B3_Solicitation_W9126G-16-T-0116.pdf
PDF 430 KB Posted
- Solicitation number
- W9126G-16-T-0116
About this file
Solicitation - Flood Debris Collection Services at Whitney Lake Texas
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9126G-16-T-0116 01-Jul-2016
b. TELEPHONE NUMBER
817-886-1061
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 01 Aug 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KEVIN S ANDERSON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
817-886-6403FAX:
TEL: 817-886-1043 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$38.5 Million
NAICS:
562119
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF80
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 2,900 Cubic
Yard
Funded Amt:
Flood Debris Collection
The contractor shall provide Flood Debris Clean-up services at Whitney Lake, Texas in accordance with the attached Performance Work Statement.
Period of Performance: 30 calendar days after contract award
All invoices shall be mailed to: Whitney/Aquilla Lake office, 285 CR3602, Clifton, TX 76634-3332
NAICS CD: 562119
, FSC CD: S205
CONTRACTING OFFICER STATEMENT
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
INSTRUCTIONS TO OFFERORS
QUOTER DUE DATE/LOCAL TIME: see block 8, SF 1449 Central Time POINT OF CONTACT: Kevin Anderson, Contract Specialist Phone: 817-886-1061 EMAIL your proposal to: CIV‐OPS.Proposals@usace.army.mil
Copy Furnish: kevin.s.anderson2@usace.army.mil
Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hand carry, “NO EXCEPTIONS.” Subject line of email must include the solicitation number.
For additional help contact your local Procurement Technical Assistance Centers (PTAC). Centers were created by Congress to assist businesses seeking to compete on federal contracts. Services are generally free;
however, a small fee may be charged for certain services. Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.
SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is:
www.sam.gov.
DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business.
DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below). The website to obtain your DUNS number: http://fedgov.dnb.com/webform for technical difficulties, contact govt@dnb.com
ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA)
allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Manager (SAM): www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM. Contractors MUST be certified in the NAICS Code and Size Standard applicable with this solicitation.
ATTENTION TO OFFEROR(s)/CONTRACTOR(s): On July 14, 2014, Small Business Administration (SBA) increased the monetary-based industry size standards to account for inflation. You must update your Representations (Reps) and Certifications (Certs) for the impacted North American Industry Classification System (NAICS) codes identified with an exclamation point "!" next to the "Small Business" value in the System for Award Management (SAM). Please log into SAM, review, and resubmit your registration to apply the new size standard.
WAGE RATES: The Service Contract Act applies (see attached wage rates in Section J). Note: Does not apply to Contractors registered in System for Award Management (SAM) as Sole Proprietorships.
Below is a checklist to assist you to ensure all the proper documents are returned for consideration on this solicitation. Only those items checked below as “required” must be returned.
Required Contractor Item
Complete page 1 of Solicitation (SF 1449-Sign and date in block 30).
Complete Bid Schedule
Complete Contractor Information Sheet below: Include your SSN or firm’s Tax ID Number (TIN) and active email address.
You will be notified of your selection by this method!!!
Offerors shall complete electronically ORCA profile on line in SAMS:
Clause 52.212-3 (Section K- Representation, Certifications and Other Statements of Offerors), paragraph (b) of solicitation AND submit complete ORCA profile.
Offerors shall submit an active SAM registration (Attach first page).
The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of CCR/FedReg, ORCA and EPLS.
Website: www.sam.gov
Add NAICS Code 562119 to your Representations and Certification in SAMS.
Provide two (2) Past Performance Questionnaires (PPQ) completed by employer/s or references who can vouch for your work capability, and have them send the PPQ’s to CIV-OPS.Proposals@usace.army.mil and the CT Specialist. Please ensure that references submit the form to the specified email addresses and make sure they reference the solicitation number in the email subject line. PPQ forms must be submitted by proposal due date to be considered for evaluation.
Scan all documents into a single.pdf file. (For Help contact your local Library, copy centers or PTACs-http://www.aptac-us.org/new/
EMAIL your proposal to: CIV-OPS.Proposals@usace.army.mil, Subject line of email must include the solicitation number and your company name
A formal site visit shall be performed in order to clarify expectations and answer any questions concerning the requirements of the specified work. A formal site visit will be conducted on 15 July 2016 at 10:00am at the Whitney Lake Office (285 CR3602, Clifton, TX 76634). The Government contact for this action is Mr. Dwight Black (254-622-7380).
**Insurance Requirements: Please see FAR Clause 52.228-5 and INSURANCE REQUIREMENT Section for specific insurance requirements
**Please see FAR Clause 52.212-2 for proposal evaluation criteria
** Please submit all solicitation inquiries through ProjNet, instructions can be found below
CONTRACTOR INFORMATION SHEET
IN THE EVENT OF AWARD, ISSUE CONTRACT
TO:
NAME
(Last, First Middle)
ADDRESS
(Number & Street) (City, State and Zip)
HOME PHONE NUMBER MOBILE
(Area code and number) (Area code and number)
EMAIL ADDRESS
DUNS NUMBER CAGE CODE NUMBER
SSN/TIN NUMBER
SUBMISSION OF OFFEROR'S QUESTIONS AND COMMENTS THROUGH PROJNET
Questions and/or comments relative to this solicitation must be submitted via:
Bidder Inquiry in ProjNet at http://www.projnet.org/projnet
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
From this page you may view all bidder inquiries or add inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W9126G-16-T-0116 The Bidder Inquiry Key is: DAFA3D-H88ZDK
The Bidder Inquiry System will be unavailable for new inquires 7 calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals
Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
PAST PERF. QUESTIONNAIRE
NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm name: CAGE Code:
Address: DUNS Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract CompletionDate(mm/dd/yy):
Actual Completion Date (mm/dd/yy) Explain Differences:
Original Contract Price (Award Amount):
Final contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil and kevin.s.anderson2@usace.army.mil. Ensure the former employer references the solicitation number in the email subject line.
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
The contractor’s proposed actions appear
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
only marginally effective or were not fully implemented.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive or negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E
VG
S
M
U
N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?
E VG S M U N
b) Ability to hire, apply, and retain qualified workforce to this effort
E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines
E VG S M U N
g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agree price(s)? E VG S M U N
b) Contractor Proposed innovative alternative
W9126G-16-T-0116 methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.
Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
YES NO
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
YES
NO
f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.
YES NO
6. SAFETY/SECURITY
a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
U N
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
YES NO
d) In Summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
AFTER COMPLETION, PLEASE EMAIL TO: CIV‐OPS.Proposals@usace.army.mil
Please provide responses to the questions above (if applicable) and/or additional remarks.
Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):
BID SCHEDULE
Recreational Park Flood Debris Collection Service
FORT WORTH DISTRICT, TEXAS
BID SCHEDULE
Furnish all labor, equipment and materials to provide debris clean up services at locations in the vicinity of the Fort Worth District area lakes in accordance with the Performance Work Statement and Performance Requirements Standards, itemized at each location, lump sum rate.
Whitney Lake Period of Performance: 30 Days after Contract award
CLIN Description Qty. U/M Unit Price
Price
0001 Flood Debris Collection 2900 CY
TOTAL
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
FLOOD DEBRIS COLLECTION
WHITNEY LAKE RECREATIONAL PARKS
FORT WORTH DISTRICT, TEXAS
1. GENERAL: This is a non-personal services contract to provide all management, tools, equipment, materials, and labor necessary to perform flood debris collection at Whitney Lake recreational parks located within the Three Rivers Region, Texas. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform debris collection at recreational parks as defined in this Performance Work Statement except for those items specified as Government furnished property and services. The Contractor shall be required to perform to the standards in this contract.
1.2 Scope: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform debris collection at Whitney Lake, Texas. Services include collection of debris (driftwood/woody vegetation) into designated/measurable piles. The Contractor shall accomplish all operations safely, in accordance with EM 385-1-1.
1.3 Period of Performance: 30 calendar days from contract award.
1.4 General Information
1.4.1 Award of Other Contracts: The services provided under this contract shall be independent of all services provided under other contracts, at this work site or any other work site, at which the Contractor may receive awards. The Contractor shall be responsible for meeting any and all deadlines for services specified under this contract.
1.4.2 Cooperation with Other Contractors: The Government may undertake or award other contracts for additional work not related to the contract, Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit, direct, lead or permit any acts that will interfere with the performance of work by another Contractor, or Government employees.
1.4.3 Performance Contract: Services to be performed will be specified herein on an as-ordered basis.
1.4.3.1 Unit of Measure (UM): For the purpose of this contract, collection of debris in designated areas shall be bid by the cubic yard.
1.4.3.2 Preferred Sequence: The Contractor will be furnished a preferred sequence of areas for debris collection at the time of award. All debris collection required in recreational parks shall be completed and inspected by the (COR).
1.4.4 Time Limitations: The Contractor shall be allowed thirty calander days from the date of the award of contract, excluding rain days. Work shall not be accomplished on Saturdays, Sundays or Federal Holidays unless requested in writing and approved by the COR. Federal Holidays are listed in Section 1.4.13 of this PWS. Work shall commence on the start date specified and completed by close of business on date specified by the contract. The Contractor shall promptly submit in writing a proposed revised schedule to the COR if the Contractor cannot comply with specified start date. Delay of the start date shall not release the Contractor from his obligation to complete all work by the date specified in the contract. The Contractor shall be required to re-accomplish work until it is performed as stated in this PWS, failure to do so may result in payment deduction.
1.4.5 Rain Days: Rain days are delays in service requiring an extension to the completion date, due to inclement weather or conditions beyond the Contractor’s control. They may only be allowed with concurrence and approval of the KO. The Contractor is responsible to notify the COR on days when weather or poor ground working conditions prohibit performance of services. The Contractor shall ascertain if the work day is considered a “rain” day by KO. In no instance may the Contractor operate equipment during conditions that will result in excessive damage to turf or ground surfaces on Government property, without approval of the COR. Any damages caused by Contractor operations shall be reconciled in accordance with Technical Exhibit 3, Appendix A, “Damage Reconciliation”.
1.4.7 Payment: Payment for completed and accepted work will be made upon completion of the contract and receipt of an accurate invoice submitted by the Contractor. Invoice shall align with the signed volume worksheets (See QASP Attachment #3), which were agreed upon by Government and Contractor.
1.4.8 Post Award Orientation: The Contractor agrees to attend any post award orientation convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5; “This orientation aids the Government and Contractor personnel to (1) achieve a clear and mutual understanding of all contract requirements, and (2) identify and resolve any potential problems.
However, it’s not a substitute for the Contractor’s fully understanding the work requirements at the time offers are submitted, nor is it to be used to alter the final agreement arrived at in any negotiations leading to contract award. These meetings shall be at no additional cost to the Government”.
1.4.9 Performance Evaluation Progress Meetings: The Contractor, Contractor’s superintendent, and Quality Control Inspector(s) shall meet with the COR as required to discuss performance or any issues of concern.
During these meetings the COR will apprise the Contractor of the Government’s evaluation results of the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. However, a meeting shall not be held later than two working days after a Contract Deficiency Report (CDR) is issued. A mutual effort will be made to resolve any and all problems identified by the team. Written minutes of these meetings shall be prepared and signed by the COR, Contractor and their respective employees. These meetings shall be at no additional cost to the Government”.
1.4.10 Performance of Work Outside of Scope of this Contract: If the Contractor performs work above and beyond the scope of the contract the Government shall not be liable for additional cost. Only the Contracting Officer is authorized to authorize and make legal modifications to any signed contract, including any changes to work scope or negotiated price changes.
1.4.11 Quality Control: The Contractor shall develop and maintain an effective means of Quality Control to ensure services are performed in accordance with this PWS and all work complies with the requirements of the contract.
1.4.12 Quality Assurance: The Government shall evaluate the Contractor’s quality control program under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.4.13 Government Holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.4.14 Hours of Operation: The Lake Office’s normal office hours are 08:00am to 4:30 pm but, may vary slightly. The Contractor work hours shall be 8:00 am to 4:30 pm. The Lake Office shall be closed on Federal holidays. The Contractor shall be required to follow the defined sequence provided and approved by the COR.
1.4.15 Place of Performance: The work to be performed under this contract will be performed at Whitney Lake, located in central Texas, Three Rivers Region, Fort Worth District, Texas.
1.4.16 Type of Contract: The Government will award a Firm Fixed Price contract.
1.4.17 Safety: The Contractor shall develop and execute an effective safety program to ensure all required services are performed safely. The Contractor shall develop and implement procedures to identify, minimize and prevent safety risks in the form of a Safety Plan. The Contractor’s Safety Plan is the means by which he assures safety of personnel in the work place. The Safety Plan is to be available upon request by the COR for review and approval, as needed. The Contractor shall adhere to all applicable safety rules in accordance with the OSHA and all pertinent provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, 30 November 2014 or most current version. OSHA standards are subject to change and such changes may affect the Contractor in their performance during the contract period and shall be at no additional cost to the Government.
1.4.18 Special Qualifications: The Contractor shall, without additional expense to the Government, be responsible for obtaining any and all necessary licenses, permits, and letters of certification. All current federal, state and county rules and regulations shall be met and maintained throughout the performance of the work specified under this contract.
1.4.19 Contracting Officer Representative (COR): The COR will be assigned and identified by separate letter upon approval by the KO. The COR monitors all technical aspects of the contract and assists in contract administration as designated by the KO. The COR is authorized to perform the following functions; assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.
1.4.20 Contractor Key Personnel: The following personnel are considered key personnel by the Government; The Contractor, Contractor’s Superintendent, Manager, or Quality Control Inspector. The Contractor shall provide a contract point of contact who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the Superintendent or Manager is absent shall be designated in writing to the COR.
1.4.21 Security Requirements: All Contractor and all associated Sub-contractors employees shall comply with applicable facility access and local security procedures (provided by COR). The Contractor shall also provide all information for background checks to meet facility access requirements to be accomplished by the Government organizations Director of Emergency Services or Security Office. Contract workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and /or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility change, the Government may require changes in the Contractor security matters or processes.
1.4.21.1 The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I‐9, Employment Eligibility Verification, with the COR. This Form will be provided to the COR and shall become part of the official contract file.
1.4.21.2 I-WATCH, Corps Watch, or See Something, Say Something program. The Contractor and all associated sub-contractors shall receive a brief/training on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training. The I-Watch/CORPS watch training video and literature can be found at the following web site. http://www.swf.usace.army.mil/BusinessWithUs/Contracting.aspx.
1.4.21.3 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property during the execution of this contract.
1.4.21.4 Key Control: No keys shall be issued during the execution of this contract.
1.4.21.5 Contractor’s Employee Conduct: The Contractor shall be responsible for insuring employees strictly comply with all Federal, State, and Municipal laws. Any illegal or criminal activity shall result in the removal of the employee/employees and or may result in the termination of the contract. The COR may require the Contractor to immediately remove from work site any employee of the Contractor or Subcontractor, who, in the opinion of the COR, endangers persons or property, or whose physical or mental conditions are such that it would impair the employee’s ability to satisfactorily perform work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone and shall be confirmed in writing as soon as possible. No such removal, however, shall reduce the obligation to perform all work required under the contract and immediate replacement shall be made as required. This removal shall not be made the basis of any claim for compensation or damages against the United States or any of its employees, officers, or agents. Employee attire shall meet the requirements of the EM 385-1-1, “Safety and Health Requirements Manual”
1.4.22 Identification of Contractor Employees: The Contractor shall provide each of its employees who will be involved in the performance of the contract, on a Government facility, with a means of identification displaying the company’s name and logo. This could be a shirt with the company logo or a photo identification badge to all contractor employees. Employees shall wear, in clear view or present a photo badge on their person as they perform duties to execute the work items under this contract.
Contractor shall allow only persons directly involved with accomplishment of the Contractor's operations in facilities serviced by this contract (i.e., no friends, guests, children, or pets).
1.4.23 Contractor Travel: Any travel requirement associated with this contract is at the Contractor’s own expense and shall be at no additional cost to the Government.
1.4.24 Data Rights: Not applicable under this contract.
1.4.25 Organizational Conflict of Interest: Not applicable under this contract.
1.5. GOVERNMENT FURNISHED ITEMS AND SERVICES:
1.5.1 Facilities: The Government may allow parking of debris collection equipment in designated areas during the execution of work within a period covered by the contract period. No permanent or long term storage will be allowed. Any equipment needing repairs shall be removed from Government property, other than those considered to be minor. Minor repairs may be considered equipment belts, tires, lighting or safety items, warning lights, back-up alarms, fire extinguishers, etc. No repairs of equipment leaking any oils, hydraulic fluids or any other chemicals shall be allowed, this equipment will be immediately removed. Any hazardous materials or contamination will be cleaned up in accordance with industry standards. Reporting of such incidents shall be reported per Federal, State or Local regulatory laws. No other facilities will be provided under this contract.
1.5.2 Equipment: The Government will provide no additional equipment under this contract.
1.5.3 Materials: The Government will provide no materials under this contract.
1.6 CONTRACTOR FURNISHED EQUIPMENT AND RESPONSIBILITIES:
1.6.1 General: The Contractor shall furnish all management, labor, supplies, equipment, facilities and services required to perform work under this contract.
1.6.2 Certification of Equipment - The Contractor shall utilize equipment that equals or exceeds industry standards; no certification of equipment is required, if no modifications to the Manufacture’s original design have been made, such as modification of roll over protection, etc. All equipment shall be presented to the COR for a safety inspection prior to use, at the beginning of work, to insure safety compliance IAW
EM 385-1-1.
1.6.3 Equipment: The Contractor shall provide all equipment necessary to accomplish the services required including but, not limited to; skid steers, tractors, bulldozers, etc. to complete services for Debris Collection of Recreational Parks to meet the requirements under this PWS.
1.6.3.1 If the Contractor is unable to accomplish work in accordance with the PWS of this contract within the times specified, the Contractor shall immediately obtain additional equipment or manpower necessary to fulfill the requirements of this contract at no additional cost to the Government.
1.6.3.2 All vehicle maintenance will be conducted off Government property. Contractor shall insure leaking and unsafe equipment is repaired immediately and shall be responsible for containment and clean up of leakage. Contractor shall remove and dispose of contaminated soils resulting from leaks or spills in accordance with Federal, State, County and Municipal laws, codes and regulations and restore the area to the original state.
1.6.3.3 The Contractor shall present all equipment to the COR for inspection before beginning initial services.
1.6.3.4 All dozers, skid steer machines, tractors or motorized equipment utilized in the performance of this contract shall be equipped with seat belts on the driver's seat and ROPS per the manufacturer’s original design. Contractor's personnel will be required to wear seat belts while operating equipment. One 2 ½ pound A/B/C dry chemical fire extinguisher will be required on all equipment capable of being ridden.
1.6.3.5 All service vehicles utilized under this contract shall be serviceable, have proof of required insurance and shall comply with safety standards as required by the State of Texas.
1.6.4 Materials: The Contractor shall provide all material necessary to meet the requirements under this
PWS.
1.6.5 Track or Debris Damage. Damage to the turf is anticipated under this scope of work. Damage shall be dressed sufficiently as to allow normal recreational park turf mowing during future operations covered by existing contracts. The Contractor will minimize damage and shall be responsible for all damage to facilities, concrete edges, signs, fences, or live trees as a result of debris collection activities. Extreme caution and judgment shall be exercised when moving in the vicinity of the general public, personnel or other equipment.
1.7 CONTRACTOR MANAGEMENT REPORTING (CMR): Not applicable under this contract.
1.8 APPLICABLE PUBLICATIONS (CURRENT EDITIONS): The Contractor must abide by all applicable regulations, publications, manuals, State, local and Texas Commission on Environmental Quality policies and procedures. Regarding safety and health standards, the Contractor shall follow the guidelines of OSHA and the Engineer Manual (EM) 385-1-1, entitled "Safety and Health Requirements Manual".
1.9 Attachment/Technical Exhibit List:
1.9.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
1.9.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule
1.9.3 Attachment 3/Technical Exhibit 3 – Appendices
1.9.4 Attachment 3 of Quality Assurance Surveillance Plan (QASP) – Volume Worksheet
TECHNICAL EXHIBIT 1
Performance Requirements Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. The Government expects the Contractor to perform at a minimum, the identified acceptable levels throughout the life of the contract. The Contractor’s performance shall be significant consideration when exercising contract option years and evaluating recommendations for future Government contracts and or awards.
Performance Objective: Describes the work that is to take place.
Standard: Describes the desired results that are to be achieved.
Performance Threshold: The Contractor shall be rated acceptable or unacceptable based upon the scores of all inspections. Deficiencies will be noted for each inspection for each Performance Objective item. This number is identified as the Performance Threshold.
Acceptable Performance: Acceptable Performance Threshold is 100%.
Unacceptable Performance: COR’s inspection scores fall below 100% of work specified by the contract.
Method of Surveillance: The Government will monitor the Contractor’s service performance using the 100% Inspection method as detailed in “Quality Assurance Surveillance Plans (QASP).
Performance Objective
Standard Performance Threshold Method of Surveillance
PRS # 1.
Debris Collection:
The Contractor shall collect all flood debris (driftwood/woody vegetation) into designated/measurable piles
All driftwood/woody vegetation shall be collected into designated/measurable piles.
Once debris is collected, it shall allow for normal park mowings with a ZTR mower.
No man-made materials shall be collected in flood debris piles (lumber, cans, bottles, tires etc.).
Scores 100% on all inspections.
100 % Inspections by the COR
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Item A.
The Contractor shall possess a detailed Safety Plan for review and approval if requested by the COR. This plan shall describe the Contractor’s method to insure safe operations, emergency accident prevention and response, the nearest emergency medical treatment facility for intended use. Activity Hazard Analysis (AHA), Material Safety Data Sheets (MSDS) and Personal Protective Equipment needs and uses shall be included in this plan.
Contractor shall submit a formal safety plan along with an initial Activity Hazard Analysis, for review and approval, within five (5) calendar days of contract award All plans and analysis shall be prepared in accordance with OSHA and the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, latest edition.
One copy, if requested, subject to review and approval by the
COR.
The Contractor shall submit required documents in hardcopy.
Deliverable shall be submitted to the Whitney Project Office:
Whitney Lake Project Office 285 C.R. 3602 Clifton, Texas 76634
Item B.
Contractor shall submit a detailed daily Quality Control Report of the Contractor’s design for review and approval by the COR. This report shall have the Contract Number, Date, Time started and completed, QC’s Name, Contract Line Item, Total Quantity of cubic yards shall be agreed upon by Government and Contractor,which shall be documented on the Volume Worksheet (see QASP Attachment #3)
QC report and Volume worksheet shall be submitted to the COR daily.
Two copies of the QC report and Volume worksheet are required.
The Contractor shall submit daily QC Reports and Volume worksheet by E-mail, Fax or hand delivery to the COR.
Deliverable shall be submitted to the Whitney Project Office:
Whitney Lake Project Office
Item C.
Form I-9 Employment Eligibility Verification Form for each employee.
Submit all receipts of I- 9 verification before the first day of work by any employee.
One copy per Employee required and subject to review and approval by the
COR.
The Contractor may submit required documents by hardcopy or by email to the COR.
Deliverable shall be submitted to the Whitney Project Office:
Whitney Lake Project Office
TECHNICAL EXHIBIT 3
APPENDIX A
DAMAGE RECONCILIATION
The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of his operation. He shall also be responsible for any damage to private property or injury to any person as a result of his operations. The Contractor shall notify the Contracting Officer immediately of damage to Government and private property and injury to any person resulting from his operation. Also, the Contractor shall advise the COR of damage to Government facilities from his operations or other causes on the day he first notices such damage.
Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor will be charged for damage at replacement or repair cost (i.e., damaged trees, tire ruts, signs, posts, instrumentation, protective posts, etc).
The Contractor shall protect from damage all existing improvements and utilities
(1) At or near the work site, and
(2) On adjacent property of a third party, the locations of which are made known to or should be known by the Contractor.
The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
Ground and Vegetative Cover Damage The contractor shall restore damaged ground/turf to its original grade with no areas protruding above adjacent ground/turf. Areas which are lower than original grade shall be backfilled to the original grade with topsoil of the same type at the contractor’s expense. The COR shall approve the topsoil before replacement. Areas with exposed soil which is greater than twelve (12) inches from surrounding existing vegetation shall be seeded with a seed mixture, approved by the COR. Seeded area shall be watered immediately after placement and once a week for three weeks thereafter. If the contractor fails to do any or all parts of the above described mitigation, the Government reserves the right to have the work completed by others and deduct that cost from the contractors invoice.
QUALITY ASSUR. SURV. PLAN
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled, Flood Debris Collection at Whitney Lake Recreational Parks located within the Three Rivers Region, Texas.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .