W9126G-15-R0001Vol2BarkerCivilPlansThruCG152.pdf
PDF 47 MB Posted
- Solicitation number
- W9126G-15-R-0001
About this file
Vol 2 Barker Civil Plans CG152
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
IV
IL
A
N D S
IT
E N
O T
E S
A R
S
C-001
CIVIL NOTES
F U
L L S
IZ
E
A B
M D C -0
.d g n
A
S J C
R
DEMOBILIZATION AND FINAL PROJECT CLOSEOUTAI.
AS-BUILT DOCUMENT PREPARATION, SUBMISSION, AND APPROVALAH.
BORROW AREA MITIGATIONAG.
FINAL FILL AND GRADING, TURFING, SITE RESTORATIONAF.
CONSTRUCT UPSTREAM ABANDONMENT CUTOFF WALLAE.
CONSTRUCT ABANDONMENT BUTTRESSAD.
DEMOLISH REMAINING T-WALL STRUCTUREAC.
BACKFILL EXISTING APPROACH STRUCTURE AND APPROACH CHANNELAB.
EXCAVATE AND DEMOLISH EXISTING APPROACH WALLS AND SLABAA.
DEMOLISH EXISTING GATE TOWER ABOVE GRADE, ACCESS BRIDGE, GAGING TOWER, EQUIPMENTZ.
CONSTRUCT EXISTING UPSTREAM CHANNEL DIVERSION PLUGY.
CONSTRUCT DOWNSTREAM FILTER; BACKFILL EXISTING OUTLET STRUCTURE, EXISTING OUTLET CHANNELX.
EXCAVATE AND DEMOLISH EXISTING STILLING BASIN, SPILLWAY, OUTLET WINGWALLSW.
CONSTRUCT EXISTING DOWNSTREAM CHANNEL DIVERSION PLUGV.
GROUTING OF EXISTING CONDUIT STRUCTURE, INCLUDING GATE TOWER AND MONOLITH 1U.
INSTALL INSTRUMENTATIONT.
COMMISSIONING OF NEW OUTLET WORKS STRUCTURE (ASSUME PRIMARY SITE OPERATIONS)S.
INSTALL PERMANENT EROSION CONTROL / REVETMENTR.
EXCAVATION OF DOWNSTREAM AND UPSTREAM CHANNELS, COFFERDAM REMOVALQ.
INSTALL UTILITIES AND CONSTRUCT GENERATOR AND EQUIPMENT BUILDINGSP.
CONSTRUCT MAINTENANCE ACCESS BRIDGE TO TOWERO.
PRIMARY EMBANKMENT FILL AND GEOTECHNICAL FILTERS (SEE REQUIRED SLOPES, AND GRADING PLANS)N.
CONSTRUCT NEW OUTLET WORKS STRUCTUREM.
FOUNDATION MAPPING IN EXCAVATIONL.
PRIMARY AND SECONDARY EXCAVATION K.
CONSTRUCT EMBANKMENT CUTOFF WALL AT NEW OUTLET WORKSJ.
CONSTRUCT COFFERDAM; PHASE ONE T-WALL PANEL DEMO; INSTALL DEWATERING SYSTEMI.
CLEARING AND GRUBBING WORK AREAS, BORROW AREA, STAGING AREASH.
CONTRACTOR TEMPORARY HAUL ROADSG.
TEMPORARY CONSTRUCTION SIGNAGE, BARRICADES, HIKE AND BIKE TRAIL CLOSURE / RE-ROUTEF.
CONTRACTOR EROSION CONTROL AND STORMWATER POLLUTION PREVENTIONE.
PRE-CONSTRUCTION SUBMITTAL DEVELOPMENT, SUBMISSION, APPROVALD.
PRE-CONDITION ASSESSMENT SURVEYS (VIDEO, NOTES, UTILITIES)C.
MOBILIZATION ON SITE, CONTRACTOR AND GOVERNMENT CONSTRUCTION OFFICESB.
CONTRACTOR ACCESS - INGRESS / EGRESS, PROJECT SITE ACCESS, CROSSINGSA.
4. CONSTRUCTION SEQUENCE (TO BE INCLUDED IN CONTRACTOR'S SCHEDULE):
3. CURRENT TOP OF EMBANKMENT (OUTSIDE OF T-WALL LIMITS): VARIES 108.00 - 112.00'
2. CURRENT TOP OF EMBANKMENT AT OUTLET WORKS STRUCTURE (T-WALL SECTION): 111.65'
EXISTING CONDITIONS.
SHALL, AT NO TIME, REDUCE THE CURRENT LEVEL OF PROTECTION (ELEVATION) OF THE DAM FROM
SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL. THE ACTIVITY SEQUENCE
IF THE CONTRACTOR ELECTS TO DEVIATE FROM THE SEQUENCE BELOW, THAT DEVIATION SHALL BE
"SUMMARY OF WORK" AND APPLICABLE SPECIFICATIONS FOR ADDITIONAL SEQUENCING REQUIREMENTS.
THE ACTIVITIES LISTED BELOW ARE NOT ALL-INCLUSIVE. REFER TO SPECIFICATION SECTION 01 00 10
SHALL INCLUDE, AT A MINIMUM, THE ACTIVITIES LISTED BELOW IN THE CONTRACTOR'S SCHEDULE.
CONSTRUCTION OF THE NEW OUTLET WORKS STRUCTURE AT BARKER DAM. THE CONTRACTOR
1. THE FOLLOWING REPRESENTS THE GOVERNMENT INTENT FOR ACTIVITY SEQUENCING FOR THE
PROJECT CONSTRUCTION SEQUENCING NOTES:
PLANE NAD83, SOUTH CENTRAL ZONE, US FOOT.
REFLECTS A REPROJECTION OF THE ORIGINAL ALIGNMENT TO TEXAS STATE
PROJECTION. EMBANKMENT ALIGNMENT INFORMATION SHOWN ON C-601
3. ORIGINAL EMBANKMENT ALIGNMENT WAS BASED ON TEXAS STATE PLAN NAD27
ALIGNMENT SHOWN ON THESE SHEETS.
2. THE CURRENT EMBANKMENT CREST DOES NOT ALIGN WITH THE EMBANKMENT
ORIGINAL ALIGNMENT.
SUBSEQUENT HISTORIC PHASES OF REHABILITATION HAVE UTILIZED THE
SHEETS, WAS USE FOR THE DEVELOPMENT OF THE CIVIL SHEETS.
THE AS-BUILT CONSTRUCTION DOCUMENTS SHOWN IN THE R-XXX SERIES
1. THE ORIGINAL EMBANKMENT ALIGNMENT AND STATIONING, AS SHOWN ON
EXISTING EMBANKMENT AND EXISTING CHANNEL ALIGNMENT NOTES:
14. STATION XX+XX.XXN - NEW PEDESTRIAN ACCESS ROAD DITCH AT ADDICKS
13. STATION XX+XX.XXM - NEW BORROW AREA DITCH AT ADDICKS
12. STATION XX+XX.XXL - BARKER DITCH AT BARKER
AT BARKER
11. STATION XX+XX.XXK - NEW PEDESTRIAN ACCESS ROAD REPLACEMENT EAST LEG
10. STATION XX+XX.XXJ - NEW PEDESTRIAN ACCESS ROAD RE-ROUTE AT BARKER
9. STATION XX+XX.XXH - NEW PEDESTRIAN ACCESS ROAD REPLACEMENT AT BARKER
8. STATION XX+XX.XXG - NEW PEDESTRIAN ACCESS ROAD REPLACEMENT AT ADDICKS
7. STATION XX+XX.XXF - NEW OUTLET WORKS STRUCTURAL ALIGNMENT AT BARKER
6. STATION XX+XX.XXE - NEW OUTLET WORKS STRUCTURAL ALIGNMENT AT ADDICKS
5. STATION XX+XX.XXD - TEMPORARY COFFERDAM ALIGNMENT AT BARKER
4. STATION XX+XX.XXC - TEMPORARY COFFERDAM ALIGNMENT AT ADDICKS
3. STATION XX+XX.XXB - EXISTING OUTLET WORKS STRUCTURAL ALIGNMENT AT ADDICKS
2. STATION XX+XX.XXA - EXISTING OUTLET WORKS STRUCTURAL ALIGNMENT AT BARKER
ADDICKS AND BARKER DAMS
1. STATION XX+XX.XX - EXISTING EARTHEN EMBANKMENT ALIGNMENT FOR
NEW FEATURE ALIGNMENT
THE FOLLOWING DETAILS THE NAMING CONVENTION FOR EXISTING AND
GENERAL FEATURE ALIGNMENT NOTES:
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICESMUTCD
CIVIL ENGINEERINGUFC 3-210-01
SAFETY OF DAMSER 1100-2-1156
USACE SAFETY AND HEALTH REQUIREMENTS MANUALEM 385-1-1
DESIGN CRITERIA:
61,200 VPD ALONG HIGHWAY 6 SOUTH OF MEMORIAL.
ACCOMMODATE 61,200 VPD ALONG NOBLE ROAD/BRIAR FOREST DRIVE AND
SHOWN ON SHEETS G-002 AND G-003 IN THE TRAFFIC CONTROL PLAN TO
3. CONTRACTOR SHALL INCORPORATE PROVISIONS AT SITE ACCESS POINTS
DEVICES AND TXDOT STANDARD SPECIFICATIONS.
APPLICABLE CRITERIA IN THE MANUAL ON UNIFORM TRAFFIC CONTROL
2. CONTRACTOR DEVELOPED TRAFFIC CONTROL PLAN SHALL CONFORM TO
OF TRANSPORTATION, AND ACCEPTED BY THE CONTRACTING OFFICER.
WITH APPLICABLE SPECIFICATIONS, TO BE APPROVED BY THE TEXAS DEPARTMENT
1. CONTRACTOR SHALL DEVELOP A TRAFFIC CONTROL PLAN IN ACCORDANCE
TRAFFIC CONTROL AND TEMPORARY SIGNAGE:
BORROW AREAS.
9. CONTRACTOR MAY DISPOSE ALL NON-CONTAMINATED SOIL MATERIAL IN THE
8. NO CONSTRUCTION OR DEMOLITION DEBRIS SHALL BE DISPOSED ON SITE.
WERE DESIGNED USING US SURVEY FEET AS THE PRIMARY UNIT OF MEASURE.
7. UNLESS STATED OTHERWISE, ALL CIVIL AND GEOTECHNICAL SHEETS
IMPLEMENTED THAT MEET EM 385-1-1 REQUIREMENTS.
POWER TRANSMISSION LINES SAFETY PRECAUTIONS SHALL BE
6. IF ANY EQUIPMENT NEEDS TO OPERATE WITHIN 20 FEET FROM THE
FROM POWER TRANSMISSION LINES.
OF 10 FEET FROM ANY POWER DISTRIBUTION LINES AND 20 FEET
5. WORKER TOOLS AND EQUIPMENT SHALL BE KEPT A MINIMUM
STRUCTURES PRIOR TO COMMENCEMENT OF WORK.
4. CONTRACTOR SHALL FIELD VERIFY LOCATION OF ALL EXISTING
STRUCTURES IS PROVIDED FOR INFORMATION ONLY.
3. INFORMATION SHOWN ON THESE DRAWINGS FOR EXISTING
THE CONTRACTING OFFICER.
ASSOCIATED WITH THIS PROJECT SHALL BE COORDINATED WITH
2. TREE REMOVAL FROM THE PROJECT BOUNDARIES
A MINIMUM OF 48 HOURS PRIOR TO COMMENCING ANY EXCAVATION.
1. CONTRACTOR SHALL CALL 811 AND HAVE ALL UTILITY LINES MARKED,
GENERAL NOTES:
WORKS WALLS OR PIEZOMETERS PRIOR TO ANY DEMOLITION OF THE EXISTING OUTLET WORKS WALLS.
2. THE CONTRACTOR SHALL NOT OPERATE HEAVY EQUIPMENT WITHIN 15 FEET OF THE EXISTING OUTLET
EQUIPMENT PRIOR TO DEMOLITION OF THEDOWNSTREAM PORTION OF THE OUTLET WORKS.
1. THE CONTRACTOR SHALL NOT TRAVERSE THE DAM OVER THE EXISTING OUTLET WORKS WITH ANY
EXISTING OUTLET WORKS NOTES:
APPROXIMATELY 20' TO 32' UPSTREAM OF THE CURRENT EMBANKMENT CREST.
THE DAM. THE DAM EMBANKMENT HAS SINCE BEEN RAISED 0' TO 4'. THE ORIGINAL CUTOFF WALL IS NOW
2. THE ORIGINAL CUTOFF WALL ALIGNMENT WAS OFFSET 20' UPSTREAM OF THE ORIGINAL CENTERLINE OF
OF WORK AS REQUIRED.
CONTRACTOR SHALL FIELD VERIFY LOCATION AND ALIGNMENT OF EXISTING CUTOFF WALL WITHIN LIMITS
1. THE EXISTING CUTOFF WALL ALIGNMENT SHOWN ON THE FOLLOWING SHEETS IS APPROXIMATE.
CUTOFF WALL NOTES:
1. THE CONTRACTOR SHALL NOT PERFORM CONSTRUCTION ACTIVITIES OUTSIDE OF PROJECT LIMITS.
ENVIRONMENTAL / CULTURAL RESOURCE NOTES:
CONSTRUCT THE ABANDONMENT BUTTRESS.
CHANNELS MAY BE USED TO BACKFILL THE EXISTING UPSTREAM AND DOWNSTREAM CHANNELS AND
SATISFACTORY MATERIAL EXCAVATED TO CONSTRUCT THE NEW UPSTREAM AND DOWNSTREAM
4. BORROW AREA MATERIAL USED TO CONSTRUCT THE TEMPORARY COFFERDAM STRUCTURE AND
SECTION UPON COMPLETION OF THE NEW OUTLET WORKS STRUCTURE.
LOCATIONS IDENTIFIED ON THE PLANS, BUT SHALL BE USED TO RESTORE THE OVERBUILT EMBANKMENT
3. EXCAVATED MATERIAL FROM THE EMBANKMENT MAY BE TEMPORARILY STOCKPILED IN APPROVED
RESTORED ACCORDING TO APPLICABLE SPECIFICATIONS.
BUTTRESS SHALL BE RETURNED TO THE BORROW AREAS AND THE DESIGNATED BORROW AREA,
G-003, WHICH IS NOT REQUIRED TO CONSTRUCT THE OVERBUILT EMBANKMENT OR ABANDONMENT
2. ANY EXCESS MATERIAL REMOVED FROM THE BORROW AREAS, IDENTIFIED ON SHEETS G-002 AND
ANALYSIS PERFORMED TO MINIMIZE OFF-SITE BORROW AND WASTE.
1. THE LINES AND GRADES SHOWN ON THE FOLLOWING SHEETS REPRESENT A SITE MASS BALANCE
MASS BALANCE / PROJECT SITE LIMIT NOTES:
SHALL BE DESIGNED TO ACCOMMODATE ANTICIPATED VEHICULAR OR PEDESTRIAN TRAFFIC.
2. ANY TEMPORARY RAMPS SHALL BE SUBMITTED FOR APPROVAL BY THE CONTRACTING OFFICER AND
CONTRACT SHALL CONFORM TO REQUIREMENTS IN EM 385-1-1.
1. ANY PROJECT RAMPS, TEMPORARY OR PERMANENT, RELATED TO CONSTRUCTION ACTIVITIES IN THIS
PROJECT RAMP NOTES:
10H:1V LONGITUDINAL SLOPEUPSTREAM/DOWNSTREAM RAMPS - L.
3H:1V BELOW ELEV. 107.00EXISTING FEATURE BUTTRESS - K.
2H:1VEXISTING FEATURE EXCAVATION - J.
3H:1VNEW APPROACH CHANNEL SIDES - I.
3H:1VNEW OUTLET CHANNEL SIDES -H.
2% FROM CENTERLINEEMBANKMENT CREST - G.
3H:1V EMBANKMENT FILL - F.
2H:1VSECONDARY EXCAVATION - E.
3H:1VPRIMARY EXCAVATION - D.
2.5H:1VCOFFERDAM DOWNSTREAM SLOPE - C.
2.5H:1V TRANSITIONS TO 3H:1VCOFFERDAM UPSTREAM SLOPE - B.
2% FROM CENTERLINE, SLOPE TO DRAINCOFFERDAM CREST - A.
2. UNLESS NOTED OTHERWISE, THE FOLLOWING SLOPES SHALL APPLY TO EARTHWORK ACTIVITIES:
QUESTION.
TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL PRIOR PERFORMING THE DEVIATION IN
BUT A SLOPE STABILITY ANALYSIS SHALL BE PERFORMED ON THE PROPOSED CHANGES AND PROVIDED
SLOPE STABILITY ANALYSES. THE CONTRACTOR MAY DEVIATE FROM THE LINES AND GRADES SHOWN,
1. LINES AND GRADES IDENTIFIED ON THE FOLLOWING SHEETS WERE DEVELOPED FROM USACE
GRADING REQUIREMENTS / SLOPES:
CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT.
CROSSINGS SHALL BE REMOVED AND/OR RE-INSTALLED AT THE DIRECTION OF THE C.
CHANNEL CROSSING.
CONTRACTOR WILL NOT BE REIMBURSED FOR ANY DAMAGE TO THE DOWNSTREAM B.
CROSSING STRUCTURE.
CURRENT RELEASE RATES OF 2,000 CFS SHALL NOT BE IMPEDED BY ANY DOWNSTREAMA.
2. THE OPTIONAL TEMPORARY CHANNEL CROSSING SHALL MEET THE FOLLOWING CRITERIA:
CROSSING SHALL BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION.
STRUCTURE, WITHIN PROJECT LIMITS SHOWN ON SHEET G-003. THE CONTRACTOR
MAY CONSTRUCT A TEMPORARY CHANNEL CROSSING DOWNSTREAM OF THE EXISTING
STILLING BASIN AND OUTLET CHANNEL, THE CONTRACTOR
1. TO FACILITATE CONSTRUCTION OPERATIONS IN THE AREAS NEAR THE EXISTING
OUTLET CHANNEL CROSSING NOTES:
WITHOUT PRIOR APPROVAL FROM THE CONTRACTING OFFICER.
2. CONTRACTOR SHALL NOT DEVIATE FROM THE SITE ACCESS LIMITS SHOWN ON THE PLANS
APPROXIMATELY 1400 FEET SOUTH OF THE ADDICKS AND BARKER PROJECT OFFICE.
SOUTH OF THE EXISTING OUTLET WORKS STRUCTURE AND OFFICE ACCESS FROM HIGHWAY 6
G-003 (PROJECT LIMITS). FOR BARKER, PRIMARY ACCESS WILL BE FROM NOBLE ROAD
1. PRIMARY ACCESS TO THE BARKER CONSTRUCTION SITE SHALL BE AS SHOWN ON SHEET
PROJECT SITE ACCESS NOTES:
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
IDENTIFICATION
SHEET
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X X
W
G -1
-R -0
/0
/2
N
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P .E
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
10' U.E.
U .E
H.C.C.O.R.R.P.
F.N. J178064 & H850232
5' WATER & SANITARY SEWER ESMT.
H.C.C.O.P.R.R.P.
F.N. J178064 & H850232
20' SANITARY SEWER ESMT.
H.C.M.R.
VOL. 335, PG. 39
25' B.L.
H.C.O.P.R.R.P.
F268040
5' S.W.B.T. ESMT.
H.C.D.R.
ESMT. F.N. C019555
ESMT. W/ AERIAL
10' H.L.&P. CO.
CROSSING
DRAINAGE DITCH
C002
546+00
545+00
544+00
543+00
542+00
541+00
540+00
539+00
538+00
537+00
547+00
548+00
549+00
550+00
551+00
552+00
553+00
554+00
555+00
556+00
C-002
A B
M D C -0
.d
A
S J C
R
SCALE IN FEET
50' 100' 200' 300'
E
IS
T
IN
G S
U R
V E
Y A
D
T
IL
IT
Y P
L
70 75
65 65
75 70
PROPERTY LIMITS
USACE BOUNDARY
EASTING = 3032838.38
NORTHING = 13842220.08
EASTING = 3033107.30
NORTHING = 13842203.49
EASTING = 3033241.70
NORTHING = 13842997.21
EASTING = 3032542.85
NORTHING = 13843293.29
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
OFFICE COMPOUND
EXISTING USACE
N
ON SHEET G-005
MONUMENT CARD
HCFCD MON. W 100 BM 091
CONSTRUCTION, REFER TO C-601.
ON ORIGINAL EMBANKMENT
AND ALIGNMENT IS BASED
CENTERLINE STATIONING
ON SHEET G-005
MONUMENT CARD
B1 USACE 2014
UTILITY PLAN
EXISTING SITE SURVEY AND
UTILITY INFORMATION, BOUNDARIES
HORIZONTAL AND VERTICAL CONTROL, CONTOURS,
LIMITS (TYP.)
PROPERTY PLAT
NON-GOVERNMENT
PROPERTY LIMITS
BOUNDARY
USACE
LIMITS (TYP.)
PROPERTY
USACE BOUNDARY
H
IG
H W
A Y
H
IG
H W
A Y
UTILITIES, SEE E-101
EXISTING ELECTICAL
(TYP.)
PROPERTY LIMITS
USACE BOUNDARY
LIMITS (TYP.)
PROPERTY PLAT
NON-GOVERNMENT
SEE G-003 FOR INFO
WORK LIMITS (TYP.),
CONSTRUCTION
PROJECT
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
C003
UTILITY INFORMATION, BOUNDARIES
HORIZONTAL AND VERTICAL CONTROL
AND UTILITY PLAN
EXISTING SITE SURVEY, BOUNDARIES,
SCALE IN FEET
50' 100' 200' 300'
N
C-003
A B
M D C -0
.d
A
S J
IS
T
IN
G S
U R
V E
Y A
IL
IT
Y P
L A
N A
T N
O B
L E R
O
H O
U S T O
N P
IP
E
LIN
E C
O
20" N .G . P
IP
E
LIN
E
LIMITS
PROPERTY
USACE BOUNDARY
EASTING = 3,032,828.94
NORTHING = 13,837,529.58
EASTING = 3,032,934.55
NORTHING = 13,837,533.80
CONSTRUCTION, REFER TO C-601.
ON ORIGINAL EMBANKMENT
AND ALIGNMENT IS BASED
CENTERLINE STATIONING
ON SHEET G-005
MONUMENT CARD
B2 USACE 2014
NOBLE ROAD
NOBLE ROAD
C L
O D
IN
E D
IT
C H
C L
O D
IN
E D
IT
C H
C L
O D
IN
E D
IT
C H
BRIAR FOREST DRIVE
S T
A T
E H
IG
H W
A Y
S T
A T
E H
IG
H W
A Y
(WATER SURFACE ELEV. APPROX. 86.0')
BORROW PIT
CONSTRUCTION
ORIGINAL EMBANKMENT
501+00
482+00
483+00
484+00
485+00
486+00
487+00
488+00
489+00
490+00
491+00
492+00
493+00
494+00
495+00
496+00
497+00
498+00
499+00
500+00
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
+80.00'
+80.00' +80.00'
+80.00'
+80.46'
+80.59'
+80.64'
+81.00'
+81.16'
+81.30'
+81.61'
+81.67'
+81.90'
+82.00'
+82.00'
+82.33'
+82.82'
+83.34'
+83.78'
+83.87'
+83.98'
+84.58'
C004
SCALE IN FEET
N
C-004
A B
M D C -0
.d
S J
IS
T
IN
G S
U R
V E
Y A
N D U
T
IL
IT
Y
P
L A
N A
T B
O R
R O
W A
R E
I
30' 60' 120' 180'
M A
T C
H L
IN
E C -0
M A
T C
H L
IN
E C -0
AND SHALL BE FIELD VERIFIED BY THE CONTRACTOR.
2. ELEVATIONS SHOWN THIS SHEET ARE APPROXIMATE
SURVEY FOOT.
STATE PLANE, SOUTH CENTRAL ZONE, NAD83, US
1. COORDINATES SHOWN THIS SHEET ARE IN TEXAS
NOTES:
N 13 844 977.30
ELEV. 83.00'
E 3 027 158.95
N 13 844 436.30
ELEV. 82.00'
E 3 027 158.95
N 13 844 437.81
E 3 028 680.18
N 13 845 423.98
E 3 028 680.18
N 13 845 381.30
ELEV. 85.00'
E 3 027 569.94
PLAN - BORROW AREA
EXISTING SITE SURVEY AND UTILITY
INFORMATION, SPOT ELEVATIONS
EXISTING SURVEY CONTOURS UTILITY
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
80 80
80 +80.00'
+80.00'
+80.55'
+80.63'
+81.00'
+81.00'
+81.16'
+81.19'
+81.36' +81.73'
+81.97'
+81.99'
+82.00' +82.75'
+82.89'
+83.00'
+83.00'
+83.00'
+84.00'
+84.00'
C005
SCALE IN FEET
N
C-005
A B
M D C -0
.d
S J
IS
T
IN
G S
U R
V E
Y A
N D U
T
IL
Y
A
N A
T B
O R
R O
W A
R E
A
30' 60' 120' 180'
A
T C
H L
IN
E C -0
M A
T C
H L
IN
E C -0
AND SHALL BE FIELD VERIFIED BY THE CONTRACTOR.
2. ELEVATIONS SHOWN THIS SHEET ARE APPROXIMATE
SURVEY FOOT.
STATE PLANE, SOUTH CENTRAL ZONE, NAD83, US
1. COORDINATES SHOWN THIS SHEET ARE IN TEXAS
NOTES:
PIPELINE CROSSING)
(SEE G-003 FOR
EXISTING PIPELINE
MORE INFORMATION
SEE G-003 FOR
HAUL ROAD (THIS CONTRACT)
NEW BORROW AREA
N 13 844 439.30
ELEV. 80.00'
E 3 030 175.94N 13 844 439.00
ELEV. 80.00'
E 3 029 875.94
N 13 845 476.30
ELEV. 84.00'
E 3 030 040.94
N 13 845 423.98
E 3 028 680.18
N 13 844 437.81
E 3 028 680.18
PLAN - BORROW AREA
EXISTING SITE SURVEY AND UTILITY
INFORMATION, SPOT ELEVATIONS
EXISTING SURVEY CONTOURS UTILITY
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
Production Center
SWD Dam Safety
®of Engineers
US Army Corps
N
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
IDENTIFICATION
SHEET
B R
O
J
R
J
S
E X
IS
T
IN
G H
A B
IT
A T
A B
M D
E
X
IS
T
IN
G H
A B
IT
A T .d
C-104
LEGEND:
EXISTING WETLANDS
BORROW SITE
LIMITS OF WORK
GOVERNMENT PROPERTY LINE
SCALE IN FEET
1200'800'400'200' 1" = 400'-0"
4. FOR WETLANDS OUTSIDE THE LIMITS OF WORK SEE SPECIFICATION SECTION 01 57 20.00 1.
TO THE BORROW SITE AND SPREAD UNIFORMLY ACROSS IT.
3. ALL EXCESS SOIL MATERIAL FROM THE INTERIOR OF THE RESERVOIR SHALL BROUGHT
THESE WETLANDS.
PRE-CONSTRUCTION ELEVATIONS. CONTRACTOR IS NOT REQUIRED TO RE-VEGETATE
STOCKPILE AREAS, COFFERDAM, ETC...) SHALL BE RETURNED TO
2. ALL TEMPORARY IMPACTS TO WETLAND (HAUL ROADS, CHANNEL CROSSINGS,
AT THESE LOCATIONS.
OF THE PROJECT. THE CONTRACTOR SHALL RECORD THE EXISTING ELEVATION
1. THIS DRAWING SHOWS APPROXIMATE LOCATION OF WETLANDS WITHIN WORK AREA
NOTES:
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
SCALE IN FEET
40' 80' 160' 240'
O J E
C T F
IL
L K
E Y P
L
R
A
C-101
COFFERDAM
NEW OUTLET WORKS
NEW OVERBUILT EMBANKENT
EXISTING OUTLET CHANNEL DIVERSION PLUG
EXISTING DOWNSTREAM CHANNEL FILL
EXISTING APPROACH CHANNEL DIVERSION PLUG
EXISTING APPROACH CHANNEL FILL
EXISTING OVERBUILT EMBANKMENT
EXISTING ABANDONMENT BERM
SEE SHEET SERIES CG-X1X
COFFERDAM
SEE SHEET SERIES CG-X6X
CHANNEL DIVERSION PLUG
EXISTING APPROACH
SEE SHEET SERIES CG-X6X
CHANNEL FILL
EXISTING APPROACH
SEE SHEET SERIES CG-X6X
ABANDONMENT BERM
EXISTING UPSTREAM
SEE SHEET SERIES CG-X6X
CHANNEL DIVERSION PLUG
EXISTING OUTLET
SEE SHEET SERIES CG-X6X
ABANDONMENT OVERBUILD
EXISTING EMBANKMENT
SEE SHEET SERIES CG-X3X
EMBANKMENT OVERBUILD
NEW OUTLET WORKS
541+00
542+00
543+00
544+00
545+00
546+00
A
547+00
548+00
549+00
550+00
551+00
552+00
553+00
554+00
555+00
556+00
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
SEE SHEET SERIES CG-X2X
NEW OUTLET WORKS STRUCTURE
SEE SHEET SERIES CG-X6X
CHANNEL FILL
EXISTING OUTLET
J E
U
A B
M D C -1
.d
PROJECT FILL KEY PLAN
FILL ACTIVITIES
LIMITS OF TEMPORARY AND PERMANENT
C101
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
0 70
75 75
0 80
K
Y P
L
O J E
C T E
X C
A V
A T
IO
45' 90' 180' 270'
B
M D C -1
.d
R
A
NEW APPROACH CHANNEL
EXISTING DOWNSTREAM EXCAVATION
EXISTING UPSTREAM EXCAVATION
SEE SHEET SERIES CG-X3X
NEW OUTLET CHANNEL
SEE SHEET SERIES CG-X3X
NEW APPROACH CHANNEL
SEE SHEET SERIES CG-X6X
AND DEMOLITION
STRUCTURE EXCAVATION
EXISTING APPROACH
SEE SHEET SERIES CG-X6X
AND DEMOLITION
STRUCTURE EXCAVATION
AND WINGWALLS
EXISTING STILLING BASIN
NEW CONDUIT EMBANKENT EXCAVATION
NEW DOWNSTREAM CHANNEL
SECONDARY OUTLET WORKS EXCAVATION
SEE SHEET SERIES CG-X2X
STRUCTURE EXCAVATION
SECONDARY OUTLET WORKS
SEE SHEET SERIES CG-X2X
STRUCTURE EXCAVATION
NEW OUTLET WORKS
C-102
541+00
542+00
543+00
544+00
545+00
546+00
547+00
548+00
549+00
550+00
551+00
552+00
553+00
554+00
555+00
556+00
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A R
S
EXCAVATION ACTIVITIES
LIMITS OF TEMPORARY AND PERMANENT
PROJECT EXCAVATION KEY PLAN
C102
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
75 75
0 80
+0
0F
F
F
F
F
F
F
F
+0
0F
+0
0F28 +0
+0
8F
.0
F
P O
B
.0
F
P C
7+33.87F
P T
.4
F
P I
F
F
F
F
F
F
F
F
8+
F
9+
F
10+08.76F P C
.0
F
P I1
.7
F
P T
.3
F P I
.6
F P I
.9
F
P C
.0
F
P I
27+22.17F
PT
28+08.15F
POE
F
F
F
F
F
F
F
F
F
C103
S
T -C
O N
S T
R U
C T
IO
N C
O N
D
IT
50' 100' 200' 300'
IV
IL
S
IT
E P
L
A B
M D C -1
.d
S
A
C-103
O N
E W C
H A
N N
E L
G R
A D
E T
O D
R A
IN
FINAL DESIGN CONTOURS
NEW FEATURE ACTIVITIES
J C
R
FF ELEV. 113.3'
BUILDING
GENERATOR
FF ELEV. 113.3'
BUILDING
EQUIPMENT
CROWN @ ELEV. 113.0'
CREST ROAD
EMBANKMENT
SLOPE 1% TO DRAIN
BENCH @ 107.0'
BUTTRESS
ABANDONMENT
ELEV. 87.0'
PAVEMENT
TRAIL TOP OF
HIKE AND BIKE
ALIGNMENT
CHANNEL
NEW OUTLET
ALIGNMENT
CHANNEL
APPROACH
NEW
547+00
548+00
549+00
550+00
551+00
552+00
553+00
554+00
555+00
556+00
547+00
546+00
545+00
544+00
543+00
542+00
541+00
540+00
539+00
538+00
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
SHOWN ON SHEET C-601
ALIGNMENT INFORMATION
EXISTING EMBANKMENT
C401
SN152
6" ABOVE EXISTING GRADE
TOP OF PAVEMENT
PEDESTRIAN ACCESS ROAD RE-ROUTE
NEW PEDESTRIAN BRIDGE
PEDESTRIAN ACCESS ROAD RE-ROUTE
DETAIL ON THE NEW OUTLET WORKS STRUCTURE.
PAD PLAN AND DETAILS, SHEET SN-152, FOR ADDITIONAL
2. SEE ENLARGED SITE PLAN, SHEET C-401, AND CONCRETE
THE EXISTING AND NEW STRUCTURES.
INFORMATION REGARDING UTILITY INFORMATION FOR
PLAN, AND ELECTRICAL DEMOLITION PLAN FOR
1. SEE ELECTRICAL SITE PLAN, EXISTING SURVEY & UTILITY
NOTES:
FLOW
CIVIL SITE PLAN
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
10+08.76F P C
.0
F
P I1
.7
F
P T
.3
F P I
.6
F P I
F
F
F
F
F
F
F
F
F
C401
SCALE IN FEET
N
A B
M D C -4
.d
C-401
R
CG303
C401
CG303
C401
SEE SHEET CG-136 FOR REVETMENT
SEE SHEET CG-135 FOR ALIGNMENT
NEW APPROACH CHANNEL
FOR DIMENSIONING
SEE STRUCTURAL
APPROACH STRUCTURE
NEW OUTLET WORKS
FOR DIMENSIONING
SEE STRUCTURAL
INTAKE TOWER
NEW OUTLET WORKS
FOR DIMENSIONING
SEE STRUCTURAL
TRANSITION AND CONDUIT
NEW OUTLET WORKS
N T
E R
L
IN
E O
U T
L E
T W
O R
K S
'-0
" E X
T E
R
IO
R F
A C
E
N T
E R
L
IN
E O
U T
L E
T W
O R
K S
'-0
" E X
T E
R
IO
R F
A C
E
FOR DIMENSIONING
SEE ARCHITECTURAL
EQUIPMENT BUILDING
NEW OUTLET WORKS
FOR DIMENSIONING
SEE ARCHITECTURAL
GENERATOR BUILDING
NEW OUTLET WORKS
FOR DIMENSIONING
SEE STRUCTURAL
EXIT STRUCTURE
NEW OUTLET WORKS
SEE SHEET CG-133 FOR REVETMENT
SEE SHEET CG-132 FOR ALIGNMENT
NEW OUTLET CHANNEL
FOR ALIGNMENT
SEE CG-151 AND CG-152
NEW HIKE AND BIKE TRAIL
B R
S
550+00
549+00
548+00
552+00
551+00
547+00
A
A
A
A 9
A
A
A
A
A
15' 30' 60' 90'
ELEVATION = 68.5' (TOP OF SLAB)
NORTHING = 13843034.50
EASTING = 3032085.53
STA. 17+02.74F US FACE ELEVATION = 55.0' (TOP OF SLAB)
NORTHING = 13843049.29
EASTING = 3032431.73
STA. 13+56.23F DS FACE
L
A R
G E
D C
IV
IL
S
IT
E P
L
FOR ALIGNMENT
SEE CG-151 AND CG-152
NEW PEDESTRIAN ACCESS ROAD
SN152
ENLARGED CIVIL SITE PLAN
FINAL DESIGN CONTOURS
NEW FEATURE ACTIVITIES
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
C-601
B
M D C -6
.d
R A
R S
P R
O J E
C T F
E A
T U
R E A
L
IG
N M
E N
T D
A T
A
SEE DRAWINGS CG-133 AND CI-402 FOR BARKER DITCH PLAN VIEW.
SEE DRAWING CG-252 FOR PROFILE OF REPLACEMENT TRAIL.
SEE DRAWING CG-152 FOR PLAN VIEW OF REPLACEMENT TRAIL.
SEE DRAWING CG-251 FOR PROFILE OF RE-ROUTE TRAIL.
SEE DRAWING CG-151 FOR PLAN VIEW OF RE-ROUTE TRAIL.
SEE DRAWING CG-135 FOR APPROACH CHANNEL EXCAVATION PLAN.
SEE DRAWING CG-132 FOR OUTLET CHANNEL EXCAVATION PLAN.
2. SEE DRAWING CG-111 FOR COFFERDAM GRADING PLAN.
AND APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION.
1. THE ALIGNMENT SHOWN HERE SHALL BE STAKED OUT BY THE CONTRACTOR
NOTE:
C601
1 PROJECT FEATURE ALIGNMENT DATA
NOT TO SCALE
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
75 75
0 80
SCALE IN FEET
40' 80' 160' 240'
AND GRUBBING LIMITS, NON-STRUCTURAL DEMO
EXISTING FEATURE STRIPPING, CLEARING,
STRIP APPROX. 2.47 AC
CLEAR, GRUB, AND
CHANNEL EXCAVATION
UPSTREAM APPROACH
STRIP APPROX. 6.57 AC
CLEAR AND GRUB APPROX. 1.0 AC
EXCAVATION, PRIMARY FILL
EXCAVATION, NEW OUTLET CHANNEL
PRIMARY EXCAVATION, SECONDARY
GRUB, STRIP APPROX. 3.87 AC
CLEAR APPROX. 1.5 AC
COFFERDAM EXCAVATION
NEW COFFERDAM AND
1.50 AC, STRIP 3.87 AC
CLEAR AND GRUB APPROX.
BUTTRESS
ABANDONMENT FILL AND
EXISTING CHANNEL FILL,
STRIP APPROX. 4.28 AC
EMBANKMENT ABANDONMENT FILL
EXISTING CHANNEL FILL
EMBANKMENT CREST ROAD
EXISTING 12' WIDE GRAVEL
DEMO APPROX. 875.0'
CD-101
R E
R J C
R
A B
M D C
D -1
.d
R
T H
W O
R K D
E M
O L
IT
IO
N P
L
32 92 00.00 45 "TURF."
ACCORDANCE WITH SPECIFICATION SECTION
PERMANENT EROSION CONTROL SHALL BE TURFED IN
ARE NOT TO RECEIVE PAVEMENT, REVETMENT, OR
1. AREAS DISTURBED BY CONSTRUCTION ACTIVITES WHICH
NOTES:
PROJECT WORK LIMITS
CD101
EARTHWORK DEMOLITION PLAN
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
0 70
75 75
154'83'
/2
/2
171'-5"
197'-2 1/2 "
'-0 /2
'-4 /2
RIPRAP
DEMO DOWNSTREAM CHANNEL
DEMO REVETMENT BLOCK
AND WALLS
DEMO EXISTING CHUTE SLAB, BAFFLES,
DEMO EXISTING T-WALL
DEMO DOWNSTREAM WINGWALLS
AND WALLS
DEMO UPSTREAM APPROACH SLAB
DEMO STEEL SUPERSTRUCTURE
AND ACCESS BRIDGE ABUTMENT
DEMO ACCESS BRIDGE, ACCESS STAIRS,
DEMO INTAKE TOWER
DEMO GENERATOR BUILDING
AND BIKE TRAIL
DEMO EXISTING HIKE
CONCRETE BLOCK
DEMO EXISTING DS
M O
L
IT
IO
N P
L
B
M D C
D -1
.d
R
SCALE IN FEET
25' 50' 100' 150'
22'-1 1/2 "
J C
R
CD-102
CD102
63'
60'
E S
T R
U C
T U
R
SEE SHEET CG-464
DEMO REVETMENT BLOCK
SEE SHEET CG-466
DEMO EXISTING INTAKE TOWER
SEE SHEET CG-466
AND ABUTMENT
DEMO ACCESS BRIDGE
SEE SHEET CG-466
DEMO GENERATOR BUILDING
SEE SHEET CG-464
DEMOLITION OF WING WALL
SEE SHEET CG-464
DEMO DOWNSTREAM CHANNEL RIPRAP
AND NOTE 4 THIS SHEET
T-WALL SEE SHEET CG-466
DEMOLITION OF EXISTING
552+00
551+00
550+00
549+00
548+00
547+00
546+00
545+00
544+00
543+00
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
SEE SHEET CG-466
SUPERSTRUCTURE
DEMO STEEL
SHEET CG-466
BLOCK SEE
DEMO REVETMENT
SHEET CG-462
CONDUIT SEE
GROUT IN-PLACE
SEE SHEET CG-461
SLAB AND WALLS
DEMO APPROACH
SITE STRUCTURAL DEMOLITION PLAN
PEDESTRIAN BRIDGE
REMOVE AND RELOCATE EXISTING
HIKE AND BIKE TRAIL,
DEMO APPROX. 2,700 SY EXISTING
SEE SHEET CG-464
AND WALLS
BAFFLE BLOCKS,
CHUTE SLAB,
DEMO EXISTING
EXISTING CONTOURS
EXISTING FEATURE DEMOLITION AND REMOVAL
5. REFER TO ELECTRICAL DEMOLITION PLAN, SHEET E-101, FOR ADDITIONAL UTILITY DEMOLITION.
C. SEE REFERENCE SHEET R-714 FOR ADDITIONAL DETAIL ON T-WALL STRUCTURE.
SECTIONS, APPROXIMATELY 286.5' FROM STA. 544+64.5 TO STA. 547+51.
ABANDONMENT BACKFILL, AND WILL CONSIST OF THE REMAINING NINE (9) WALL
B. PHASE TWO DEMOLITION WILL OCCUR PRIOR TO COMPLETION OF THE UPSTREAM
SECTIONS, APPROXIMATELY 134.0' FROM STA. 547+51 TO STA. 548+85.
EMBANKMENT TIE-INS, AND WILL CONSIST OF THE NORTHERNMOST FOUR (4) WALL
A. PHASE ONE DEMOLITION WILL OCCUR PRIOR TO COMPLETION OF THE COFFERDAM
4. DEMOLITION OF THE T-WALL WILL OCCUR IN PHASES:
EXISTING RIPRAP UPSTREAM OF THE EXITING OUTLET WORKS CAN RANGE FROM 40 TO 600 LBS.
3. EXISTING RIPRAP DOWN STREAM OF STILLING BASING CAN RANGE FROM 200 TO 4,000 LBS.
2. EXISTING PRECAST CONCRETE BLOCK ARE GENERALLY 3' X 3' BY 2' DEEP.
COVERED WITH SOIL WHEN CHANNEL IS FILLED.
BLOCKS, RIPRAP, AND GRAVEL BASE BELOW THAT DEPTH CAN REMAIN IN PLACE AND
CONCRETE BLOCK, RIPRAP, AND GRAVEL BASE TO A MINIMUM DEPTH OF 3' BELOW GROUND.
INTERFERE WITH CONSTRUCTION. IN AREAS OF CHANNEL TO BE FILLED, REMOVE PRECAST
1. REMOVE EXISTING PRECAST CONCRETE BLOCKS, RIPRAP, AND GRAVEL BASE THAT WILL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
D
0+00D
D
10+33D
5+00D
D
D
4+
D
6+00D
7+00D
D
D
5 65
75 75
SCALE IN FEET
25' 50' 100' 150'
N
FOR COFFERDAM AND EXISTING SURVEY TIE-IN
FILL LIMITS AND FEATURE INFORMATION
554+00
553+00
552+00
551+00
550+00
549+00
548+00
547+00
546+00
545+00
A B
M D C
G -1
.d
R A
R S
A
F F
E R
D A
M A
L
IG
N M
E
A
A
A
A
A
A
A
A
A
A
A
A
CG111
CG-111
D G
R A
D
IN
G P
L
CG112
CG112
GRADING PLAN
COFFERDAM ALIGNMENT AND
WORK LIMITS
CONSTRUCTION
WORK LIMITS
CONSTRUCTION
WORK LIMITS
CONSTRUCTION
CG301
CG111
2.5H:1V
3H:1V
H :1
V
.5
H
H :1
V
3H :1V
H
SEE DRAWING CG-112
STA. 1+55D TO STA. 2+85D
LIMITS OF RIPRAP
APPROXIMATE
CG112
STA. 4+00D.
FROM 2.5H:1V AT STA. 3+00D TO 3H:1V AT
4. COFFERDAM UPSTREAM SLOPE TRANSITIONS
ROAD DETAILS.
3. SEE SHEET CG-501 FOR COFFERDAM CREST
STATIONING SECTIONS.
2. SEE SHEETS CG-311 AND CG-312 FOR COFFERDAM
ALIGNMENT DATA.
1. SEE SHEET C-601 FOR ADDITIONAL COFFERDAM
NOTES:
STA. 552+80.24
EASTING = 3032206.60
NORTHING = 13843257.21
STA. 547+50.49
EASTING = 3032226.40
NORTHING = 13842727.83
WORKS STRUCTURE
EXISTING OUTLET
EXISTING T-WALL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
0 5' 10'
SCALE IN FEET
30'20'
0 5' 10'
SCALE IN FEET
30'20'
CG-112
0 1
10+20D
NORTH TIE-IN
COFFERDAM & EMBANKMENT
SOUTH TIE-IN
COFFERDAM & EMBANKMENT
F F
E R
D A
M A
N D E
M B
A N
K M
E
IE
-I
N D
E T
R J C
R
A R
S
A B
M D C -1
.d
EL= 84'
EXISTING GROUND
SIDE SLOPE
COFFERDAM
NTSCG112
STA. 1+55D TO STA. 2+85D
SECTION - COFFERDAM RIPRAP
2.5
2.5
TRANSITION 10V:1H
TRANSITION 10V:1H
D
D
10+33D
553+00D
0+00D
0+20D
0+40D
0+
D
D
D
EXISTING T-WALL
3. SEE SHEETS CG-311 THROUGH CG-312 FOR COFFERDAM CROSS SECTIONS.
2. SEE SHEET CG-501 FOR COFFERDAM CREST ROAD DETAILS.
1. SEE SHEET C-601 FOR ADDITIONAL COFFERDAM ALIGNMENT DATA.
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
0 70
75 75
SCALE IN FEET
25' 50' 100' 150'
N
545+00
546+00
547+00
548+00
549+00
550+00
551+00
552+00
553+00
554+00
A B
M D C
G -1
.d
S J
IM
A R
Y E
X C
A V
A T
IO
N P
L
A
A
A
A 8
A
A
A
A
A
A
A
A
CG121
CG-121
PRIMARY EXCAVATION PLAN
STRUCTURE, INTAKE TOWER, AND CONDUIT
EMBANKMENT EXCAVATION LIMITS FOR APPROACH
ELEVATION = 63.17'
EASTING = 3032059.40
NORTHING = 13843054.93
NEW OUTLET STRUCTURE
EXCAVATION LIMITS FOR
ELEVATION = 63.17'
EASTING = 3032063.57
NORTHING = 13842957.17
NEW OUTLET STRUCTURE
EXCAVATION LIMITS FOR
ELEVATION = 62.36'
EASTING = 3032340.64
NORTHING = 13843066.94
NEW OUTLET STRUCTURE
EXCAVATION LIMITS FOR
ELEVATION = 62.36'
EASTING = 3032344.82
NORTHING = 13842969.18
NEW OUTLET STRUCTURE
EXCAVATION LIMITS FOR
ELEVATION = 59.52'
EASTING = 3032323.93
NORTHING = 13842989.59
NEW HORIZONTAL FILTER
EXCAVATION LIMITS FOR
ELEVATION = 59.52'
EASTING = 3032321.57
NORTHING = 13843044.82
NEW HORIZONTAL FILTER
EXCAVATION LIMITS FOR
ELEVATION = 60.06'
EASTING = 3032249.63
NORTHING = 13843041.75
NEW HORIZONTAL FILTER
EXCAVATION LIMITS FOR
ELEVATION = 60.06'
EASTING = 3032251.99
NORTHING = 13842986.52
NEW HORIZONTAL FILTER
EXCAVATION LIMITS FOR
SEE CI-101 FOR MORE INFORMATION
EMBANKMENT CUTOFF WALL
EXISTING 3' SOIL BENTONITE
APPROXIMATE CENTERLINE OF
SEE CI-101 FOR MORE INFORMATION
EMBANKMENT CUTOFF WALL
EXISTING 3' SOIL BENTONITE
APPROXIMATE CENTERLINE OF
VARIES
ELEVATION
EXCAVATION,
FILTER
HORIZONTAL
EXCAVATION ELEV. 63.17'
AND INTAKE TOWER
APPROACH STRUCTURE
SEE C-002 AND G-003
AND PROJECT LIMITS,
GOVERNMENT PROPERTY
NON-GOVERNMENT PROPERTY
CG302
CG121
CG301
CG121
N 13 842 823.61
E 3 032 228.11
WORK LIMITS
CONSTRUCTION
WORK LIMITS
CONSTRUCTION
WORK LIMITS
CONSTRUCTION
N 13 843 209.21
E 3 032 215.11
H :1
V
3H:1V
H :1
3H:1V
B
A N
K M
E N
T E
X C
A V
A T
2. TEMPORARY ACCESS RAMPS SHALL MEET CRITERIA AS SHOWN ON C-001.
ALONG THE NEW OUTLET CHANNEL ALIGNMENT SHOWN ON CG-132.
1. TEMPORARY ACCESS RAMPS INTO THE EXCAVATION SHALL BE CONSTRUCTED
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
0 70
SCALE IN FEET
25' 50' 100' 150'
N
545+00
546+00
547+00
548+00
550+00
551+00
552+00
553+00
554+00
A B
M D C
G -1
.d
R A
R S
A
C
O N
D A
R Y E
X C
A V
A T
IO
N P
L
U T
E S
L A
B A
N D S
T
IL
L
IN
G B
A S
IN
A
A
A
A 8
A
A
A
A
A
A
A
A
CG122
CG-122
549+00
ELEVATION = 48.17'
EASTING = 3032435.48
NORTHING = 13843073.07
CHUTE SLAB AND STILLING BASIN
EXCAVATION LIMITS FOR
ELEVATION = 48.17'
EASTING = 3032439.83
NORTHING = 13842971.16
CHUTE SLAB AND STILLING BASIN
EXCAVATION LIMITS FOR
ELEVATION = 48.17'
EASTING = 3032376.89
NORTHING = 13842968.47
CHUTE SLAB AND STILLING BASIN
EXCAVATION LIMITS FOR
ELEVATION = 48.17'
EASTING = 3032372.53
NORTHING = 13843070.38
CHUTE SLAB AND STILLING BASIN
EXCAVATION LIMITS FOR
ELEVATION = 60.54'
EASTING = 3032344.91
NORTHING = 13842967.11
CHUTE SLAB AND STILLING BASIN
EXCAVATION LIMITS FOR
ELEVATION = 60.54'
EASTING = 3032340.55
NORTHING = 13843069.01
CHUTE SLAB AND STILLING BASIN
EXCAVATION LIMITS FOR
ELEVATION = 60.68'
EASTING = 3032322.57
NORTHING = 13843068.25
CHUTE SLAB AND STILLING BASIN
EXCAVATION LIMITS FOR
ELEVATION = 60.68'
EASTING = 3032326.97
NORTHING = 13842966.34
BASIN
CHUTE SLAB AND STILLING
EXCAVATION LIMITS FOR
E L E
V .1
E X
C A
V A
T
IO
N S
T
IL
L
IN
G B
A
IN
CG122
SEE C-002 AND G-003
AND PROJECT LIMITS,
GOVERNMENT PROPERTY
NON-GOVERNMENT PROPERTY
CHUTE SLAB AND STILLING BASIN
SECONDARY EXCAVATION PLAN -
STRUCTURAL FOR DIMENSIONS
AND INTAKE TOWER, SEE
NEW APPROACH STRUCTURE
AND CI-301
WALL, SEE SHEETS CI-102
NEW EMBANKMENT CUTOFF
SEE STRUCTURAL SHEETS
STRUCTURAL MUD SLAB
SEE CI-101 FOR MORE INFORMATION
EMBANKMENT CUTOFF WALL
EXISTING 3' SOIL BENTONITE
APPROXIMATE CENTERLINE OF
WORK LIMITS
CONSTRUCTION
WORK LIMITS
CONSTRUCTION
WORK LIMITS
CONSTRUCTION
CG122
WORK LIMITS
CONSTRUCTION
H :1
V
2H:1V
H :1
V
INFORMATION FOR CHUTE SLAB AND STILLING BASIN
EXCAVATION LIMITS AND FEATURE
2. TEMPORARY ACCESS RAMPS SHALL MEET CRITERIA AS SHOWN ON C-001.
ALONG THE NEW OUTLET CHANNEL ALIGNMENT SHOWN ON CG-132.
1. TEMPORARY ACCESS RAMPS INTO THE EXCAVATION SHALL BE CONSTRUCTED
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
0 70
556065
SCALE IN FEET
25' 50' 100' 150'
N
AND CREST WIDENING
BACKFILL OF EMBANKMENT EXCAVATION
545+00
546+00
547+00
548+00
549+00
550+00
551+00
552+00
553+00
554+00
A B
M D C
G -1
.d
S J C
R
A
B
A N
K M
E N
T P
R
IM
A R
Y G
R A
D
G
A
A
A
A
A
A
A
A
A
A
A
A
CG-131
CG131
CI301
CG131
CI301
CG131
SHEET G-003
WORK LIMITS, SEE
AND CONSTRUCTION
ESTATE BOUNDARY
GOVERNMENT REAL
WORK LIMITS
CONSTRUCTION
WORK LIMITS
CONSTRUCTION
WORK LIMITS
CONSTRUCTION
CG551
CG501
CREST WIDTH
EMBANKMENT
20'-0"
WIDTH
12'-0" TRAIL
T R
A
IL
L
E N
G T
H
.1
H :1V
LIMITS SHOWN SHEET SU-382
TO CHANNEL EXCAVATION
EXCAVATION LIMITS
BACKFILL SECONDARY
LIMITS SHOWN SHEET SU-382
TO CHANNEL EXCAVATION
EXCAVATION LIMITS
BACKFILL SECONDARY
N 13 843 205.36
3H:1V
3H:1V
3H:1V
3H:1V
H :1
V
ELEV. 113.0'
E 3 032 215.65
N 13 842 820.52
ELEV. 113.0'
E 3 032 230.03
E M
B A
N K
M E
N T R
O A
D W
A Y
ROADWAY, SEE PAVING PLAN
EMBANKMENT CREST
EMBANKMENT PRIMARY GRADING PLAN
FOR DETAIL INFORMATION
ASPHALT SECTION, SEE CG-151
PEDESTRIAN ACCESS ROAD
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
0 70
+0
0F
F
.0
F
P C
7+33.87F
P T
.4
F
P I
F
F
F
F
8+
F
9+
F
10+08.76F P C
.0
F
P I1
.7
F
P T
.3
F P I
.6
F P I
F
F
F
F
F
F
F
F
F
SCALE IN FEET
25' 50' 100' 150'
N
CONTOURS
FEATURE LIMITS, STATIONING, EXCAVATION
545+00
546+00
547+00
548+00
549+00
550+00
551+00
552+00
553+00
544+00
A B
M D C
G -1
.d
S J
W
N S
T R
E A
M O
U T
L E
T C
H A
N N
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
OUTLET CHANNEL EXCAVATION
CG-132
CG132
ACCESS RAMP
OUTLET CHANNEL
12+92.23F TO 57' AT STA. 13+56.23F
BOTTOM FROM 25' WIDE AT STA.
TRANSITION FINISHED CHANNEL
4. SEE CI-401 FOR OUTLET CHANNEL ACCESS RAMP INFORMATION.
ON SHEET CG-231.
3. PROFILE FOR THE DOWNSTREAM OUTLET CHANNEL IS SHOWN
ARE SHOWN ON SHEET CG-331.
2. STATIONING SECTIONS FOR DOWNSTREAM OUTLET CHANNEL
IS SHOWN ON SHEET C-601.
1. ADDITIONAL DOWNSTREAM CHANNEL ALIGNMENT DATA
C
A V
A T
IO
N P
L
EXCAVATION PLAN
DOWNSTREAM OUTLET CHANNEL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
90 90
85 85
105 105
110 11
SCALE IN FEET
N
A B
M D C
G -1
.d
S J C
R
15' 30' 60' 90'
CG-134
CG134
SECONDARY FILL CONTOURS, COFFERDAM REMOVAL
FEATURE LIMITS, STATIONING, UPSTREAM EMBANKMENT
F F
E R
D A
M R
E M
O V
APPROXIMATELY 385' MINIMUM LIMITS OF EMBANKMENT SECONDARY FILL
4+00A
5+00A
6+00A
7+00A
8+00A
9+00A
CG134
GRADING PLAN, COFFERDAM REMOVAL
UPSTREAM EMBANKMENT SECONDARY
H :1
V
H :1
V
H :1
V
H :1
V
H :1
V
H :1
V
H :1
V
H
S
T R
E A
M E
M B
A N
K M
E
C
O N
D A
R Y G
R A
D
IN
G P
L
S T
A T
IO
N
.9
S T
A T
IO
N
.0
15+00F
16+00F
17+00F
18+00F
19+00F
20+00F
19+24.65
PI
EXISTING EMBANKMENT AS SHOWN THIS SHEET.
FILL AND OVERBUILT EMBANKMENT SECTION INTO THE
2. CONTRACTOR SHALL TRANSITION THE SECONDARY
STA. 548+42.94 TO STA. 552+28.05.
THIS SHEET. LIMITS CORRESPOND APPOXIMATELY FROM
1. MINIMUM SECONDARY FILL LIMITS SHOWN ON PLAN
NOTES:
STA. 553+31.02
STA. 547+37.10
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G A
L V
E S
T O
N D
IS
T R
IC
T
G A
L V
E S
T O
N T
X
S O
U T
H W
E S
T E
R N D
IV
IS
IO
N D
A M
S A
F E
T Y P
R O
D U
C T
IO
N C
E N
T E
R
M L
O C
K E P
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X M
M /D
D /Y
Y Y
Y X
X X
D
C
A
B
12345
E
P R
O J E
C T P
R E
Q U
E S
T F
O R P
R O
P O
S A
L
S W
G H
S C
-2
H A
R R
IS
A
N D F
O R
T B
E N
D C
O U
N T
IE
S T
E X
A S
F
F
F
F
F
F
F
F
F
F
F2 F
+0
0F
+0
0F
+0
+0
8F
6P
C
P T
P I
P I
+2
2.
F
PT
+0
8.
F
POE
F
P I
75 75
F
F
F
F
F
F
F
+0
0F
+0
0F28 +0
+0
8F .7
F
P T
.3
F P I
.6
F P I
.9
F
P C
.0
F
P I
27+22.17F
PT
F
F
F
F
F
F
F
SCALE IN FEET
25' 50' 100' 150'
N
545+00
546+00
547+00
548+00
549+00
550+00
551+00
552+00
553+00
544+00
A B
M D C
G -1
.d
S J
S
T R
E A
M A
P P
R O
A C
H C
H A
N N
A
A
A
A 8
A
A
C
A V
A T
IO
N P
L
CHANNEL EXCAVATION LIMITS
NEW UPSTREAM APPROACH
CG-135
CG135
1 EXCAVATION PLAN
UPSTREAM APPROACH CHANNEL
EXCAVATION CONTOURS
FEATURE LIMITS, STATIONING, CHANNEL
N 13 843 131.97
E 3 032 126.16 N 13 843 127.91
E 3 032 032.26
N 13 842 864.15
E 3 032 043.52
N 13 842 892.08
E 3 032 133.76
FLOW
BORROW AREA DITCH TOWARDS NEW APPROACH CHANNEL.
3. CONTRACTOR SHALL SLOPE (i.e. GRADE) EXISTING
APPROACH CHANNEL STATIONING SECTIONS.
CHANNEL PROFILE AND SHEET CG-332 FOR UPSTREAM
2. SEE SHEET CG-231 FOR UPSTREAM APPROACH
ON APPROACH CHANNEL ALIGNMENT
1. SEE SHEET C-601 FOR ADDITIONAL INFORMATION
NOTES:
G R
A D
E T
O D
R
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
Production Center
SWD Dam Safety
B A
R K
E R D
A M S
A F
E T
Y M
O D
IF
IC
A T
IO
N S
B U
F F
A L
O B
A Y
O U A
N D T
R
IB
U T
A R
IE
S
A D
D
IC
K S A
N D B
A R
K E
R D
A M
S
®of Engineers
US Army Corps
R E
V
IE
W E
D B
Y
SHEET OF YYY
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B o b b y V a n C le a v e L e a d E n g r
X X
X X
X X -X
X -X -X
X
G -1
-R -0
/0
/2
S I
D x
F u ll S iz e
U .S
A R
M Y C
O R
P S O
F E
N G
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .