Solicitation No.: W9l26G-l6-B-0023 Date Issued: 29 JUL 16 Date Opened: 29 AUG 16 Issuing Office: USAED-Galveston

Number of Amendments Issued: 0001 Government Estimate (Without Profit)

0018 Channel Compacted Fill 4,000 CY $ 4.36 $ 17,440.00

SUM

Project Title: Total Small Business Set-Aside - Drainage Structures and Channel Improvements, Greens Bayou, Houston, Texas, Flood Damage Prevention, South Detention Basin, Harris County, Houston, Texas.

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL

MARIA E. RODRIGUEZ

CONTRACTING OFFICER

l JOB SUM l JOB SUM

310,000 3,850

CY

TON

1,498,000 CY

$ 9.74 $ 115.07

$ 8.14 l JOB SUM lChannel Storm Drainage Structures

Cutten Basin Weir Modification Channel Turfing Channel Excavation

SUM

TOTAL SCHEDULE NO. 1

l JOB SUM l JOB SUM l JOB l JOB SUM l JOB SUM l JOB SUM

Detention Basin Stripping

Detention Basin Outfall Structures

Weir Structure

Connecting Structure

Detention Basin Storm Drainage

Detention Basin Turfing

Detention Basin Excavation

ITEM SCHEDULE NO. 1 UNIT

NO. DESCRIPTION QUANTITY PRICE TOTAL

0010 Detention Basin Access Ramps l JOB SUM $ 103,000.00 $ 16,639,220.00

0001 Mobilization and Demobilization l JOB SUM $ 508,000.00

0002 Clearing, Grubbing, and Removal of l JOB SUM $ 875,000.00

Channel Stripping

Channel Blanket Stone

JOB

OPTION NO.I

0017 Channel Reprap (40 to 640 lbs) 10,300 TON

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1

0019 Channel Paving 1,300 CY $ 336.80

TOTAL OPTION 1

$ 437,840.00 $ 6,923,920.50

$ 175,000.00

$ 218,000.00

$ 381,000.00

$ 1,926,000.00

$ 7,500.00

$ 252,000.00

$ 12,193,720.00

$ 23,563,140.50

$ 115.07

$ 308,000.00 $ 784,000.00 $ 124,000.00 $ 605,000.00 $ 3,019,400.00 $ 443,019.50 $ 1,185,221.00

The apparent low bidder, *Lecon Inc. is 9% below the Government's Estimate

ABSTRACT OF OFFERS (CONT'D) Page 2

$ 5,781,500.00 Channel Paving 1,300 CY $ 460.00

TOTAL OPTION 1

4,000 CY $ 10.00

JOB SUM

$ 450,000.00

TOTAL

$ 1,300,000.00

$ 150,000.00 $ 19,180,000.00

SUM

SUM

0016 Channel Blanket Stone

0018 Channel Compacted Fill 10,300

JOB

CY

TON

TON

0014 Channel Turfing l

$ 50.00 $ 70.00

SUM0013 Cutten Basin Weir Modification

0011 Channel Stripping l

0012 Channel Storm Drainage Structures l

$ 10.00 l

310,000

JOB

0017 Channel Reprap (40 to 640 lbs) 3,850

JOB

0015 Channel Excavation l JOB SUM

OPTION NO. 1

TOTAL SCHEDULE NO. 1

0009 Detention Basin Excavation l JOB SUM

0010 Detention Basin Access Ramps

1,498,000 CY $ 10.00

JOB SUM

0007 Detention Basin Storm Drainage l JOB SUM

0008 Detention Basin Turfing l JOB SUM

JOB SUM

0005 Weir Structure l JOB SUM

PRICE

0006 Connecting Structure l

JOB SUM

QUANTITY

0003 Detention Basin Stripping l

0004 Detention Basin Outfall Structures l

NO. DESCRIPTION

0001 Mobilization and Demobilization 0002 Clearing, Grubbing, and Removal of l

JOB SUM

ITEM SCHEDULE NO. 1

Offeror: Williams Group, LLC, Boligee, Alabama

Issuing Office: USAED-Ft. Worth

Business Size: Small Business

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1

$ 40,000.00

$ 24,961,500.00

$ 250,000.00 $ 300,000.00

$ 250,000.00 $ 200,000.00

0019 $ 598,000.00

$ 380,000.00 $ 200,000.00 $ 3,100,000.00 $ 192,500.00 $ 721,000.00

$ 300,000.00 $ 900,000.00 $ 450,000.00 $ 200,000.00 $ 14,980,000.00

ABSTRACT OF OFFERS (CONT'D) Page 3

4,000 CY $ 7.00

0019 Channel Paving 1,300 CY $ 520.00 l SUM l SUM

Offeror: * Lecon, Inc. Houston, Texas l SUM

1,498,000 CY $ 7.83

ITEM SCHEDULE NO. 1 UNIT

NO. DESCRIPTION QUANTITY PRICE TOTAL

0001 Mobilization and Demobilization SUM l JOB SUM l JOB SUM l JOB

Detention Basin Outfall Structures

$ 380,000.00

JOB

$ 28,000.00

$ 21,433,790.00 l JOB SUM l JOB SUM l JOB SUM

0002 Clearing, Grubbing, and Removal of $ 820,000.00 Detention Basin Stripping l SUM l SUM

Weir Structure

0006 Connecting Structure 0007 Detention Basin Storm Drainage 0008 Detention Basin Turfing

OPTION NO. 1

JOB

0009 Detention Basin Excavation 0010 Detention Basin Access Ramps $ 48,000.00

$ 15,448,340.00

310,000 CY

3,850 TON

10,300 TON

0018 Channel Compacted Fill

JOB

JOB

JOB

Channel Stripping

0012 Channel Storm Drainage Structures

0013 Cutten Basin Weir Modification 0014 Channel Turfing

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1

$ 8.35 $ 41.00

$ 47.00

TOTAL SCHEDULE NO. 1

0015 Channel Excavation

JOB

$ 11,729,340.00

SUM

l JOB SUM l

Issuing Office: USAED-Ft. Worth

Business Size: Small Business

$ 76,000.00 $ 255,000.00

$ 545,000.00

$ 1,225,000.00 $ 145,000.00

0016 Channel Blanket Stone

0017 Channel Reprap (40 to 640 lbs)

$ 225,000.00

$ 61,000.00

$ 1,110,000.00

$ 665,000.00 $ 215,000.00 $ 2,588,500.00

$ 157,850.00

$ 484,100.00

$ 676,000.00

TOTAL OPTION 1 $ 5,985,450.00