US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, RM 2A19
FORT WORTH TX 76102-0300
(817) 886-1267
(817) 886-6403
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
$7M
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
W9126G-10-T-0152 26-Jul-2010
b. TELEPHONE NUMBER
469-645-9113
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 20 Aug 2010
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
W9126G
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MAXIE A MCALPIN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
561990
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: 100 % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
2 COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
X
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
Section B - Supplies or Services and Prices
BID SCHEDULE
BID SCHEDULE – WINTER GATE ATTENDANT
LAKE O' THE PINES, JEFFERSON, TEXAS (JOHNSON CREEK PARK)
PROVIDE GATE ATTENDANT SERVICES FOR JOHNSON CREEK PARK AT LAKE O’ THE PINES IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK FOR ONE BASE YEAR AND TWO OPTION YEARS. THE BASE YEAR IS FOR THE PERIOD 1 OCTOBER THRU 28 FEBRUARY. ACQUIRE AND MAINTAIN $5,000 SURETY BOND FROM AN ESTABLISHED
COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
FURNISH EQUIPMENT, MATERIALS, SUPPLIES, TRANSPORTATION, AND LABOR NECESSARY TO PERFORM GATE
ATTENDANT SERVICES AT LAKE O' THE PINES, TX, IN ACCORDANCE WITH CONTRACT.
Item No. Description Units Quantity Unit Price ($) Total Price ($)
001A
BASE YEAR: 01 OCTOBER 2010
THRU 28 FEBRUARY 2011
Gate Attendant Services Day 108
Winter, 5 Day Gate Attendant
002A
OPTION YEAR 1: 01 OCTOBER 2011
THRU 28 FEBRUARY 2012
Gate Attendant Services Day 108
003A
OPTION YEAR 2: 01 OCTOBER 2012
THRU 28 FEBRUARY 2013
Gate Attendant Services Day 107
CONTRACT TOTAL
LAKE O' THE PINES, JEFFERSON, TEXAS (BUCKHORN CREEK PARK)
PROVIDE GATE ATTENDANT SERVICES FOR BUCKHORN CREEK PARK AT LAKE O’ THE PINES IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK FOR ONE BASE YEAR AND TWO OPTION YEARS. THE BASE YEAR IS FOR THE PERIOD 1 OCTOBER THRU 28 FEBRUARY. ACQUIRE AND MAINTAIN $5,000 SURETY BOND FROM AN ESTABLISHED
COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
Gate Attendant Services Day 109
LAKE O' THE PINES, JEFFERSON, TEXAS (JOHNSON AND BUCKHORN CREEK PARKS - ALTERNATING)
PROVIDE GATE ATTENDANT SERVICES FOR JOHNSON AND BUCKHORN CREEK PARKS AT LAKE O’ THE PINES IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK FOR ONE BASE YEAR AND TWO OPTION YEARS. THE BASE YEAR IS FOR THE PERIOD 1 OCTOBER THRU 28 FEBRUARY. ACQUIRE AND MAINTAIN $5,000 SURETY BOND FROM AN
ESTABLISHED COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
Gate Attendant Services Day 85
Winter, 4 Day Gate Attendant
Gate Attendant Services Day 87
Gate Attendant Services Day 88
WRIGHT PATMAN LAKE-ROCKY POINT PARK SHIFT 1
PROVIDE GATE ATTENDANT SERVICES FOR WRIGHT PATMAN LAKE-ROCKY POINT PARK SHIFT 1 IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK FOR ONE BASE YEAR AND TWO OPTION YEARS. THE BASE YEAR IS FOR THE PERIOD 1 OCTOBER 2010 THRU 28 FEBRUARY 2011. ACQUIRE AND MAINTAIN $5,000 SURETY BOND FROM AN
ESTABLISHED COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
ATTENDANT SERVICES AT WRIGHT PATMAN LAKE, TX, IN ACCORDANCE WITH CONTRACT.
Gate Attendant Services Rocky Point Park Shift 1
Day 76
THRU 29 FEBRUARY 2012
Day 107
WRIGHT PATMAN LAKE-ROCKY POINT PARK SHIFT 2
PROVIDE GATE ATTENDANT SERVICES FOR WRIGHT PATMAN LAKE-ROCKY POINT PARK SHIFT 2 IN ACCORDANCE
PERIOD 1 OCTOBER THRU 28 FEBRUARY. ACQUIRE AND MAINTAIN $5,000 SURETY BOND FROM AN ESTABLISHED
COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
ATTENDANT SERVICES AT WRIGHT PATMAN LAKE, IN ACCORDANCE WITH CONTRACT.
Rocky Point Park Shift 2
Day 75
WRIGHT PATMAN LAKE-CLEAR SPRINGS PARK SHIFT 1
PROVIDE GATE ATTENDANT SERVICES FOR WRIGHT PATMAN LAKE-CLEAR SPRINGS PARK SHIFT 1 IN ACCORDANCE
PERIOD 1 OCTOBER THRU 28 FEBRUARY. ACQUIRE AND MAINTAIN $5,000 SURETY BOND FROM AN ESTABLISHED
COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
Clear Springs Shift 1
WRIGHT PATMAN LAKE-CLEAR SPRINGS PARK SHIFT 2
PROVIDE GATE ATTENDANT SERVICES FOR WRIGHT PATMAN LAKE-CLEAR SPRINGS PARK SHIFT 2 IN ACCORDANCE
PERIOD 1 OCTOBER THRU 28 FEBRUARY. ACQUIRE AND MAINTAIN $5,000 SURETY BOND FROM AN ESTABLISHED
COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
Clear Springs Shift 2
WRIGHT PATMAN LAKE-MALDEN LAKE PARK SHIFT 1
PROVIDE GATE ATTENDANT SERVICES FOR WRIGHT PATMAN LAKE-MALDEN LAKE PARK SHIFT 1 IN ACCORDANCE
PERIOD 1 OCTOBER THRU 28 FEBRUARY. ACQUIRE AND MAINTAIN $5,000 SURETY BOND FROM AN ESTABLISHED
COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
Malden Lake Park Shift 1
WRIGHT PATMAN LAKE-MALDEN LAKE PARK SHIFT 2
PROVIDE GATE ATTENDANT SERVICES FOR WRIGHT PATMAN LAKE-MALDEN LAKE PARK SHIFT 2 IN ACCORDANCE
PERIOD 1 OCTOBER THRU 28 FEBRUARY. ACQUIRE AND MAINTAIN $5,000 SURETY BOND FROM AN ESTABLISHED
COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
Malden Lake Park Shift 2
TOWN BLUFF PROJECT, MAGNOLIA RIDGE CAMPGROUND
PROVIDE GATE ATTENDANT SERVICES FOR TOWN BLUFF PROJECT, MAGNOLIA RIDGE CAMPGROUND IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK FOR ONE BASE YEAR AND TWO OPTION YEARS. THE BASE YEAR IS FOR THE PERIOD 1 OCTOBER 2010 THRU 30 SEPTEMBER 2011. ACQUIRE AND MAINTAIN $5,000 SURETY
BOND FROM AN ESTABLISHED COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
FURNISH EQUIPMENT, MATERIALS, SUPPLIES, TRANSPORTATION, AND LABOR NECESSARY TO PERFORM GATE ATTENDANT SERVICES AT TOWN BLUFF PROJECT, MAGNOLIA RIDGE CAMPGROUND, IN ACCORDANCE WITH
CONTRACT.
THRU 30 SEPTEMBER 2011
Magnolia Ridge Park (5 short days on, Day 314
1 day off)
SANDY CREEK SHIFT I CAMPGROUND
PROVIDE GATE ATTENDANT SERVICES FOR SANDY CREEK SHIFT I CAMPGROUND, IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK FOR ONE BASE YEAR AND TWO OPTION YEARS. THE BASE YEAR IS FOR THE PERIOD 1 OCTOBER 2010 THRU 28 SEPTEMBER 2011. ACQUIRE AND MAINTAIN $5,000 SURETY BOND FROM AN ESTABLISHED
COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
ATTENDANT SERVICES AT SANDY CREEK SHIFT I CAMPGROUND, IN ACCORDANCE WITH CONTRACT.
THRU 28 SEPTEMBER 2011
Sandy Creek Park Shift 1 (4 days on, 4
Day 185
Days off)
SANDY CREEK SHIFT II CAMPGROUND
PROVIDE GATE ATTENDANT SERVICES FOR SANDY CREEK SHIFT II CAMPGROUND, IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK FOR ONE BASE YEAR AND TWO OPTION YEARS. THE BASE YEAR IS FOR THE PERIOD 1 OCTOBER 2010 THRU 28 SEPTEMBER 2011. ACQUIRE AND MAINTAIN $5,000 SURETY BOND FROM AN ESTABLISHED
COMPANY IN ACCORDANCE WITH THE SCOPE OF WORK.
ATTENDANT SERVICES AT SANDY CREEK SHIFT II CAMPGROUND, IN ACCORDANCE WITH CONTRACT.
THRU 30 SEPTEMBER 2011
Sandy Creek Park Shift II (4 Days on, 4
Day 185
Off)
INFORMATION SHEET
*Contractor Name______________________________________________________
* Work Partner Name ________________________________________________
Company Name______________________________________________________
* Address __________________________________________________________
* Phone Number____________________________________________________
* Cell Number______________________________________________________
Fax Number________________________________________________________
* Email Address_____________________________________________________
* Cage Code_____________________________________________________________
* DUNS Number____________________________________________________
* Signature________________________________________________________
* REQUIRED FIELDS * BOND INFORMATION
Bonds are required before you will be allowed to start Bonds will be required to be in both workers names
Bonds must be signed by both workers
Section C - Descriptions and Specifications
SCOPE OF WORK
U.S. ARMY CORPS OF ENGINEERS
FORT WORTH DISTRICT
LAKE O’ THE PINES
GATE ATTENDANT - SCOPE OF WORK
1. GENERAL:
The contractor must be a two (2) person team, at least 21 years of age, who are both physically and mentally capable of performing the duties specified here and in the enclosed additional scopes of work, for the duration of the contract, including option periods (unless otherwise specified in the individual lake scope of work). Work to be performed under this contract may not be subcontracted. The contractor and team member must be identified on Request for Quotation (SF18), to be accepted. The term “contractor” will refer to both members of the identified two person team. Work to be accomplished under this contract shall be in accordance with this Scope of Work, the Lake Office’s Additional Scope of Work and the Lake Office Gate Attendant Handbook, for the recreation area named and described herein. The contractor will be required to furnish all labor, equipment, fuel, transportation, tools and supplies (except as otherwise noted herein as Government furnished) necessary to provide the specified services for the duration of the contract period. The successful contractor must pass a criminal background check. Site visits are highly recommended prior to bidding.
NOTE: AWARD OF THIS SOLICITATION WILL BE BASED ON THE BEST VALUE TO THE
GOVERNMENT. FACTORS TO BE CONSIDERED ARE PAST PERFORMANCE, EXPERIENCE AND
PRICE.
2. DEFINITIONS:
CONTRACTOR: The person awarded the contract. Gate attendant
CONTRACTING OFFICER (KO): The person with the authority to enter into, administer, and/or terminate contracts and make related determination and findings on behalf of the Government. This person will be identified on the SF1449 (Solicitation/Contract/Order for Commercial Items).
NATURAL RESOURCES MANAGER: The manager of the local lake. The Natural Resources Manager may appoint an authorized representative to act in their behalf.
3. BASIC REQUIREMENTS: The following requirements for submitting a quote and receiving an award are now mandatory for conducting business with the DOD Government.
All offerors are required to obtain a Data Universal Numbering System (DUNS) number by calling 1-800-333-0505 or by visiting www.dnb.com .
All prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to any award resulting from this solicitation. If at time of award, contractor is not registered, award will be made to the next successful “registered” offer.
Registration may be accomplished via the internet at www.ccr.gov .
All payments shall be made by Electronic Funds Transfer (EFT) or “direct deposit”
4. TERM OF CONTRACT/DUTY HOURS:
The term of the contract and duty hours are defined in this solicitation in each Lake Office’s Scope of Work.
5. PRE-WORK CONFERENCE:
The Contractor will be required to attend a pre-work conference at no additional cost to the government to be conducted by the Natural Resources Manager or their representative, at each local lake office or other agreed upon location. This meeting will cover the policies outlined in the Scope of Work and Responsibilities. The pre-work conference is normally held the week before the Contractor begins providing the services.
6. PERMITS/COMPLIANCE:
The contractor shall, without additional expense to the Government, be responsible for complying with and obtaining any necessary licenses and/or permits. The contractor will comply with all Federal, State, County, and Municipal laws, codes and regulations in connection with the performance of the work.
7. TEMPORARY LIVING QUARTERS:
The contractor shall furnish a fully operable “self-contained” recreational vehicle (RV) of the travel trailer or motor home type to serve as temporary living quarters for the duration of the contract. Maximum size of the trailer is determined by physical limitations of the site furnished. It will be located near the entrance to the park at a location to be designated by the Natural Resources Manager. Pickup (shell-type) campers, pop-up tent trailer, tents, mini-travel trailers, mobile homes, buses, or any other types of recreation vehicles which do not meet general size requirements or the self-contained classification as determined by inspection of the Natural Resources Manager will not be acceptable. The Contractor team will be the sole occupants of the site. Adult family members and friends will not live with the contractor.
8. VISITORS OF THE CONTRACTOR/GATE ATTENDANT:
Adult family members and friends will not live with the Contractor “Living with the Contractor” is defined as a person staying with the contractor for more than 14 days in a 30 day period. Visitors of the contractor will be required to lodge in the Contractor’s trailer, or, if they have their own equipment, visitors will be required to camp at a campsite in the park and pay the regular camping fee. Visitors will not be allowed to connect to the Contractor’s utilities at any time. All non-authorized personnel are to remain outside the gate house.
9. UNIFORM DRESS AND PERSONAL APPEARANCE:
The contractor shall, at all times when on duty and when dealing with the public, be required to maintain a fully clothed and neat, well groomed appearance. Shoes shall be worn; however, flip flops or similar footwear will not be permitted. The contractor will promote a favorable image of the Corps through personal appearance, actions, attitude and a willingness to assist park visitors in a prompt, courteous manner. Identification badges or tags may be required at some locations.
10. LIVING AREA AND GATEHOUSE MAINTENANCE:
The contractor will maintain the area where the trailer is parked (Gate Attendant Site) in a clean and sanitary condition at all time. No dog pens, horse corral, poultry cages or similar facilities for pets or the raising of animals will be allowed. All pets will be confined in the contractor’s trailer or on a leash of 6 foot or less in length and must not disturb park visitors. The contractor’s site will remain clean of animal waste at all times. Pets will have all vaccinations as required by the state laws and will wear a collar that displays the vaccination tags at all times. No pets are allowed inside the gatehouse. No washers, dryers, deep freezers, or excessive personal items will be permitted around trailer pad areas or inside the gatehouse. Smoking is not allowed in or within 15 feet of the gatehouse. The contractor will maintain the gatehouse in a clean, orderly and sanitary condition at all times. Gate attendants will provide all equipment, tools, and supplies necessary to clean the gatehouse. Only authorized personnel are to enter the gatehouse at anytime. Solid waste and refuse shall be deposited in a nearby trash receptacle (dumpster) furnished by the Government. Security of the Attendant’s living quarters and all personal property shall remain the Attendant’s responsibility throughout the duration of the contract. The Government accepts no responsibility for, nor will it be liable for, damage or theft occurring to the attendant’s property.
11. USER FEES:
The Contractor will follow fee collection, credit voucher, refund and campsite reservation procedures established by the U.S. Army Corps of Engineers, Fort Worth District. The Contractor is required to collect User Fees daily, to insure that visitors have paid applicable user fees, utilizing the U.S. Army Corps of Engineers User Permit (ENG Form 4457) Automated User Permit System (AUPS), National Recreation Reservation Service (NRRS), an automated cash register, and/or collection from an honor vault. This includes going through the park to collect and safeguard fees when necessary. The Contractor is required to collect user fees for specialized recreation sites, facilities and services provided by the Corps of Engineers. This may include, but is not limited to, camping, group facility use, day use, special facility use, and multiple site rental use.
The Contractor is required to accept cash, personal check, traveler’s checks, money orders or credit card payments as methods of use fee payment. The Contractor will be responsible for User Fee Permits (ENG Form 4457), cash register receipts and journal, computer generated receipts, signed credit card receipts, and all collected forms of use fee payments until turned over to an authorized fee collector/cashier. The Contractor may be audited at any time, with or without prior notice, and is required to place all forms of collected use fee payments/monies in the gatehouse cash drawer or fee safe provided immediately upon receipt. The cash drawer or fee safe will remain closed immediately after every transaction and the automatic lock shall not be defeated at any time. The Contractor/Gate Attendant is required to have personal cash on hand at all times (minimum of $50.00) to make change. A signed statement with the amount of personal funds in use will be placed in the cash drawer and updated immediately anytime this amount changes. Refer to the additional scopes of work for amounts required at each park.
12. DELIVERY / INSPECTION OF USE FEES:
All Lakes require User Fee submission a minimum of once a week. See “Use Fee Collections” in each lakes “Additional Scope of Work”, for which process is used at the location(s) you are bidding. Inspections will be performed during the contract period as deemed necessary by the Natural Resources Manager.
13. SECURITY BONDING:
The contractor must be fully bonded or insured to cover collected funds not received by the designated government agent or Reserve America as directed in the specifications.
The contractor is required to furnish the Lake Office Purchasing Agent proof of such bond or security in the minimum amount of $5,000.00 payable to the Fort Worth District US Army Corps of Engineers. Condition of the bond obligation covers the loss of Government Funds/Use Fees that are stolen or embezzled by the contract gate attendant. The bond must name all persons that will handle Government Funds/ Use Fees. The bonds should note that the contract gate attendant collector(s) are not a direct employee of the Government. The term of the bond is to be a minimum of 60 days past the contract gate attendant’s effective date of termination. A condition in the bond will require the bonding company to notify the Corps of Engineers before the bond is modified, terminated or cancelled, prior to the original termination date. The contractor must provide a copy of the bond at the Pre-Work Conference. The Contractor shall not start work without proof of bonding. The contractor can choose one of the following options to fulfill this requirement:
a. Obtain a Business Services, Fidelity or Dishonesty bond from an insurance agent meeting the criteria stated above. The cost of the bond varies by type, individual and the issuing company.
b. Furnish an irrevocable, unconditional letter of credit from a financial institution in the specified amount.
***SPECIAL NOTICE***
All persons handling Government monies or accessing the Government computer system under this contract shall be subject to a background investigation to establish their reliability, trustworthiness, conduct and character. By execution of the contract, the contractor certifies that all persons providing such services under the contract are so qualified, including but not limited to, not having been convicted of a felony. Any person so found not to have the necessary reliability, trustworthiness, conduct and character shall be dismissed. If the contractor fails to meet this requirement, the contract will be terminated for default. By providing a bid on this contract, you are providing authorization for US Army Corps of Engineers, its agents or representatives to investigate your background, as deemed necessary by such agent or representative, to establish your trustworthiness, reliability and character. In the course of performance of this contract, the Contractor/Contractor Personnel may come into contact with or possession of information covered by the Privacy Act (e.g. Social Security numbers) and/or sensitive personal information of Corps employees/members of the public/patrons/customers (e.g. personal checks with account numbers, credit card numbers, etc.). The Contractor/Contractor Personnel shall not memorize copy or record this information in any way, nor shall they use their access to this information for any personal reason or financial gain, or provide this information to any third person or party. Failure to comply with these restrictions will result in the immediate termination of the contractor employee, and may subject the employee to civil suit for money damages and/or criminal prosecution to the fullest extent under the law. Repeated violation of this provision may serve as a basis for termination of the contract. The contractor will secure an acknowledgement from every employee that they have read, understand and will comply with this paragraph.
14. CAMPSITE RESERVATIONS:
The Contractor will comply with local and District policies for reservations. The contractor will adhere to guidelines and procedures established under the National Recreation Reservation System, using Park Office program in the campground. The contractor may also be required to take advance campsite reservations, which would consist of receiving and booking reservations requests, collecting and processing camping fees, and handling cancellation and refund requests. The Contractor will be required to perform some or all the following duties daily: a) pickup reservation data reports, i.e.
bookings, arrival reports, cancellation reports, etc., from the local lake office or accept the reports delivered in person, and /or transmitted by telephone, electronic mail received through a computer, facsimile machine, etc.; b) maintain and update necessary status reports utilizing charts, status boards, note pads, card systems, computer/cash register systems, AUPS, NRRS, etc., to insure that campsite status is kept current at all times; c) keep records and monitor date of arrivals, departures, no-shows, cancellations, etc.; d) fill out refund and credit voucher forms according to policy.; and e) post or identify reserved and vacant campsites by positing provided signs or markers. The Contractor will also maintain records as necessary for the administration of the campsite reservation program as directed by the Natural Resources Manager. The Contractor will accept the campsite reservation permit / confirmation letter as both proof and payment of the reservation.
15. GROUP SHELTERS:
The contractor will keep records and insure compliance of group shelter use as required by the Natural Resources Manager including the use of the NRRS system, where applicable.
16. CAMPING STATUS:
The Contractor will record the campsite occupied and maintain record of the current status for each campsite occupied. The contractor will keep written records of each camper’s length of stay to insure compliance with the Fort Worth Districts camping policy. The contractor will register park users, issue appropriate passes and deliver messages to visitors as required by the Natural Resources Manager. The Contractor will keep a written record of campers who are turned away due to lack of campsites or campsites with desired hook-ups. The Contractor shall also participate as required in all Recreation Use Surveys that may be conducted.
17. VISITOR ASSISTANCE:
The contractor will occupy the gatehouse at all times during duty hours and is required to handout information pamphlets, copies of rules and regulations and maps to all visitors, courteously answer questions for visitors and assist campers or visitors in locating campsites. The contractor will advise campers and park visitors (1) to utilize only developed facilities or designated overflow areas and (2) to operate and park all vehicles and campers only on paved surfaces or designated parking areas. The contractor will advise campers of quiet hours (10:00 P.M. until 6:00 A.M.) as they enter the park, and assist in maintaining quiet hours.
18. COMPLAINTS:
The contractor will keep a written record of all complaints and criticisms of park facilities.
These records will be given to the Natural Resources Manager at regular intervals or upon request.
19. DISTURBANCES:
The contractor will promptly report all accidents, violations of law, disturbances, and situations that could affect health and safety of visitors to the Park Ranger. In the event the contractor is unable to communicate with the Park Ranger and the situation dictates, the contractor will contact the local law enforcement officers as soon as practical. All communications with local law enforcement officers will be reported to the Park Ranger or Natural Resources Manager, on the next workday. The Contractor will not attempt to apprehend any violators or enforce rules, regulations or laws. Attendants will inform park visitors of rules, regulations and laws and refer persistent violations to the Park Ranger.
NOTE: Serious incidents such as a fatality in the park or situations of significant public interest will be reported immediately to the Natural Resources Manager and to the local law enforcement agency.
20. COOPERATION WITH OTHERS:
The contractor will maintain good communications and relations with the public, other contractors, volunteers, and Corps employees. and others who work with the Corps of Engineers for the construction of new facilities, repair of existing facilities, sanitation services, trash pick-up services, and grass mowing, etc. The contractor will allow Corps employees to utilize communication facilities furnished by the Government. Cooperation will include, but not be limited too summoning assistance and reporting all instances of vandalism, harassment, public intoxication, speeding, etc. to proper authorities. The contractor will diligently attempt to provide for the needs of our visiting public as public relations representatives for the Corps of Engineers. The contractor may be asked to work additional days with compensation in the event that another contractor requires emergency time off.
21. PARK INSPECTION:
The contractor will inspect the park area and facilities a minimum number of times each day as required by the Natural Resources Manager. Inspections will be made in a vehicle provided and maintained by the contractor. During all inspections, if the contractor observes park users violating Corps of Engineers rules and regulation, the contractor should advise the visitor of the violation, the contractor is not to pursue enforcement. If violations persist, the contractor should contact a Park Ranger. If a Park Ranger is not available, in minor cases, a record of the incident should be made and reported to the Natural Resources Manager as soon as practical.
22. CONTRACTOR VEHICLE:
The contractor will provide a transportation vehicle, which can be operated independently of the RV, it must be free of leaks and in good mechanical condition for use in performing the requirements of the contract. Minimum state required liability insurance must be carried and have current Motor Vehicle Inspection (MVI). Proof of liability insurance will be submitted to the Natural Resources Manager, no later than 10 days after the beginning date of the contract. All motor vehicles and operators will comply with state laws such as licensed operators, vehicle safety equipment, etc. The Gate Attendant may be required to display the vehicle identification provided by the Corps of Engineers on the vehicle while on duty. The Gate Attendant’s vehicle will not display Emergency Red and/or Blue Lights, use a siren, or otherwise represent an appearance of an emergency vehicle while on duty.
23. LOST AND FOUND:
The contractor will keep lost and found articles in the gatehouse or trailer and turn over all found articles with as much information as possible to a Park Ranger as soon as possible.
24. WEAPONS:
Firearms or any type of object that could be considered a weapon will not be carried or kept in the park (e.g. pepper spray, clubs. etc.). This includes, but not limited to the gatehouse or trailer occupied by the contractor.
25. ALCOHOL:
The contractor will not consume or be under the influence of alcoholic beverages, illicit drugs and/or medication unless administered under a doctor’s prescription while on duty or while in view of the public. This includes, but is not limited to, the park entrance area, attendant site, gatehouse, park restrooms, campsites, etc.
26. INSPECTION AND CONTRACT PERFORMANCE:
The service performed by the contractor under the provisions of this contract shall be subject to inspections by the Contracting Officer or his designated representative to insure strict compliance with the terms of the contract.
A. NOTIFICATION OF DEFICIENCIES: Contractor shall be notified verbally and/or in writing of any serious or recurring minor deficiency in service observed by the Contraction Officer or his/her authorized representative. Verbal notification will be recorded in a memorandum for record.
B. DOCUMENTATION OF DEFICIENCIES: Written notifications and memoranda for the record shall be prepared in triplicate by the Contraction Officer or his/her authorized representative. The original will be part of the Contractor’s permanent file at the Operations Manager’s Office, a copy will be issued to the contractor, and a copy will be forwarded to the Contracting Officer at the U.S. Army Corps of Engineers, Fort Worth District Office.
C. CORRECTION OF CONTRACT DEFICIENCIES: Upon receipt of notification of deficiency in service, Contractors will immediately correct deficiencies and /or take steps to prevent recurrence of the deficiency.
D. DEFICIENCIES OF SERVICE: This contract may be terminated by the Contracting Officer upon receipt of any “Notification of Contract Deficiency”. Termination will be based on the seriousness of the deficiency.
E. EVALUATION OF PERFORMANCE: All contractors will have their performance evaluated no less than mid-term and at the conclusion of their contract.
Performance criteria will be distributed to contractors at the orientation/training sessions.
27. TRAILER SITE:
Unless otherwise indicated in the Lake Offices’ park information sheet or additional scope of work, the Government will furnish a site for self-contained travel trailer or motor home with 110 volt electricity, water, sewer hook-ups and/or dump station nearby. If the contractors’ travel trailer is not configured or adaptable to the sewage, water or electric hookups available at the site, the Government will not be responsible for providing attachments’ etc. No reimbursement will be made whenever utilities are not available and must be secured elsewhere. The use of the facilities is at the contractors own risk and damage to equipment will be the sole responsibility of the contractor.
28. COMMUNICATIONS EQUIPMENT:
The contractor may be required to operate and use radio equipment. The Government will furnish radio equipment when required.
29. GOVERNMENT PROPERTY:
The contractor will be required to return Government property on the last day of the contract. The Contractor will be held liable for any missing or damaged government equipment or materials. Computers, printers, radios, and telephone equipment provided by the government are for official use only. Contractor shall not use gate house computers for personal business or install any personally owned software. Any damages incurred as result of personally owned software being installed on the Government computers will be considered damages to Government property and Contractor will be held responsible for reimbursement to the Government any cost associated with repairs or replacement of the equipment. Final payment will not be paid until all Government property is returned and all fee monies have been turned in.
30. DAMAGE RESPONSIBILITY:
The contractor shall be responsible for restoring any Government facilities, structures, or trees damaged as a result of his/her operation. The contractor shall also be responsible for any damage to private property, and will notify the Natural Resources Manager immediately of damage to Government property and/or private property, and injury to any person resulting from his/her operation. The Contractor will notify the Natural Resources Manager immediately of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed.
31. SOLID WASTE DISPOSAL:
A trash removal contractor will remove all solid waste material (trash) from the Government furnished containers on regular scheduled days.
32. ABSENTEEISM:
No payment will be made for time not worked. The Natural Resources Manager should be contacted and given as much advance notice as possible about anticipated absences. The Natural Resources Manager must approve all absences in advance. An absence by any one or both of the two-person contract team, without prior approval by the Natural Resources Manager, is grounds for dismissal of the contractor and termination of the contract. If arrangements will be made for someone to cover the shift, these persons must be approved in advance and must meet the required bonding and insurance requirements.
33. PAYMENT FOR SERVICES:
Payment will be made monthly by Electronic Funds Transfer (EFT) for the actual days worked at the unit price indicated on the bid sheet. Contractors should be aware that the payment could take as long as 45 days after invoice.
34. SUBSTITUTION OF TEAM MEMBER:
Team member substitution may be allowed upon prior approval by the Contracting Officer.
35. TERMINATION:
Failure of the Contractor to provide items in full and to provide complete services listed in the contract specifications and applicable specific park sheets may be grounds for termination. Breach of contract and/or voluntary termination of contract without sufficient cause may jeopardize the contractor’s standing for future contract with the U.S. Army Corps of Engineers. Contractors may be terminated if the Government determines Gate Attendant services are no longer needed due to unforeseen closures of the park or if major facilities (e.g., beaches, boat ramps, restrooms, campgrounds, etc.). Unforeseen closures would include those resulting from droughts, flood, storm damage, infrastructure failure and previously unknown safety hazards. Inappropriate conduct or unacceptable actions of Gate Attendants may be grounds for termination of the contract.
Examples of actions meriting termination include, but not limited to:
A. Theft, misappropriation, personal use, and/or improper security and accountability of user fees or government services, property, equipment, facilities and/ or supplies. Any of these acts may also result in criminal prosecution.
B. Consumption of alcoholic beverages and/or intoxication while on duty, and possession or use of illicit drugs at any time.
C. Discrimination, harassment, profanity, or other inappropriate behavior perpetrated against customers, Corps personnel, or other contractors.
D. Recurring written and/or verbal complaints from visitors and/or Lake Office personnel on Attendant’s attitude, lack of cooperation and/or resistance to implementation of policies and program as directed by the Operations Manager or his/her authorized representative.
E. Failure to follow security procedures, including the allowance of unauthorized personnel inside the gatehouse or the contractor (non-public) work area of the gatehouse/entrance stations.
F. Inability to perform duties and job responsibilities in accordance with the General Specifications, Specific Park Sheet(s) and Lake Office Gate Attendant Manual.
G. Violations of public health and safety, including smoking in the gatehouse.
H. Failure to maintain a neat, clean, well-groomed personal appearance.
I. Failure to abide by Title 36 CFR, Chapter III, Section 327.
36. DUTY OF CONTRACTOR TO FINISH CONTRACT:
The contractor may not terminate the contract. If the contractor fails to complete the contract through the specified term including option periods (if applicable), the contractor is subject to re-procurement cost. The contractor’s failure to comply with contract specifications may be grounds for suspension or debarment for a period of time not to exceed 3 years. Acceptance of the contract shall be evidence of such knowledge, approval, or acquiescence of all contract specifications.
37. LIABILITY:
During the period of this contract, the Contractor shall be responsible for all injuries or damages of any nature caused or contributed to by the contractor, his/her agents, and/or employees while engaged in work under this contractor.
38. CONTRACT OPTION PERIOD:
The Government retains the right to exercise option periods. Option periods shall obligate contractor services for the following year for the same season awarded.
39. INSURANCE:
In addition to automobile insurance required in Section 22, Attendants are responsible for obtaining and paying for any other insurance desired, including but not limited to, medical, general liability, and comprehensive property. The Contractor may be responsible for damage to private or government property if in the opinion of the Contracting Officer or his designated representative the damage is a result of contractor negligence.
40. OTHER REQUIREMENTS:
See the Additional Scope of Work included in this solicitation for further requirements at the various lakes. Other requirements may include, but not limited to:
A. Gatehouse and landscape maintenance B. Issuing Annual Day Use Passes and Interagency Senior Pass.
C. Inspection of group use areas.
D. Documenting and maintaining lost and found items.
E. Monitoring volunteer projects.
41. GATEHOUSE OPERATIONS:
The Contractor will occupy the gatehouse at all times during duty hours and is required to handout information pamphlets as required by the Lake Office additional scope of work and Lake Office Gate Attendant Handbook. Smoking is not permitted in the gatehouse. Contractor will not solicit, advertise, sell or offer to sell any unauthorized goods or services to campers or visitors on public property (CFR Title 26, Section 327.18).
ADDITIONAL SCOPE OF WORK
GATE ATTENDANT
(For all Campground Gate Attendant positions at Lake O’ the Pines)
TOUR OF DUTY
The Lake O’ the Pines winter gate attendants work one of three positions. Johnson Creek gate attendant will work 5 days per week with Mondays and Tuesdays off.
Buckhorn Creek gate attendant will work 5 days per week with Wednesdays and Thursdays off. The roving gate attendant will work Monday and Tuesday at Johnson Creek, Wednesday and Thursday at Buckhorn Creek, and be off Friday through Sunday. The hours of operation for the gatehouse are 9:00 a.m. until 8:00 p.m. each day. Gate attendants will be required to close the exit gates at the end of their shifts.
The base year of the contract will start October 1, 2010 and go through February 28, 2011. There will be two option years with this contract, each beginning on October 1st and ending on the last day of February.
PRE-WORK CONFERENCE
Gate Attendants will attend a pre-work conference at the Lake O’ the Pines Project Office no later than one (1) week prior to start date.
PARK INSPECTION
Gate attendants will make a minimum of three (3) park inspections each workday.
Additional inspections may be required to check on visitor complaints, deliver messages, and check park status.
LIVING FACILITIES
Gate attendant camping pads with water, electrical, and sewer hookups will be provided at each park. A storage building is also available.
TELEPHONE
A phone line connects the gatehouse to the gate attendant camping pad. All long distance phone calls will be collect calls or by calling card.
*REMITTING OF FEE MONIES
The contractor will be responsible for remitting monies for each individual approved DEPOSIT (formerly BFC). The final approved DEPOSIT, cashier check or money order, and all personal checks shall be remitted in a single envelope to the Atlanta Lockbox, the address being on the DEPOSIT. Each DEPOSIT must be mailed separately either the day after a shift ends or the first day of the next shift. The contractor will be required to submit 30 DEPOSIT during the base year and will be required to purchase a cashier check or money order at the expense of the contractor. The contractor will be required to pay all postage needed to submit DEPOSIT. Fund instruments will be made payable to the “National Recreation Reservation Service” or “NRRS” and be stamped on the back “For Credit to the U.S.
Treasury”. The Unit and Contract/Subcontract number will also be written or stamped on each fund instrument. The use of cashier checks is strongly recommended over the use of money orders. The DEPOSIT must be clear and legible with no hand changes or notes included on this copy. Separate notes can be included to explain extenuating circumstances. One additional copy of the DEPOSIT along with the DEPOSIT Detail Report, DEPOSIT Summary Report, Void Report, and Credit Card Summary Report will be printed and picked up at the gate attendant station by a ranger and delivered to the lake office to be kept on file. Any discrepancy in the DEPOSIT will be resolved with the Ranger in charge prior to remitting.
MATERIALS & SUPPLIES
The Government will not provide the following materials or supplies, including but not limited to:
Cleaning supplies; brooms, mops, solvents, floor/furniture cleaners, disinfectant, polishes etc.
Toiletries; toilet paper, facial tissue, paper towels
Herbicides or pesticides (unless deemed appropriate by Project Manager)
Transportation or fuel
The government will provide supplies deemed necessary by the Project Manager for the completion of Scope of Work, including but not limited to:
Office supplies; pens, paper, printer ink, adding machines, ink ribbons.
Office Furniture; chairs
Computer Equipment; monitor, printer, mouse, keyboard
RECREATION AREA DESCRIPTIONS:
Johnson Creek Campground Located at Lake O' the Pines in north-east Texas, approximately 13 miles west of Jefferson, Texas, on FM 729. Johnson Creek Campground contains a total of 85 campsites of which 63 are hard surfaced Class A sites with electrical and water hookups. The other 22 sites are Class A tent sites with a table and cooker at each site. The 10 sites in tent area 2 have electrical hookups. Johnson Creek Campground is a heavily used camping area at Lake O' the Pines and normally maintains a very high rate of occupancy during the recreation season. The Campground includes a group camping area with pavilion and 12 improved campsites. The adjacent day use area has an amphitheater and pavilion. Attendant on duty is responsible for opening Johnson day use at 0600 and closing at 2200 (10 PM). Also provides keys for pavilion and group camping users.
Buckhorn Creek Campground Located at Lake O' the Pines in north-east Texas, approximately 10 miles west of Jefferson, Texas, on FM 726. Buckhorn Creek Campground contains a total of 100 campsites of which 62 are hard surfaced Class A sites with electrical and water hookups. The other 38 sites are Class A tent sites with a table and cooker at each site. Buckhorn Creek Campground is a heavily used camping area at Lake O' the Pines and normally maintains a very high rate of occupancy during the recreation season. Attendant on duty is responsible for opening the Lakeside Day Use Area at 0600 and closing at 2200 (10 PM). Also unlocks Lakeside Pavilion for users.
WORKDAYS PER YEAR
JOHNSON CREEK PARK
BASE YEAR OPTION YEAR 1 OPTION YEAR 2 TOTAL
108 108 107 323
BUCKHORN CREEK PARK
109 109 107 325
ROVING (JOHNSON AND BUCKHORN)
85 87 88 260
Johnson Creek Park- Gate Attendant Work Calendar- Base Year 2010-11 Workdays are Highlighted
October November December
Su Mo Tu We Th Fr Sa
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
January February March
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
6 7 8 9 10 11 12 13 14 15 16 17 18 19
27 28 29 30 31
Buckhorn Creek Park- Gate Attendant Work Calendar- Base Year 2010-11
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
7 8 9 10 11 12 13
14 15 16 17 18 19 20
5 6 7 8 9 10 11
12 13 14 15 16 17 18
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
6 7 8 9 10 11 12 13 14 15 16 17 18 19
6 7 8 9 10 11 12 13 14 15 16 17 18 19
Johnson Creek and Buckhorn Creek Parks - Roving Gate Attendant Work Calendar- Base Year 2010-11
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
7 8 9 10 11 12 13
14 15 16 17 18 19 20
5 6 7 8 9 10 11
12 13 14 15 16 17 18
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
6 7 8 9 10 11 12 13 14 15 16 17 18 19
6 7 8 9 10 11 12 13 14 15 16 17 18 19
Work calendars are provided for reference only
WRIGHT PATMAN LAKE
GATE ATTENDANT
ROCKY POINT PARK, CLEAR SPRINGS, and MALDEN LAKE PARKS
(6 separate positions)
1. Tour of Duty The Rocky Point, Clear Springs, and Malden Lake gate attendant positions (Shifts 1 and 2) will be on a 4 days on, 4 days off basis. The base year of the contract will start October 1, 2010 and go through February 28, 2011. There will be two option years with each of these contracts, each beginning on October 1st and ending on February 29th (2012) and February 28th (2013). The hours of operation for the gatehouses are 9:00 a.m. until 7:00 p.m. Gate attendants will be required to close the entrance and exit gates at the end of their shifts.
2. Pre-Work Conference
Gate Attendants will attend a pre-work conference at the Wright Patman Project Office no later than one (1) week prior to start date, at a time and date specified by the Corps of Engineers.
3. Park Inspection
Gate attendants will make a minimum of three (3) park inspections each workday.
Additional inspections may be required to check on visitor complaints, deliver messages, and check park status.
4. Living Facilities
Gate attendant camping pads with water, electrical, and sewer hookups will be provided at each park. A storage building is also available. In Rocky Point and Malden Lake Parks, Shift 1 gate attendants will occupy the site on the entrance side of the park, and Shift 2 gate attendants will occupy the site on the exit side. At Clear Springs Park, Shift 1 will occupy the first gate attendant site upon entering the park, and Shift 2 will occupy the second site. Gate attendants shall arrive no more than seven (7) days prior to beginning work, and if their campsite is occupied by the prior gate attendant, will be set up on a campsite within the park.
5. Telephone A phone line connects the gatehouse to one of the gate attendant camping pads. All long distance phone calls will be collect calls or by calling card.
6. Remitting of Fee Monies
The contractor will be responsible for remitting monies for each individual approved DEPOSIT (formerly BFC). The final approved DEPOSIT, cashier check or money order, and all personal checks shall be remitted in a single envelope to the Atlanta Lockbox, the address being on the DEPOSIT. Each DEPOSIT must be mailed separately either the day after a shift ends or the first day of the next shift. The contractor will be required to submit 19 DEPOSITS during this contract period of 5 months and will be required to purchase a cashier check or money order at the expense of the contractor. The contractor will be required to pay all postage needed to submit DEPOSIT.