AMEND-0005_W9126G-15-B-0031.PDF

PDF 122 KB Posted

Attached to
USACE Galveston District-Pipeline Dredging, Shallow, GIWW, Texas Corpus Christi Ship Channel to Port Isabel.
Solicitation number
W9126G-15-B-0031
Issued by

About this file

Quantity Summary Table

View the file

Other files

File Type Posted
C1_ABSTRACT_6G-15-B-0031.pdf PDF
AMEND-0004_W9126G-15-B-0031.PDF PDF
AMEND0003_29SEP2015.pdf PDF
AMEND0002_18SEP2015.pdf PDF
AMEND0001_Revised_SF1442.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Page 2. Bid Opening remains 9 Oct 2015, 2:00 p.m. CST.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-15-B-0031

X 9B. DATED (SEE ITEM 11)

21-Aug-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

5-Oct-2015

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

2000 FORT POINT ROAD

GALVESTON TX 77550-1229

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

x

W9126G-15-B-0031

A0005-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. The specifications for Solicitation No. W9126G-15-B-0031, Gulf Intracoastal Waterway, Texas, Corpus Christi Ship Channel to Port Isabel in Nueces, Kleberg, Kennedy, Willacy, and Cameron Counties, Texas, Pipeline Dredging, are hereby amended as follows:

a) Specifications.

(1) SECTION 35 20 23.16 45, PIPELINE DREDGING, APPENDIX 1- QUANTITY

SUMMARY TABLE – The enclosed SECTION 35 20 23.16 45, entitled PIPELINE DREDGING, APPENDIX 1- QUANTITY SUMMARY TABLE, supersedes that issued with Amendment 0004 to this Solicitation.

b) Drawings.

(1) None.

2. This amendment shall be attached to and become a part of the solicitation.

1 Encl:

1. SECTION 35 20 23.16 45, PIPELINE DREDGING, APPENDIX 1- QUANTITY SUMMARY

TABLE

SWG FILE NO.:IWW 1175-273 SOLICITATION NO.:W9126G-15-B-0031

Side Slope

Required Depth

(CY)

Allowable Overdepth

(CY)

Total Estimated

(CY)

1 1526+000.00 1531+000.00 5,000 125 12 2 1V : 5H 54,000 42,000 96,000 197

2 1531+000.00 1536+000.00 5,000 125 12 2 1V : 5H 58,000 46,000 104,000 197

3 1548+000.00 1553+000.00 5,000 125 12 2 1V : 5H 61,000 46,000 107,000 199

4 1570+000.00 1575+000.00 5,000 125 12 2 1V : 5H 79,000 46,000 125,000 201

5 1575+000.00 1581+000.00 6,000 125 12 2 1V : 5H 68,000 48,000 116,000 202

6 1940+000.00 1945+000.00 5,000 125 14 2 1V : 3H 148,000 46,000 194,000 233A

7 1945+000.00 1950+000.00 5,000 125 14 2 1V : 3H 176,000 46,000 222,000 233A

8 1950+000.00 1955+000.00 5,000 125 14 2 1V : 3H 116,000 46,000 162,000 233A

9 1955+000.00 1960+000.00 5,000 125 14 2 1V : 3H 74,000 46,000 120,000 233A

46,000 834,000 412,000 1,246,000

10 1743+000.00 1747+000.00 4,000 125 12 2 1V : 3H 15,000 35,000 50,000 214

11 1747+000.00 1751+000.00 4,000 125 12 2 1V : 3H 16,000 35,000 51,000 215

12 1777+000.00 1782+000.00 5,000 125 12 2 1V : 3H 21,000 43,000 64,000 218

13 1782+000.00 1787+000.00 5,000 125 12 2 1V : 3H 25,000 46,000 71,000 218

14 1787+000.00 1792+000.00 5,000 125 12 2 1V : 3H 35,000 46,000 81,000 219

23,000 112,000 205,000 317,000

69,000 946,000 617,000 1,563,000

15 6+000 7+915 1,915 75 - 200 9 1 1V : 3H 237

APPENDIX 1 - QUANTITY SUMMARY TABLE

CHANNEL DIMENSIONS QUANTITIES

Placement Area

Distribution Section

No.

From

Station To

Station

Length of Station (Feet)

Width Project Depth

Allowable Overdepth

SCHEDULE 1 - GIWW - 12' + 2' MLT

SCHEDULE 1 - GIWW - 14' + 2' MLT

SUBTOTAL SCHEDULE 1

OPTION NO. 2 - Port Isabel Small Boat Harbor

25,000

OPTION NO. 1 - GIWW - 12' + 2' MLT

SUBTOTAL, OPTION NO. 1

TOTAL SCHEDULE 1 AND OPTION NO. 1

The term “Required Depth” is synonymous with the term “Prescribed Depth” and “Required Dredging Prism” used elsewhere in the specifications.

Includes anticipated shoaling.

Channel end slope is the same as the side slope at the end stations, as shown.

Port Isabel Small Boat Harbor, Section 29, is a Lump Sum Bid Item - Estimated Quantity is For Information Only

Section 35 20 23.16 45 - APPENDIX 1 - QUANTITY SUMMARY TABLE - Page 1

(TO ACCOMPANY AMENDMENT 0005 TO SOLICITATION NO.:W9126G-15-B-0031)

SF-30_AMEND0005_5OCT2015
Amend 0005 page-2
AMEND-0005_1175-273_Dredging Quantity Table