UNIT ESTIMATED

PRICE AMOUNT

1 JOB SUM 362,000.00$

12000 TON 89.20$ 1,070,400.00$

4300 TON 96.00$ 412,800.00$

7800 TON 6.00$ 46,800.00$

1,892,000.00$

2000 TON 81.00$ 162,000.00$

800 TON 83.00$ 66,400.00$

1300 SY 6.00$ 7,800.00$

236,200.00$

2,128,200.00$

2000 TON 81.00$ 162,000.00$

800 TON 83.00$ 66,400.00$

1300 SY 6.00$ 7,800.00$

236,200.00$

2,364,400.00$

2000 TON 81.00$ 162,000.00$

800 TON 83.00$ 66,400.00$

1300 SY 6.00$ 7,800.00$

236,200.00$

2,600,600.00$

2000 TON 81.00$ 162,000.00$

800 TON 83.00$ 66,400.00$

1300 SY 6.00$ 7,800.00$

236,200.00$

2,836,800.00$

The apparent low bidder *BIS Services, LLC is 24.53% below the Government's Estimate

OPTION NO. 2

0011 Riprap (40-650 lbs) 0012 Blanket Stone (1/2" - 6")

0014 Riprap (40-650 lbs)

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 &2

Riprap (40-650 lbs) 0009 Blanket Stone (1/2" - 6")

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2 & 3

OPTION NO. 4

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1

TOTAL OPTION 4

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2, 3 &4

0010 Geotextile

TOTAL OPTION 2

TOTAL SCHEDULE NO. 1

Blanket Stone (1/2" - 6")

Geotextile

TOTAL OPTION 3

OPTION NO. 3

Geotextile

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN

RESPONSE TO THIS SOLICITATION.

CURTIS COLE.JR.

GALVESTON EXECUTION BRANCH CHIEF

QUANTITY

Mobilization & Demobilization

TOTAL OPTION 1

ABSTRACT OF OFFERS Page 1 Solicitation No.: W9126G-17-B-0012 Date Issued: 14 Apr 2017 Date Opened: 15 May 2017 Issuing Office: USAED-Ft. Worth Project Title: Gulf Intraxoastal Waterway, Texas, Aransas National Wildlife Refuge (ANWR), in Aransas and Calhoun Counties, Beneficial Use Site (BUS) Site "B". 100% Small Business Set-Aside.

Number of Amendments Issued: 1 GOVERNMENT ESTIMATE (Without Profit)

NO.

ESTIMATED

DESCRIPTION

OPTION NO. 1

Riprap (40-650 lbs)

Geotextile

Blanket Stone (1/2" - 6")

ITEM

Geotextile

0005 Riprap (40-650 lbs) 0006 Blanket Stone (1/2" - 6")

COLE.CURTIS.JR.12310

25746

Digitally signed by COLE.CURTIS.JR.1231025746 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=COLE.CURTIS.JR.1231025746 Date: 2017.05.17 10:24:42 -05'00'

1 JOB SUM 300,000.00$

12000 TON 67.00$ 804,000.00$

4300 TON 68.00$ 292,400.00$

7800 TON 7.00$ 54,600.00$

1,451,000.00$

2000 TON 67.00$ 134,000.00$

800 TON 68.00$ 54,400.00$

1300 SY 7.00$ 9,100.00$

197,500.00$

1,648,500.00$

2000 TON 67.00$ 134,000.00$

800 TON 68.00$ 54,400.00$

1300 SY 7.00$ 9,100.00$

197,500.00$

1,846,000.00$

2000 TON 67.00$ 134,000.00$

800 TON 68.00$ 54,400.00$

1300 SY 7.00$ 9,100.00$

197,500.00$

2,043,500.00$

2000 TON 67.00$ 134,000.00$

800 TON 68.00$ 54,400.00$

1300 SY 7.00$ 9,100.00$

197,500.00$

2,241,000.00$

0007 Geotextile

TOTAL OPTION 1

0014 Riprap (40-650 lbs) 0015 Blanket Stone (1/2" - 6") 0016 Geotextile

0001 Mobilization & Demobilization 0002 Riprap (40-650 lbs)

Blanket Stone (1/2" - 6")

TOTAL SCHEDULE NO. 1

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2 & 3

OPTION NO. 4

0006 Blanket Stone (1/2" - 6")

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1

TOTAL OPTION 2

0013 Geotextile

TOTAL OPTION 3

TOTAL OPTION 4

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2, 3 &4

OPTION NO. 2

0008 Riprap (40-650 lbs) 0009 Blanket Stone (1/2" - 6") 0010 Geotextile

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 &2

OPTION NO. 3

0011 Riprap (40-650 lbs) 0012 Blanket Stone (1/2" - 6")

OPTION NO. 1

QUANTITY

0005 Riprap (40-650 lbs)

0004 Geotextile

NO.

Business Size: Small Business, Women-Owned Offeror: #1 Midwest Construction Co., Nebraska City, NE Issuing Office: USAED-Ft. Worth Solicitation No.: W9126G-17-B-0012 Date Issued: 14 Apr 2017 Date Opened: 15 May 2017

ABSTRACT OF OFFERS (CONT'D) Page 2

ITEM

DESCRIPTION

ESTIMATED

1 JOB SUM 1,400,000.00$

12000 TON 176.25$ 2,115,000.00$

4300 TON 125.00$ 537,500.00$

7800 TON 3.20$ 24,960.00$

4,077,460.00$

2000 TON 18.00$ 36,000.00$

800 TON 15.00$ 12,000.00$

1300 SY 1.20$ 1,560.00$

49,560.00$

4,127,020.00$

2000 TON 18.00$ 36,000.00$

800 TON 15.00$ 12,000.00$

1300 SY 1.20$ 1,560.00$

49,560.00$

4,176,580.00$

2000 TON 18.00$ 36,000.00$

800 TON 15.00$ 12,000.00$

1300 SY 1.20$ 1,560.00$

49,560.00$

4,226,140.00$

2000 TON 18.00$ 36,000.00$

800 TON 15.00$ 12,000.00$

1300 SY 1.20$ 1,560.00$

49,560.00$

4,275,700.00$TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2, 3 &4

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 &2

OPTION NO. 3

0011 Riprap (40-650 lbs)

0003 Blanket Stone (1/2" - 6")

Solicitation No.: W9126G-17-B-0012 Date Issued: 14 Apr 2017 Date Opened: 15 May 2017

DESCRIPTION QUANTITY

TOTAL OPTION 2

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1

OPTION NO. 1

TOTAL OPTION 1

Riprap (40-650 lbs) Blanket Stone (1/2" - 6") Geotextile

Geotextile

Issuing Office: USAED-Ft. Worth Offeror: #2 Trade West Construction, Inc., Mesquite, Nevada Business Size: Small Business, Women-Owned

ABSTRACT OF OFFERS (CONT'D) Page 3

0009 Blanket Stone (1/2" - 6") 0010 Geotextile

TOTAL SCHEDULE NO. 1

0012 Blanket Stone (1/2" - 6") 0013 Geotextile

TOTAL OPTION 3

0016 Geotextile

TOTAL OPTION 4

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2 & 3

OPTION NO. 4

0014 Riprap (40-650 lbs) 0015 Blanket Stone (1/2" - 6")

0001 Mobilization & Demobilization 0002 Riprap (40-650 lbs)

OPTION NO. 2

0008 Riprap (40-650 lbs)

ITEM ESTIMATED

NO.

1 JOB SUM 1,256,500.00$

12000 TON 168.00$ 2,016,000.00$

4300 TON 126.00$ 541,800.00$

7800 TON 81.20$ 633,360.00$

4,447,660.00$

2000 TON 112.20$ 224,400.00$

800 TON 83.40$ 66,720.00$

1300 SY 81.00$ 105,300.00$

396,420.00$

4,844,080.00$

2000 TON 112.20$ 224,400.00$

800 TON 83.40$ 66,720.00$

1300 SY 81.00$ 105,300.00$

396,420.00$

5,240,500.00$

2000 TON 112.20$ 224,400.00$

800 TON 83.40$ 66,720.00$

1300 SY 81.00$ 105,300.00$

396,420.00$

5,636,920.00$

2000 TON 112.20$ 224,400.00$

800 TON 83.40$ 66,720.00$

1300 SY 81.00$ 105,300.00$

396,420.00$

6,033,340.00$TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2, 3 &4

0014 Riprap (40-650 lbs) 0015 Blanket Stone (1/2" - 6") 0016 Geotextile

TOTAL OPTION 4

Geotextile

TOTAL OPTION 3

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2 & 3

OPTION NO. 4

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1

TOTAL OPTION 2

Solicitation No.: W9126G-17-B-0012 Date Issued: 14 Apr 2017 Date Opened: 15 May 2017

TOTAL SCHEDULE NO. 1

0001 Mobilization & Demobilization 0002 Riprap (40-650 lbs) 0003 Blanket Stone (1/2" - 6") 0004 Geotextile

NO. DESCRIPTION QUANTITY

Issuing Office: USAED-Ft. Worth Offeror: #3 RBM Contracting Services, LLC, Santa Rosa Beach, FL Business Size: Small Business, Economically Disadvantaged Women-Owned

ITEM ESTIMATED

ABSTRACT OF OFFERS (CONT'D) Page 4

Riprap (40-650 lbs)

Geotextile

OPTION NO. 2

0008 Riprap (40-650 lbs) 0009 Blanket Stone (1/2" - 6")

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 &2

OPTION NO. 3

0011 Riprap (40-650 lbs) 0012 Blanket Stone (1/2" - 6")

TOTAL OPTION 1

OPTION NO. 1

Blanket Stone (1/2" - 6") Geotextile

1 JOB SUM 277,992.02$

12000 TON 65.25$ 783,000.00$

4300 TON 64.00$ 275,200.00$

7800 TON 6.00$ 46,800.00$

1,382,992.02$

2000 TON 65.25$ 130,500.00$

800 TON 64.00$ 51,200.00$

1300 SY 6.00$ 7,800.00$

189,500.00$

1,572,492.02$

2000 TON 65.25$ 130,500.00$

800 TON 64.00$ 51,200.00$

1300 SY 6.00$ 7,800.00$

189,500.00$

1,761,992.02$

2000 TON 65.25$ 130,500.00$

800 TON 64.00$ 51,200.00$

1300 SY 6.00$ 7,800.00$

189,500.00$

1,951,492.02$

2000 TON 65.25$ 130,500.00$

800 TON 64.00$ 51,200.00$

1300 SY 6.00$ 7,800.00$

189,500.00$

2,140,992.02$TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2, 3 &4

0014 Riprap (40-650 lbs) 0015 Blanket Stone (1/2" - 6") 0016 Geotextile

TOTAL OPTION 4

0013 Geotextile

TOTAL OPTION 3

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2 & 3

OPTION NO. 4

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 &2

OPTION NO. 3

0011 Riprap (40-650 lbs) 0012 Blanket Stone (1/2" - 6")

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1

TOTAL OPTION 2

Business Size: Small Business, HubZone Offeror: #4 BIS Services, LLC * Issuing Office: USAED-Ft. Worth Solicitation No.: W9126G-17-B-0012 Date Issued: 14 Apr 2017 Date Opened: 15 May 2017

ABSTRACT OF OFFERS (CONT'D) Page 5

OPTION NO. 2

TOTAL SCHEDULE NO. 1

0001 Mobilization & Demobilization

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

OPTION NO. 1

0005 Riprap (40-650 lbs) 0007 Geotextile

Riprap (40-650 lbs) 0003 Blanket Stone (1/2" - 6") 0004 Geotextile

TOTAL OPTION 1

Blanket Stone (1/2" - 6")

0008 Riprap (40-650 lbs) 0009 Blanket Stone (1/2" - 6") 0010 Geotextile

1 JOB SUM 350,000.00$

12000 TON 68.00$ 816,000.00$

4300 TON 65.00$ 279,500.00$

7800 TON 5.50$ 42,900.00$

1,488,400.00$

2000 TON 75.00$ 150,000.00$

800 TON 75.00$ 60,000.00$

1300 SY 5.50$ 7,150.00$

217,150.00$

1,705,550.00$

2000 TON 75.00$ 150,000.00$

800 TON 75.00$ 60,000.00$

1300 SY 5.50$ 7,150.00$

217,150.00$

1,922,700.00$

2000 TON 75.00$ 150,000.00$

800 TON 75.00$ 60,000.00$

1300 SY 5.50$ 7,150.00$

217,150.00$

2,139,850.00$

2000 TON 75.00$ 150,000.00$

800 TON 75.00$ 60,000.00$

1300 SY 5.50$ 7,150.00$

217,150.00$

2,357,000.00$TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2, 3 &4

0014 Riprap (40-650 lbs) 0015 Blanket Stone (1/2" - 6") 0016 Geotextile

TOTAL OPTION 4

0013 Geotextile

TOTAL OPTION 3

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2 & 3

OPTION NO. 4

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 &2

OPTION NO. 3

0011 Riprap (40-650 lbs) 0012 Blanket Stone (1/2" - 6")

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1

TOTAL OPTION 2

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

0001 Mobilization & Demobilization

Solicitation No.: W9126G-17-B-0012 Date Issued: 14 Apr 2017 Date Opened: 15 May 2017 Issuing Office: USAED-Ft. Worth Offeror: #5 Apollo Environmental Strategies, Inc., Beaumont, Texas Business Size: Small Business, Economically Disadvantaged Women-Owned

ABSTRACT OF OFFERS (CONT'D) Page 6

0002 Riprap (40-650 lbs) 0003 Blanket Stone (1/2" - 6") 0004 Geotextile

TOTAL SCHEDULE NO. 1

OPTION NO. 1

0005 Riprap (40-650 lbs) 0006 Blanket Stone (1/2" - 6") 0007 Geotextile

TOTAL OPTION 1

0009 Blanket Stone (1/2" - 6") 0010 Geotextile

OPTION NO. 2

0008 Riprap (40-650 lbs)

1 JOB SUM 716,000.00$

12000 TON 110.00$ 1,320,000.00$

4300 TON 110.00$ 473,000.00$

7800 TON 14.00$ 109,200.00$

2,618,200.00$

2000 TON 90.00$ 180,000.00$

800 TON 90.00$ 72,000.00$

1300 SY 14.00$ 18,200.00$

270,200.00$

2,888,400.00$

2000 TON 90.00$ 180,000.00$

800 TON 90.00$ 72,000.00$

1300 SY 14.00$ 18,200.00$

270,200.00$

3,158,600.00$

2000 TON 90.00$ 180,000.00$

800 TON 90.00$ 72,000.00$

1300 SY 14.00$ 18,200.00$

270,200.00$

3,428,800.00$

2000 TON 90.00$ 180,000.00$

800 TON 90.00$ 72,000.00$

1300 SY 14.00$ 18,200.00$

270,200.00$

3,699,000.00$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB SUM 800,000.00$

0015 Blanket Stone (1/2" - 6") 0016 Geotextile

TOTAL OPTION 4

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2, 3 &4

TOTAL OPTION 3

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2 & 3

OPTION NO. 4

0014 Riprap (40-650 lbs)

OPTION NO. 3

0011 Riprap (40-650 lbs) 0012 Blanket Stone (1/2" - 6") 0013 Geotextile

0009 Blanket Stone (1/2" - 6") 0010 Geotextile

TOTAL OPTION 2

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 &2

TOTAL OPTION 1

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1

OPTION NO. 2

0008 Riprap (40-650 lbs)

OPTION NO. 1

0005 Riprap (40-650 lbs) 0006 Blanket Stone (1/2" - 6") 0007 Geotextile

0003 Blanket Stone (1/2" - 6") 0004 Geotextile

TOTAL SCHEDULE NO. 1

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

0001 Mobilization & Demobilization 0002 Riprap (40-650 lbs)

ABSTRACT OF OFFERS (CONT'D) Page 7 Solicitation No.: W9126G-17-B-0012 Date Issued: 14 Apr 2017 Date Opened: 15 May 2017 Issuing Office: USAED-Ft. Worth Offeror: #6 Affolter Contracting Company, Inc., La Marque, Texas Business Size: Small Business

ABSTRACT OF OFFERS (CONT'D) Page 7 Solicitation No.: W9126G-17-B-0012 Date Issued: 14 Apr 2017 Date Opened: 15 May 2017 Issuing Office: USAED-Ft. Worth Offeror: #7, Cayo, LLC, Fort Worth, Texas Business Size: Small Business, HubZone Joint Venture

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

0001 Mobilization & Demobilization

12000 TON 105.00$ 1,260,000.00$

4300 TON 105.00$ 451,500.00$

7800 TON 9.00$ 70,200.00$

2,581,700.00$

2000 TON 98.00$ 196,000.00$

800 TON 98.00$ 78,400.00$

1300 SY 9.00$ 11,700.00$

286,100.00$

2,867,800.00$

2000 TON 98.00$ 196,000.00$

800 TON 98.00$ 78,400.00$

1300 SY 9.00$ 11,700.00$

286,100.00$

3,153,900.00$

2000 TON 98.00$ 196,000.00$

800 TON 98.00$ 78,400.00$

1300 SY 9.00$ 11,700.00$

286,100.00$

3,440,000.00$

2000 TON 98.00$ 196,000.00$

800 TON 98.00$ 78,400.00$

1300 SY 9.00$ 11,700.00$

286,100.00$

3,726,100.00$

0002 Riprap (40-650 lbs) 0003 Blanket Stone (1/2" - 6") 0004 Geotextile

TOTAL SCHEDULE NO. 1

OPTION NO. 1

0005 Riprap (40-650 lbs) 0006 Blanket Stone (1/2" - 6") 0007 Geotextile

TOTAL OPTION 1

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1

OPTION NO. 2

0008 Riprap (40-650 lbs) 0009 Blanket Stone (1/2" - 6") 0010 Geotextile

TOTAL OPTION 2

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 &2

OPTION NO. 3

0011 Riprap (40-650 lbs) 0012 Blanket Stone (1/2" - 6") 0013 Geotextile

TOTAL OPTION 3

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2 & 3

OPTION NO. 4

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1, 2, 3 &4