B3_AMD_0001_17_Q_0027_W_TX_Mowing.pdf
PDF 102 KB Posted
- Attached to
- Proctor Lake & Hords Creek Embankment Mowing
- Solicitation number
- W9126G-17-Q-0027
About this file
AMD 0001 to add the seed task order to the combined solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B3_17_Q_0027_W_TX_Embankment_Mowing1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add the seed task order schedule to the combined solicitation. Offerors must acknow ledge the amendment by completing blocks 8 and 15. The SF30 must be submitted w ith the vendors quote.
All other terms and conditions remain unchanged and in full effect.
POC: Jamauh Winston (817)886-1077 or jamauh.d.w inston@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G17Q0027
X 9B. DATED (SEE ITEM 11)
21-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Aug-2017
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G17Q0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
SEED TASK ORDER
CONTRACT TASK ORDER #0001
25 September 2017 through 22 December 2017.
CLIN 0001 HORD'S CREEK - EMBANKMENT MOWING
ITEM DESCRIPTION EST.QT
Y
U/M UNIT PRICE AMOUNT
0001AA EMBANKMENT (SLOPE AREA) 0 AC
0001AB VEGETATION CONTROL AREA (NON-SLOPE) 30 AC
0001AC UNCONTROLLED SPILLWAY (NON-SLOPE) 14 AC
0001AD EMBANKMENT GUARD RAIL SIDE "A" (NON-SLOPE) 1 EA
0001AE EMBANKMENT GUARD RAIL SIDE "B" (NON-SLOPE) 1 EA
HORD'S CREEK LAKE - MOWING - ITEMS 0001AA THRU 0001AE TOTAL
CLIN 0001 OC FISHER LAKE - EMBANKMENT MOWING
ITEM DESCRIPTION EST.QT
Y
U/M UNIT PRICE AMOUNT
0001AA EMBANKMENT (SLOPE AREA) 0 AC
0001AB VEGETATION CONTROL AREA (NON-SLOPE) 115 AC
OC FISHER LAKE - MOWING ITEMS 0001AA THRU 0001AB
TOTAL
CLIN 0001 PROCTOR LAKE - EMBANKMENT/LEVEE MOWING
ITEM DESCRIPTION EST.QT
Y
U/M UNIT PRICE AMOUNT
0001AA EMBANKMENT (SLOPE AREA) 35 AC
0001AB VEGETATION CONTROL AREA (NON-SLOPE) 34 AC
PROCTOR LAKE - MOWING ITEMS 0001AA THRU 0001AB TOTAL
TASK ORDER #0001
SUMMARY - 25 September 2017 through 22 December 2017.
HORD'S CREEK LAKE MOWING ITEMS 0001AA - 0001AE
OC FISHER LAKE MOWING ITEMS 0001AA - 0001AB
PROCTOR LAKE MOWING ITEMS 0001AA - 0001AB
TASK ORDER#0001 TOTAL
This Contract Bid Sheet must be signed and dated by the Contractor to be considered a valid submission for the applicable Government Solicitation.
Contractor Signature: Date
(End of Summary of Changes)
The following have been modified:
BASE SCHEDULE
West Texas Embankment Mowing Services for the Regional Lakes of Hord's Creek, OC Fisher and Proctor Lakes
Indefinate Delivery/Indefinate Quantity Supplies and Non-Personal Services Contractor Certified Bid Schedule
Contractor shall provide all labor, equipment, materials, supplies, management, and supervision to perform flood control embankment mowing services at Hord's Creek, OC Fisher and Proctor lakes, US Army Corps of Engineers, Three Rivers Region, Fort Worth District, Texas. All services will be performed in accordance with the attached Performance Work Statement and all contract terms.
CONTRACT BASE YEAR
25 Sept 2017 through 24 Sept 2018.
CLIN 0001 HORD'S CREEK - EMBANKMENT MOWING
ITEM DESCRIPTION Est Max
QTY
U/M UNIT PRICE AMOUNT
0001AA EMBANKMENT (SLOPE AREA) 72 AC
0001AB VEGETATION CONTROL AREA (NON-SLOPE) 90 AC
0001AC UNCONTROLLED SPILLWAY (NON-SLOPE) 42 AC
0001AD EMBANKMENT GUARD RAIL SIDE "A" (NON-SLOPE) 3 EA
0001AE EMBANKMENT GUARD RAIL SIDE "B" (NON-SLOPE) 3 EA
HORD'S CREEK LAKE - MOWING - ITEMS 0001AA THRU 0001AE TOTAL
CLIN 0001 OC FISHER LAKE - EMBANKMENT MOWING
ITEM DESCRIPTION EST.QT
Y Max
QTY
U/M UNIT PRICE AMOUNT
0001AA EMBANKMENT (SLOPE AREA) 285 AC
0001AB VEGETATION CONTROL AREA (NON-SLOPE) 345 AC
OC FISHER LAKE - MOWING ITEMS 0001AA THRU 0001AB
TOTAL
CLIN 0001 PROCTOR LAKE - EMBANKMENT/LEVEE MOWING
ITEM DESCRIPTION EST Max
QTY
U/M UNIT PRICE AMOUNT
0001AA EMBANKMENT (SLOPE AREA) 210 AC
0001AB VEGETATION CONTROL AREA (NON-SLOPE) 204 AC
PROCTOR LAKE - MOWING ITEMS 0001AA THRU 0001AB TOTAL
CONTRACT BASE YEAR
SUMMARY - 25 September 2017 through 24 September 2018.
HORD'S CREEK LAKE MOWING ITEMS 0001AA - 0001AE
OC FISHER LAKE MOWING ITEMS 0001AA - 0001AB
PROCTOR LAKE MOWING ITEMS 0001AA - 0001AB
CONTRACT BASE YEAR TOTAL
OPTION YR ONE SCHEDULE
CONTRACT OPTION YEAR ONE
25 September 2018 through 24 September 2019.
CLIN 1001 HORD'S CREEK - EMBANKMENT MOWING
ITEM DESCRIPTION Est Max
QTY
U/M UNIT PRICE AMOUNT
1001AA EMBANKMENT (SLOPE AREA) 72 AC
1001AB VEGETATION CONTROL AREA (NON-SLOPE) 90 AC
1001AC UNCONTROLLED SPILLWAY (NON-SLOPE) 42 AC
1001AD EMBANKMENT GUARD RAIL SIDE "A" (NON-SLOPE) 3 EA
1001AE EMBANKMENT GUARD RAIL SIDE "B" (NON-SLOPE) 3 EA
HORD'S CREEK LAKE - MOWING - ITEMS 1001AA THRU 1001AE TOTAL
CLIN 1001 OC FISHER LAKE - EMBANKMENT MOWING
.QTY
U/M UNIT PRICE AMOUNT
1001AA EMBANKMENT (SLOPE AREA) 285 AC
1001AB VEGETATION CONTROL AREA (NON-SLOPE) 345 AC
OC FISHER LAKE - MOWING ITEMS 1001AA THRU 1001AB
CLIN 1001 PROCTOR LAKE - EMBANKMENT/LEVEE MOWING
ITEM DESCRIPTION EST.
Max
QTY
U/M UNIT PRICE AMOUNT
1001AA EMBANKMENT (SLOPE AREA) 210 AC
1001AB VEGETATION CONTROL AREA (NON-SLOPE) 204 AC
PROCTOR LAKE - MOWING ITEMS 1001AA THRU 1001AB TOTAL
CONTRACT OPTION YEAR ONE
SUMMARY - 25 September 2018 through 24 September 2019.
HORD'S CREEK LAKE MOWING ITEMS 1001AA - 1001AE
OC FISHER LAKE MOWING ITEMS 1001AA - 1001AB
PROCTOR LAKE MOWING ITEMS 1001AA - 1001AB
CONTRACT OPTION YEAR ONE - TOTAL
OPTION YR THREE SCHEDULE
CONTRACT OPTION YEAR THREE
25 September 2020 through 24 September 2021.
CLIN 1003 HORD'S CREEK - EMBANKMENT MOWING
ITEM DESCRIPTION Est Max
QTY
U/M UNIT PRICE AMOUNT
1003AA EMBANKMENT (SLOPE AREA) 72 AC
1003AB VEGETATION CONTROL AREA (NON-SLOPE) 90 AC
1003AC UNCONTROLLED SPILLWAY (NON-SLOPE) 42 AC
1003AD EMBANKMENT GUARD RAIL SIDE "A" (NON-SLOPE) 3 EA
1003AE EMBANKMENT GUARD RAIL SIDE "B" (NON-SLOPE) 3 EA
HORD'S CREEK LAKE - MOWING - ITEMS 1003AA THRU 1003AE TOTAL
CLIN 1003 OC FISHER LAKE - EMBANKMENT MOWING
.QTY
U/M UNIT PRICE AMOUNT
1003AA EMBANKMENT (SLOPE AREA) 285 AC
1003AB VEGETATION CONTROL AREA (NON-SLOPE) 345 AC
OC FISHER LAKE - MOWING ITEMS 1003AA THRU 1003AB
CLIN 1003 PROCTOR LAKE - EMBANKMENT/LEVEE MOWING
Max
QTY
U/M UNIT PRICE AMOUNT
1003AA EMBANKMENT (SLOPE AREA) 210 AC
1003AB VEGETATION CONTROL AREA (NON-SLOPE) 204 AC
PROCTOR LAKE - MOWING ITEMS 1003AA THRU 1003AB TOTAL
CONTRACT OPTION YEAR THREE
SUMMARY - 25 September 2020 through 24 September 2021.
HORD'S CREEK LAKE MOWING ITEMS 1003AA - 1003AE
OC FISHER LAKE MOWING ITEMS 1003AA - 1003AB
PROCTOR LAKE MOWING ITEMS 1003AA - 1003AB
CONTRACT OPTION YEAR THREE - TOTAL
BASE YEAR 0001 TOTAL
OPTION YEAR ONE 1001 TOTAL
OPTION YEAR TWO 1002 TOTAL
OPTION YEAR THREE 1003 TOTAL
BASE AND ALL OPTIONS GRAND TOTAL
This Contract Bid Sheet must be signed and dated by the Contractor to be considered a valid submission for the applicable Government Solicitation.
Contractor Signature: Date
OPTION YR TWO SCHEDULE
CONTRACT OPTION YEAR TWO
25 September 2019 through 24 September 2020.
CLIN 1002 HORD'S CREEK - EMBANKMENT MOWING
ITEM DESCRIPTION Est Max
QTY
U/M UNIT PRICE AMOUNT
1002AA EMBANKMENT (SLOPE AREA) 72 AC
1002AB VEGETATION CONTROL AREA (NON-SLOPE) 90 AC
1002AC UNCONTROLLED SPILLWAY (NON-SLOPE) 42 AC
1002AD EMBANKMENT GUARD RAIL SIDE "A" (NON-SLOPE) 3 EA
1002AE EMBANKMENT GUARD RAIL SIDE "B" (NON-SLOPE) 3 EA
HORD'S CREEK LAKE - MOWING - ITEMS 1002AA THRU 1002AE TOTAL
CLIN 1002 OC FISHER LAKE - EMBANKMENT MOWING
.QTY
U/M UNIT PRICE AMOUNT
1002AA EMBANKMENT (SLOPE AREA) 285 AC
1002AB VEGETATION CONTROL AREA (NON-SLOPE) 345 AC
OC FISHER LAKE - MOWING ITEMS 1002AA THRU 1002AB
CLIN 1002 PROCTOR LAKE - EMBANKMENT/LEVEE MOWING
Max
QTY
U/M UNIT PRICE AMOUNT
1002AA EMBANKMENT (SLOPE AREA) 210 AC
1002AB VEGETATION CONTROL AREA (NON-SLOPE) 204 AC
PROCTOR LAKE - MOWING ITEMS 1002AA THRU 1002AB TOTAL
CONTRACT OPTION YEAR TWO
SUMMARY - 25 September 2019 through 24 September 2020.
HORD'S CREEK LAKE MOWING ITEMS 1002AA - 1002AE
OC FISHER LAKE MOWING ITEMS 1002AA - 1002AB
PROCTOR LAKE MOWING ITEMS 1002AA - 1002AB
CONTRACT OPTION YEAR TWO - TOTAL
File details come from the government source that posted it. Updated .