Amendment No. 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| am_4.pdf | ||
| W9126G-08-R-0173 Amend2.doc | DOC document | |
| W9126G08R0173AMEND2.doc | DOC document | |
| W9126G08R0173Amend2.doc | DOC document | |
| g08r0173.exe | EXE file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53 243
The Solicitation for Design/Build Indefinite Delivery Indefinite Quantity IDIQ Contracts for Construction Services for Military and Civil Support for Southwestern Division primarily Fort Worth District, is amended as follows:
See Continuation Sheet(s)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G-08-R-0173
X 9B. DATED (SEE ITEM 11)
16-June-2008
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-July-2008
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G-08-R-0173
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION SF30 - CONTINUATION PAGE
SUMMARY OF CHANGES
A. CHANGES TO IDIQ MATOC REQUEST FOR PROPOSAL
CHANGE TO PROPOSAL RECEIPT DATE
1. Proposal Receipt Date: Change the proposal receipt date from "16 July 2008, 4:30 pm, local time,” to "18 July 2008, 4:30 pm, local time".
CHANGES TO DOCUMENTS 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
2. Contract Line Item (CLIN) Schedule: Following SF 1442, Solicitation, Offer and Award, Add Contract Line Item (CLIN) Schedule, bearing the notation " ACCOMPANYING AMENDMENT NO. 0001 TO SOLICITATION
NO. W9126G-08-R-0173."
B. CHANGES TO INITIAL TASK ORDER
CHANGES TO DOCUMENTS 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
1. Bidding Schedule: Replace the Bidding Schedule, with the accompanying new Task Order Bidding Schedule, bearing the notation " ACCOMPANYING AMENDMENT NO. 0001 TO SOLICITATION NO. W9126G-08-R- 0173."
2. Section 00 73 46 Wage Determination Schedule: replace the page containing the note concerning rates of wages with the attached pages 00 73 46-1 through 00 73 46-9, each page bearing the notation "ACCOMPANYING
AMENDMENT NO. 0001 TO SOLICITATION NO. W9126G-08-R-0173."
CHANGES TO THE SPECIFICATIONS
3. Section 01 81 13 Sustainable Design Requirements: Delete entire section.
4. Write-in change to Section 08 44 00 Glazed Curtain Wall: In Paragraph 1.4, change Item a. to read as follows:
a. Unified Facilities Criteria (UFC) Standard 10 - Windows, Skylights and Glazed Doors, UFC 4-010-01, B-3.1 Requirements dated 8-October-2003, including change 1, 22 January 2007.
CHANGES TO THE DRAWINGS
5. Drawing No. G-002 (Sheet 3 of 86) – In the Option Line Item Schedule, delete the following note:
“OPTION *12: PROVIDE LEED GOLD RATING IN LIEU OF BASE BID SILVER RATING.”
End of Summary of Changes
ACCOMPANYING AMENDMENT NO. 0001 TO SOLICITATION NO. W9126G-08-R-0173
00 11 00 - Page 1 of 5
BASE PERIOD
ITEM NO. DESCRIPTION
ESTIMATED
QTY
UNIT OF
MEASURE
UNIT
PRICE EXTENDED PRICE
0010 SITE VISIT **** **** **** ****
0010AA TYPE I SITE VISIT **** LS ****
0010BB TYPE II SITE VISIT **** LS ****
0010CC TYPE III SITE VISIT **** LS ****
0020 WORK PLAN TBD TBD TBD TBD
0030 CONSTRUCTION TBD TBD TBD TBD
FIRM FIXED PRICE SUMMARY WAGE
RATES (see Note 8 below) **** **** **** ****
0040AA PROGRAM MANAGER 500 HR
0040BB PROJECT MANAGER 2000 HR
0040CC ARCHITECT/ENGINEER 100 HR
0040DD AE/TECHNICIAN 100 HR
0040EE COST ESTIMATOR 500 HR
0040FF SUPERINTENDENT 2000 HR
0040GG QUALITY CONTROL MANAGER 2000 HR
0050 BONDING (PERFORMANCE AND
PAYMENT) (Lump Sum to Cover Amount of Guaranteed Minimum) **** LS ****
0060 ADDITIONAL BONDING (PERFORMANCE
AND PAYMENT) (Unit price for each additional $1,000 of Bonding) 1 1k
BASE PERIOD TOTAL
(to be attached to SF1442) for the Southwestern Division primarily Fort Worth District for Military and Civil Support
Design/Build IDIQ Contracts for Construction Services
CONTRACT LINE ITEM (CLIN) SCHEDULE
00 11 00 - Page 2 of 5
(to be attached to SF1442) for the Southwestern Division primarily Fort Worth District for Military and Civil Support
Design/Build IDIQ Contracts for Construction Services
CONTRACT LINE ITEM (CLIN) SCHEDULE
OPTION YEAR 1
ITEM NO. DESCRIPTION
ESTIMATED
QTY
UNIT OF
MEASURE
UNIT
PRICE EXTENDED PRICE
1010 SITE VISIT **** **** **** ****
1010AA TYPE I SITE VISIT **** LS ****
1010BB TYPE II SITE VISIT **** LS ****
1010CC TYPE III SITE VISIT **** LS ****
1020 WORK PLAN TBD TBD TBD TBD
1030 CONSTRUCTION TBD TBD TBD TBD
FIRM FIXED PRICE SUMMARY WAGE
RATES (see Note 8 below) **** **** **** ****
1040AA PROGRAM MANAGER 500 HR
1040BB PROJECT MANAGER 2000 HR
1040CC ARCHITECT/ENGINEER 100 HR
1040DD AE/TECHNICIAN 100 HR
1040EE COST ESTIMATOR 500 HR
1040FF SUPERINTENDENT 2000 HR
1040GG QUALITY CONTROL MANAGER 2000 HR
1050 NOT USED **** **** **** ********
1060 BONDING (PERFORMANCE AND
PAYMENT) (Unit price for each $1,000 of Bonding) 1 1k
OPTION YEAR 1 TOTAL
00 11 00 - Page 3 of 5
(to be attached to SF1442) for the Southwestern Division primarily Fort Worth District for Military and Civil Support
Design/Build IDIQ Contracts for Construction Services
CONTRACT LINE ITEM (CLIN) SCHEDULE
OPTION YEAR 2
ITEM NO. DESCRIPTION
ESTIMATED
QTY
UNIT OF
MEASURE
UNIT
PRICE EXTENDED PRICE
2010 SITE VISIT **** **** **** ****
2010AA TYPE I SITE VISIT **** LS ****
2010BB TYPE II SITE VISIT **** LS ****
2010CC TYPE III SITE VISIT **** LS ****
2020 WORK PLAN TBD TBD TBD TBD
2030 CONSTRUCTION TBD TBD TBD TBD
FIRM FIXED PRICE SUMMARY WAGE
RATES (see Note 8 below) **** **** **** ****
2040AA PROGRAM MANAGER 500 HR
2040BB PROJECT MANAGER 2000 HR
2040CC ARCHITECT/ENGINEER 100 HR
2040DD AE/TECHNICIAN 100 HR
2040EE COST ESTIMATOR 500 HR
2040FF SUPERINTENDENT 2000 HR
2040GG QUALITY CONTROL MANAGER 2000 HR
2050 NOT USED **** **** **** ********
2060 BONDING (PERFORMANCE AND
PAYMENT) (Unit price for each $1,000 of Bonding) 1 1k
OPTION YEAR 2 TOTAL
W9126G-08-R-0173 00 11 00 - Page 4 of 5
Design/Build IDIQ Contracts for Construction Services for Military and Civil Support for
Southwestern Division Primarily Fort Worth District
CLIN SCHEDULE
NOTES:
1. ARITHMETIC DISCREPANCIES (EFARS 14.407-2)
(a) For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the CLIN schedule as submitted by bidders:
(1) Obviously misplaced decimal points will be corrected;
(2) In case of discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected; and
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of price proposal evaluation, the Government will proceed on the assumption that the offeror intends his price proposal to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the price proposal will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which proposal is low.
2. If a modification to a price proposal based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the CLIN schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the CLIN schedule.
3. Offerors must bid on all items.
4. Costs attributable to Division 01 General Requirements are assumed to be prorated among CLIN items listed.
5. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.
6. The above CLINS identified with “TBD” are to be determined on a task order basis.
7. SITE VISITS: The site visit line items within this bid schedule shall contain only labor hour costs. All travel, per diem and supplies necessary for the site visit shall be negotiated and definitive within the work plan line item. For site visit definitions, see SECTION 00 90 00.
W9126G-08-R-0173 00 11 00 - Page 5 of 5
NOTES: (cont)
8. Reference the FIRM FIXED PRICE SUMMARY WAGE RATES above. These are hourly rates.
Offerors shall complete the Firm Fixed Price Summary Wage Rates above in addition to the rest of the CLINs on the CONTRACT LINE ITEM (CLIN) SCHEDULE (Section 00 11 00). The Firm Fixed Price Summary Wage Rates apply to the PRIME CONTRACTOR ONLY. Firm Fixed Price Summary Wage Rates DO NOT APPLY TO ANY SUBCONTRACTOR. If the prime contractor does not currently employ any of these individuals, the prime shall provide the wage rate that it would pay that individual if the individual were employed by the prime contractor. In addition, these rates will also be evaluated for price reasonableness for the purpose of the initial award of the IDIQ. Unusually low or high rates may result in the Offeror’s not being selected for contract award. Offerors may not be given the opportunity to revise their prices, so Offerors are strongly encouraged to provide their best pricing the first time.
9. BONDING (Overhead and Profit shall not be applied to bond costs):
The Contractor shall include the cost of bonding for the appropriate guaranteed minimum as identified within this solicitation for the Base Period as well as a rate for additional bonding. There is no guaranteed minimum amount required for the Option Periods, just for the Base Period.
Unless requested by the Contractor in accordance with FAR 52.232-5(g) (Section 00 70 00, CONTRACT CLAUSES), the premiums paid for performance and payment bonds associated with the contract award will be reimbursed on a Task Order basis based on the value of the task order in accordance with the per unit price established in the bidding schedule. The Contractor shall submit a line item bid price to reflect costs for bonding per $1,000.00. The bid item shall be applied and listed separately on each task order when issued, based on the cost of the construction services.
The premiums paid for performance and payment bonds will not exceed the amount established in the bidding schedule. Upon verification of the bonding premiums as annotated on Standard Form 25 and 25A, the Government may modify the contract to reflect a decrease in the amount bid.
10. TRAVEL COSTS: Costs for travel may be negotiated for each task order as allowed by Federal Acquisition Regulations (FAR) 31.205-46 Travel costs. The Federal Travel Regulation will be used for travel in the conterminous 48 United States. The Joint Travel Regulation will be used for travel in Alaska, Hawaii, The Commonwealth of Puerto Rico, and territories and possessions of the United States. Travel costs are allocable expenses for transportation, lodging, meals, and incidental expenses associated with official Government business as allowed by FAR 31.205-46. (Federal Travel Regulation web site is http://www.policyworks.gov/org/main/mt/homepage/mtt/ftr/ftrhp.shtml. Joint Travel Regulation web site is http://www.dtic.mil/perdiem/trvlregs.html, then click on JTR – VOL 2 DOD CIVILIANS, then Acrobat PDF File.)
11. ABBREVIATIONS: For the purpose of this solicitation, the units of measure are represented as follows:
a. EA (each)
b. HR (hour)
c. K (thousand)
d. LS (Lump Sum)
e. TBD (To Be Determined)
END OF CLIN SCHEDULE
Item No. Description Quantity Unit Unit Price Amount
0001 BCTC Facility complete, including utilities to the 5-ft line, and exclusive of all other work listed separately.
1 LS *** $
0002 BCT Facility Exterior Work outside the building’s 5 ft line (Including utilities, earthwork, paving, sidewalk, curb and gutter, screen walls, and all other work not listed separately).
1 LS *** $
0003 Operation and Maintenance Manuals 1 LS *** $ 25,000.00
0004 Final Record Drawings 1 LS *** $ 21,500.00
OPTIONS
0005 OPTION NO. 1 : Additional cost for all work required by the plans and specifications to provide exterior elevation enhancement. 1 LS *** $
0006 OPTION NO. 2 : Additional cost for all work required by the plans and specifications to provide classroom wall finishes and interior door upgrade. 1 LS *** $
0007 OPTION NO. 3 : Additional cost for all work required by the plans and specifications to provide Latrine and Administration Area interior finishes upgrade. 1 LS *** $
BASE BID: All work required by the plans and specifications exclusive of work required by Option Bid Items.
TOTAL BASE BID
Battle Command Training Center (BCTC) Facility Fort Sam Houston, Texas
TASK ORDER BIDDING SCHEDULE
(To be attached to SF 1442)
Section 00 11 00.02, Page 1 of 6
Battle Command Training Center (BCTC) Facility Fort Sam Houston, Texas
TASK ORDER BIDDING SCHEDULE
(To be attached to SF 1442)
0008 OPTION NO. 4 : Additional cost for all work required by the plans and specifications to provide entry walk area enhancement and pedestrian site lighting along walks.
1 LS *** $
0009 OPTION NO. 5 : Additional cost for all work required by the plans and specifications to provide additional electrical and telecommunication service bundle (50% additional).
1 LS *** $
0010 OPTION NO. 6 : Additional cost for all work required by the plans and specifications to provide STC 50 rating operable partition and classroom interior partition. 1 LS *** $
0011 OPTION NO. 7 : Additional cost for all work required by the plans and specifications to provide special concrete floor finish system SC-1 and SC-2 in lieu of Base Proposal sealed concrete floor system.
1 LS *** $
0012 OPTION NO. 8 : Additional cost for all work required by the plans and specifications to provide architectural Mechanical Equipment Enclosure and decorative fencing in lieu of base proposal chain-link fencing. 1 LS *** $
0013 OPTION NO. 9 : Additional cost for all work required by the plans and specifications to provide pre-action sprinkler system for entire facility in lieu of base proposal wet pipe system. 1 LS *** $
Section 00 11 00.02, Page 2 of 6
Battle Command Training Center (BCTC) Facility Fort Sam Houston, Texas
TASK ORDER BIDDING SCHEDULE
(To be attached to SF 1442)
0014 OPTION NO. 10 : Additional cost for all work required by the plans and specifications to provide double wall lined ductwork in lieu of base proposal exterior wrapped duct insulation. 1 LS *** $
0015 OPTION NO. 11 : Additional cost for all work required by the plans and specifications to provide new architectural Trash Enclosure. 1 LS *** $
0016 OPTION NO. 12 : Additional cost for all work required by the plans and specifications to provide LEED Gold rating in lieu of base proposal Silver rating.
Option 12 is deleted. 1 LS
*Note: Completion Time for all work (NOT to exceed the maximum time stated in Section 01 00 00 CONSTRUCTION SCHEDULE) See Section 00 22 10, paragraph 3.4 Factor 4: Construction Duration (Volume II, Tab 4)
PROJECT COMPLETION TIME ______ Calendar days*
TOTAL (BASE BID + ALL OPTIONS)
TOTAL (ALL OPTIONS)
Section 00 11 00.02, Page 3 of 6
Battle Command Training Center (BCTC) Facility
Fort Sam Houston, Texas
TASK ORDER BIDDING SCHEDULE
Section 00 11 00.02, Page 4 of 6
NOTES:
1. ARITHMETIC DISCREPANCIES (EFARS 14.407-2)
(a) For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by bidders:
(1) Obviously misplaced decimal points will be corrected;
(2) In case of discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected; and
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends his bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
2. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
3. Bidders must bid on all items.
4. Costs attributable to Division 01 - General Requirements are assumed to be prorated among bid items listed.
5. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.
6. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)
(a) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(b) The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
7. EXERCISE OF OPTIONS (SWDR 715-1-1 (16 January 1996))
The Government reserves the right to exercise the option(s) by written notice to the Contractor either singularly or in any combination for up to 90 calendar days after award of the Base Bid without an increase in the Offeror's Bid Price. Completion of added items shall continue at the same schedule as the Base Bid unless otherwise noted in Section 01 00 00 CONSTRUCTION SCHEDULE, paragraph 1 entitled
SCHEDULE.
Section 00 11 00.02, Page 5 of 6
8. ABBREVIATIONS
For the purpose of this solicitation, the units of measure are represented as follows:
a. LS (lump sum)
9. DESCRIPTION OF OPTION BID ITEMS
(a) Item 0005 Option No. 1: Provide exterior elevation enhancement.
Basis-of-Proposal for Option No. 1 shall be the addition of the following work complete: Provision of all work associated with the addition of deeper CMU pilasters and full-height CMU veneer on north exterior wall of Classroom 103 as indicated on Sheet A-203.
(b) Item 0006 Option No. 2: Provide Classroom wall finishes and interior door upgrade.
Basis-of-Proposal for Option No. 2 shall be the addition of the following work complete: Provision of all work associated with additional acoustical wall panels and 10-feet high by full width markerboard wallcovering in classrooms as indicated on Sheets A-103, A-601, and specification section 09 83 13 “Acoustical Wall Treatment”. In addition the provision of all work associated with providing interior wood doors in lieu of base proposal wood doors as indicated on Sheet A-601 and specification section 08 14 00 “Wood Doors”.
(c) Item 0007 Option No. 3: Provide Latrine and Administration Area interior finishes upgrade.
Basis-of-Proposal for Option No. 3 shall be the addition of the following work complete: Provision of all work associated with providing full height ceramic wall tile and ceramic floor tile in the latrines in lieu of base proposal sealed concrete floor and painted walls per Sheets A-103, A-601, and specification section 09 30 00 “Ceramic Tile”.
In addition the provision of all work associated with providing carpet flooring in lieu of base proposal vinyl composition tile VCT) in the administration area per Sheets A-103, A-601, and specification section 09 68 00 “Carpet”.
(d) Item 0008 Option No. 4: Provide entry walk area enhancement and pedestrian site lighting along walks.
Basis-of-Proposal for Option No. 4 shall be the addition of the following work complete: Provision of all work associated with providing enhancement of the entry walk by utilizing patterned concrete walks and hardscaping per Sheet L-101, specification sections 03 35 33 “Stamped Concrete Finishing” and 12 93 00 “Site Furnishings”. In addition, the provision of all work associated with providing four new pedestrian site lighting per Sheet E-101.
(e) Item 0009 Option No. 5: Provide additional electrical and telecommunication service bundle (50% additional).
Basis-of-Proposal for Option No. 5 shall be the addition of the following work complete: Provision of all work associated with quantity ( 16 ) additional communication CAT 6 ScTP cable bundle sets per Sheet Detail C3/ES703 and quantity ( 16 ) additional power cable type SOW Cord Sets per Sheet Detail A1/E502.
(f) Item 0010 Option No. 6: Provide STC 50 rating operable partition and classroom interior partition.
Basis-of-Proposal for Option No. 6 shall be the addition of the following work complete: Provision of all work associated with providing STC 50 rating operable partitions and classroom interior partitions per Sheets A-103, A- 602, and specification section 10 22 26 “Operable Partitions”.
Section 00 11 00.02, Page 6 of 6
(g) Item 0011 Option No. 7: Provide special concrete floor finish system SC-1 and SC-2 in lieu of base proposal sealed concrete floor system
Basis-of-Proposal for Option No. 7 shall be the addition of the following work complete: Provision of all work associated with providing floor finish system SC-1 in classrooms and floor finish system SC-2 in corridors and vestibule in lieu of base proposal sealed concrete floor per Sheets A-103, A-601, and specification section 03 35 10 “Special Concrete Floor Finish”.
(h) Item 0012 Option No. 8: Provide architectural Mechanical Equipment Enclosure and decorative fencing in lieu of base proposal chain-link fencing.
Basis-of-Proposal for Option No. 8 shall be the addition of the following work complete: Provision of all work associated with architectural Mechanical equipment enclosure in lieu of base proposal chain-link fencing per Sheet L102 and specification section 32 31 19 “Decorative Metal Fences and Gates”.
(i) Item 0013 Option No. 9: Provide pre-action sprinkler system for entire facility in lieu of base proposal wet pipe system.
Basis-of-Proposal for Option No. 9 shall be the addition of the following work complete: Provision of all work associated with providing pre-action sprinkler system in lieu of base proposal wet pipe system per Sheet FX-101.
(j) Item 0014 Option No. 10: Provide double wall lined ductwork in lieu of base proposal exterior wrapped duct insulation.
Basis-of-Proposal for Option No. 10 shall be the addition of the following work complete: Provision of all work associated with providing new double-walled ductwork in lieu of base proposal exterior wrapped duct insulation per Sheet M-101.
(k) Item 0015 Option No. 11: Provide new architectural Trash Enclosure.
Basis-of-Proposal for Option No. 11 shall be the addition of the following work complete: Provision of all work associated with providing new aluminum fixed louver fencing per Sheets C-101, L-102, and specification section 05 50 00 “Metal: Miscellaneous and Fabrications”.
(l) Item 0016 Option No. 12: Provide LEED Gold rating in lieu of base proposal Silver rating.
Basis-of-Proposal for Option No. 12 shall be the addition of the following work complete: Provision of all work associated with providing LEED Gold rating in lieu of base proposal Silver rating per specification section 01 81 13 “Sustainable Design Requirements”. Deleted (AM#1)
END OF PROPOSAL
00 73 46 - Page 1
APPLICATION OF WAGE DECISIONS
Solicitation No: W9126G-08-R-0173
Project: Battle Command Training Center
Location: Fort Sam Houston, Texas Bexar County, Texas
1. Davis-Bacon Act Wage Decision TX080003, Building Construction Projects, will be applicable to the construction, alteration, painting or repair of buildings, installations within buildings, appurtenances to buildings, foundations for buildings, excavation and fill for buildings, and utilities within five feet of buildings for those construction activities performed in Bexar County Texas.
2. Davis-Bacon Act Wage Decision TX080041, Heavy and Highway Construction Projects, is applicable to all heavy and highway construction activities (paving and utilities incidental to building construction) and all other construction requirements not shown in Paragraph 2 above which are performed in Bexar County Texas.
NOTE:
(1) PAYROLL RECORDS ARE REQUIRED, UNDER THE DAVIS-BACON ACT, TO
BE SUBMITTED TO THE U.S. ARMY CORPS OF ENGINEERS FOR ALL
CONSTRUCTION WORK PERFORMED.
(2) THE WAGE DECISIONS NUMBER APPLICABLE TO THE WORK PERFORMED
IS TO BE SHOWN ON ALL THE CERTIFIED PAYROLL RECORDS SUBMITTED.
00 73 46 - Page 2
GENERAL DECISION: TX20080003 06/06/2008 TX3
Superseded General Decision Number: TX20070003
State: Texas
Construction Type: Building
County: Bexar County in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories). (Use current heavy & highway general wage determination for Paving & Utilities Incidental to Building Construction).
Modification Number Publication Date 0 02/08/2008 1 03/28/2008 2 04/11/2008 3 05/09/2008 4 06/06/2008
ASBE0087-001 01/01/2006
Rates Fringes Asbestos/Insulator Worker (Includes application of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems.)........................$ 19.67 6.37
BRTX0001-004 05/01/2008
Rates Fringes
BRICKLAYER.......................$ 24.50 1.50
* ELEC0060-001 06/02/2008
Rates Fringes
Cable splicer....................$ 22.90 6.48 ELECTRICIAN (Including pulling and installing cable through conduit for low voltage).....................$ 22.65 6.48
ELEV0081-001 01/01/2005
Rates Fringes Elevator Constructor
MECHANIC....................$ 26.885 12.115+A
FOOTNOTE; A = UNDER 5 YEARS EMPLOYMENT, 6% BHR; OVER 5 YEARS
EMPLOYMENT, 8% BHR. PAID HOLIDAYS : New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day and Christmas Day.
00 73 46 - Page 3
ENGI0450-001 04/01/1994
Rates Fringes Power equipment operators:
Cranes......................$ 12.95 3.30
IRON0066-001 06/01/2007
Rates Fringes IRONWORKER (Excluding metal building erectors) Structural..................$ 17.40 5.00
MARB0002-001 07/01/2005
Rates Fringes
TILE SETTER......................$ 18.50 6.10
PLUM0142-001 10/10/2007
Rates Fringes Plumbers and Pipefitters (Including HVAC WORK)............$ 28.30 8.02
SFTX0669-001 04/01/2008
Rates Fringes SPRINKLER FITTER (Fire Sprinklers)......................$ 25.30 13.30
SHEE0067-001 04/01/2007
Rates Fringes Sheet metal worker (Including HVAC Duct Work)..................$ 23.70 9.74
SUTX1988-002 11/01/1988
Rates Fringes
Acoustical Ceiling Installer.....$ 12.26
CARPENTER (Excluding Acoustical Ceiling Installer & Drywall Hanger)................$ 10.64
CEMENT MASON/CONCRETE FINISHER...$ 11.46
DRYWALL HANGER...................$ 11.88
GLAZIER..........................$ 10.78 1.40
IRONWORKER (Excluding Metal Building Assemblers) Reinforcing.................$ 10.19 3.57
Laborers:
Mason Tenders...............$ 8.36 1.78 Mortar Mixers...............$ 8.99
PLASTERER'S TENDERS.........$ 8.68
Unskilled...................$ 7.06
00 73 46 - Page 4
LATHER...........................$ 15.25
PAINTER (Excluding Tapers/Finishers)................$ 8.01
PLASTERER........................$ 15.25
Power equipment operators:
Front End Loader............$ 7.36
Roofers:
Kettlemen...................$ 8.85 Roofers.....................$ 8.14 Waterproofers...............$ 6.88
Sheet Metal Worker Other Work..................$ 11.62
Taper/Finisher...................$ 7.99
TRUCK DRIVER.....................$ 7.10
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
00 73 46 - Page 5
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
00 73 46 - Page 6
General Decision Number: TX080041 02/08/2008 TX41
Superseded General Decision Number: TX20070043
State: Texas
Construction Types: Heavy and Highway
Counties: Bell, Bexar, Brazos, Comal, Coryell, Guadalupe, Hays, McLennan, Travis and Williamson Counties in Texas.
Heavy (excluding tunnels and dams) and Highway Construction Projects (does not include building structures in rest area projects). *NOT TO BE USED FOR WORK ON SEWAGE OR WATER
TREATMENT PLANTS OR LIFT/PUMP STATIONS IN BELL, CORYELL,
McLENNAN AND WILLIAMSON COUNTIES.
Modification Number Publication Date 0 02/08/2008
SUTX2005-001 01/03/2005
Rates Fringes
Air Tool Operator..............$ 16.00 0.00 Asphalt Distributor Operator...$ 12.09 0.00 Asphalt paving machine operator$ 11.82 0.00 Asphalt Raker..................$ 9.96 0.00 Asphalt Shoveler...............$ 10.56 0.00 Broom or Sweeper Operator......$ 9.74 0.00 Bulldozer operator ...........$ 11.04 0.00 Carpenter......................$ 12.25 0.00 Concrete Finisher, Paving......$ 10.53 0.00 Concrete Finisher, Structures..$ 10.95 0.00 Concrete Paving Curbing Machine Operator...............$ 14.00 0.00 Concrete Paving Finishing Machine Operator...............$ 12.00 0.00 Concrete Rubber................$ 10.88 0.00 Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel Operator.......................$ 13.66 0.00 Electrician....................$ 24.11 0.00 Flagger........................$ 9.49 0.00 Form Builder/Setter, Structures$ 10.88 0.00 Form Setter, Paving & Curb.....$ 9.89 0.00 Foundation Drill Operator, Truck Mounted..................$ 15.00 0.00 Front End Loader Operator......$ 11.36 0.00 Laborer, common................$ 9.34 0.00 Laborer, Utility...............$ 10.12 0.00 Mechanic.......................$ 14.74 0.00 Mixer operator, Concrete Paving$ 15.25 0.00 Mixer operator.................$ 10.83 0.00 Motor Grader Operator, Fine
00 73 46 - Page 7
Grade..........................$ 15.26 0.00 Motor Grader Operator, Rough...$ 12.96 0.00 Oiler..........................$ 14.71 0.00 Painter, Structures............$ 11.00 0.00 Pavement Marking Machine Operator.......................$ 11.52 0.00 Pipelayer......................$ 10.49 0.00 Planer Operator................$ 17.45 0.00 Reinforcing Steel Setter, Paving.........................$ 15.50 0.00 Reinforcing Steel Setter, Structure......................$ 14.00 0.00 Roller Operator, Pneumatic, Self-Propelled.................$ 9.34 0.00 Roller Operator, Steel Wheel, Flat Wheel/Tamping.............$ 9.60 0.00 Roller Operator, Steel Wheel, Plant Mix Pavement.............$ 10.24 0.00 Scraper Operator...............$ 9.93 0.00 Servicer.......................$ 11.41 0.00 Sign Installer (PGM)...........$ 14.85 0.00 Slip Form Machine Operator.....$ 15.17 0.00 Spreader Box operator..........$ 10.39 0.00 Structural Steel Worker........$ 13.41 0.00 Tractor operator, Crawler Type.$ 11.10 0.00 Traveling Mixer Operator.......$ 10.04 0.00 Trenching machine operator, Heavy..........................$ 14.22 0.00 Truck Driver Tandem Axle Semi- Trailer........................$ 10.95 0.00 Truck driver, lowboy-Float.....$ 15.30 0.00 Truck driver, Single Axle, Heavy..........................$ 11.88 0.00 Truck driver, Single Axle, Light..........................$ 9.98 0.00 Wagon Drill, Boring Machine, Post Hole Driller Operator.....$ 14.65 0.00 Welder.........................$ 14.26 0.00 Work Zone Barricade Servicer...$ 11.15 0.00 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
00 73 46 - Page 8
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
00 73 46 - Page 9
SAN ANTONIO, TX, SMSA AREA
NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION (APR 1984) (FAR 52.222-23D) (DEVIATION)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation Goals for female participation for each trade for each trade
47.8% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area.
If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed.
Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs Office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects.
The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance Programs, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--
(1) Name, address, and telephone number of the subcontractor;
(2) Employer’s identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographic area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is: the City of San Antonio, TX, and the Counties of Bexar, Comal, and Guadalupe.
| AMENDMENT NO. 0001 |
| PAGE 2 of 2 |
| CONTRACT LINE ITEM (CLIN) SCHEDULE |
| CLIN SCHEDULE NOTES |
| TASK ORDER BIDDING SCHEDULE |
| TASK ORDER BIDDING SCHEDULE NOTES |