Solicitation for Prefabricated Reinforced Concrete Flush Restroom Reynolds Creek Waco Lake Texas
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A1.2_Drawings-Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9126G-16-T-0150 22-Aug-2016
b. TELEPHONE NUMBER
817 886-1080
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 15 Sep 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JASON S RINEHART
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, RM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
(817) 886-6403FAX:
TEL: (817) 886-1077 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
500 Employees
NAICS:
327390
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF55
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9126G-16-T-0150
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Funded Amt:
Reynold's Creek Pre-Fab Restroom
The contractor shall provide all labor, materials, supplies and equipment to furnish one (1) pre-fabricated concrete restroom as outlined in the attached Scope of Work.
The Government anticipates award of one (1) purchase order from this solicitation.
Incomplete proposals shall be considered nonresponsive and may not be evaluated.
Point of Contact: Scott Rinehart (817) 886-1080 Email: jason.s.rinehart@usace.army.mil
Email proposal to: CIV-OPS.Proposals@usace.army.mil CC:
jason.s.rinehart@usace.army.mil
Only a warranted Contracting Officer, either a Procuring Contracting Officer (PCO) or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
NAICS CD: 327390
, FSC CD: 5410
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
PROPOSAL DUE DATE/LOCAL TIME: see block 8, SF 1449 Central Standard Time (CST) POINT OF CONTACT: Scott Rinehart Phone: (817) 886-1080 Email POC: jason.s.rinehart@usace.army.mil
Quotes shall be accepted via EMAIL ONLY, no fax, mail, express mail, or hand carry, NO EXCEPTIONS.
EMAIL your proposal to: CIV‐OPS.Proposals@usace.army.mil cc: jason.s.rinehart@usace.army.mil. Subject line of email must include solicitation number.
For additional help contact your local Procurement Technical Assistance Centers (PTAC).
Centers were created by Congress to assist businesses seeking to compete on federal contracts.
Services are generally free; however, a small fee may be charged for certain services. Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.
SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: www.sam.gov.
DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business. DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).
The website to obtain your DUNS number: http://fedgov.dnb.com/webform for technical difficulties, contact govt@dnb.com
ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA)
allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Manager (SAM): www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM. Contractors MUST be certified in the NAICS Code and Size Standard applicable with this solicitation.
ATTENTION TO OFFEROR(s)/CONTRACTOR(s): On July 14, 2014, Small Business Administration (SBA) increased the monetary-based industry size standards to account for inflation. You must update your Representations (Reps) and Certifications (Certs) for the impacted North American Industry Classification System (NAICS) codes identified with an exclamation point "!" next to the "Small Business" value in the System for Award Management (SAM). Please log into SAM, review, and resubmit your registration to apply the new size standard.
WAGE RATES: The Davis Bacon Act applies (see attached wage rates). Note: Does not apply to Contractors registered in System for Award Management (SAM) as Sole Proprietorships.
Below is a checklist to assist you to ensure all the proper documents are returned for consideration on this solicitation. Only those items checked below as “required” must be returned
Required Contractor Item
Complete page 1 of Solicitation (SF 1449-Sign and date in block 30).
Complete Bid Schedule(s) Solicitation Contract Task Order 1
Offerors shall complete ORCA profile online in SAMS:
Clause 52.212-3, paragraph (b) of solicitation AND submit complete ORCA profile.
Offerors shall submit an active SAM registration (Attach first page).
The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of CCR/FedReg, ORCA and EPLS. Website: www.sam.gov
Add NAICS Code 327390 to your Representations and Certification in SAMS.
Provide two (2) Past Performance Questionnaires (PPQ) completed by employer/s or references who can vouch for your work capability, and have them send the PPQ’s to CIV-OPS.Proposals@usace.army.mil and the CT Specialist. Please ensure that references submit the form to the specified email addresses and make sure they reference the solicitation number in the email subject line. PPQ forms must be submitted by proposal due date to be considered for evaluation.
Scan all documents into a single.pdf file. (For Help contact your local Library, copy centers or PTACs-http://www.aptac-us.org/new/
EMAIL your proposal to: CIV‐OPS.Proposals@usace.army.mil cc:jason.s.rinehart@usace.army.mil. Subject line of email: Include the solicitation number and your company name
PPQ
NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm name: CAGE Code:
Address: DUNS Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy) Explain Differences:
Original Contract Price (Award Amount):
Final contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
AFTER COMPLETION, PLEASE EMAIL TO: CIV‐OPS.Proposals@usace.army.mil Ensure the former employer references the solicitation number in the email subject line.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
The contractor’s proposed actions appear only marginally effective or were not fully implemented.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive or negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?
E VG S M U N
b) Ability to hire, apply, and retain qualified workforce to this effort
E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines
E VG S M U N
g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agree price(s)?
E VG S M U N
b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.
Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
YES NO
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
YES NO
f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.
YES NO
6. SAFETY/SECURITY
a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
YES NO
d) In Summary, provide an overall rating for the work performed by this contractor.
AFTER COMPLETION, PLEASE EMAIL TO: CIV‐OPS.Proposals@usace.army.mil Please provide responses to the questions above (if applicable) and/or additional remarks.
Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):
BID SCHEDULE
OD-R Recreational Work Waco Lake
BID SCHEDULE
Unit price shall include all associated costs for each item.
Reference Summary of Work and attachments
Item Description Quantity Unit Price Amount
0001 Install one Prefabricated 1 Job each $_________ Concrete Restroom at Reynolds Creek Park
Total $___________________
SCOPE OF WORK
Scope of Work Reynold’s Creek Restroom
1.0 INTRODUCTION
The United States Army Corps of Engineers (USACE) – Ft. Worth District, Waco Lake provides recreation facilities for public use in camp grounds and day use parks.
2.0 PROJECT PURPOSE AND NEED
The purpose of this contract is to provide new prefabricated reinforced concrete flush restroom at Reynolds Creek Park at Waco Lake, Waco, TX.
3.0 PROJECT DURATION:
The project is to be completed no later than 28 January 2017. The Contractor shall be given a notice, from the KO/ACO, to start site preparation work after the completion of award documents The Contractor will be allowed to start the fabrication of the restroom buildings directly after award, which is anticipated to be authorized by 30 September 2016.
4.0 GENERAL:
The Contractor shall provide one new prefabricated, 100% reinforced concrete, flush restroom as described below.
The unit shall be installed at Reynolds Creek Park equestrian area, Waco Lake, Waco Texas.
This is a turnkey project. Restroom shall be operable on the day the government takes possession of this facility.
This is also to include all permitting and associated fees necessary to be fully operational.
The contractor will conduct a Pre-Fabrication meeting with the assigned Contracting Officer Representative (COR).
Upon receipt of the award, the contractor shall coordinate with the COR identified below within two days to arrange a site/coordination meeting within one week after award. At this meeting, the contractor and the government will review the specifications, and discuss any other details required to begin fabrication. At this meeting the contractor will conduct an in depth survey of the site locating all utilities that will impact this contract. The Contractor should take away from this visit, mark-ups of the site layout and floor plan(s) provided under this Contract. A complete review/discussion of the specifications will be conducted and, the contractor will also set a time to finalize the color and finish selections.
The Contractor shall coordinate closely with the project team during each phase of the project to ensure that the project is meeting the intent of the below requirements.
POC’s for project coordination will be established at this meeting.
The proposed price shall include all costs for the work items described herein and shall fully document all assumptions made for accomplishment of all tasks.
5.0 STRUCTURE SCOPE OF WORK:
5.1: Prefabricated Restrooms: Structure shall be manufactured of 100% reinforced concrete;
minimum wall thickness of 4”, minimum roof thickness 4.5”, minimum floor thickness 5”. The restroom shall be approximately 11’ x 25’ in size and shall have two multi-user restroom shower rooms. Minimum requirements for each room:
a) One ADA toilet, wall hung with concealed flush valve, siphon jet action, push button, water saver type. Seat shall be heavy duty solid plastic with open front.
b) ADA grab bars shall be stainless steel, 18 gauge or better.
c) One Three roll toilet paper dispenser, lockable.
d) Wall One ADA Lavatory; wall hung, with back splash guard, front overflow opening, brass drain pipe and trap, ADA trap cover, self-closing push button water valve.
e) One ADA shower stall; stainless steel recessed shower panel with 2.5 gpm flow rate, pressure balancing valve, recessed soap dish, high low diverter valve and integral stainless steel shower heads.
Heavy duty shower bench, satin finish stainless steel.
f) Stainless steel mirror.
g) Lighting for damp locations.
h) Lockable door with deadbolt locking mechanism.
i) One GFI outlet.
j) Wall vent
k) ADA Exhaust fan. sign at each entrance
l) Spray foam insulation and drop down ceiling.
m) Non-slip floor surface in shower area.
n) Ventilation system
5.2: Exterior Wall Textures/Colors: wall texture shall be barnwood, oatmeal in color. Roof texture shall be cedar shake, java brown in color.
5.3: Pipe chase shall contain one 200 amp breaker panel, one 80 gallon quick recovery water heater, one hose bib, lighting and main water cut-off valve.
5.4: Building shall be equal to or better than a precast Ranier Shower Room, by CXT.
5.5: Concrete Work: Contractor shall install concrete pads at each end of the building, approximately 64 SF each. Pads shall be placed in front of and adjacent to the restroom entrance doors and shall be 6 inches thick with footings.
6.0 SITE SCOPE OF WORK:
6.1: Before work is started, the Contractor shall arrange with the Contracting Officer's Representative a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches.
6.3: Excavation/Backfill:
a) The contractor shall comply with all applicable sections of the U.S. Army Corps of Engineers (USCAE) Safety and Health Requirements Manual, EM 385-1.
b) The contractor shall excavate the area and prepare the site for installation of the building. Preparation shall include prepping the subgrade, adding 12" of flex base material compacted with an additional 6" of crusher fines or course sand, placed according to manufacturer’s drawings.
c) Contractor shall install rough-in for sewer, electrical and water in accordance with pre-fabricated concrete restroom manufacturers plans and drawings.
d) Contractor shall run plumbing and underground electrical to new building, approximately 50 LF, to maintain a working restroom.
e) Gravity flow sewer line shall stubbed out 10' from the rear of the building and capped off.
f) Building shall be installed in accordance with the manufactures specifications and by experienced, qualified personnel.
g) Place top soil as needed and finish grade area to allow for drainage and ease of mowing.
7.0 GOVERNMENT FURNISHED EQUIPMENT: None
8.0 OPTIONS: None
9.0 SPECIFICATIONS:
9.1: The Contractor is to follow all applicable local, state and federal regulations.
9.2: All plans and specifications will be stamped by a professional engineer from the State of Texas.
9.3: The Contractor is required to provide a restroom that will meet all State and building codes and sustain local wind and seismic loads.
9.4: All exterior conduits and/or plumbing are to be sealed to withstand the high temperatures and harsh environment.
9.5: All wiring/plumbing will be per code.
9.6: All security requirements shall meet USACE standards and IA guidelines.
10.0 GOVERNMENT SUPPLIED DOCUMENTS
Conceptual Floor Plan/Concrete Pad (Atch 1)
Site Location (Atch 2)
11.0 SPECIAL CONSIDERATIONS:
Neither the contractor nor their representative shall release or publish any sketch, photograph, report, or other material of any nature derived or prepared under this contract without specific written permission of the USACE Project Manager (PM) except as is specifically provided for in this Scope of Work.
12.0 Point of Contact for this contract:
USACE Contracting Officer Representative (COR) and Invoice POC Heath McLane Fort Worth District, Corps of Engineers ATTN: CESWF-OD- WA (Heath McLane) 3801 Zoo Park Rd.
Waco, Texas 76708 254-756-5359 E-mail: Heath.R.McLane@usace.army.mil
USACE Contracting Officer Carl Oelschig Fort Worth District, Corps of Engineers ATTN: CECT-SWF (Carl Oelschig) 819 Taylor Street Fort Worth, Texas 76102-0300 817/886-1060 E-mail: Carl.S.Oelschig@usace.army.mil
USACE Contract Specialist Scott Rinehart Fort Worth District, Corps of Engineers ATTN: CECT-SWF (Jason Rinehart) 819 Taylor Street Fort Worth, Texas 76102-0300
(817) 886-1061
E-mail: Jason.S.Rinehart@usace.army.mil
USACE Project Manager James Harvey Fort Worth District, Corps of Engineers ATTN: CESWF-OD-R/J. Harvey 2330 W. Highway 6 Waco, Texas 76712
(254) 399-9068 E-mail: James.F.Harvey@usace.army.mil
INSURANCE REQUIREMENT
Prior to commencement of work, the Contractor shall furnish an original copy of their Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN: CECT- SWF, P.O. Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office. The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:
Submit a copy of Insurance Certificate directly to:
1) U.S. Army Corps of Engineers, Waco Project office, 3801 Zoo Park Rd. Waco, TX 76708-
2) Email to: jason.s.rinehart@usace.army.mil Phone: 817-886-1080
(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.
(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $500,000 per accident for bodily injury and $20,000 per accident for property damage.
(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000.00, or in compliance with applicable State statutes.
(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.
NOTE:
(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.
WD TX310
General Decision Number: TX160310 06/17/2016 TX310
Superseded General Decision Number: TX20150310
State: Texas
Construction Type: Building
County: McLennan County in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least
$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/08/2016
1 06/17/2016
BOIL0074-003 01/01/2014
Rates Fringes
BOILERMAKER......................$ 23.14 21.55
ELEC0072-002 06/01/2015
ELECTRICIAN......................$ 24.90 4%+6.85
ENGI0178-005 06/01/2014
POWER EQUIPMENT OPERATOR
(1) Tower Crane.............$ 29.00 10.60
(2) Cranes with Pile
Driving or Caisson
Attachment and Hydraulic
Crane 60 tons and above.....$ 28.75 10.60
(3) Hydraulic cranes 59
Tons and under..............$ 27.50 10.60
IRON0084-011 06/01/2015
IRONWORKER, ORNAMENTAL...........$ 23.02 6.35
* PLUM0286-011 05/30/2016
PIPEFITTER (Excludes HVAC
Pipe Installation)...............$ 28.03 12.43
* PLUM0529-004 04/01/2016
PLUMBER (Including HVAC Pipe
Installation)....................$ 25.49 9.21
SUTX2014-036 07/21/2014
BRICKLAYER.......................$ 18.00 0.00
CARPENTER, Excludes Drywall
Hanging, and Metal Stud
Installation.....................$ 14.76 0.00
CEMENT MASON/CONCRETE FINISHER...$ 13.13 0.00
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 14.27 0.00
GLAZIER..........................$ 20.00 0.00
HVAC MECHANIC (Installation of HVAC Unit Only)...............$ 15.00 1.56
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical
System Insulation)...............$ 19.77 7.13
IRONWORKER, REINFORCING..........$ 13.35 0.00
IRONWORKER, STRUCTURAL...........$ 20.50 5.15
LABORER: Common or General......$ 11.10 0.00
LABORER: Mason Tender - Brick...$ 8.00 0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 9.93 0.00
LABORER: Pipelayer..............$ 12.49 2.13
LABORER: Roof Tearoff...........$ 11.28 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 13.59 1.60
OPERATOR: Bobcat/Skid
Steer/Skid Loader................$ 13.93 0.00
OPERATOR: Bulldozer.............$ 18.29 1.31
OPERATOR: Drill.................$ 16.22 0.34
OPERATOR: Forklift..............$ 15.00 0.00
OPERATOR: Grader/Blade..........$ 14.34 1.68
OPERATOR: Loader................$ 14.01 0.44
OPERATOR: Mechanic..............$ 17.52 3.33
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.03 0.00
OPERATOR: Roller................$ 13.11 0.00
PAINTER (Brush, Roller, and
Spray)...........................$ 13.00 0.00
ROOFER...........................$ 13.75 0.00
SHEET METAL WORKER (HVAC Duct
Installation Only)...............$ 19.00 5.73
SHEET METAL WORKER, Excludes
HVAC Duct Installation...........$ 14.62 0.00
TILE FINISHER....................$ 11.22 0.00
TILE SETTER......................$ 14.74 0.00
TRUCK DRIVER: Dump Truck........$ 12.24 1.62
TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57
TRUCK DRIVER: Semi-Trailer
Truck............................$ 12.50 0.00
TRUCK DRIVER: Water Truck.......$ 12.00 4.11
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management JUL 2013 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2015
52.204-13 System for Award Management Maintenance JUL 2013 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications
JAN 2015
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-17 Delivery of Excess Quantities SEP 1989 52.212-1 Instructions to Offerors--Commercial Items OCT 2015 52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies FEB 2016 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity APR 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-50 Combating Trafficking in Persons MAR 2015 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.223-19 Compliance with Environmental Management Systems MAY 2011 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-18 Place of Manufacture MAR 2015 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.242-15 Stop-Work Order AUG 1989 52.246-1 Contractor Inspection Requirements APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.203-7005 Representation Relating to Compensation of Former DoD Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7006 Billing Instructions OCT 2005 252.204-7011 Alternative Line Item Structure SEP 2011 252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
MAY 2016
252.225-7001 Buy American And Balance Of Payments Program-- Basic (Nov 2014)
NOV 2014
252.225-7002 Qualifying Country Sources As Subcontractors DEC 2012 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.207-4 ECONOMIC PURCHASE QUANTITY--SUPPLIES (AUG 1987)
(a) Offerors are invited to state an opinion on whether the quantity(ies) of supplies on which bids, proposals or quotes are requested in this solicitation is (are) economically advantageous to the Government.
Each offeror who believes that acquisitions in different quantities would be more advantageous is invited to recommend an economic purchase quantity. If different quantities are recommended, a total and a unit price must be quoted for applicable items. An economic purchase quantity is that quantity at which a significant price break occurs. If there are significant price breaks at different quantity points, this information is desired as well.
OFFEROR RECOMMENDATIONS
PRICE
ITEM QUANTITY QUOTATION TOTAL
(c) The information requested in this provision is being solicited to avoid acquisitions in disadvantageous quantities and to assist the Government in developing a data base for future acquisitions of these items. However, the Government reserves the right to amend or cancel the solicitation and resolicit with respect to any individual item in the event quotations received and the Government's requirements indicate that different quantities should be acquired.
(End of provision)
52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS--
REPRESENTATION (NOV 2015)
(a) Definitions. Inverted domestic corporation and subsidiary have the meaning given in the clause of this contract entitled Prohibition on Contracting with Inverted Domestic Corporations (52.209-10).
(b) Government agencies are not permitted to use appropriated (or otherwise made available) funds for contracts with either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation, unless the exception at 9.108-2(b) applies or the requirement is waived in accordance with the procedures at 9.108-4.
(c) Representation. The Offeror represents that--
(1) It [ ___ ] is, [ ___ ] is not an inverted domestic corporation; and
(2) It [ ___ ] is, [ ___ ] is not a subsidiary of an inverted domestic corporation.
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)
(a) Definition. Commercially available off-the-shelf (COTS) item, as used in this clause--
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition in FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
(b) The Government suspends or debars Contractors to protect the Government's interests. Other than a subcontract for a commercially available off-the-shelf item, the Contractor shall not enter into any subcontract, in excess of $35,000 with a Contractor that is debarred, suspended, or proposed for debarment by any executive agency unless there is a compelling reason to do so.
(c) The Contractor shall require each proposed subcontractor whose subcontract will exceed $35,000, other than a subcontractor providing a commercially available off-the-shelf item, to disclose to the Contractor, in writing, whether as of the time of award of the subcontract, the subcontractor, or its principals, is or is not debarred, suspended, or proposed for debarment by the Federal Government.
(d) A corporate officer or a designee of the Contractor shall notify the Contracting Officer, in writing, before entering into a subcontract with a party (other than a subcontractor providing a commercially available off-the-shelf item) that is debarred, suspended, or proposed for debarment (see FAR 9.404 for information on the System for Award Management (SAM) Exclusions). The notice must include the following:
(1) The name of the subcontractor.
(2) The Contractor's knowledge of the reasons for the subcontractor being listed with an exclusion in SAM.
(3) The compelling reason(s) for doing business with the subcontractor notwithstanding its being listed with an exclusion in SAM.
(4) The systems and procedures the Contractor has established to ensure that it is fully protecting the Government's interests when dealing with such subcontractor in view of the specific basis for the party's debarment, suspension, or proposed debarment.
(e) Subcontracts. Unless this is a contract for the acquisition of commercial items, the Contractor shall include the requirements of this clause, including this paragraph (e) (appropriately modified for the identification of the parties), in each subcontract that--
(1) Exceeds $35,000 in value; and
(2) Is not a subcontract for commercially available off-the-shelf items.
(End of clause)
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A
FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that--
(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and
(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Factor 1: Price Price is more important than past performance. The Government will award a contract resulting from this solicitation to the lowest priced proposal for the Bid Schedule that is fair and reasonable to the Government within the competitive range. Prices will be evaluated for fairness and reasonableness through a price analysis that compares the offered prices against each other and against an independent government estimate. Award may not be made to an Offeror’s proposal for janitorial services that is found to be unbalanced and/or unreasonably low or high.
Factor 2: Past performance Past Performance Questionnaire forms provided in the solicitation shall be completed and submitted as specified in the Instructions to Offerors. They will be evaluated to assess the degree of confidence the Government has in an Offeror's ability to supply products and services that meet users' needs based on a demonstrated record of performance of work similar to the work described in this solicitation. Past performance is less important than price.
For an offer to be eligible for award, it must have either a satisfactory or neutral past performance.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (JUL 2016)
ALTERNATE I (OCT 2014)
The offeror shall complete only paragraphs (b) of this provision if the Offeror has completed the annual representations and certification…