AMEND-0002_W9126G-17-B-0005.pdf
PDF 7 MB Posted
- Attached to
- USACE Corpus Christi Ship Channel, Placement Area 13 Containment Dike, Nueces County, Texas, Construction
- Solicitation number
- W9126G-17-B-0005
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C1_ABSTRACT_W9126G-17-B-0005(1).pdf | ||
| C1_ABSTRACT_W9126G-17-B-0005.pdf | ||
| B3_Amend0001.pdf | ||
| B3_W9126G-17-B-0005-Plans.pdf | ||
| B3_W9126G-17-B-0005-Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is shown on page 2.
BID OPENING DATE AND TIME REMAIN AS 11 MAY 2017 @ 2:00 P.M. LOCAL TIME
1. CONTRACT ID CODE PAGE OF PAGES
1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-17-B-0005
X 9B. DATED (SEE ITEM 11)
12-Apr-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Apr-2017
CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
2000 FORT POINT ROAD
GALVESTON TX 77550-1229
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G-17-B-0005
A0002-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. The specifications for Solicitation No. W9126G-17-B-0005, Corpus Christi Ship Channel, Texas, Placement Area No. 13, in Nueces County, Texas, Dike Raise, are hereby amended as follows:
a) Specifications.
(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.
b) Drawings.
(1) DRAWINGS NO. G-03, C-01, C-02, C-03, AND C-10 - The enclosed Drawings No. G-03, C- 01, C-02, C-03, and C-10, supersedes that issued with this Solicitation.
(2) DRAWINGS NO. C-28, C-29, AND C-30 – Drawings No. C-28, C-29, and C-30 are deleted from this solicitation.
2. This amendment shall be attached to and become a part of the solicitation.
2 Encls:
1. SECTION 00 11 00.00 45, BID SCHEDULE
2. DRAWINGS NO. G-03, C-01, C-02, C-03, AND C-10
SWG FILE NO.:803-351 SOLICITATION NO.: W9126G-17-B-0005
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
BID SCHEDULE
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1
1.1.2 Option No. 1
1.2 MODIFICATIONS (CESWG)
1.3 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
(TO ACCOMPANY AMENDMENT NO. 0002 TO SOLICITATION NO. W9126G-17-B-0005)
SECTION 00 11 00.00 45
BID SCHEDULE
AMENDMENT 0002
PART 1 GENERAL
1.1 BID SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization 1 JOB SUM $___________
0002 Demolish and Remove the Existing Drop-outlet Structure
1 JOB SUM $___________
0003 Riprap
4,500 TON $_________ $___________
0004 Blanket Stone
1,600 TON $_________ $___________
0005 Geotextile 2,600 S.Y. $_________ $_________
0006 New Drop-outlet Structure 1 JOB SUM $___________
0007 Semi-compacted Containment Dike Construction
528,500 C.Y. $_________ $___________
0008 Uncompacted Training Dike Construction
2,700 L.F. $_________ $___________
DOCUMENT 00 11 00.00 45 Page 2
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0009 Turfing
1 JOB SUM $___________
Perimeter Ditch 33,700 LF $_________ $___________
Lateral Ditch 2,300 LF $_________ $___________
0012 As-Built Drawings 1 JOB SUM $5,000
TOTAL SCHEDULE NO. 1 $___________
NOTE: Completion time stated in SECTION 00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for SCHEDULE NO. 1 work.
DOCUMENT 00 11 00.00 45 Page 3
BID SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.2 Option No. 1
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 1
0013 Exterior Berm
3,100 LF $_________ $___________
TOTAL OPTION NO. 1 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 $___________
NOTE FOR OPTION NO. 1: The Government may exercise this Option by written notice to the Contractor within 120 calendar days after date of acknowledgement of Notice to Proceed. Award of this Option is contingent upon availability of funds. No additional time will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 4
BID SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
1.2 MODIFICATIONS (CESWG)
If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment of each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
1.3 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 5
NAME PID EASTING (X)
NAD-83 TX-S
NORTHING (Y)
NAD-83 TX-S
ELEV
(NAVD88)
DINK 1 BBDR95 1,426,793.272 17,216,549.989 4.32
877 5283 B (Ingleside) DP0724 1,404,577.070 17,189,599.450 9.54 90008 D=877 5296 D TIDAL (Aquarium) AC8423 1,342,542.470 17,186,711.770 3.93
CONTROL MONUMENTS - TEXAS SOUTH ZONE
NAD83, TEXAS SOUTH ZONE, US SURVEY FEET
Corpus Survey Area
STATION NORTHING EASTING STATION NORTHING EASTING STATION NORTHING EASTING STATION NORTHING EASTING
0+00.00 17,204,711.88 1,388,458.84 84+29.65 17,197,205.64 1,391,643.78 180+12.06 17,202,486.75 1,386,982.63 299+92.75 17,206,916.26 1,387,130.98 2+21.95 17,204,504.76 1,388,538.62 85+91.40 17,197,062.41 1,391,718.92 181+25.83 17,202,591.14 1,386,937.42 300+59.42 17,206,888.26 1,387,191.48 3+13.93 17,204,414.53 1,388,556.45 87+53.40 17,196,916.64 1,391,789.61 181+99.92 17,202,661.80 1,386,915.13 301+13.24 17,206,863.43 1,387,239.24 5+04.87 17,204,227.21 1,388,593.47 88+78.17 17,196,803.33 1,391,841.83 182+98.67 17,202,758.56 1,386,895.39 301+88.58 17,206,834.15 1,387,308.65 6+05.74 17,204,131.58 1,388,625.55 90+03.74 17,196,690.02 1,391,895.96 184+22.37 17,202,880.78 1,386,876.28 302+76.41 17,206,790.86 1,387,385.07 7+09.93 17,204,036.89 1,388,669.01 91+17.34 17,196,588.17 1,391,946.27 184+98.56 17,202,955.89 1,386,863.54 303+36.82 17,206,758.40 1,387,436.02 8+11.58 17,203,946.66 1,388,715.82 91+54.70 17,196,553.80 1,391,960.92 185+70.04 17,203,025.28 1,386,846.35 303+91.77 17,206,720.84 1,387,476.14 9+13.42 17,203,869.16 1,388,781.89 91+99.48 17,196,509.24 1,391,965.37 186+55.74 17,203,108.03 1,386,824.06 304+73.65 17,206,655.27 1,387,525.17
10+64.40 17,203,772.40 1,388,897.79 92+46.30 17,196,463.41 1,391,955.82 187+74.92 17,203,221.34 1,386,787.13 305+45.75 17,206,592.25 1,387,560.20 11+68.83 17,203,708.74 1,388,980.58 92+83.90 17,196,430.31 1,391,937.99 189+42.23 17,203,379.21 1,386,731.72 306+20.67 17,206,524.14 1,387,591.40 11+99.32 17,203,694.10 1,389,007.33 93+23.97 17,196,401.66 1,391,909.97 190+54.56 17,203,486.15 1,386,697.33 307+05.51 17,206,448.39 1,387,629.61 13+23.36 17,203,618.99 1,389,106.03 93+86.64 17,196,374.93 1,391,853.29 191+40.29 17,203,563.81 1,386,661.03 307+61.32 17,206,396.19 1,387,649.35 15+49.51 17,203,475.13 1,389,280.52 94+42.85 17,196,370.47 1,391,797.25 192+11.75 17,203,628.10 1,386,629.83 308+25.43 17,206,332.54 1,387,657.00 16+50.86 17,203,405.74 1,389,354.40 96+39.14 17,196,362.83 1,391,601.11 192+83.39 17,203,694.30 1,386,602.45 308+92.42 17,206,265.70 1,387,661.45 17+02.65 17,203,368.18 1,389,390.06 97+96.44 17,196,363.47 1,391,443.82 193+65.38 17,203,773.87 1,386,582.71 309+45.95 17,206,212.23 1,387,664.00 17+27.76 17,203,346.54 1,389,402.79 99+08.67 17,196,369.20 1,391,331.73 194+32.01 17,203,836.89 1,386,561.05 309+99.26 17,206,160.03 1,387,674.83 17+48.61 17,203,326.17 1,389,407.25 100+39.98 17,196,388.29 1,391,201.82 195+09.00 17,203,907.55 1,386,530.49 310+59.06 17,206,105.92 1,387,700.30 17+69.71 17,203,305.17 1,389,405.34 103+84.93 17,196,453.22 1,390,863.03 195+58.84 17,203,951.47 1,386,506.92 311+18.55 17,206,062.00 1,387,740.42 17+95.62 17,203,282.25 1,389,393.24 104+46.39 17,196,464.04 1,390,802.53 196+32.13 17,204,011.95 1,386,465.53 312+01.08 17,206,013.62 1,387,807.29 19+00.68 17,203,195.04 1,389,334.65 105+28.08 17,196,475.50 1,390,721.66 197+18.39 17,204,088.97 1,386,426.68 312+47.05 17,205,986.25 1,387,844.22 19+42.41 17,203,156.21 1,389,319.37 106+40.20 17,196,478.68 1,390,609.58 198+31.05 17,204,194.00 1,386,385.93 313+01.35 17,205,944.24 1,387,878.61 19+88.46 17,203,110.38 1,389,314.91 107+69.50 17,196,476.14 1,390,480.30 199+01.38 17,204,257.02 1,386,354.72 313+44.70 17,205,906.68 1,387,900.26 20+19.07 17,203,079.82 1,389,316.82 108+89.02 17,196,465.95 1,390,361.21 199+55.37 17,204,299.67 1,386,321.61 314+04.90 17,205,850.02 1,387,920.64 20+86.70 17,203,014.26 1,389,333.38 110+06.34 17,196,460.22 1,390,244.04 200+22.63 17,204,350.60 1,386,277.67 314+85.64 17,205,773.00 1,387,944.84 21+60.40 17,202,944.87 1,389,358.22 110+92.32 17,196,461.50 1,390,158.07 201+21.25 17,204,421.89 1,386,209.53 316+11.06 17,205,656.51 1,387,991.33 22+38.93 17,202,871.03 1,389,384.96 111+67.85 17,196,469.14 1,390,082.92 202+12.56 17,204,480.46 1,386,139.48 317+46.08 17,205,530.47 1,388,039.73 22+98.84 17,202,813.10 1,389,400.25 112+26.86 17,196,487.60 1,390,026.88 202+65.69 17,204,518.01 1,386,101.90 317+98.94 17,205,481.63 1,388,059.96 23+57.36 17,202,755.18 1,389,408.53 112+86.46 17,196,526.43 1,389,981.67 203+25.19 17,204,571.48 1,386,075.79 318+74.23 17,205,412.07 1,388,088.76 24+45.85 17,202,666.69 1,389,407.25 113+88.73 17,196,601.54 1,389,912.25 204+52.62 17,204,689.89 1,386,028.67 319+99.53 17,205,298.76 1,388,142.26 26+06.54 17,202,506.28 1,389,397.70 115+18.47 17,196,696.39 1,389,823.73 205+61.74 17,204,791.10 1,385,987.91 322+83.07 17,205,037.77 1,388,253.06 26+81.66 17,202,431.17 1,389,397.70 116+47.97 17,196,804.99 1,389,753.18 206+86.81 17,204,906.95 1,385,940.79 323+32.97 17,204,994.49 1,388,277.90 27+46.11 17,202,366.87 1,389,402.16 117+91.58 17,196,926.11 1,389,676.03 207+86.70 17,204,999.25 1,385,902.58 323+85.08 17,204,951.84 1,388,307.83 28+09.91 17,202,304.49 1,389,415.53 119+06.96 17,197,030.51 1,389,626.91 208+95.55 17,205,098.56 1,385,858.00 324+63.54 17,204,893.27 1,388,360.05 28+88.02 17,202,230.65 1,389,441.00 119+85.90 17,197,097.44 1,389,585.06 211+10.14 17,205,296.53 1,385,775.21 325+38.42 17,204,834.07 1,388,405.90 29+81.76 17,202,143.44 1,389,475.39 121+65.83 17,197,258.94 1,389,505.73 212+92.74 17,205,456.94 1,385,687.97 326+13.66 17,204,765.32 1,388,436.47 30+69.71 17,202,061.96 1,389,508.51 123+58.87 17,197,425.54 1,389,408.20 214+26.62 17,205,574.71 1,385,624.28 32+21.35 17,201,923.19 1,389,569.64 124+08.16 17,197,463.01 1,389,376.18 214+84.31 17,205,620.54 1,385,589.26 0+00.00-A 17,204,414.53 1,388,556.45 32+96.80 17,201,855.72 1,389,603.39 125+70.04 17,197,608.14 1,389,304.49 215+32.48 17,205,654.28 1,385,554.87 1+49.33-A 17,204,371.07 1,388,413.59 34+02.61 17,201,765.96 1,389,659.43 127+77.11 17,197,785.65 1,389,197.87 215+86.87 17,205,688.01 1,385,512.20 1+91.12-A 17,204,359.06 1,388,373.56 34+94.59 17,201,694.03 1,389,716.75 130+04.38 17,197,994.08 1,389,107.26 216+44.98 17,205,721.11 1,385,464.44 2+59.65-A 17,204,340.15 1,388,307.69 35+92.88 17,201,620.82 1,389,782.34 141+79.21 17,199,086.88 1,388,675.95 218+62.75 17,205,845.85 1,385,285.94 2+81.90-A 17,204,338.69 1,388,285.50 36+87.90 17,201,552.08 1,389,847.93 142+59.50 17,199,158.81 1,388,640.28 221+67.19 17,205,883.45 1,384,983.84 3+05.59-A 17,204,343.06 1,388,262.21 38+00.45 17,201,472.51 1,389,927.54 143+17.02 17,199,209.73 1,388,613.54 226+77.61 17,205,983.47 1,384,483.31 3+28.91-A 17,204,352.15 1,388,240.74 38+78.07 17,201,413.94 1,389,978.48 144+16.09 17,199,293.12 1,388,560.04 232+12.39 17,206,180.06 1,383,985.98 3+61.07-A 17,204,374.70 1,388,217.81 39+25.22 17,201,375.11 1,390,005.23 145+94.65 17,199,443.99 1,388,464.52 236+65.97 17,206,407.73 1,383,593.68 3+94.43-A 17,204,404.17 1,388,202.16 39+90.21 17,201,318.46 1,390,037.07 146+66.68 17,199,508.28 1,388,432.04 239+48.23 17,206,511.74 1,383,331.28 4+50.25-A 17,204,454.73 1,388,178.51 40+81.42 17,201,238.89 1,390,081.65 147+47.68 17,199,582.76 1,388,400.20 245+35.06 17,206,570.08 1,382,747.35 5+11.45-A 17,204,510.38 1,388,153.04 42+03.46 17,201,126.85 1,390,130.05 148+44.83 17,199,676.33 1,388,374.09 246+76.70 17,206,711.72 1,382,747.59 6+59.07-A 17,204,644.24 1,388,090.81 44+46.37 17,200,907.24 1,390,233.85 149+45.33 17,199,775.00 1,388,354.99 248+65.13 17,206,891.62 1,382,803.63 8+42.84-A 17,204,811.20 1,388,014.03 46+05.30 17,200,767.20 1,390,308.99 150+44.79 17,199,869.85 1,388,325.06 252+40.78 17,207,236.76 1,382,951.92 9+66.94-A 17,204,924.69 1,387,963.81 47+41.72 17,200,646.89 1,390,373.31 151+30.49 17,199,946.23 1,388,286.21 256+27.35 17,207,607.55 1,383,061.22 10+91.08-A 17,205,035.27 1,387,907.40 48+53.42 17,200,545.04 1,390,419.17 152+69.79 17,200,072.91 1,388,228.26 263+86.71 17,207,790.67 1,383,798.17 11+40.59-A 17,205,083.65 1,387,896.85 49+30.54 17,200,472.47 1,390,445.27 154+80.85 17,200,264.51 1,388,139.74 273+87.84 17,207,938.33 1,384,788.36 12+07.49-A 17,205,142.58 1,387,865.19 50+63.89 17,200,348.98 1,390,495.58 156+69.21 17,200,436.38 1,388,062.68 278+88.71 17,207,890.03 1,385,286.89 12+68.97-A 17,205,199.32 1,387,841.54 54+20.04 17,200,015.42 1,390,620.40 158+24.10 17,200,573.88 1,387,991.36 280+22.72 17,207,840.24 1,385,411.31 13+31.09-A 17,205,258.61 1,387,822.98 55+40.07 17,199,902.75 1,390,661.80 160+09.29 17,200,742.57 1,387,914.94 284+95.66 17,207,586.15 1,385,810.20 14+07.83-A 17,205,331.73 1,387,799.69 57+48.26 17,199,708.60 1,390,736.94 162+52.02 17,200,963.46 1,387,814.32 285+21.05 17,207,574.00 1,385,832.50 14+28.56-A 17,205,352.46 1,387,799.69 60+03.61 17,199,470.52 1,390,829.28 165+09.47 17,201,190.71 1,387,693.33 287+10.14 17,207,481.53 1,385,997.43 14+64.22-A 17,205,373.56 1,387,828.44 61+98.31 17,199,289.10 1,390,899.97 166+72.11 17,201,333.94 1,387,616.27 288+04.16 17,207,436.97 1,386,080.22 15+02.00-A 17,205,391.75 1,387,861.55 62+93.55 17,199,199.35 1,390,931.81 167+25.44 17,201,382.95 1,387,595.26 288+66.83 17,207,407.69 1,386,135.62 15+35.59-A 17,205,404.84 1,387,892.48 64+00.41 17,199,096.22 1,390,959.83 168+20.25 17,201,470.80 1,387,559.59 289+46.12 17,207,363.13 1,386,201.22 17+19.82-A 17,205,481.63 1,388,059.96 64+95.08 17,199,003.92 1,390,980.84 170+12.01 17,201,656.67 1,387,512.47 290+35.72 17,207,306.48 1,386,270.63 66+36.83 17,198,867.06 1,391,017.78 170+76.83 17,201,718.42 1,387,492.73 291+14.30 17,207,258.73 1,386,333.04 0+00.00-B 17,205,352.46 1,387,799.69 67+91.78 17,198,715.56 1,391,050.26 171+37.85 17,201,774.44 1,387,468.53 292+06.90 17,207,210.36 1,386,412.00 0+40.99-B 17,205,355.84 1,387,758.84 69+07.46 17,198,600.98 1,391,066.18 172+14.86 17,201,839.37 1,387,427.13 292+73.52 17,207,175.34 1,386,468.68 1+13.09-B 17,205,345.29 1,387,687.51 70+39.11 17,198,471.12 1,391,087.83 173+25.74 17,201,921.48 1,387,352.63 293+65.47 17,207,120.60 1,386,542.55 2+03.80-B 17,205,326.74 1,387,598.72 72+09.28 17,198,303.07 1,391,114.58 174+07.26 17,201,977.50 1,387,293.40 294+45.19 17,207,079.22 1,386,610.69 3+45.11-B 17,205,286.50 1,387,463.26 72+93.42 17,198,221.59 1,391,135.59 174+97.18 17,202,035.43 1,387,224.62 295+33.19 17,207,039.12 1,386,689.02 5+10.04-B 17,205,224.12 1,387,310.58 73+91.69 17,198,132.47 1,391,176.99 175+62.58 17,202,084.44 1,387,181.32 296+22.80 17,207,009.84 1,386,773.72 7+03.34-B 17,205,155.05 1,387,130.04 75+64.81 17,197,979.06 1,391,257.23 176+33.44 17,202,144.91 1,387,144.38 297+25.52 17,206,983.74 1,386,873.06 8+72.95-B 17,205,085.99 1,386,975.13 77+55.70 17,197,811.64 1,391,348.93 177+10.53 17,202,211.12 1,387,104.90 298+25.82 17,206,965.92 1,386,971.77 10+03.64-B 17,205,032.51 1,386,855.89 79+88.59 17,197,603.49 1,391,453.37 178+65.85 17,202,353.07 1,387,041.86 299+22.84 17,206,940.45 1,387,065.39
PLACEMENT AREA ALIGNMENT DATA
HORIZONTAL DATUM: TEXAS SOUTH ZONE, NAD83, U.S. SURVEY FEET
CORPUS CHRISTI SHIP CHANNEL - PLACEMENT AREA NO. 13
TRAINING DIKE LOOP
TRAINING DIKE
PA-13 PERIMETER DIKE PA-13 PERIMETER DIKE PA-13 PERIMETER DIKEPA-13 PERIMETER DIKE
SHEET #
of 59
DWG.
NO. TITLE
GENERAL
1 COVER SHEET
2 G-02 LOCATION PLAN AND LEGEND
▲3 G-03 INDEX OF DRAWINGS, GENERAL NOTES, CONTROL, AND ALIGNMENT TABLES
CIVIL-SITE
▲4 C-01 PLAN - PLACEMENT AREA NO. 13
▲5 C-02 CONSTRUCTION PLAN - PLACEMENT AREA NO. 13
▲6 C-03 TYPICAL SECTIONS
7 C-04 CROSS SECTIONS STA. 0+00 TO STA. 14+00
8 C-05 CROSS SECTIONS STA. 16+00 TO STA. 30+00
9 C-06 CROSS SECTIONS STA. 32+00 TO STA. 46+00
10 C-07 CROSS SECTIONS STA. 48+00 TO STA. 62+00
11 C-08 CROSS SECTIONS STA. 64+00 TO STA. 78+00
▲12 C-09 CROSS SECTIONS STA. 80+00 TO STA. 94+00
▲13 C-10 CROSS SECTIONS STA. 96+00 TO STA. 110+00
14 C-11 CROSS SECTIONS STA. 112+00 TO STA. 126+00
15 C-12 CROSS SECTIONS STA. 128+00 TO STA. 142+00
16 C-13 CROSS SECTIONS STA. 144+00 TO STA. 158+00
17 C-14 CROSS SECTIONS STA. 160+00 TO STA. 174+00
18 C-15 CROSS SECTIONS STA. 176+00 TO STA. 190+00
19 C-16 CROSS SECTIONS STA. 192+00 TO STA. 206+00
20 C-17 CROSS SECTIONS STA. 208+00 TO STA. 222+00
21 C-18 CROSS SECTIONS STA. 224+00 TO STA. 238+00
22 C-19 CROSS SECTIONS STA. 240+00 TO STA. 254+00
23 C-20 CROSS SECTIONS STA. 256+00 TO STA. 270+00
24 C-21 CROSS SECTIONS STA. 272+00 TO STA. 286+00
25 C-22 CROSS SECTIONS STA. 288+00 TO STA. 302+00
26 C-23 CROSS SECTIONS STA. 304+00 TO STA. 318+00
27 C-24 CROSS SECTIONS STA. 320+00 TO STA. 326+71.60
28 C-25 TRAINING DIKE LOOP CROSS SECTIONS STA. 0+50-A TO STA. 14+00-A
29 C-26 TRAINING DIKE LOOP CROSS SECTIONS STA. 16+00-A TO STA. 17+00-A
30 C-27 TRAINING DIKE CROSS SECTIONS STA. 0+50-B TO STA. 10+00-B
▲31 C-28 PLAN - PLACEMENT AREA NO. 13 EROSION PROTECTION REACH 1
▲32 C-29 CROSS SECTIONS STA. 100+00 TO STA. 107+00 EROSION PROTECTION REACH 1
▲33 C-30 CROSS SECTIONS STA. 108+00 TO STA. 109+00 EROSION PROTECTION REACH 1
34 C-31 PLAN - PLACEMENT AREA NO. 13 EROSION PROTECTION REACH 2
35 C-32 CROSS SECTIONS STA. 239+00 TO STA. 246+00 EROSION PROTECTION REACH 2
36 C-33 CROSS SECTIONS STA. 247+00 TO STA. 248+00 EROSION PROTECTION REACH 2
37 C-34 STORM WATER POLLUTION PREVENTION PLAN DETAILS
38 C-35 POLLUTION PREVENTION DETAILS
GEOTECHNICAL
39 F-01 SAMPLING LOCATION PLAN - PLACEMENT AREA NO. 13
40 F-02 CONE PENETRATION TEST LOGS
41 F-03 CONE PENETRATION TEST LOGS
42 F-04 CONE PENETRATION TEST LOGS
43 F-05 CONE PENETRATION TEST LOGS
44 F-06 CONE PENETRATION TEST LOGS
45 F-07 CONE PENETRATION TEST LOGS
46 F-08 CONE PENETRATION TEST LOGS
47 F-09 CONE PENETRATION TEST LOGS
48 F-10 CONE PENETRATION TEST LOGS
49 F-11 CONE PENETRATION TEST LOGS
50 F-12 CONE PENETRATION TEST LOGS
51 F-13 CONE PENETRATION TEST LOGS
52 F-14 CONE PENETRATION TEST LOGS
53 F-15 CONE PENETRATION TEST LOGS
54 F-16 CONE PENETRATION TEST LOGS
STRUCTURAL
55 S-01 NEW DROP-OUTLET STRUCTURE PROFILE AND TYPICAL DETAILS
56 S-02 NEW DROP-OUTLET STRUCTURE PLAN AND ELEVATION VIEW
57 S-03 NEW DROP-OUTLET STRUCTURE PIPE OUTLET EROSION PREVENTION STEEL
MEMBER DETAILS AND NOTES
58 S-04 NEW DROP-OUTLET STRUCTURE WALKWAY PLAN AND CONNECTION DETAILS
59 S-05 NEW DROP-OUTLET STRUCTURE GRATING PLAN AND MISCELLANEOUS DETAILS
▲ ← AMENDED DRAWINGS
59 59 -- Total Number of Drawings
INDEX OF DRAWINGS
| AMEND-0002_W9126G-17-B-000B |
| STANDARD FORM SF30 |
| SF30 PAGE 2 |
| SPECS |
| 00 11 00.00 45 - BID SCHEDULE |
| DRAWINGS |
| DRAWINGS NO. G-03, C-01, C-02, C-03, C-10 |
File details come from the government source that posted it. Updated .