B3_Solicitation_15-R-0019_Cntrl_TX_Herb-Pest.pdf
PDF 964 KB Posted
- Solicitation number
- W9126G-15-R-0019
About this file
Solicitation
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9126G-15-R-0019 23-Dec-2015
b. TELEPHONE NUMBER
817-886-1061
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 25 Jan 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KEVIN S ANDERSON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W45XMAHERBICI
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
817-886-6403FAX:
TEL: 817-886-1043 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$11 Million
NAICS:
561710
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9126G-15-R-0019
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1,800,000 Job
Funded Amt:
Base Year; Ctrl TX Herbicide-Pesticide
Firm Fixed Price
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the eradication or abatement of undesirable invasive species, provide pest control and hydro-seeding treatments at the Three Rivers Regional Lakes of Central Texas, these being Aquilla, Navarro Mills, Waco and Whitney Lakes as described in the Performance Work Statement.
Period of Performance: 1 February 2016 through 31 January 2017
POC: Kevin Anderson (817) 886-1061, email: kevin.s.anderson2@usace.army.mil
All invoices shall be mailed to: See Performance Work Statement
NAICS CD: 561710
, FSC CD: F999
1001 2,000,000 Job
OPTION Funded Amt:
Opt Year 1; Ctrl TX Herbicide-Pesticide
Firm Fixed Price
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the eradication or abatement of undesirable invasive species, provide pest control and hydro-seeding treatments at the Three Rivers Regional Lakes of Central Texas, these being Aquilla, Navarro Mills, Waco and Whitney Lakes as described in the Performance Work Statement.
Period of Performance: 1 February 2017 through 31 January 2018
2001 2,000,000 Job
OPTION Funded Amt:
Opt Year 2; Ctrl TX Herbicide-Pesticide
Firm Fixed Price
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the eradication or abatement of undesirable invasive species, provide pest control and hydro-seeding treatments at the Three Rivers Regional Lakes of Central Texas, these being Aquilla, Navarro Mills, Waco and Whitney Lakes as described in the Performance Work Statement.
Period of Performance: 1 February 2018 through 31 January 2019
CONTRACTING OFFICER STATEMENT
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
Task - Delivery Order Ombudsman:
Ms. Jacqueline C. Woodson Acquisition Support Division U.S. Army Corps of Engineers 7701 Telegraph Road, Casey Building, Room 2115 Alexandria, VA 22315 Phone: 703-428-6323 Email: Jacqueline.C.Woodson@usace.army.mil
INSTRUCTIONS TO OFFERORS
PROPOSAL DUE DATE/LOCAL TIME: 25 January 2016, 10:00 AM Central Standard Time POINT OF CONTACT: Kevin Anderson
Phone: (817) 886-1061 Email: CIV-OPS.Proposals@usace.army.mil & Copy furnish Kevin.S.Anderson2@usace.army.mil
Proposals will be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hand carry, “NO EXCEPTIONS.”
Subject line of email must include the solicitation number.
For additional help contact your local Procurement Technical Assistance Centers (PTAC). Centers were created by Congress to assist businesses seeking to compete on federal contracts. Services are generally free; however, a small fee may be charged for certain services. Please use website http://www.aptac-us.org/new/ to contact a center near your business to assist you in the preparation for a federal contract, registering in SAM or other required systems.
SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: www.sam.gov.
DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business. DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).
Click here to request your D-U-N-S Number via the Web. If one does not exist for your business location, it can be created within 1 business day. The website to obtain your DUNS number: http://fedgov.dnb.com/webform . For technical difficulties, contact govt@dnb.com
ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA) allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Management (SAM): www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM. Contractors MUST be certified in the NAICS Code and Size Standard applicable with this solicitation.
WAGE RATES: The Service Contract Act applies (see attached wage rates). Note: Does not apply to Contractors registered in System for Award Management (SAM) as Sole Proprietorships.
mailto:CIV-OPS.Proposals@usace.army.mil mailto:Kevin.S.Anderson2@usace.army.mil http://www.aptac-us.org/new/ http://www.sam.gov/ http://fedgov.dnb.com/webform/pages/CCRSearch.jsp http://fedgov.dnb.com/webform mailto:govt@dnb.com http://www.sam.gov/
Below is a checklist to assist you to ensure all the proper documents are returned for consideration on this solicitation. Only those items checked as “required” must be returned.
Required Contractor Item
Complete page 1 of Solicitation. Must include a signature in block 30.
Complete Bid Schedule(s):
Qty 1 Bid Schedule Task Order #0001 Bid Schedule
Include your firm’s Tax ID Number (TIN) under
Clause 52.212-3 Alt I OFFEROR REPRESENTATIONS AND CERTIFICATIONS--
COMMERCIAL ITEMS (NOV 2015)
Include an active email address. You will be notified of your Selection/Non-selection by this method!!!
Complete clauses 52.223-3 & 252.209-7991 of the solicitation
Complete clauses 52.212-3 Alt I and 52.219-1 Alt I of the solicitation OR submit a complete ORCA profile
You must have an active SAM registration prior to award Include a print out of the first page of YOUR profile.
Provide two (2) Past Performance Questionnaires (PPQ) completed by employer/s or references who can vouch for your work capability, and have them send the PPQ’s to CIV-OPS.Proposals@usace.army.mil and the CT Specialist. Please ensure that references submit the form to the specified email addresses and make sure they reference the solicitation number in the email subject line. PPQ forms must be submitted by proposal due date to be considered for evaluation.
Scan all documents into a single .pdf file (Call your local library, copy centers, or PTACs if you need assistance)
EMAIL YOUR PROPOSAL to CIV-OPS.Proposals@usace.army.mil:
SUBJECT LINE OF EMAIL MUST INCLUDE THE SOLICITATION
NUMBER AND YOUR COMPANY NAME
** There will be a site visit at Lake Whitney Project Office, 285 County Road 3602, Clifton, TX 76634 on 6 January 2016 at 10:00 AM CST. POC: James Nolen (254) 622-7406.
** Please submit all solicitation inquiries through ProjNet, (instructions can be found below)
** Please see Clause 52.228-5- Insurance for specific insurance requirements.
** Please see FAR Clause 52.212-2 for proposal evaluation criteria
SUBMISSION OF OFFEROR'S QUESTIONS AND COMMENTS THROUGH
PROJNET
Questions and/or comments relative to this solicitation must be submitted via:
Bidder Inquiry in ProjNet at http://www.projnet.org/projnet
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
From this page you may view all bidder inquiries or add inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W9126G-15-R-0019 The Bidder Inquiry Key is: J8DRR8-ZN2U3V
The Bidder Inquiry System will be unavailable for new inquires 7 calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals
Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
http://www.projnet.org/projnet
PAST PERF. QUESTTIONAIRE
NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm name: CAGE Code:
Address: DUNS Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy) Explain Differences:
Original Contract Price (Award Amount):
Final contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION.
CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil and Kevin.S.Anderson2@usace.army.mil. Ensure the former employer references the solicitation number in the email subject line.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract
Rating will be neither positive or negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force? E VG S M U N
b) Ability to hire, apply, and retain qualified workforce to this effort
E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agree price(s)? E VG S M U N
b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports. Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. YES NO
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
YES NO
f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below. YES NO
AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil and Kevin.S.Anderson2@usace.army.mil.
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages if necessary):
6. SAFETY/SECURITY
a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
YES NO
d) In Summary, provide an overall rating for the work performed by this contractor. E VG S M U N
QUANTITY 1 BID SCHEDULE
Central Texas Lakes Herbicide Services
Services for Aquilla, Whitney, Navarro Mills and Waco Lakes
Quantity 1 Bid Schedule
Indefinite Delivery Indefinite Quantity (IDIQ) Supplies and Non-Personal Services Contract
Contractor shall provide all labor, equipment, materials, supplies, management, and supervision to perform herbicide and pesticide application services in recreational, embankment, levee and outlet areas and facilities at Aquilla, Navarro Mills, Waco and Whitney lakes, US Army Corps of Engineers, Three Rivers Regional, Fort Worth District, Texas. All services will be performed in accordance with the attached Performance Work Statement and as required by State and Federal regulations.
CONTRACT BASE YEAR
1 February 2016 through 31 January 2017.
0001 PESTICIDE/HERBICIDE - AQUILLA LAKE (BASE)
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
0001AA ROAD SHOULDER 1 MI
0001AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
0001AC AREA APPL-"NEAR WATER" 1 AC
0001AD AREA APPL-GRASSBUR TREAT 1 AC
0001AE AREA APPL-BROADLEAF OR PRAIRIE
TREATMENT
1 AC
0001AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
0001AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
0001AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
1 EA
0001AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
0001AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
0001AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
0001AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
0001AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
0001AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
0001AO AREA APPL - FIRE/MISCELLANEOUS ANT 1 AC
CONTROL
0001AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
0001AQ FACILITY TREATMENT - PEST CONTROL 1 AC
0001AR AREA APPL-HYDRO-SEED 1 AC
0001AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
AQUILLA - PESTICIDE/HERBICIDE - ITEMS 0001AA THRU 0001AS TOTAL
0002 PESTICIDE/HERBICIDE - NAVARRO MILLS LAKE (BASE)
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
0002AA ROAD SHOULDER 1 MI
0002AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
0002AC AREA APPL-"NEAR WATER" 1 AC
0002AD AREA APPL-GRASSBUR TREAT 1 AC
0002AE AREA APPL-BROADLEAF OR PRAIRIE
TREATMENT
1 AC
0002AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
0002AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
0002AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
1 EA
0002AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
0002AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
0002AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
0002AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
0002AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
0002AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
0002AO AREA APPL - FIRE/MISCELLANEOUS ANT
CONTROL
1 AC
0002AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
0002AQ FACILITY TREATMENT - PEST CONTROL 1 AC
0002AR AREA APPL-HYDRO-SEED 1 AC
0002AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
NAVARRO MILLS - PESTICIDE/HERBICIDE-ITEMS 0002AA THRU 0002AS TOTAL
0003 PESTICIDE/HERBICIDE - WACO LAKE (BASE)
PRICE
AMOUNT
0003AA ROAD SHOULDER 1 MI
0003AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
0003AC AREA APPL-"NEAR WATER" 1 AC
0003AD AREA APPL-GRASSBUR TREAT 1 AC
0003AE AREA APPL-BROADLEAF OR PRAIRIE
TREATMENT
1 AC
0003AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
0003AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
0003AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
1 EA
0003AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
0003AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
0003AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
0003AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
0003AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
0003AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
0003AO AREA APPL - FIRE/MISCELLANEOUS ANT
CONTROL
1 AC
0003AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
0003AQ FACILITY TREATMENT - PEST CONTROL 1 AC
0003AR AREA APPL-HYDRO-SEED 1 AC
0003AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
WACO - PESTICIDE/HERBICIDE -ITEMS 0003AA THRU 0003AS TOTAL
0003 PESTICIDE/HERBICIDE - WHITNEY LAKE (BASE)
PRICE
AMOUNT
0004AA ROAD SHOULDER 1 MI
0004AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
0004AC AREA APPL-"NEAR WATER" 1 AC
0004AD AREA APPL-GRASSBUR TREAT 1 AC
0004AE AREA APPL-BROADLEAF OR PRAIRIE 1 AC
TREATMENT
0004AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
0004AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
0004AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
1 EA
0004AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
0004AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
0004AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
0004AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
0004AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
0004AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
0004AO AREA APPL - FIRE/MISCELLANEOUS ANT
CONTROL
1 AC
0004AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
0004AQ FACILITY TREATMENT - PEST CONTROL 1 AC
0004AR AREA APPL-HYDRO-SEED 1 AC
0004AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
WHITNEY - PESTICIDE/HERBICIDE -ITEMS 0004AA THRU 0004AS TOTAL
SUMMARY CONTRACT BASE: 1 February 2016 through 31 January 2017.
AQUILLA / WHITNEY LAKES (BASE) ITEMS 0001AA - 0001AS
NAVARRO MILLS LAKE (BASE) ITEMS 0002AA - 0002AS
WACO LAKE (BASE) ITEMS 0003AA - 0003AS
WHITNEY LAKE (BASE) ITEMS 0004AA - 0004AS
(BASE) TOTAL ITEMS 0001AA - 0004AS
CONTRACT OPTION YEAR ONE
1 February 2017 through 31 January 2018.
1001 PESTICIDE/HERBICIDE - AQUILLA LAKE
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
1001AA ROAD SHOULDER 1 MI
1001AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
1001AC AREA APPL-"NEAR WATER" 1 AC
1001AD AREA APPL-GRASSBUR TREAT 1 AC
1001AE AREA APPL-BROADLEAF OR PRAIRIE
TREATMENT
1 AC
1001AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
1001AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
1001AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN
HEIGTH)
1 EA
1001AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
1001AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
1001AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
1001AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
1001AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
1001AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
1001AO AREA APPL - FIRE/MISCELLANEOUS ANT
CONTROL
1 AC
1001AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
1001AQ FACILITY TREATMENT - PEST CONTROL 1 AC
1001AR AREA APPL-HYDRO-SEED 1 AC
1001AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
AQUILLA LAKE PESTICIDE/HERBICIDE - ITEMS 1001AA THRU 1001AS TOTAL
1002 PESTICIDE/HERBICIDE - NAVARRO MILLS LAKE
ITEM DESCRIPTION EST.QTY U/M UNIT AMOUNT
PRICE
1002AA ROAD SHOULDER 1 MI
1002AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
1002AC AREA APPL-"NEAR WATER" 1 AC
1002AD AREA APPL-GRASSBUR TREAT 1 AC
1002AE AREA APPL-BROADLEAF OR PRAIRIE
TREATMENT
1 AC
1002AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
1002AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
1002AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN
HEIGTH)
1 EA
1002AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
1002AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
1002AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
1002AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
1002AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
1002AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
1002AO AREA APPL - FIRE/MISCELLANEOUS ANT
CONTROL
1 AC
1002AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
1002AQ FACILITY TREATMENT - PEST CONTROL 1 AC
1002AR AREA APPL-HYDRO-SEED 1 AC
1002AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
NAVARRO MILLS-PESTICIDE/HERBICIDE -ITEMS 1002AA THRU 1002AS TOTAL
1003 PESTICIDE/HERBICIDE - WACO LAKE
PRICE
AMOUNT
1003AA ROAD SHOULDER 1 MI
1003AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
1003AC AREA APPL-"NEAR WATER" 1 AC
1003AD AREA APPL-GRASSBUR TREAT 1 AC
1003AE AREA APPL-BROADLEAF OR PRAIRIE
TREATMENT
1 AC
1003AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
1003AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
1003AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN
HEIGTH)
1 EA
1003AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
1003AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
1003AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
1003AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
1003AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
1003AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
1003AO AREA APPL - FIRE/MISCELLANEOUS ANT
CONTROL
1 AC
1003AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
1003AQ FACILITY TREATMENT - PEST CONTROL 1 AC
1003AR AREA APPL-HYDRO-SEED 1 AC
1003AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
WACO - PESTICIDE/HERBICIDE -ITEMS 1003AA THRU 1003AS TOTAL
1004 PESTICIDE/HERBICIDE - WHITNEY LAKE
PRICE
AMOUNT
1004AA ROAD SHOULDER 1 MI
1004AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
1004AC AREA APPL-"NEAR WATER" 1 AC
1004AD AREA APPL-GRASSBUR TREAT 1 AC
1004AE AREA APPL-BROADLEAF OR PRAIRIE
TREATMENT
1 AC
1004AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
1004AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
1004AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN
HEIGTH)
1 EA
1004AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
1004AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
1004AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
1004AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
1004AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
1004AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
1004AO AREA APPL - FIRE/MISCELLANEOUS ANT
CONTROL
1 AC
1004AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
1004AQ FACILITY TREATMENT - PEST CONTROL 1 AC
1004AR AREA APPL-HYDRO-SEED 1 AC
1004AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
WHITNEY - PESTICIDE/HERBICIDE -ITEMS 1004AA THRU 1004AS TOTAL
SUMMARY - OPTION YEAR ONE: 1 February 2017 through 31 January 2018.
AQUILLA / WHITNEY LAKES (OPTION YEAR ONE) ITEMS 1001AA - 1001AS
NAVARRO MILLS LAKE (OPTION YEAR ONE) ITEMS 1002AA - 1002AS
WACO LAKE (OPTION YEAR ONE) ITEMS 1003AA - 1003AS
WHITNEY LAKE (OPTION YEAR ONE) ITEMS 1004AA - 1004AS
(OPTION YEAR ONE) TOTAL ITEMS 1001AA - 1004AS
CONTRACT OPTION YEAR TWO
1 February 2018 through 31 January 2019.
2001 PESTICIDE/HERBICIDE - AQUILLA LAKE
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
2001AA ROAD SHOULDER 1 MI
2001AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
2001AC AREA APPL-"NEAR WATER" 1 AC
2001AD AREA APPL-GRASSBUR TREAT 1 AC
2001AE AREA APPL-BROADLEAF OR PRAIRIE
TREATMENT
1 AC
2001AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
2001AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
2001AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
1 EA
2001AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
2001AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
2001AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
2001AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
2001AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
2001AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
2001AO AREA APPL - FIRE/MISCELLANEOUS ANT
CONTROL
1 AC
2001AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
2001AQ FACILITY TREATMENT - PEST CONTROL 1 AC
2001AR AREA APPL-HYDRO-SEED 1 AC
2001AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
AQUILLA LAKE PESTICIDE/HERBICIDE - ITEMS 2001AA THRU 2001AS TOTAL
2002 PESTICIDE/HERBICIDE - NAVARRO MILLS LAKE
PRICE
AMOUNT
2002AA ROAD SHOULDER 1 MI
2002AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
2002AC AREA APPL-"NEAR WATER" 1 AC
2002AD AREA APPL-GRASSBUR TREAT 1 AC
2002AE AREA APPL-BROADLEAF OR PRAIRIE
TREATMENT
1 AC
2002AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
2002AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
2002AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
1 EA
2002AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
2002AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
2002AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
2002AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
2002AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
2002AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
2002AO AREA APPL - FIRE/MISCELLANEOUS ANT
CONTROL
1 AC
2002AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
2002AQ FACILITY TREATMENT - PEST CONTROL 1 AC
2002AR AREA APPL-HYDRO-SEED 1 AC
2002AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
NAVARRO MILLS-PESTICIDE/HERBICIDE -ITEMS 2002AA THRU 2002AS TOTAL
2003 PESTICIDE/HERBICIDE - WACO LAKE
PRICE
AMOUNT
2003AA ROAD SHOULDER 1 MI
2003AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
2003AC AREA APPL-"NEAR WATER" 1 AC
2003AD AREA APPL-GRASSBUR TREAT 1 AC
2003AE AREA APPL-BROADLEAF OR PRAIRIE
TREATMENT
1 AC
2003AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
2003AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
2003AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
1 EA
2003AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
2003AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
2003AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
2003AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
2003AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
2003AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
2003AO AREA APPL - FIRE/MISCELLANEOUS ANT
CONTROL
1 AC
2003AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
2003AQ FACILITY TREATMENT - PEST CONTROL 1 AC
2003AR AREA APPL-HYDRO-SEED 1 AC
2003AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
WACO - PESTICIDE/HERBICIDE -ITEMS 2003AA THRU 2003AS TOTAL
2004 PESTICIDE/HERBICIDE - WHITNEY LAKE
PRICE
AMOUNT
2004AA ROAD SHOULDER 1 MI
2004AB AREA APPL-AQUATIC OR "IN WATER" 1 AC
2004AC AREA APPL-"NEAR WATER" 1 AC
2004AD AREA APPL-GRASSBUR TREAT 1 AC
2004AE AREA APPL-BROADLEAF OR PRAIRIE
TREATMENT
1 AC
2004AF AREA APPL-WOODY BRUSH TREATMENT (UP
TO 8 FEET IN HEIGTH)
1 AC
2004AG AREA APPL-PRICKLY PEAR TREATMENT 1 AC
2004AH SPOT TREATMENT - WOODY BRUSH (SMOOTH
BARK FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
1 EA
2004AI SPOT TREATMENT - WOODY BRUSH (ROUGH
BARK FOLIAR TREES - OVER 8 FEET IN HEIGTH)
1 EA
2004AJ SPOT TREATMENT-PRICKLY PEAR 1 EA
2004AK EMBANKMENT AREA APPL-BROADLEAF TREAT 1 AC
2004AL EMBANKMENT SPOT TREATMENT WOODY
BRUSH (SMOOTH BARK FOLIAR - UP TO 8 FEET
IN HEIGTH)
1 EA
2004AM EMBANKMENT SPOT TREATMENT WOODY
BRUSH (ROUGH BARK FOLIAR - OVER 8 FEET
IN HEIGTH)
1 EA
2004AN EMBANKMENT SPOT TREATMENT PRICKLY
PEAR
1 EA
2004AO AREA APPL - FIRE/MISCELLANEOUS ANT
CONTROL
1 AC
2004AP AREA APPL - "ARGENTINA ANT" CONTROL 1 SF
2004AQ FACILITY TREATMENT - PEST CONTROL 1 AC
2004AR AREA APPL-HYDRO-SEED 1 AC
2004AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 1 AC
WHITNEY - PESTICIDE/HERBICIDE -ITEMS 2004AA THRU 2004AS TOTAL
SUMMARY-OPTION YEAR TWO: 1 February 2018 through 31 January 2019.
AQUILLA / WHITNEY LAKES (OPTION YEAR TWO) ITEMS 2001AA - 2001AS
NAVARRO MILLS LAKE (OPTION YEAR TWO) ITEMS 2002AA - 2002AS
WACO LAKE (OPTION YEAR TWO) ITEMS 2003AA - 2003AS
WHITNEY LAKE (OPTION YEAR TWO) ITEMS 2004AA - 2004AS
(OPTION YEAR TWO) TOTAL ITEMS 2001AA - 2004AS
BASE YEAR - TOTAL (CLIN 0001AA - 0004AS)
OPTION YEAR ONE - TOTAL (CLIN 1001AA - 1004AS)
OPTION YEAR TWO - TOTAL (CLIN 2001AA - 2004AS)
BASE AND ALL OPTIONS - (CLIN 0001AA-2004AS) - CONTRACT TOTAL
TASK ORDER #0001 BID SCHEDULE
Central Texas Lakes Herbicide Services
Services for Aquilla, Whitney, Navarro Mills and Waco Lakes
BID SCHEDULE - TASK ORDER #0001
INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) SUPPLIES AND
SERVICES CONTRACT
Contractor shall provide all labor, equipment, materials, supplies, management, and supervision to perform herbicide and pesticide application services in recreational, embankment, levee and outlet areas and facilities at Aquilla, Navarro Mills, Waco and Whitney lakes, US Army Corps of Engineers, Three Rivers Regional, Fort Worth District, Texas. All services will be performed in accordance with the attached Performance Work Statement and as required by State and Federal regulations.
CONTRACT TASK ORDER #0001
SUMMARY - CONTRACT TASK ORDER #0001: 15 April 2015 through 15 July 2015.
0001 PESTICIDE/HERBICIDE - AQUILLA
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
0001AA ROAD SHOULDER 3 MI
0001AB AREA APPL-AQUATIC OR "IN WATER" AC
0001AC AREA APPL-"NEAR WATER" AC
0001AD AREA APPL-GRASSBUR TREAT AC
0001AE AREA APPL-BROADLEAF OR PRAIRIE TREATMENT AC
0001AF AREA APPL-WOODY BRUSH TREATMENT (UP TO 8 FEET
IN HEIGTH)
AC
0001AG AREA APPL-PRICKLY PEAR TREATMENT AC
0001AH SPOT TREATMENT - WOODY BRUSH (SMOOTH BARK
FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
20 EA
0001AI SPOT TREATMENT - WOODY BRUSH (ROUGH BARK
FOLIAR TREES - OVER 8 FEET IN HEIGTH)
EA
0001AJ SPOT TREATMENT-PRICKLY PEAR EA
0001AK EMBANKMENT AREA APPL-BROADLEAF TREAT 5 AC
0001AL EMBANKMENT SPOT TREATMENT WOODY BRUSH
(SMOOTH BARK FOLIAR - UP TO 8 FEET IN HEIGTH)
40 EA
0001AM EMBANKMENT SPOT TREATMENT WOODY BRUSH
(ROUGH BARK FOLIAR - OVER 8 FEET IN HEIGTH)
EA
0001AN EMBANKMENT SPOT TREATMENT PRICKLY PEAR AC
0001AO AREA APPL - FIRE/MISCELLANEOUS ANT CONTROL AC
0001AP AREA APPL - "ARGENTINA ANT" CONTROL AC
0001AQ FACILITY TREATMENT - PEST CONTROL SF
0001AR AREA APPL-HYDRO-SEED AC
0001AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) AC
AQUILLA - PESTICIDE/HERBICIDE - ITEMS 0001AA THRU 0001AS TOTAL
0002 PESTICIDE/HERBICIDE - NAVARRO MILLS LAKE
SUMMARY CONTRACT TASK ORDER #0001: 15 April 2015 through 15 July 2015.
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
0002AA ROAD SHOULDER 43 MI
0002AB AREA APPL-AQUATIC OR "IN WATER" AC
0002AC AREA APPL-"NEAR WATER" 1 AC
0002AD AREA APPL-GRASSBUR TREAT AC
0002AE AREA APPL-BROADLEAF OR PRAIRIE TREATMENT 1 AC
0002AF AREA APPL-WOODY BRUSH TREATMENT (UP TO 8 FEET
IN HEIGTH)
AC
0002AG AREA APPL-PRICKLY PEAR TREATMENT AC
0002AH SPOT TREATMENT - WOODY BRUSH (SMOOTH BARK
FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
EA
0002AI SPOT TREATMENT - WOODY BRUSH (ROUGH BARK
FOLIAR TREES - OVER 8 FEET IN HEIGTH)
EA
0002AJ SPOT TREATMENT-PRICKLY PEAR EA
0002AK EMBANKMENT AREA APPL-BROADLEAF TREAT 2 AC
0002AL EMBANKMENT SPOT TREATMENT WOODY BRUSH
(SMOOTH BARK FOLIAR - UP TO 8 FEET IN HEIGTH)
40 EA
0002AM EMBANKMENT SPOT TREATMENT WOODY BRUSH
(ROUGH BARK FOLIAR - OVER 8 FEET IN HEIGTH)
EA
0002AN EMBANKMENT SPOT TREATMENT PRICKLY PEAR AC
0002AO AREA APPL - FIRE/MISCELLANEOUS ANT CONTROL AC
0002AP AREA APPL - "ARGENTINA ANT" CONTROL 5 AC
0002AQ FACILITY TREATMENT - PEST CONTROL 6602 SF
0002AR AREA APPL-HYDRO-SEED AC
0002AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) AC
NAVARRO MILLS - PESTICIDE/HERBICIDE-ITEMS 0002AA THRU 0002AS TOTAL
0003 PESTICIDE/HERBICIDE - WACO LAKE
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
0003AA ROAD SHOULDER 37 MI
0003AB AREA APPL-AQUATIC OR "IN WATER" AC
0003AC AREA APPL-"NEAR WATER" AC
0003AD AREA APPL-GRASSBUR TREAT AC
0003AE AREA APPL-BROADLEAF OR PRAIRIE TREATMENT AC
0003AF AREA APPL-WOODY BRUSH TREATMENT (UP TO 8 FEET
IN HEIGTH)
AC
0003AG AREA APPL-PRICKLY PEAR TREATMENT AC
0003AH SPOT TREATMENT - WOODY BRUSH (SMOOTH BARK
FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
EA
0003AI SPOT TREATMENT - WOODY BRUSH (ROUGH BARK
FOLIAR TREES - OVER 8 FEET IN HEIGTH)
EA
0003AJ SPOT TREATMENT-PRICKLY PEAR EA
0003AK EMBANKMENT AREA APPL-BROADLEAF TREAT AC
0003AL EMBANKMENT SPOT TREATMENT WOODY BRUSH
(SMOOTH BARK FOLIAR - UP TO 8 FEET IN HEIGTH)
EA
0003AM EMBANKMENT SPOT TREATMENT WOODY BRUSH
(ROUGH BARK FOLIAR - OVER 8 FEET IN HEIGTH)
EA
0003AN EMBANKMENT SPOT TREATMENT PRICKLY PEAR AC
0003AO AREA APPL - FIRE/MISCELLANEOUS ANT CONTROL AC
0003AP AREA APPL - "ARGENTINA ANT" CONTROL AC
0003AQ FACILITY TREATMENT - PEST CONTROL SF
0003AR AREA APPL-HYDRO-SEED AC
0003AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) AC
WACO - PESTICIDE/HERBICIDE -ITEMS 0003AA THRU 0003AS TOTAL
0004 PESTICIDE/HERBICIDE - WHITNEY LAKE
ITEM DESCRIPTION EST.QTY U/M UNIT
PRICE
AMOUNT
0004AA ROAD SHOULDER 57 MI
0004AB AREA APPL-AQUATIC OR "IN WATER" AC
0004AC AREA APPL-"NEAR WATER" AC
0004AD AREA APPL-GRASSBUR TREAT 20 AC
0004AE AREA APPL-BROADLEAF OR PRAIRIE TREATMENT AC
0004AF AREA APPL-WOODY BRUSH TREATMENT (UP TO 8 FEET
IN HEIGTH)
AC
0004AG AREA APPL-PRICKLY PEAR TREATMENT AC
0004AH SPOT TREATMENT - WOODY BRUSH (SMOOTH BARK
FOLIAR TREES - UP TO 8 FEET IN HEIGTH)
EA
0004AI SPOT TREATMENT - WOODY BRUSH (ROUGH BARK
FOLIAR TREES - OVER 8 FEET IN HEIGTH)
EA
0004AJ SPOT TREATMENT-PRICKLY PEAR EA
0004AK EMBANKMENT AREA APPL-BROADLEAF TREAT 5 AC
0004AL EMBANKMENT SPOT TREATMENT WOODY BRUSH
(SMOOTH BARK FOLIAR - UP TO 8 FEET IN HEIGTH)
21 EA
0004AM EMBANKMENT SPOT TREATMENT WOODY BRUSH
(ROUGH BARK FOLIAR - OVER 8 FEET IN HEIGTH)
20 EA
0004AN EMBANKMENT SPOT TREATMENT PRICKLY PEAR AC
0004AO AREA APPL - FIRE/MISCELLANEOUS ANT CONTROL AC
0004AP AREA APPL - "ARGENTINA ANT" CONTROL AC
0004AQ FACILITY TREATMENT - PEST CONTROL SF
0004AR AREA APPL-HYDRO-SEED AC
0004AS AREA APPL-FERTILIZER (5-3-1 MIXTURE) 8 AC
WHITNEY - PESTICIDE/HERBICIDE -ITEMS 0004AA THRU 0004AS TOTAL
SUMMARY - CONTRACT TASK ORDER #0001: 15 April 2015 through 15 July 2015.
AQUILLA LAKE ITEMS 0001AA - 0001AS
NAVARRO MILLS LAKE ITEMS 0002AA - 0002AS
WACO LAKE ITEMS 0003AA - 0003AS
WHITNEY LAKE ITEMS 0004AA - 0004AS
TASK ORDER #0001 - (CLIN 0001AA-0004AS) TOTAL
PERFORMANCE WORK STATEMENT
HERBICIDE AND PESTICIDE SERVICES
AQUILLA, NAVARRO MILLS, WACO & WHITNEY LAKES
THREE RIVERS REGION, TEXAS
1. GENERAL: This is a non-personal services contract providing all management, tools, equipment, materials, chemicals and labor required to achieve the desired results described herein through the application of herbicides and insecticides. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, travel, supervision, and other items and non-personal services necessary to perform herbicide and pesticide applications at the Three Rivers Regional Lakes of Central Texas, these being Aquilla, Navarro Mills, Waco and Whitney Lakes. All applications and treatment results shall be as defined in this Performance Work Statement (PWS). The Contractor shall be required to perform within the standards of this contract.
1.2 Scope: The objective of these services shall be the eradication or abatement of undesirable invasive species, provide pest control and hydro-seeding treatments, as described herein. All herbicides, pesticides hydro-seed mixtures applied during the execution of these services shall be submitted to the Lake Manager for approval prior to use. Lake Manager may define in writing, additional points of contacts referred to as Government Representatives to perform certain duties in execution of this contract. Contractor is solely responsible for proper application of the herbicides and pesticides under this contract, per the Manufacturer’s label instructions and Texas Department of Agriculture regulations. Work under this contract requires the following applications:
a. Road Shoulder and Parking Area Herbicide Treatment (PRS #1)
b. Area Application –Broadleaf, Non Embankment (PRS#2)
c. Spot Treatment Non-Embankment (PRS#3)
d. Embankment and Levee Application, Broadleaf (PRS#4)
e. Spot Herbicide Treatment - Embankment (PRS#5)
f. Area Application-Ant Control (PRS#6)
g. Area Application-Argentina Ant Control (PRS#7)
h. Facility Pesticide Control Treatment (PRS#8)
i. Hydro-Seeding Services (PRS#9)
j. Fertilizer Application Services (PRS#10)
1.2.1 Areas of application: The following treatments and applications are included to demonstrate the desired results. Other chemical treatments and application methods may be used per label instructions and with the COR’s approval, as long these are products and methods are equal to or better, with results achieved at no additional cost to the Government.
a. (PRS1) Road Shoulder and Parking Area Herbicide Treatment. Road shoulder and parking area treatments shall be ordered by the mile of increment thereof and one linear mile of road shall be considered two miles of treatment e.g.; one mile each side. Parking area perimeters are considered in these tabulations. All invasive vegetation migrating into areas of the roadway or parking area cracks shall also be treated under this work item. Contractor shall select the chemicals proven to achieve the results as specified in section 1.9.1 Technical Exhibit 1- “Performance Requirements Summary” and in accordance with all portions of this PWS. Designated areas shall be treated using the required mixture and application rates per the Manufacturer’s label to achieve results for the target species. The use of an approved dye shall be used to verify 100% coverage of the designated area.
b. (PRS2) Area Application-Broadleaf, Non Embankment Category. Area application shall be ordered by the acre or increment thereof and will be ordered for use on level to mild terrain (less than a slope of 10 degrees), considered “non-embankment” areas. Applications may consist of various types, granular, liquid, etc. In the area application, foliar or granular treatment shall target various invasive species as specified in each task order and by contract line item. Contractor shall select the chemicals proven to achieve the results as specified in section 1.9.1 Technical Exhibit 1- “Performance Requirements Summary” and in accordance with all portions of this PWS. Designated areas shall be treated using the required mixture and application rates per the Manufacturer’s label to achieve results for the target species. The use of an approved dye shall be used to verify 100% coverage of the designated area. Note: The following are subcategories of area applications require equal results as listed in the Performance Requirements Summary with similar application techniques but, may require a variance in species specific chemicals.
1. “Aquatic ”. Herbicide treatment must contain chemicals labeled for use in aquatic areas and applied at rate specified in the Manufacturer’s label for control of the target species. The types of plants treated under this line item may include but, not limited to, those plants in the Typha (Cat Tail), Hydrilla genus, Water Hyacinth or other aquatic invasive species. The Contractor shall select the best chemicals to achieve the results as specified in section 1.9.1 Technical Exhibit 1- “Performance Requirements Summary” and in accordance with all portions of this PWS. Special license requirements may be necessary per Texas Department of Agriculture for treatment in these areas.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .