AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for Hangar 8 Renovations; Corpus Christi Army Depot, Texas is amended as follows:
See SF30 Continuation Sheet(s)
NOTE: Government is (only) seeking Phase 1 proposals in accordance with Section 00 22 10.
Phase1 Proposal Receipt date will be, 27 June 2017, at 2:00 p.m. Central Time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G-17-R-0020
X 9B. DATED (SEE ITEM 11)
05-June -2017
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-June -2017
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL: TEL:
W9126G-17-R-0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. Section 00 22 10 - PHASE 1 OF A 2 PHASE-DESIGN BUILD SELECTION PROCEDURES, There were 4 attachments that were added to this section, each page bearing the notation “W9126G-17-R-0020, Amendment No.
0001”.
End of Summary of Changes
SECTION 00 22 10
PHASE 1 - TAB A
PROPOSAL DATA SHEET
SECTION 00 22 10
ATTACHMENT 1
Solicitation Number
Firm
Address
Phone
Fax
Tax ID Number
DUNS Number
Also provide any other assigned number that identifies the member firm(s) in the ACASS or CCASS databases. If a separate DUNS has been created for a joint venture (J-V) it must also be submitted. Provide a DUNS number for each company identified in any proposed Contractor-subcontractor association of firms. If the firm is a joint venture or contractor-subcontractor association of firms, list the individual firms and briefly describe the nature of the association. Provide DUNS for each.
Firm 1 Nature of Association
DUNS
Number
Firm 2 Nature of Association
DUNS
Number
Firm 3 Nature of Association
DUNS
Number
Authorized Negotiators IAW FAR 52.215-11 - The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Proposals (RFP).
Name
Title
Address
Telephone
W9126G-17-R-0020, Amendment No. 0001
SECTION 00 22 10
PAST PERFORMANCE ASSESSMENT WORKSHEET
ATTACHMENT 2
(To be completed for each project submitted)
CONSTRUCTION
OR PRIME CONTRACTOR PROJECT #_______
Offeror:
Project and Location:
Owner:
Owner’s Point of Contact for Reference:
Telephone:
Awarded Construction Cost: Final Construction Cost:
Explain Cost Growth, if any:
Date of Award:
Original Completion Date: Revised Completion Date: Percent Complete:
Explain Time Growth, if any:
General Scope of Construction and Offeror’s Role:
Work Your Company Self-Performed:
Extent and Type of Work You Subcontracted Out:
Describe extent of relevancy and complexity of the project by checking all applicable boxes below.
RELEVANCY:
Renovation of an industrial building or their equivalent or similar commercial or institutional maintenance facility type
Minimum 40,000 square feet per building
Complex electrical project with a Minimum relocation of 5 panels, dealing with low voltage (less than or equal to 480 volts), minimum 1600 amps
Construction value of at least $20 million
ADDITIONAL FEATURES OF COMPLEXITY:
Design/Build construction
Asbestos and Lead Based Paint Abatement Experience
Structural Analysis on Existing Facilities, Reinforcing Existing Structure
Discuss construction in occupied buildings
Familiarity in performing construction in occupied areas
Provide any additional narrative to support relevancy assessment (in terms of scope, magnitude and complexity as compared to the scope of the RFP).
Your Performance Evaluation by Owner, if known :
PAST PERFORMANCE ASSESSMENT WORKSHEET
ATTACHMENT 3
(To be completed for each project submitted)
DESIGN
FIRM OR IN-HOUSE DESIGN PROJECT #_______
Offeror:
Project and Location:
Owner:
Owner’s Point of Contact for Reference:
Telephone:
Estimated Construction Cost: Actual Construction Cost (if known):
Date of Award:
Original Design Completion Date: Revised Design Completion Date:
Explain Time Growth, if any:
General Scope of Construction and Offeror’s Role in Design:
Offeror’s Role in Design (Self-Performed Work):
Extent and Type of Work You Subcontracted Out:
Describe extent of relevancy and complexity of the project by checking all applicable boxes below.
RELEVANCY:
Renovation of an industrial building or their equivalent or similar commercial or institutional maintenance facility type
Minimum 40,000 square feet per building
Complex electrical project with a Minimum relocation of 5 panels, dealing with low voltage (less than or equal to 480 volts), minimum 1600 amps
Construction value of at least $20 million
ADDITIONAL FEATURES OF COMPLEXITY:
Design/Build construction
Asbestos and Lead Based Paint Abatement Experience
Structural Analysis on Existing Facilities, Reinforcing Existing Structure
Discuss construction in occupied buildings
Familiarity in performing construction in occupied areas
Provide any additional narrative to support relevancy assessment (in terms of scope, magnitude and complexity as compared to the scope of the RFP).
Your Performance Evaluation by Owner, if known:
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
PAST PERFORMANCE QUESTIONAIRRE
ATTACHMENT 4
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
PAST PERFORMANCE QUESTIONAIRRE
ATTACHMENT 4
continued
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS
QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE
OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH
THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE
SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO
SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER,
QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT
THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES
THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| PHASE 1 - TAB APROPOSAL DATA SHEET SECTION 00 22 10 ATTACHMENT 1 |
| PAST PERFORMANCE ASSESSMENT WORKSHEET ATTACHMENT 2 |
| PAST PERFORMANCE ASSESSMENT WORKSHEET ATTACHMENT 3 |
| PAST PERFORMANCE QUESTIONAIRRE ATTACHMENT 4 |