B3_16_T_0034_Piney_Woods_Solicitation.pdf
PDF 349 KB Posted
- Attached to
- Piney Woods Regional Summer Gate Attendant
- Solicitation number
- W9126G-16-T-0034
About this file
FY16 Piney Woods Region Summer Gate Attendant Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B3_Amd_0001_16_T_0034.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9126G-16-T-0034 11-Jan-2016
b. TELEPHONE NUMBER
(817) 886-1077
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 09 Feb 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JAMAUH D WINSTON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS X
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
817-886-6403FAX:
TEL: 817-886-1043 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$7.5 Mil
NAICS:
721211
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF99
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9126G-16-T-0034
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Days $_________________ $__________________
Piney Woods Region Summer Gate Attendant
The contractor shall provide all labor, materials, supplies and equipment to furnish gate attendant services as outlined in the attached Performance Work Statements. The Government anticipates award of up to eleven positions/shifts for Lake O' The Pines and Wright Patman Lakes TX
Incomplete proposals shall be considered non-responsive and will not be evaluated. If a proposer declines to accept a purchase order for a park, the proposer will not be considered for any other awards offered in the solicitation. Only one offer will be made by the Government.
Point of Contact: Jamauh Winston (817)886-1077 Email: jamauh.d.winston@usace.army.mil Email proposal to: CIV-OPS.Proposals@usace.army.mil
Only a warranted Contracting Officer, either a Procuring Contracting Officer (PCO) or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the COntracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
BID SCHEDULE
LAKE O’ THE PINES - ALLEY CREEK CAMPGROUND
SUMMER 4-DAY GATE ATTENDANT
BRUSHY CK 4 DAY BID SCHEDULE
ITEM
NO
DESCRIPTION
Contract Gate Attendant Services
Quantity
Unit Price Per Day
TOTAL
0001a
Base Period:
01 March 2016 to 30 September 2016
123 Days
0001b
Option Period:
01 March 2017 to 30 September 2017
122 Days
0001c
01 March 2018 to 30 September 2018
121 Days
TOTAL AMOUNT :
LAKE O’ THE PINES - BRUSHY CREEK CAMPGROUND
SUMMER 4-DAY GATE ATTENDANT
BRUSHY CK DAY USE BID SCHEDULE
NO
DESCRIPTION
01 March 2016 to 30 November 2016
158 Days
01 March 2017 to 30 November 2017
158 Days
01 March 2018 to 30 November 2018
157 Days
LAKE O’ THE PINES - BRUSHY CREEK DAY USE AREA
SUMMER GATE ATTENDANT
BUCKHORN CK 3 DAY BID SCHEDULE
NO
DESCRIPTION
124 Days
LAKE O’ THE PINES - BUCKHORN CREEK CAMPGROUND
3-DAY GATE ATTENDANT
BUCKHORN CK 4 DAY BID SCHEDULE
NO
DESCRIPTION
01 March 2016 to 28 February 2017
156 Days
01 March 2017 to 28 February 2018
01 March 2018 to 28 February 2019
LAKE O’ THE PINES - BUCKHORN CREEK CAMPGROUND
4-DAY GATE ATTENDANT
JOHNSON CK 4 DAY BID SCHEDULE
NO
DESCRIPTION
209 Days
01 March 2018 to 30 November 2019
LAKE O’ THE PINES - JOHNSON CREEK DAY USE AREA
4-DAY GATE ATTENDANT
JOHNSON CK DAY BID SCHEDULE
NO
DESCRIPTION
SUMMER GATE ATTENDANT
JOHNSON CK 3 DAY BID SCHEDULE
NO
DESCRIPTION
124 Days
3-DAY GATE ATTENDANT
NORTH SHORE PARK SHIFT II
NO
DESCRIPTION
WRIGHT PATMAN LAKE, NORTH SHORE PARK, SHIFT II
ROCKY POINT SHIFT I BID SCHEDU
NO
DESCRIPTION
Days
5 APRIL 2016 to 5 SEPTEMBER 2016
05 APRIL 2017 to 4 SEPTEMBER 2017
05 APRIL 2018 to 30 AUGUST 2018
WRIGHT PATMAN LAKE, ROCKY POINT PARK, SHIFT I
ROCKY POINT SHIFT II BID SCHED
NO
DESCRIPTION
1 MARCH 2016 to 28 SEPTEMBER 2016
01 MARCH 2017 to 28 SEPTEMBER 2017
01 MARCH 2018 to 28 SEPTEMBER 2018
WRIGHT PATMAN LAKE, ROCKY POINT PARK, SHIFT II
NO
DESCRIPTION
5 MARCH 2016 to 30 SEPTEMBER 2016
05 MARCH 2017 to 30 SEPTEMBER 2017
05 MARCH 2018 to 30 SEPTEMBER 2018
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
FORT WORTH DISTRICT
PERFORMANCE WORK STATEMENT (PWS)
GATE ATTENDANT SERVICES
1. GENERAL: This is a non-personal services contract to provide Gate Attendant Services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.
Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Gate Attendant Services for the duration of the contract period as defined in this Performance Work Statement, except for those items specified as government-furnished property and services in each lakes appendices in this solicitation. The contractor shall perform to the standards in this contract. Work to be accomplished under this contract shall be in accordance with this PWS, the lake appendices and the Lake Office Gate Attendant Handbook, for the recreation area named and described herein. The successful contractor must pass a criminal background check. Site visits are highly recommended prior to bidding.
See Lake-specific PWS appendices for gate attendant team requirements.
1.1.1 Definitions:
(a) Contractor: The person awarded the contract.
(b) Contracting Officer (KO): The person with the authority to enter into, administer, and/or terminate contracts and make related determination and findings on behalf of the Government. This person will be identified on the SF 1449 (Solicitation/Contract/Order for Commercial Items).
(c) Lake Manager: The manager of the local lake. The Lake Manager may appoint an authorized representative to act on their behalf.
1.1.2 Basic Requirements: The following requirements for submitting a quote and receiving an award are now mandatory for conducting business with the DOD Government.
(a) All offerors are required to obtain a Data Universal Numbering System (DUNS) number by calling 1-800-333-0505 or by visiting www.dnb.com.
(b) All prospective contractors must be registered in System for Award Management (SAM) database prior to any award resulting from this solicitation. If at time of award, contractor is not registered, award will be made to the next successful “registered” offer.
Registration may be accomplished via the internet at www.sam.gov.
(c) All payments shall be made by Electronic Funds Transfer (EFT) or “direct deposit”.
(d) E-Verify Verification of Eligibility. The Contractor must use the U.S. Department of Homeland Security E-Verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Contractor must provide to the
Government two valid forms of Government-issued identification prior to beginning work to ensure the correct information is entered into the E-Verify system.
1.2 Scope: Gate Attendant services as described in Section 1.11, Work to be Performed, and in lake-specific appendices.
1.3 Period of Performance: The term of the contract and required services are defined in this solicitation in each lake’s appendix.
1.4 General Information
1.4.1 Quality Control: Not Applicable.
1.4.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.4.2.1 Inspection and Contract Performance: The service performed by the contractor under the provisions of this contract shall be subject to inspections by the Contracting Officer or his designated representative to ensure strict compliance with the terms of the contract.
(a) Notification of Deficiencies: Contractor shall be notified verbally and/or in writing of any serious or recurring minor deficiency in service observed by the Contracting Officer or his/her authorized representative. Verbal notification will be recorded in a memorandum for record.
(b) Documentation of Deficiencies: Written notifications and memoranda for the record shall be prepared in triplicate by the Contraction Officer or his/her authorized representative. The original will be part of the Contractor’s permanent file at the Operations Manager’s Office, a copy will be issued to the contractor, and a copy will be forwarded to the Contracting Officer at the U.S.
Army Corps of Engineers, Fort Worth District Office.
(c) Correction of Contract Deficiencies: Upon receipt of notification of deficiency in service, Contractors will immediately correct deficiencies and /or take steps to prevent recurrence of the deficiency.
(d) Deficiencies of Service: This contract may be terminated by the Contracting Officer upon receipt of any “Notification of Contract Deficiency”. Termination will be based on the seriousness of the deficiency.
(e) Evaluation of Performance: All contractors will have their performance evaluated no less than mid-term and at the conclusion of their contract.
1.4.3 Government Holidays: The Contractor will work the holidays that fall on their shift.
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.4.4 Hours of Operation: The hours of park operation are as specified in Lake-specific appendices. The contractor will provide adequate staffing during all posted hours of park operation.
1.4.5 Place of Performance: The work to be performed under this contract will be performed as described in Lake-specific appendices.
1.4.6 Type of Contract: The government will award a Firm Fixed Price contract.
1.4.7 Security Requirements:
1.4.7.1 Physical Security: The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.4.7.2 Key Control: Government keys provided to the contractor will be issued and controlled in accordance with IAW AR 190-51 and the U.S. Army Corps of Engineers, Southwestern Division Recreation Use Fee Program Regulation, SWDR 1130-2-550-1.
The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.
(a) The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor and team member. The Contractor shall prohibit the opening of locked areas by persons other than the Contractor and team member.
1.4.7.3 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.
1.4.8 Special Qualifications: Not Applicable.
1.4.9 Pre-Work Conference: The Contractor will be required to attend a pre-work conference at no additional cost to the government to review the policies outlined in the PWS. This conference will be conducted by the Lake Manager or their representative, at each local lake office or other agreed upon location, and at a time specified in each Lake Appendix.
1.4.9.1 Training. The Contractor will be provided I-Watch and CorpsWatch Training and Southwestern Division Authorized Collectors Training.
1.4.10 Contracting Officer Representative (COR): Not applicable unless otherwise established by the Contracting Officer.
1.4.11 Contractor Key Personnel: Not Applicable.
1.4.12 Identification of Contractor Employees: The Government will provide photo identification cards to all contractors. Contractors will wear photo badges on their person as they perform duties to execute the work items under this contract (PWS 1.11).
1.4.13 Contractor Travel: Not Applicable.
1.4.14 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government.
These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.4.15 Organizational Conflict of Interest: Not Applicable.
1.5 Government-Furnished Items and Services:
1.5.1 Facilities: The Government will provide a gate house in the park in which the contractor will work.
1.5.2 Equipment: The Government will provide a non-networked computer for non-sensitive data entry, computer monitors, printers, telephone and radio communication equipment.
1.5.3 Materials: The Government will provide gate house supplies, including forms, maps, brochures, handouts, light bulbs, air condition filters, computer paper, staplers, staples, china markers, water hose and sprinklers. The Government will provide other items as specified in the lake-specific appendices.
1.5.4 Trailer Site: Unless otherwise indicated in the Lake Offices’ park information sheet or additional scope of work, the Government will furnish a site for self-contained travel trailer or motor home with 110- volt electricity, water, and sewer hook-ups and/or dump station nearby. If the contractor’s travel trailer is not configured or adaptable to the sewage, water or electric hookups available at the site, the Government will not be responsible for providing attachments, etc. No reimbursement will be made whenever utilities are not available and must be secured elsewhere. The use of the facilities is at the contractors own risk and damage to equipment will be the sole responsibility of the contractor.
1.6 Contractor-Furnished Items and Responsibilities:
1.6.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 1.5, Government- Furnished Items and Responsibilities, of this PWS.
1.6.2 Equipment: The contractor will provide a transportation vehicle, which can be operated independently of the RV free of leaks and in good mechanical condition for use in performing the requirements of the contract. Minimum state required liability insurance must be carried. Proof of liability insurance will be submitted during the pre-work meeting and prior to the work start date. All motor vehicles and operators will comply with state laws such as licensed operators, vehicle safety equipment, etc. The Gate Attendant may be required to display the vehicle identification provided by the Corps of Engineers on the vehicle while on duty. The Gate Attendant’s vehicle will not display Emergency Red and/or Blue Lights, use a siren, or otherwise represent an appearance of an emergency vehicle while on duty. The contractor will supply the gas for operation of the vehicle while on duty.
1.6.3 Materials: The Contractor shall furnish all materials, excluding those furnished by government as specified above, needed to operate the gatehouse. This list includes, but is not limited to highlighters, color markers, notepads, pens, pencils, tape, trash bags, cleaning supplies, restroom supplies and any other items that may be necessary to operate the gatehouse.
1.6.4 Temporary Living Quarters: The contractor shall furnish a fully operable “self-contained” recreational vehicle (RV) of the travel trailer or motor home type to serve as temporary living quarters for the duration of the contract. Maximum size of the trailer is determined by physical limitations of the site furnished. It will be located near the entrance to the park at a location to be designated by the Lake Manager. Pickup (shell-type) campers, pop-up tent trailer, tents, mini-travel trailers, mobile homes, buses, or any other types of recreation vehicles which do not meet general size requirements or the self-contained classification as determined by inspection of the Contracting Officer or his/her authorized representative will not be acceptable. The Contractor will be the sole occupants of the site. Adult family members and friends will not live with the contractor.
1.7 Contractor Management Reporting (CMR): Not Applicable.
1.8 Applicable Publications (Current Editions): The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
1.9 Attachment/Technical Exhibit List:
1.9.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary. See Lake-specific appendices.
1.9.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule. See Lake-specific appendices.
1.10 Safety:
1.10.1 Safety Manual Requirements: The Contractor(s) shall comply with all pertinent sections of the Corps of Engineers' Safety and Health Requirements Manual, EM 385-1-1, current at the time of award, and any subsequent revisions. This manual can be found on-line at:
www.usace.army.mil/usace-docs/eng-manuals/em385-1-1/toc.htm.
1.11 Work to be Performed:
1.11.1 User Fees: The Contractor will follow fee collection, credit voucher, refund, campsite reservation and remittance procedures established by the U.S. Army Corps of Engineers, Southwestern Division Recreation Use Fee Program Regulation, SWDR 1130-2-550-1.
(a) User Fee Collection: The Contractor is required to collect User Fees daily, to ensure visitors have paid applicable user fees, utilizing the U.S. Army Corps of Engineers User Permit (ENG Form 4457), National Recreation Reservation Service (NRRS), Outdoor Recreation Management Suite (ORMS) Field Manager Program, an automated cash register, and/or collection from an honor vault. This includes going through the park to collect and safeguard fees when necessary. The Contractor is required to collect user fees for specialized recreation sites, facilities and services provided by the Corps of Engineers. This may include, but is not limited to, camping, group facility use, day use, special facility use, and multiple site rental use. The Contractor is required to accept cash, personal check, traveler’s checks, money orders or credit card payments as methods of use fee payment.
(b) Audits and Fee Security: The Contractor will be responsible for User Fee Permits (ENG Form 4457), cash register receipts and journal, computer generated receipts, signed credit card receipts, and all collected forms of use fee payments until turned over to an authorized fee collector/cashier. The Contractor may be audited at any time, with or without prior notice, and is required to place all forms of collected use fee payments/monies in the gatehouse cash drawer or fee safe provided immediately upon receipt. The cash drawer or fee safe will remain closed immediately after every transaction and the automatic lock shall not be defeated at any time.
(c) Cash on Hand: The Contractor/Gate Attendant is required to have personal cash on hand at all times (minimum of $50.00) to make change. A signed statement with the amount of personal funds in use will be placed in the cash drawer and updated immediately anytime this amount changes. Refer to the lake appendences for amounts required at each park.
(d) Remittance Procedures and Inspection of Use Fees: All Lakes require User Fee remittance a minimum of once a week. See “Use Fee Collections” in each lake appendix, for which process is used at the location(s) on which you are bidding. Inspections will be performed during the contract period as deemed necessary by the Lake Manager.
1.11.2 Campsite Reservations: The Contractor will comply with local and District policies for reservations. The contractor will adhere to guidelines and procedures established under the National Recreation Reservation System, using Outdoor Recreation Management Suite (ORMS) Field Manager program in the campground. The contractor may also be required to take advance campsite reservations, which would consist of receiving and booking reservations requests, collecting and processing camping fees, and handling cancellation and refund requests. The Contractor will be required to perform some or all the following duties daily:
(a) Pick up reservation data reports, i.e. bookings, arrival reports, cancellation reports, etc., from the local lake office or accept the reports delivered in person, and /or transmitted by telephone, electronic mail received through a computer, facsimile machine, etc.
(b) Maintain and update necessary status reports utilizing charts, status boards, note pads, card systems, computer/cash register systems, ORMS, Field Manager, NRRS, etc., to ensure that campsite status is kept current at all times.
(c) Keep records and monitor date of arrivals, departures, no-shows, cancellations, etc.
(d) Fill out refund and credit voucher forms according to policy.
(e) Post or identify reserved and vacant campsites by positing provided signs or markers.
The Contractor will also maintain records as necessary for the administration of the campsite reservation program as directed by the Lake Manager. The Contractor will accept the campsite reservation permit/confirmation letter as both proof and payment of the reservation.
1.11.3 Group Shelters: The contractor will keep records and ensure compliance of group shelter use as required by the Lake Manager including the use of the NRRS system, where applicable.
1.11.4 Camping Status: The Contractor will record the campsite occupied and maintain record of the current status for each campsite occupied. The contractor will keep written records of each camper’s length of stay to ensure compliance with the Fort Worth District camping policy. The contractor will register park users, issue appropriate passes and deliver messages to visitors as required by the Lake Manager. The Contractor will keep a written record of campers who are turned away due to lack of campsites or campsites with desired hook-ups. The Contractor shall also participate as required in all Recreation Use Surveys that may be conducted.
1.11.5 Park Inspection: The contractor will inspect the park area and facilities a minimum number of times each day as required by the lake appendices. Inspections will be made in a vehicle provided and maintained by the contractor. During all inspections, if the contractor observes park users violating Corps of Engineers rules and regulations, the contractor should advise the visitor of the violation, the contractor is not to pursue enforcement. If violations persist, the contractor should contact a Park Ranger. If a Park Ranger is not available, contractor will record any violations of USACE rules or regulations and forward them immediately to the Lake Manager.
1.11.6 Visitor Assistance: The gatehouse will be occupied by the contractor during the posted hours of the park during which time they will assist the park visitors by providing information concerning the visitors stay. This may include providing free copies of informational pamphlets, rules and regulations and/or maps. The contractor will conduct themselves in a professional and courteous manner at all times.. The contractor will advise campers and park visitors: (1) to utilize only developed facilities or designated overflow areas and, (2) to operate and park all vehicles and campers only on paved surfaces or designated parking areas. The contractor will advise campers of quiet hours (10:00 P.M. until 6:00 A.M.) as they enter the park, and assist in maintaining quiet hours.
1.11.7 Disturbances: The contractor will promptly report all accidents, violations of law, disturbances and situations that could affect health and safety of visitors to the Park Ranger or Lake Manager. In the event the contractor is unable to communicate with the Park Ranger and the situation dictates, the contractor will contact the local law enforcement officers as soon as practical. All communications with local law enforcement officers will be reported to the Park Ranger or Lake Manager, on the next workday. The Contractor will not attempt to apprehend any violators or enforce rules, regulations, or laws. Attendants will inform park visitors of rules, regulations and laws and refer violations to the Park Ranger. NOTE: Serious incidents such as a fatality in the park or situations of significant public interest will be reported immediately to the local law enforcement agency and to the Lake Manager.
1.11.8 Complaints: The contractor will keep a written record of all complaints and criticisms of park facilities. These records will be given to the Lake Manager at regular intervals or upon request.
1.11.9 Lost and Found: The contractor will keep lost and found articles in the gatehouse or trailer and turn over all found articles with as much information as possible to a Park Ranger as soon as possible.
1.12 Image, Personal Appearance and Dress:
1.12.1 Favorable Image of the Corps: The contractor will promote a favorable image of the Corps through personal appearance, actions, attitude and a willingness to assist park visitors in a prompt, courteous manner.
1.12.2 Personal Appearance and Dress: The contractor shall, at all times when on duty and when dealing with the public, be required to maintain a fully-clothed and neat, well-groomed appearance. Contractor-furnished shirts, hats and/or vests identifying the contractor as the attendant are encouraged and may be required as noted in the lake appendices. In no way shall these clothing items create an appearance that the contractor or their employee is an employee of the Government. Government-furnished contractor identification badges or tags will be worn by the contractor during on-duty hours at all locations. Cut-offs are not allowed, and shorts must be knee-length or longer. Shoes shall be worn at all times; flip flops or similar footwear will not be permitted.
1.13 Cooperation with Others: The contractor will maintain good communications and relations with the public, other contractors, volunteers, Corps employees and others who work with the Corps of Engineers for the construction of new facilities, repair of existing facilities, sanitation services, trash pick-up services, and grass mowing, etc. The contractor will allow Corps employees to utilize communication facilities furnished by the Government. Cooperation will include, but not be limited to summoning assistance and reporting all instances of vandalism, harassment, public intoxication, speeding, etc., to proper authorities.
The contractor will diligently attempt to provide for the needs of our visiting public as public relations representatives for the Corps of Engineers. The contractor may be asked to work additional days with compensation in the event that another contractor requires emergency time off.
1.14 Living Area and Gatehouse Maintenance:
1.14.1 Trailer Area Maintenance: The contractor will maintain the area where the trailer is parked (Gate Attendant Site) in a clean and sanitary condition at all time. No dog pens, horse corrals, poultry cages or similar facilities for pets or the raising of animals will be allowed.
1.14.2 Pets: All pets will be confined in the contractor’s trailer or on a leash of 6-foot or less in length and must not disturb park visitors. The contractor’s site will remain clean of animal waste at all times. Pets will have all vaccinations as required by the state laws and will wear a collar that displays the vaccination tags at all times. No pets are allowed inside the gatehouse.
1.14.3 Excessive Personal Items: No washers, dryers, deep freezers, or excessive personal items will be permitted around trailer pad areas or inside the gatehouse.
1.14.4 Smoking: Smoking is not allowed in or within 30 feet of the gatehouse.
1.14.5 Gatehouse Maintenance: The contractor will maintain the gatehouse in a clean, orderly and sanitary condition at all times. Gate attendants will provide all equipment, tools, and supplies necessary to clean the gatehouse. Only authorized personnel are to enter the gatehouse at any time.
1.14.6 Trash Removal: Solid waste and refuse shall be deposited in a nearby trash receptacle (dumpster) furnished by the Government.
1.14.7 Living Quarters Security: Security of the contractor’s living quarters and all personal property shall remain the contractor’s responsibility throughout the duration of the contract. The Government accepts no responsibility for, nor will it be liable for, damage or theft occurring to the contractor’s property.
1.15 No Soliciting: Contractor will not solicit, advertise, sell or offer to sell any unauthorized goods or services to campers or visitors on public property (CFR Title 26, Section 327.18).
1.16 Weapons: Firearms or any type of object that could be considered a weapon will not be carried or kept in the park (e.g. pepper spray, clubs). This includes, but not limited to the gatehouse or trailer occupied by the contractor.
1.17 Alcohol: The contractor will not consume or be under the influence of alcoholic beverages, illicit drugs and/or medication unless administered under a doctor’s prescription while on duty or while in view of the public. This includes, but is not limited to, the park entrance area, attendant site, gatehouse, park restrooms, campsites, etc.
1.18 Visitors of the Contractor/Gate Attendant: Adult family members and friends will not live with the contractor. “Living with the Contractor” is defined as a person staying with the contractor for more than 14 days in a 30 day period. Visitors of the contractor will be required to lodge in the contractor’s trailer, or, if they have their own equipment, visitors will be required to camp at a campsite in the park and pay the regular camping fee. Visitors will not be allowed to connect to the contractor’s utilities at any time. All non-authorized personnel are to remain outside the gate house at all times.
1.19 Security Bonding:
1.19.1 Bonding for Fee Collection: The contractor must be fully bonded or insured to cover collected funds not received by the designated government agent or ReserveAmerica as directed in the specifications. The contractor is required to furnish the Lake Office Purchasing Agent proof of such bond or security in the minimum amount of $5,000.00 payable to the U.S. Army Corps of Engineers. Condition of the bond obligation covers the loss of Government Funds/Use Fees that are stolen or embezzled by the contract gate attendant. The bond must name all persons that will be working under this contract and handle Government Funds/Use Fees. The bonds should note that the contract gate attendant collector(s) are not a direct employee of the Government. The term of the bond is to be a minimum of 60 days past the contract gate attendant’s effective date of termination. A condition in the bond will require the bonding company to notify the Corps of Engineers before the bond is modified, terminated or cancelled, prior to the original termination date. The contractor must provide a copy of the bond at the Pre- Work Conference. The contractor shall not start work without proof of bonding. The contractor can choose one of the following options to fulfill this requirement:
(a) Obtain a Business Services, Volunteer in Parks (VIP), Fidelity, or Dishonesty bond from an insurance agent meeting the criteria stated in 1.19.1, above. The cost of the bond varies by type, individual and the issuing company.
(b) Furnish an irrevocable, unconditional letter of credit from a financial institution in the specified amount.
***SPECIAL NOTICE***
All persons handling Government monies or accessing the Government computer system under this contract shall be subject to a background investigation to establish their reliability, trustworthiness, conduct and character. By execution of the contract, the contractor certifies that all persons providing such services under the contract are so qualified, including but not limited to, not having been convicted of a felony. Any person so found not to have the necessary reliability, trustworthiness, conduct and character shall be dismissed. If the contractor fails to meet this requirement, the contract will be terminated for default. By providing a bid on this contract, you are providing authorization for U.S.
Army Corps of Engineers, its agents or representatives to investigate your background, as deemed necessary by such agent or representative, to establish your trustworthiness, reliability and character. In the course of performance of this contract, the Contractor/Contractor Personnel may come into contact with or possession of information covered by the Privacy Act (e.g. Social Security numbers) and/or sensitive personal information of Corps employees/members of the public/patrons/customers (e.g., personal checks with account numbers, credit card numbers). The Contractor/Contractor Personnel shall not memorize copy or record this information in any way, nor shall they use their access to this information for any personal reason or financial gain, or provide this information to any third person or party. Failure to comply with these restrictions will result in the immediate termination of the contractor employee, and may subject the employee to civil suit for money damages and/or criminal prosecution to the fullest extent under the law. Repeated violation of this provision may serve as a basis for termination of the contract. The contractor will secure an acknowledgement from every employee that they have read, understand and will comply with this paragraph.
1.20 General Liability and Other Insurance: In addition to automobile insurance required in 1.6.2 Equipment, the contractor is responsible for obtaining and paying for any other insurance desired, including but not limited to, medical, general liability, and comprehensive property. The contractor may be responsible for damage to private or government property if in the opinion of the Contracting Officer or his designated representative the damage is a result of contractor negligence.
1.21 Damage Responsibility: The contractor shall be responsible for restoring any Government facilities, structures, or trees damaged as a result of his/her operation. The contractor shall also be responsible for any damage to private property, and will notify the Lake Manager immediately of damage to Government property and/or private property, and injury to any person resulting from his/her operation. The contractor will notify the Lake Manager immediately of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed.
1.22 Liability: During the period of this contract, the contractor shall be responsible for all injuries or damages of any nature caused or contributed to by the contractor, his/her agents, and/or employees while engaged in work under this contract.
1.23 Permits/Compliance: The contractor shall, without additional expense to the Government, be responsible for complying with and obtaining any necessary licenses and/or permits. The contractor will comply with all Federal, State, County, and Municipal laws, codes and regulations in connection with the performance of the work.
1.24 Communications Equipment: The contractor may be required to operate and use radio equipment.
The Government will furnish radio equipment when required.
1.25 Government Property: The contractor will be required to return Government property on the last day of the contract. The Contractor will be held liable for any missing or damaged government equipment or materials. Computers, printers, radios, and telephone equipment provided by the government are for official use only. Contractor shall not use gate house computers for personal business or install any personally owned software. Any damages incurred as result of personally-owned software being installed on the Government computers will be considered damages to Government property and Contractor will be held responsible for reimbursement to the Government any cost associated with repairs or replacement of the equipment. Final payment will not be paid until all Government property is returned and all fee monies have been turned in.
1.26 Absenteeism: The Lake Manager should be contacted and given as much advance notice as possible about anticipated absences. The Lake Manager must approve all absences in advance. An absence by any one or both of the two-person contract team, without prior approval by the Lake Manager, is grounds for dismissal of the contractor and termination of the contract. If arrangements will be made for someone to cover the shift, these persons must be approved in advance by the Lake Manager and must meet the required bonding and insurance requirements. Payment for time not performed will be subtracted from the lump sum amount at the daily rate. The daily rate is calculated by dividing the lump sum by the total number of days.
1.27 Payment for Services: Payment will be made monthly by Electronic Funds Transfer (EFT) in accordance with FAR 52.212.4. Payment will be made upon receipt and acceptance of proper invoice in accordance with 5 CFR 1315.5 (within approximately 10 days).
1.28 Substitution of Team Member: Team member substitution may be allowed upon prior approval by the Contracting Officer.
1.29 Termination. Failure of the contractor to provide items in full and to provide complete services listed in the contract specifications and applicable specific park sheets may be grounds for termination. Breach of contract and/or voluntary termination of contract without sufficient cause may jeopardize the contractor’s standing for future contract with the U.S. Army Corps of Engineers. Contractors may be terminated if the Government determines Gate Attendant services are no longer needed due to unforeseen closures of the park or major facilities (e.g., beaches, boat ramps, restrooms, campgrounds). Unforeseen closures would include those resulting from droughts, flood, storm damage, infrastructure failure and previously unknown safety hazards.
1.29.1 Grounds for Termination. Inappropriate conduct or unacceptable actions of a contractor may be grounds for termination of the contract. Examples of actions meriting termination include, but are not limited to:
(a) Theft, misappropriation, personal use, and/or improper security and accountability of user fees or government services, property, equipment, facilities and/ or supplies. Any of these acts may also result in criminal prosecution.
(b) Consumption of alcoholic beverages and/or intoxication while on duty, and possession or use of illicit drugs at any time.
(c) Discrimination, harassment, profanity, or other inappropriate behavior perpetrated against customers, Corps personnel, or other contractors.
(d) Recurring written and/or verbal complaints from visitors and/or Lake Office personnel on Attendant’s attitude, lack of cooperation and/or resistance to implementation of policies and program as directed by the Lake Manager or his/her authorized representative.
(e) Failure to follow security procedures, including the allowance of unauthorized personnel inside the gatehouse or the contractor (non-public) work area of the gatehouse/entrance stations.
(f) Inability to perform duties and job responsibilities in accordance with the General Specifications, Specific Park Sheet(s) and Lake Office Gate Attendant Manual.
(g) Violations of public health and safety, including smoking in the gatehouse.
(h) Failure to maintain a neat, clean, well-groomed personal appearance.
(i) Failure to abide by Title 36 CFR, Chapter III, Section 327.
1.30 Duty of Contractor to Finish Contract: The contractor may not terminate the contract. If the contractor fails to complete the contract through the specified term including option periods (if applicable), the contractor is subject to re-procurement cost. The contractor’s failure to comply with contract specifications may be grounds for suspension or debarment for a period of time not to exceed three (3) years. Acceptance of the contract shall be evidence of such knowledge, approval, or acquiescence of all contract specifications.
1.31 Contract Option Period: The Government retains the right to exercise option periods at its discretion.
Option periods shall obligate contractor services for the following year for the same season awarded.
1.32 Other Requirements: See the lake appendices included in this solicitation for further requirements.
L.O.P APPENDIX PWS
APPENDENCES PERFORMANCE WORK STATEMENT (PWS)
CAMPGROUND GATE ATTENDANT SERVICES
LAKE O’ THE PINES
1. GENERAL: This is a non-personal services contract to provide Gate Attendant services at Lake O’ the Pines.
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. Parties interested in submitting on this solicitation are informed that the U.S. Army Corps of Engineers, Fort Worth District, is currently seeking and anticipating entering into a Corporate Joint Management agreement with a nonprofit organization to assume certain activities in the management of Lake O’ the Pines. As such, gate attendant contracts are under consideration. If an agreement becomes imminent the Gate Attendant will be notified. If the Corporate Joint Management agreement is awarded the Gate Attendant's contract with the U.S. Army Corps of Engineers, Fort Worth District, will be terminated for convenience.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Gate Attendant Services as defined in the SWF District Performance Work Statement, Appendices PWS for Lake O’ the Pines and Gate Attendant Handbook except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2. Scope: Gate Attendant services as described in the Lake O’ the Pines Appendices, Section 1.10, Work to be Performed, and the Fort Worth District Gate Attendant Services PWS.
1.3: Period of Performance: Estimated deliverables for gate attendants in Alley Creek, Brushy Creek, Buckhorn Creek and Johnson Creek Campgrounds.
Positions Number
Days Surveillance
Hours Gate House
Hours Availability
Hours Buckhorn and Johnson Creek 3-Day Shifts Annual Shift Base (1 March 2016 – 28 February 2017)
156 1716 1716 2028
Buckhorn and Johnson Creek 3-Day Shifts Annual Shift Option Year 1 (1 March 2017 – 28 February 2018)
156 1716 1716 2028
Buckhorn and Johnson Creek 3-Day Shifts Annual Shift Option Year 2 (1 March 2018 – 28 February 2019)
156 1716 1716 2028
Buckhorn and Johnson Creek 4-Day Shifts Annual Shift Base
209 2299 2299 2717
(1 March 2016 – 28 February 2017))
Buckhorn and Johnson Creek 4-Day Shifts Annual Shift Option Year 1 (1 March 2017 – 28 February 2018))
209 2299 2299 2717
Buckhorn and Johnson Creek 4-Day Shifts Annual Shift Option Year 2 (1 March 2018 – 28 February 2019)
209 2299 2299 2717
Alley Creek 4-Day Shift Summer Season Base (1 March 2016 - 30 September 2016)
123 1354 1354 1599
Alley Creek 4-Day Shift Summer Season Option 1 (1 March 2017 - 30 September 2017)
122 1342 1342 1586
Alley Creek 4-Day Shift Summer Season Option 2 (1 March 2018 - 30 September 2018)
121 1331 1331 1573
Brushy Creek 4-Day Shift Summer Season Base (1 March 2016 - 30 November 2016)
158 1738 1738 2054
Brushy Creek 4-Day Shift Summer Season Option 1 (1 March 2017 - 30 November 2017)
158 1738 1738 3054
Brushy Creek 4-Day Shift Summer Season Option 2 (1 March 2018 - 30 November 2018)
157 1727 1727 3041
The Lake O’ the Pines summer campground gate attendants working the Buckhorn Creek and Johnson Creek Campground 3-Day shifts work Friday through Sunday with days off from Monday through Thursday. The summer campground gate attendants working the Alley Creek and Brushy Creek Campground 4-day shifts work Monday through Thursday with days off from Friday through Sunday. All gate attendants will be required to close the exit gates at the end of their shifts. The base year of the contracts for Buckhorn and Johnson Creek Campgrounds will start March 1, 2016, and end February 28, 2017. The base year of the contract for Alley Creek will start March 1, 2016, and end September 30, 2016. The base year of the contract for Brushy Creek will Start March 1, 2016, and end November 30, 2016. There will be two option years with each of these contracts. The option year contracts will begin on March 1, and end on February 28, September 30, or November 30, as previously specified.
1.4 General Information
1.4.1 Quality Control: Not applicable.
1.4.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.4.3 Government Holidays: The Contractor will work the holidays that fall on their shift.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.4.4 Hours of Operation: Contractors will maintain adequate staffing of the gatehouse during the following specified park hours of operation: 9:00 a.m. through 8:00 p.m. (0900 hours to 2000 hours) each day of the week during the contract period. Contractors will maintain adequate staffing on site in the park during the remaining hours of the shift to support contractual requirements to include: 8:00 p.m. through 9:00 a.m. (2000 hours to 0900 hours) each day of the week during the contract period.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .