the box "Click Here" on the side for Non-CAC Users. The website will require offeror to enter Personal Information, upload files (PDF format required), and include a brief description with the RFP number. In Recipient Information type in the Contract Specialist and the Contracting Officer’s email address (see below) and click the “Add” tab. No other boxes are required to be checked. Click Upload, click I Agree to the SAFE Usage Policy, and you should see the spinning wheel that says “uploading”. Once uploading is complete, the website will tell you that your files were successfully (or unsuccessfully) uploaded. In order to complete the proposal submission you must check your email for further instructions. Once you verify your email address the Government will then be able to download the files.
Contract Specialist, Mr. Christopher A. Ainsworth, email:
christopher.a.ainsworth@usace.army.mil
Contracting Officer, John H. Rodgers, email:
john.h.rodgers@usace.army.mil
NOTE: Save all emails received from SAFE.Team@amrdec.army.mil for your records. AMRDEC SAFE WEBSITE IS NOT DESIGNED
FOR LAST MINUTE SUMISSIONS OF PROPSALS. YOU ARE
ADVISED TO NOT WAIT UNTIL THE LAST MINUTE. Proposals received after the date and time will be handled in accordance with FAR 15.208 -- Submission, Modification, Revision, and Withdrawal of Proposals.
3.3.6.2 The Price Proposal and Technical Proposal shall be
submitted as “separate” single files. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission when necessary.
Title the file(s) in the following format:
Phase 1 Submission:
W9126G-17-R-0050_COMPANY NAME_P1_TECHNICAL
Phase 2 Submission:
W9126G-17-R-0050_COMPANY NAME_P2_TECHNICAL
W9126G-17-R-0050_COMPANY NAME_PRICE
3.3.6.3 When completing the information for transmittal at the AMRDEC SAFE website and verifying your email address, send a separate email notification to the Contract Specialist stating that you have successfully submitted (and uploaded) a proposal at the AMRDEC SAFE website. Include the solicitation number, W9126G-17- R-0050 in the subject line of your email.
Offers, modifications thereto, or cancellations of offers received by telegraph, facsimile or by e mail will not be accepted.
3.3.6.4 “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR Clause (P) 52.215-1, “Instructions to Offerors — Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.
3.3.6.5 Submit proposal revisions as page replacements with revised text readily identifiable, e.g., bold face print or underlining. Include and annotate for each revision the source of the revision or amendment, e.g., error, omission or clarification. Number and clearly marked “REVISED”, with the date of revision, proposal replacement pages.
Submit, in a different color than the original pages being replaced, the revised pages.
3.3.6.6 Within three (3) days of contract award, the awarded
Contractors shall submit their conformed proposal via the AMRDEC SAFE website at: https://safe.amrdec.army.mil/safe/.
4.0 JOINT VENTURE / LLC PROPOSAL REQUIREMENTS
4.1 Joint Venture:
When proposing as a joint venture, all members of the joint venture shall sign the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124.
4.2 LLC:
When proposing as an LLC, the offeror must submit a copy of the operating agreement which clearly demonstrates the authority to bind the LLC.
5.0 BID GUARANTEE (PHASE 2 ONLY)
A Bid Guarantee is not required for the Phase 1 proposal submission. A Bid Guarantee will be required during Phase 2 of this solicitation. The penal sum of the bond for the task order will be required as annotated in FAR Clause (P) 52.228-1 -- Bid Guarantee.
Facsimile Bonds are not acceptable. Hard copy submission of the bid bond is required and must be received by the contracting specialist prior to the due date and time for proposals submission.
6.0 CONTRACT PRICES - BIDDING SCHEDULE (PHASE 2 ONLY)
Payment for the various items listed in the Bidding Schedule shall constitute full compensation for furnishing all plant, labor, equipment, appliances, materials and bonds (performance and payment), and for performing all operations required to complete the work in conformity with the drawings, specifications, and attachments. All costs for work not specifically mentioned in the Bidding Schedule shall be included in the contract prices for the items listed.
End of Section 00 21 00
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017
52.215-20 Requirements for Certified Cost or Pricing Data or Information Other Than Certified Cost or Pricing Data
OCT 2010
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications
OCT 2010
52.216-27 Single or Multiple Awards OCT 1995 52.217-4 Evaluation Of Options Exercised At The Time Of Contract
Award
JUN 1988
52.217-5 Evaluation Of Options JUL 1990 52.236-28 Preparation of Proposals--Construction OCT 1997
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed Price, IDIQ Contract with Task Orders contract resulting from this solicitation.
(End of provision)
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be _20_ percent of the bid price or $_3M__, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Contracting Officer US Army Corps of Engineers, Fort Worth District Attn: CESWF-CT, John H. Rodgers 819 Taylor Street/ PO Box 17300 Fort Worth, TX 76102
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit will be scheduled for task orders as required.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 22 10 - Phase 1 of a 2 Phase-Design Build Selection Procedures
PHASE 1 SELECTION PROCEDURES
SECTION 00 22 10
PHASE 1 DESIGN-BUILD SELECTION PROCEDURES
1.0 OVERVIEW
2.0 GENERAL
3.0 PROPOSAL CONTENTS, EVALUATION FACTORS AND PROCEDURES
3.1 PHASE 1 PROPOSAL CONTENTS & EVALUATION FACTORS
3.2 EVALUATION PROCEDURES
3.3 RATING AND OTHER DEFINITIONS
3.4 DISCUSSIONS
4.0 TAB A: SIGNED OFFER
4.1 STANDARD FORM 1442
4.2 PROPOSAL DATA SHEET
4.3 BONDING CAPACITY
4.4 JOINT VENTURE AGREEMENT / LLC OPERATING AGREEMENT
5.0 TAB B: FACTOR 1 – PAST PERFORMANCE
5.1 SUBMISSION REQUIREMENTS
5.2 EVALUATION CRITERIA
6.0 TAB C: FACTOR 2 – ORGANIZATION AND TECHNICAL APPROACH
6.1. SUBMISSION REQUIREMENTS
6.2. EVALUATION CRITERIA
ATTACHMENT 1: Proposal Data Sheet
ATTACHMENT 2: Construction – Past Performance Assessment Worksheet
ATATCHMENT 3: Design – Past Performance Assessment Worksheet
ATTACHMENT 4: Past Performance Questionnaire (PPQ)
The Government will evaluate the proposals in accordance with the evaluation criteria described herein, using the evaluation rating systems outlined below. Price information in Phase 2 will be evaluated for fairness, reasonableness, and for material unbalancing, as described herein. Evaluation will be conducted in accordance with FAR Part 15.
2.0 GENERAL
In Phase 1 of the 2 phase design-build selection procedure, interested firms or joint venture entities (referred to as “offerors”) submit specified performance capability proposals, demonstrating their capability to successfully execute a wide variety of construction activities, to include but not limited to, shall consist of construction activities such as new construction, minor construction, sustainment, restoration and/or modernization services for military projects. The contracts are intended to execute construction, design-build and design-bid-build. All services required under these contracts shall be described in an individual scope of work which may include, but not limited to new construction, minor construction, and sustainment, restoration and/or modernization services for military projects to include the following: Abutment construction, Asphalt and concrete paving, Airfield paving, Bridge construction, Culverts, Curbs and street gutters, Elevated highway construction, Overpass construction, Road and street surfacing, Trestle construction, Construction of water and sewer lines, Mains, Pumping stations, Treatment plants and storage tanks, Anchored earth retention, Breakwater, spillway, floodwater, bulkhead wall or embankment, Channel, canal, dams, cofferdam, dikes and other flood control structures, Drainage projects and other earth work related projects, Repair, maintain, and build marine related structures, levees, flood control and jetties, Anti-terrorism and force protection, Outdoor recreation facilities, Park and recreational open space improvement, Other construction activities as appropriate under NAICS code 237310 under the resultant MATOC contracts. Note: The work this MATOC contract will cover includes two other NAICS codes, 237110, “Water and Sewer Line and Related Structures Construction” and 237990, “Other Heavy and Civil Engineering Construction”. However, the bulk of the work, 65%, will be under NAICS code 237310. The Government will evaluate the qualifications in accordance with the criteria described herein and may select up to ten
(10) of the Phase 1 offerors to compete in Phase 2. The Government reserves the right to select more than ten (10) of the Phase 1 offerors if, in the opinion of the Contracting Officer, consideration of additional offerors is warranted.
The selected Phase 2 offerors will be announced by special notice or synopsis to the Federal Business Opportunities website. Offerors may be contacted separately to request their Phase 2 proposal.
3.1 PHASE 1 PROPOSAL CONTENTS & EVALUATION FACTORS
Factor Location Description Relative Importance
TAB A Signed Offer Not rated.
FACTOR 1 TAB B Past Performance Factors 1 and 2 are of equal importance.
FACTOR 2 TAB C
Organization & Technical Approach
Factors 1 and 2 are of equal importance.
The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal, proposal corrections and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any proposal incorporated by reference, except as expressly allowed by this solicitation.
3.2.1 The Government will review the proposals and rate the information submitted for each evaluation factor, using a Combined Technical/Risk Rating with the exception of Past Performance. After listing proposal strengths, weaknesses, and deficiencies, the SSEB will assign an adjectival rating of “Outstanding”, “Good”, “Acceptable”, “Marginal”, or “Unacceptable” to each factor. The rating will reflect the Government’s confidence in each Offeror’s technical ability, as demonstrated in its proposal, to perform the requirements stated in the RFP. The SSEB will then assign a consensus rating for each evaluation factor that will be supported with a narrative, separately listing all strengths or advantages, weaknesses or disadvantages, deficiencies, and required clarifications.
3.2.1.1 Combined Technical/Risk Ratings:
(a) Outstanding. Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
(b) Good. Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
(c) Acceptable. Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
(d) Marginal. Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
(e) Unacceptable. Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is un-awardable.
3.2.2 Offerors are cautioned to put forth their best efforts for the Phase 1 submission and to furnish all information clearly to allow the Government to determine their performance capability.
3.2.3 Offerors shall not assume that they will have an opportunity to clarify or correct anything in their proposal after submitting it in response to Phase 1.
3.2.4 The Government reserves the right to allow proposal corrections, if deemed necessary to determine the most highly qualified offerors to shortlist for Phase 2.
3.2.5 The Contracting Officer, independently exercising prudent business judgment, may select up to ten (10) of the Phase 1 offerors to compete in Phase 2. The Government reserves the right to select more than ten (10) of the Phase 1 offerors if, in the opinion of the Source Selection Authority, consideration of additional offerors is warranted. In Phase 2, the selected Phase 2 offerors will submit proposals for evaluation in accordance with Section 00 22 20. In Phase 2, the Contracting Officer will award at least two
(2) and up to a target of five (5) firm fixed-price contracts to the offeror’s whose proposals offer the best overall value to the Government, considering the price and non-price factors described in Phase 2.
3.3 RATING AND OTHER DEFINITIONS
3.3.1 Deficiency: is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001 -- Definitions.
3.3.2 Weakness: means a flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.
3.3.3 Significant Weakness: is a flaw that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
3.3.4 Strength. Any aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
3.3.5 Significant Strength. An aspect of an Offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
3.3.6 Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offer is unclear (e.g. more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).
3.4 DISCUSSIONS (If Necessary)
3.4.1 The Government intends to award without discussions. A “Competitive Range” is a subjective determination of the most highly rated proposals in the event that discussions with offerors are required. In such an event, the SSA will approve a competitive range of all the most highly rated proposals.
3.4.2 If discussions are held, the Government may engage in a broad give and take with each Offeror in the competitive range, in accordance with FAR
15.306 (d). The Government will provide the Offeror an advance agenda for the discussions. During discussions, the Government may ask the Offeror to further explain its proposal and to answer questions about it.
3.4.3 Upon conclusion of discussions, those offerors still considered the most highly rated, will be afforded an opportunity to submit their proposal revisions for final evaluation and selection.
4.0 TAB A: SIGNED OFFER
Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors. Any legally organized Offeror may submit a proposal. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.
4.1 STANDARD FORM 1442. Submit the SF 1442 completed and signed by a person authorized by the offeror.
4.2 PROPOSAL DATA SHEET. Complete and submit Attachment 1.
4.3 BONDING CAPACITY
Submit a letter of commitment from a surety, signed by an officer or agent authorized to bond, that identifies the offeror’s available bonding capacity and limits that the surety will bond the Offeror, as the successful awardee for this project, taking into consideration the Cost Ceiling Limitation described in this Solicitation. The surety must be acceptable to the Government and must appear on the Department of Treasury Circular 570 “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies”. If the Offeror submits evidence from an individual Surety, the individual surety must include documentation meeting the requirements of FAR 28.203 -- Acceptability of Individual Sureties and FAR Clause 52.228-11 -- Pledges of Assets.
If the joint venture involves a prime contractor and an A-E firm and the prime contractor intends to provide the bond, provide a complete explanation with confirmation from the surety.
4.4 JOINT VENTURE AGREEMENT / LLC OPERATING AGREEMENT
4.4.1 Joint Venture: When proposing as a joint venture, all members of the joint venture shall sign the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124.
4.4.2 LLC: When proposing as an LLC, the offeror must submit a copy of the operating agreement which clearly demonstrates the authority to bind the
LLC.
5.0 TAB B: FACTOR 1 – PAST PERFORMANCE
5.1.1 The Offeror’s construction and design entities shall each demonstrate past performance through the submission of recent/relevant projects, using the Construction – Past Performance Assessment Worksheet (Attachment 2) and Designer – Past Performance Assessment Worksheet (Attachment 3). If the Offeror is a joint venture, limited liability corporation, or integrated design-build firm, provide past performance information for design and construction projects relevant to each of the proposed roles on this MATOC. If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Design firms may list prime contractors they have worked with for Government, private or commercial customers. If projects were design-build, identify them as such.
5.1.2 Both the prime contractor and the design firm(s) shall each submit three (3) to five (5) projects completed within six (6) years from the closing date of Phase 1. Projects submitted by the designer, for design experience only, must be 100% complete. Projects submitted for D-B construction experience, design must be 100% complete and construction must be at least 50% construction progress completed. The projects submitted shall best represent experience relevant to this solicitation. If Offeror is proposing as a Joint Venture (JV) and past performance cannot be provided as a JV, each partner shall submit at least three (3) but no more than five (5) projects. See para. 5.1.8, below for project submission requirements.
5.1.3 The Past Performance Questionnaire (PPQ) included in the solicitation (Attachment 4) is provided for the Offeror or its team members to submit to the client for each project the Offeror included in its proposal for Factor 1, Past Performance that does not have a final Contractor Performance Assessment Reporting System (CPARS) evaluation or is a non-Federal Government project. Ensure correct phone numbers and email addresses are provided for the client point of contact. The completed PPQ shall be submitted with the offeror’s proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s) questionnaires. If any negative past performance information is received to which the Offeror has not previously had an opportunity to respond, the contractor will be given an opportunity to provide rebuttal. If the client requests, questionnaires may be submitted directly to the Government’s Contract Specialist via e- mail prior to proposal closing date. Offerors shall not incorporate by reference into their proposals PPQ’s previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
5.1.4 Do not request past performance questionnaires (PPQ) on projects that have final CPARS evaluations. If a CPARS evaluation exists and a PPQ is provided for the same project, the CPARS evaluation will be reviewed as the official past performance record for the project, and the PPQ will not be considered by the Source Selection Board or the Source Selection Authority.
5.1.5 For USACE or other DoD projects which are underway but do not yet have an interim or final CPARS evaluation, one PPQ per contract may be submitted; to be considered, the PPQ shall be signed by the Administrative Contracting Officer (ACO) for the contract.
5.1.6 Offerors may submit performance recognition documents received within the last six (6) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition relevant to the submitted projects to demonstrate the Offeror’s performance capabilities and customer satisfaction.
5.1.7 In addition to the above, the Government may review any other sources of information for evaluation of past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS number of team members (Partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquires of owner representative(s), Federal Awardees Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rest with the Offeror.
5.1.8 Projects will be considered relevant to this procurement if they are similar in complexity, in type, scope, and magnitude. Relevancy is defined as performance in a variety of multi-discipline horizontal construction projects completed within six (6) years from the date of this solicitation or fully designed and with at least 50% construction progress completed within six (6) years from the closing date of Phase 1, to include the following:
(a) One example of a new construction project consisting of at least one of the following categories:
• Road
• Drainage
• Site work
• Airfield;
AND
(b) One example of a repair project consisting of at least one of the following categories:
• Road
• Drainage
• Site work
•…
This is the start of the file's text. The full file is on GovTribe.