Solicitation No.: W9l26G-l6-B-0023 Date Issued: 29 JUL 16 Date Opened: 29 AUG 16 Issuing Office: USAED-Galveston
Number of Amendments Issued: 0001 Government Estimate (Without Profit)
0018 Channel Compacted Fill 4,000 CY $ 4.36 $ 17,440.00
SUM
Project Title: Total Small Business Set-Aside - Drainage Structures and Channel Improvements, Greens Bayou, Houston, Texas, Flood Damage Prevention, South Detention Basin, Harris County, Houston, Texas.
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL
MARIA E. RODRIGUEZ
CONTRACTING OFFICER
l JOB SUM l JOB SUM
310,000 3,850
CY
TON
1,498,000 CY
$ 9.74 $ 115.07
$ 8.14 l JOB SUM lChannel Storm Drainage Structures
Cutten Basin Weir Modification Channel Turfing Channel Excavation
SUM
TOTAL SCHEDULE NO. 1
l JOB SUM l JOB SUM l JOB l JOB SUM l JOB SUM l JOB SUM
Detention Basin Stripping
Detention Basin Outfall Structures
Weir Structure
Connecting Structure
Detention Basin Storm Drainage
Detention Basin Turfing
Detention Basin Excavation
ITEM SCHEDULE NO. 1 UNIT
NO. DESCRIPTION QUANTITY PRICE TOTAL
0010 Detention Basin Access Ramps l JOB SUM $ 103,000.00 $ 16,639,220.00
0001 Mobilization and Demobilization l JOB SUM $ 508,000.00
0002 Clearing, Grubbing, and Removal of l JOB SUM $ 875,000.00
Channel Stripping
Channel Blanket Stone
JOB
OPTION NO.I
0017 Channel Reprap (40 to 640 lbs) 10,300 TON
TOTAL SCHEDULE NO. 1 AND OPTION NO. 1
0019 Channel Paving 1,300 CY $ 336.80
TOTAL OPTION 1
$ 437,840.00 $ 6,923,920.50
$ 175,000.00
$ 218,000.00
$ 381,000.00
$ 1,926,000.00
$ 7,500.00
$ 252,000.00
$ 12,193,720.00
$ 23,563,140.50
$ 115.07
$ 308,000.00 $ 784,000.00 $ 124,000.00 $ 605,000.00 $ 3,019,400.00 $ 443,019.50 $ 1,185,221.00
The apparent low bidder, *Lecon Inc. is 9% below the Government's Estimate
ABSTRACT OF OFFERS (CONT'D) Page 2
$ 5,781,500.00 Channel Paving 1,300 CY $ 460.00
TOTAL OPTION 1
4,000 CY $ 10.00
JOB SUM
$ 450,000.00
TOTAL
$ 1,300,000.00
$ 150,000.00 $ 19,180,000.00
SUM
SUM
0016 Channel Blanket Stone
0018 Channel Compacted Fill 10,300
JOB
CY
TON
TON
0014 Channel Turfing l
$ 50.00 $ 70.00
SUM0013 Cutten Basin Weir Modification
0011 Channel Stripping l
0012 Channel Storm Drainage Structures l
$ 10.00 l
310,000
JOB
0017 Channel Reprap (40 to 640 lbs) 3,850
JOB
0015 Channel Excavation l JOB SUM
OPTION NO. 1
TOTAL SCHEDULE NO. 1
0009 Detention Basin Excavation l JOB SUM
0010 Detention Basin Access Ramps
1,498,000 CY $ 10.00
JOB SUM
0007 Detention Basin Storm Drainage l JOB SUM
0008 Detention Basin Turfing l JOB SUM
JOB SUM
0005 Weir Structure l JOB SUM
PRICE
0006 Connecting Structure l
JOB SUM
QUANTITY
0003 Detention Basin Stripping l
0004 Detention Basin Outfall Structures l
NO. DESCRIPTION
0001 Mobilization and Demobilization 0002 Clearing, Grubbing, and Removal of l
JOB SUM
ITEM SCHEDULE NO. 1
Offeror: Williams Group, LLC, Boligee, Alabama
Issuing Office: USAED-Ft. Worth
Business Size: Small Business
TOTAL SCHEDULE NO. 1 AND OPTION NO. 1
$ 40,000.00
$ 24,961,500.00
$ 250,000.00 $ 300,000.00
$ 250,000.00 $ 200,000.00
0019 $ 598,000.00
$ 380,000.00 $ 200,000.00 $ 3,100,000.00 $ 192,500.00 $ 721,000.00
$ 300,000.00 $ 900,000.00 $ 450,000.00 $ 200,000.00 $ 14,980,000.00
ABSTRACT OF OFFERS (CONT'D) Page 3
4,000 CY $ 7.00
0019 Channel Paving 1,300 CY $ 520.00 l SUM l SUM
Offeror: * Lecon, Inc. Houston, Texas l SUM
1,498,000 CY $ 7.83
ITEM SCHEDULE NO. 1 UNIT
NO. DESCRIPTION QUANTITY PRICE TOTAL
0001 Mobilization and Demobilization SUM l JOB SUM l JOB SUM l JOB
Detention Basin Outfall Structures
$ 380,000.00
JOB
$ 28,000.00
$ 21,433,790.00 l JOB SUM l JOB SUM l JOB SUM
0002 Clearing, Grubbing, and Removal of $ 820,000.00 Detention Basin Stripping l SUM l SUM
Weir Structure
0006 Connecting Structure 0007 Detention Basin Storm Drainage 0008 Detention Basin Turfing
OPTION NO. 1
JOB
0009 Detention Basin Excavation 0010 Detention Basin Access Ramps $ 48,000.00
$ 15,448,340.00
310,000 CY
3,850 TON
10,300 TON
0018 Channel Compacted Fill
JOB
JOB
JOB
Channel Stripping
0012 Channel Storm Drainage Structures
0013 Cutten Basin Weir Modification 0014 Channel Turfing
TOTAL SCHEDULE NO. 1 AND OPTION NO. 1
$ 8.35 $ 41.00
$ 47.00
TOTAL SCHEDULE NO. 1
0015 Channel Excavation
JOB
$ 11,729,340.00
SUM
l JOB SUM l
Issuing Office: USAED-Ft. Worth
Business Size: Small Business
$ 76,000.00 $ 255,000.00
$ 545,000.00
$ 1,225,000.00 $ 145,000.00
0016 Channel Blanket Stone
0017 Channel Reprap (40 to 640 lbs)
$ 225,000.00
$ 61,000.00
$ 1,110,000.00
$ 665,000.00 $ 215,000.00 $ 2,588,500.00
$ 157,850.00
$ 484,100.00
$ 676,000.00
TOTAL OPTION 1 $ 5,985,450.00