- W9126G-08-R-0171
About this file
Amendment No. 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| am_5.pdf | ||
| W9126G-08-R-0171 Am1.pdf | ||
| W9126G-08-R-0171 Am3.pdf | ||
| am_4.exe | EXE file | |
| g08r0171.exe | EXE file | |
| README-Downloading files.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9126G99999999
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment to solicitation W9126G-08-R-0171 SWD MATOC IDIQ to be competed as Unrestricted for a Pool of Contractors is amended as follow s:
a. Contract Line Item Number (CLIN) revised to include Option Years.
b. Evaluation Criteria revised.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 66
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jul-2008
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-08-R-0171
X 9B. DATED (SEE ITEM 11)
22-Jul-2008
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jul-2008
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G-08-R-0171
C-1
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 11 00 - STANDARD FORM (SF) 1442 AND CLIN SCHEDULE
The required response date/time has changed from 12-Aug-2008 03:00 PM to 22-Aug-2008 03:00 PM.
The solicitation issue date has changed from 09-Jul-2008 to 22-Jul-2008.
The required performance has changed from Title: SWD MATOC Unrestricted IDIQ Contract. For Design Build, Design Bid Build Construction Services. Multiple Award Task Order Contract (MATOC) for military installations primarily and civil support within the Southwestern Division geographic boundaries under the U.S. Army Corps of Engineers, Fort Worth District. This is an Unrestricted solicitation.NAICS: 236220 SIC:
1542 FSC: 5680 The Government intends to award more than two contracts to arrange a pool of contractors.
The estimated value of this contract is $450 Million. Point of contact for this solicitation:
alisa.marshall@uace.army.mil to Title: SWD IDIQ MATOC Unrestricted Pool. This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Design Build, Design Bid Build, and Construction Services to meet the requirements for military installations primarily and civil support within the Southwestern Division (SWD), primarily the Fort Worth District U.S. Army Corps of Engineers.
This is an Unrestricted solicitation. NAICS: 236220 The Government intends to award more than two contracts to arrange a pool of contractors. The estimated shared value of this contract pool is $450 Million..
CLIN 0001
The CLIN description has changed from SWD Construction MATOC to SWD IDIQ MATOC Unrestricted Pool.
The CLIN extended description has changed from This contract is a firm fixed price UNRESTRICTED Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), for a BASE PERIOD of 12 months plus four (4) 12 month option years. (See next contract line items for option year details).
Any un-used capacity in one contract period may be carried over into the subsequent contract period. The Government will obligate a guaranteed minimum amount of $25,000 for the base period only. This MATOC is for design-build, design-bid-build, and construction services for military missions, civil projects, and IIS customers of the SWD. The estimated workload of this Unrestricted MATOC is $450 million, with a maximum task order limit of $33 Million each and a minimum of $3,000. The scope of this SWD MATOC includes, but is not limited to, construction, renovation, repairs, preventive maintenance, environmental abatement, and operations activities. The contracts are not only intended to execute new construction, design-build and design-bid-build, but to provide a timely response to remediation of real and personal property facilities, e.g., maintenance, repair, asbestos and lead-base paint abatement, and minor construction situations relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection. Contractor shall furnish all labor, equipment, materials, and transportation necessary to provide construction support services for the Southwestern Division (SWD), primarily The Fort Worth District, U.S. Army Corps of Engineers under this Unrestricted IDIQ SWD MATOC. The contractor shall perform in accordance with the attached Scope of Work, with the Scope of Work provided with each Task Order and within strict accordance of the terms and conditions specified herein. Be advised that payrolls must be submitted for this construction project.
See attached information in the clause section of this document for the wage determinations and payroll submission details for each task order. All questions regarding this solicitation / RFP shall be provided in WRITING to the Projnet/Dr.Checks Website at http://www.projnet.org/projnet. For evaluation purposes on this SWD MATOC an initial task order project will be issued simultaneously. The initial task order project information is provided in section 01 10 00 of the clauses area. to This contract is a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) as Unrestricted to establish a pool of contractors, for DESIGN-BUILD, DESIGN-BID-BUILD, and CONSTRUCTION SUPPORT SERVICES to meet the requirements and time constraints for military missions, civil projects, and IIS customers of the Southwestern Division (SWD), primarily the Fort Worth District U.S. Army Corps of Engineers. The scope of this SWD MATOC includes, but is not limited to, construction, renovation, repairs, preventive maintenance, environmental abatement, and operations activities. The contracts are not only intended to execute new construction, design-build and design-bid-build, but to
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
provide a timely response to remediation of real and personal property facilities, e.g., maintenance, repair, asbestos and lead-base paint abatement, and minor construction situations relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection. The contractor shall perform in accordance with the attached Scope of Work, with the Scope of Work provided with each Task Order and within strict accordance of the terms and conditions specified herein.
The estimated shared amount for the MATOC Pool of contractors is $450 million, with a maximum task order limit of $33 Million each and a minimum of $3,000.00 each. Each contract shall have a base period plus four option periods, in 12 month increments. Any un-used capacity in one contract period may be carried over into the subsequent contract period. Each contract shall have a minimum guaranteed of $25,000.00 for the base year. .
SUBCLIN 0001AA
The CLIN description INITIAL TASK ORDER PROJECT has been deleted.
The CLIN extended description INITIAL TASK ORDER PROJECT:Ft Polk Replace Bridges on Artillery Road FPRBA SECTION 01 10 00STATEMENT OF WORK1.0 SCOPE: The Contractor shall furnish all labor, materials, equipment, transportation and supervision to perform all incidental work to demolish and remove the existing bridge (H22 and H23), and to construct new prestressed concrete girder bridges in accordance with this statement of work, referenced standards and drawings and specifications. 1.1 The Contractor shall furnish all labor, materials, and equipment and perform all incidental work for the completion of this project. All materials and/or equipment shall be installed in accordance with manufacturer’s recommendations and accomplished by workmen skilled in this type of work using standard trade practices. The Contractor shall comply with all local, state and federal construction codes and specifications. 1.2 There shall be no deviations or substitutions without prior approval from the Contracting Officer. The Contractor shall not comply with any order, direction or request of any government personnel unless it is issued in writing and signed by the Contracting Officer 1.3 The Contractor shall be responsible for verification of all quantities, dimensions and site conditions prior to placing his bid. 1.4 The Contractor shall go through AECOM and complete the process required on their “FORT POLK UTILITY LOCATION AND DIG PERMIT REQUEST” to obtain all necessary clearances prior to digging on site. All new utility trenches shall be 24 inches deep unless otherwise specified. A plastic warning tape shall be placed in each new utility trench 12” below grade. 1.5 The Contractor shall present a work schedule with times and tasks included to the Contracting Officer with the proposal for this projects. Work Duration shall not exceed days on the site once all materials are on site. Completion Time for all work and Liquidated Damages See Section 01 00 00 CONSTRUCTION SCHEDULE. The work schedule shall include time required for delivery of specialized equipment and materials.1.6 Submittal Data shall be presented to Contracting Officer prior to the start of work. Ft Polk Replace Bridges on Artillery Road FPRBA1.7 As Built Drawings: Drawings shall be marked in red indicating changes and actual installed conditions.1.8 No materials containing asbestos shall be used on this project. No lead base paint shall be used on this project.1.9 The Contractor shall deliver all manufacturers’ warranties to the Contracting Officer prior to final inspection. Warranty tags shall be provided on all installed equipment that has a warranty.1.10 All waste materials shall be disposed of off Fort Polk.1.11 LOCATION OF WORK: Location of work is at the Artillery Road Fort Polk, LA.1.12 POINT OF CONTACT (POC): Steve Sherrill at 337-531-29332.0 GOVERNMENT FURNISHED ITEMS: None.3.0 UTILITY SEARCH: Upon request by the Contractor the government willprovide utility searches prior to any construction excavation. This has to berequested by the Contractor as indicated in paragraph 1.4 of these specifications4.0 CONTRACTOR FURNISHED ITEMS:
Contractor will be required to provide all labor, materials, equipment and perform all incidental work to all requirements in this statement of work and drawings that is not provided by the government as indicated in paragraph 2.0.5.0 SPECIFIC TASK:a) The Contractor shall demolish the existing bridges superstructure andsubstructure include but not limited to slab, beams, columns,abutments, wing walls, rails, concrete piles to a depth of 1’ below newfinished grade, approach slabs, guard rails, etc.b) The Contractor shall demolish and saw cut disturbed existingpavement to construct the new bridge.c) The Contractor shall haul off site all the removed material and disposeof it in an approved landfill.d) The Contractor shall construct the new bridges substructure andsuperstructure include but not limited to concrete piles, columns, caps,abutments, bents, prestress concrete beams, slab, armor joints,abutment excavation and backfill, concrete rails, wing walls, approachslabs, sleeper slab, channel back slopes, guard rails, etc.e) All disturbed areas not covered by pavement, approach slabs, or thebridge, shall receive 6” of suitable soil, sprigged with Bermuda grass,and watered until the grass has achieved an average growth of oneinch. If the construction takes place during the non-growing seasonfor Bermuda grass, then the area shall be over seeded with rye grassseed and watered until an average one inch growth has occurred. has been
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
deleted.
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
CLIN 0002
The CLIN description has changed from 1st Option Year - SWD Construction MATOC to 1st Option Year SWD IDIQ MATOC.
The CLIN extended description This contract is a firm fixed price UNRESTRICTED Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), for a BASE PERIOD of 12 months plus four (4) 12 month option years. (See next contract line items for option year details). Any un-used capacity in one contract period may be carried over into the subsequent contract period. The Government will obligate a guaranteed minimum amount of $25,000 for the base period only. This MATOC is for design-build, design-bid-build, and construction services for military missions, civil projects, and IIS customers of the SWD. The estimated workload of this Unrestricted MATOC is $450 million, with a maximum task order limit of $33 Million each and a minimum of $3,000. The scope of this SWD MATOC includes, but is not limited to, construction, renovation, repairs, preventive maintenance, environmental abatement, and operations activities. The contracts are not only intended to execute new construction, design-build and design-bid-build, but to provide a timely response to remediation of real and personal property facilities, e.g., maintenance, repair, asbestos and lead-base paint abatement, and minor construction situations relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection. Contractor shall furnish all labor, equipment, materials, and transportation necessary to provide construction support services for the Southwestern Division (SWD), primarily The Fort Worth District, U.S. Army Corps of Engineers under this Unrestricted IDIQ SWD MATOC. The contractor shall perform in accordance with the attached Scope of Work, with the Scope of Work provided with each Task Order and within strict accordance of the terms and conditions specified herein. Be advised that payrolls must be submitted for this construction project. See attached information in the clause section of this document for the wage determinations and payroll submission details for each task order. All questions regarding this solicitation / RFP shall be provided in WRITING to the Projnet/Dr.Checks Website at http://www.projnet.org/projnet. For evaluation purposes on this SWD MATOC an initial task order project will be issued simultaneously. The initial task order project information is provided in section 01 10 00 of the clauses area. has been deleted.
CLIN 0003
The CLIN description has changed from 2nd Option Year - SWD Construction MATOC to 2nd Option Year SWD IDIQ MATOC.
The CLIN extended description This contract is a firm fixed price UNRESTRICTED Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), for a BASE PERIOD of 12 months plus four (4) 12 month option years. (See next contract line items for option year details). Any un-used capacity in one contract period may be carried over into the subsequent contract period. The Government will obligate a guaranteed minimum amount of $25,000 for the base period only. This MATOC is for design-build, design-bid-build, and construction services for military missions, civil projects, and IIS customers of the SWD. The estimated workload of this Unrestricted MATOC is $450 million, with a maximum task order limit of $33 Million each and a minimum of $3,000. The scope of this SWD MATOC includes, but is not limited to, construction, renovation, repairs, preventive maintenance, environmental abatement, and operations activities. The contracts are not only intended to execute new construction, design-build and design-bid-build, but to provide a timely response to remediation of real and personal property facilities, e.g., maintenance, repair, asbestos and lead-base paint abatement, and minor construction situations relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection. Contractor shall furnish all labor, equipment, materials, and transportation necessary to provide construction support services for the Southwestern Division (SWD), primarily The Fort Worth District, U.S. Army Corps of Engineers under this Unrestricted IDIQ SWD MATOC. The contractor shall perform in accordance with the attached Scope of Work, with the Scope of Work provided with each Task Order and within strict accordance of the terms and conditions specified herein. Be advised that payrolls must be submitted for this construction project. See attached information in the clause section of this document for the wage determinations and payroll submission details for each task
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
order. All questions regarding this solicitation / RFP shall be provided in WRITING to the Projnet/Dr.Checks Website at http://www.projnet.org/projnet. For evaluation purposes on this SWD MATOC an initial task order project will be issued simultaneously. The initial task order project information is provided in section 01 10 00 of
CLIN 0004
The CLIN description has changed from 3rd Option Year - SWD Construction MATOC to 3rd Option Year SWD IDIQ MATOC.
The CLIN extended description This contract is a firm fixed price UNRESTRICTED Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), for a BASE PERIOD of 12 months plus four (4) 12 month option years. (See next contract line items for option year details). Any un-used capacity in one contract period may be carried over into the subsequent contract period. The Government will obligate a guaranteed minimum amount of $25,000 for the base period only. This MATOC is for design-build, design-bid-build, and construction services for military missions, civil projects, and IIS customers of the SWD. The estimated workload of this Unrestricted MATOC is $450 million, with a maximum task order limit of $33 Million each and a minimum of $3,000. The scope of this SWD MATOC includes, but is not limited to, construction, renovation, repairs, preventive maintenance, environmental abatement, and operations activities. The contracts are not only intended to execute new construction, design-build and design-bid-build, but to provide a timely response to remediation of real and personal property facilities, e.g., maintenance, repair, asbestos and lead-base paint abatement, and minor construction situations relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection. Contractor shall furnish all labor, equipment, materials, and transportation necessary to provide construction support services for the Southwestern Division (SWD), primarily The Fort Worth District, U.S. Army Corps of Engineers under this Unrestricted IDIQ SWD MATOC. The contractor shall perform in accordance with the attached Scope of Work, with the Scope of Work provided with each Task Order and within strict accordance of the terms and conditions specified herein. Be advised that payrolls must be submitted for this construction project. See attached information in the clause section of this document for the wage determinations and payroll submission details for each task order. All questions regarding this solicitation / RFP shall be provided in WRITING to the Projnet/Dr.Checks Website at http://www.projnet.org/projnet. For evaluation purposes on this SWD MATOC an initial task order project will be issued simultaneously. The initial task order project information is provided in section 01 10 00 of
CLIN 0005
The CLIN description has changed from 4th Option Year - SWD Construction MATOC to 4th Option Year SWD IDIQ MATOC.
The CLIN extended description This contract is a firm fixed price UNRESTRICTED Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), for a BASE PERIOD of 12 months plus four (4) 12 month option years. (See next contract line items for option year details). Any un-used capacity in one contract period may be carried over into the subsequent contract period. The Government will obligate a guaranteed minimum amount of $25,000 for the base period only. This MATOC is for design-build, design-bid-build, and construction services for military missions, civil projects, and IIS customers of the SWD. The estimated workload of this Unrestricted MATOC is $450 million, with a maximum task order limit of $33 Million each and a minimum of $3,000. The scope of this SWD MATOC includes, but is not limited to, construction, renovation, repairs, preventive maintenance, environmental abatement, and operations activities. The contracts are not only intended to execute new construction, design-build and design-bid-build, but to provide a timely response to remediation of real and personal property facilities, e.g., maintenance, repair, asbestos and lead-base paint abatement, and minor construction situations relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection. Contractor shall furnish all labor, equipment, materials, and transportation necessary to provide construction support services for the Southwestern Division (SWD), primarily The Fort Worth District, U.S. Army Corps of Engineers under this Unrestricted IDIQ SWD MATOC. The contractor shall perform in accordance with the attached Scope of Work, with the Scope of Work provided with each Task Order and within strict accordance of the terms and conditions
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
specified herein. Be advised that payrolls must be submitted for this construction project. See attached information in the clause section of this document for the wage determinations and payroll submission details for each task order. All questions regarding this solicitation / RFP shall be provided in WRITING to the Projnet/Dr.Checks Website at http://www.projnet.org/projnet. For evaluation purposes on this SWD MATOC an initial task order project will be issued simultaneously. The initial task order project information is provided in section 01 10 00 of
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
The following have been modified:
LOCAL INSTRUCTIONS
Section 00 21 00 - Instructions, Conditions and Notices to Offerors
LOCAL INSTRUCTIONS
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
This MATOC is for design-build, design-bid-build, and construction services for military missions, civil projects, and IIS customers of the SWD. The estimated shared amount of this Unrestricted MATOC Pool of Contrats is $450 million, with a maximum task order limit of $33 Million each and a minimum of $3,000.
The scope of this SWD MATOC includes, but is not limited to, construction, renovation, repairs, preventive maintenance, environmental abatement, and operations activities. The contracts are not only intended to execute new construction, design-build and design-bid-build, but to provide a timely response to remediation of real and personal property facilities, e.g., maintenance, repair, asbestos and lead-base paint abatement, and minor construction situations relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection.
1.2. GOVERNMENT SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail sent to the Fort Worth District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.
ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at ATTN: CESWF-CT-C, PO Box 17300, Fort Worth, TX, 76102-0300 if it does not contain a return mailing address. There will be no exceptions.
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the Army’s Single Face to Industry (AFSI) to the Federal Business Opportunity (FBO) website at:
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
http://www.fbo.gov
Solicitation Number W9126G-08-R-0171 http://www.swf.usace.army.mil/index.asp
It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
Additional information regarding this solicitation and potential offerors and/or subcontractors is available at http://ebs.swf.usace.army.mil/.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
Questions and/or comments relative to these documents should be submitted to the Projnet Website System. See below for more details.
Contract Specialist – Primary POC U.S. Army Corps of Engineers, Fort Worth District ATTN: Mrs. Ali Marshall ATTN: CESWF-CT-C, PO Box 17300, Fort Worth, TX, 76102-0300 Email: alisa.marshall@swf02.usace.army.mil
Note: All questions and/or comments should reach the above referenced Contracting Office no later than Five (5) calendar days after the pre-proposal conference, in order that they may be given consideration or actions taken prior to receipt of offers.
1.4.1 Bidder Inquiry
1.4.1.1 Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
1.4.1.1.1 To submit and review bid inquiry questions and or items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
1.4.1.1.2 From this page you may view all bidder inquiries or add inquiry.
1.4.1.1.3 Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
1.4.1.1.4 The Solicitation Number is : W9126G-08-R-0171
1.4.1.1.5 The Bidder Inquiry Key is: AW3D8U-UQQVI8
1.4.1.2 The Bidder Inquiry System will be unavailable for new inquires 5 days prior to proposal submission in order
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
1.4.1.3 Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
1.4.1.4 The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone. The telephone number for the Call Center is 800-428-HELP.
1.4.1.5 Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
See Section 00 45 00, FAR 52.219-1 for the small business size standard/NAICS Code.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.7. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).
The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.8. PROPOSAL SUBMITTALS
As stated on Standard Form SF 1442:
U.S. Army Corps of Engineers, Fort Worth District ATTN: Ali Marshall CESWF-CT-C, PO Box 17300, Fort Worth, TX, 76102-0300 The Packaging that contains the Proposals shall be marked:
”Proposals for Solicitation Number: W9126G-08-R-0171”
1.9. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively
1.10. SUBCONTRACTING PLAN/ SUBCONTRACTING GOALS REGARDING THE UTILIZATION OF
SMALL BUSINESS CONCERNS
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
(a) Application. This clause applies to all offerors submitting proposals.
(b) Federal Acquisition Regulations (FAR). Attention is directed to the following FAR and DFARS provisions contained in this solicitation:
52.219-8, Utilization of Small Business Concerns (Alternate I)
52.219-9, Small Business Sub Contracting Plan (Alternate I) (applies only to Large Business)
52.219-16, Liquidated Damages – Small Business Subcontracting Plan (applies only to Large Business)
252.226-7001, Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns
(c) Goals. The U.S. Army Corps of Engineers considers the following goals reasonable and achievable for the performance of the resultant contract:
(i) 70.0% of subcontracted amount contract amount with small business concerns.
(ii) 6.2% of subcontracted amount contract amount with those small business concerns owned and controlled by socially and economically disadvantaged individuals.
(iii) 7.0% of subcontracted amount contract amount with those small business concerns owned and controlled by women.
(iv) 9.8% of subcontracted amount contract amount with those small business concerns owned and controlled by HubZone small business.
(v) 3.0% of subcontracted amount contract amount with those small business concerns owned and controlled by Veteran-Owned small business.
(vi) 0.9% of subcontracted amount contract amount with those small business concerns owned and controlled by Service-Disabled Veteran-Owned small business.
1.11. BID GUARANTEE
A Bid Guarantee is required for proposal submission. The penal sum of the bond will be required as in provision 52.228-1, Bid Guarantee. Facsimile Bonds are not acceptable.
1.12 SITE VISIT
Please email Mrs. Ali Marshall if you are interested in a site visit.
Email address is Alisa.Marshall@usace.army.mil
The Government does not have a pre-proposal conference / site visit set up at this time.
All interested offerors are urged to view the site. During a site visit, the requirements set forth in the solicitation will be reviewed and discussed, with part of the site visit to include a question and answer period.
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of (as specified per task order) for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Please contact the following personnel to arrange a site visit:
Mrs. Ann Michalk at ann.m.michalk@usace.army.mil
Or call 337-531-2933.
Fort Polk Resident Engineer is Steve Sherrill.
The Government does not have a pre-proposal conference / site visit set up at this time.
All interested offerors are urged to view the site. During a site visit, the requirements set forth in the solicitation will be reviewed and discussed, with part of the site visit to include a question and answer period.
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
http://ebs.swf.usace.army.mil
(End of provision
SECTION 00 22 10 - PHASE 1 OF A 2 PHASE-DESIGN BUILD SELECTION PROCEDURES
The following have been deleted:
PROPOSAL SUBMISSION EVALUATION
SECTION 00 22 11 - PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS
OF AWARD ONE STEP - BEST VALUE, DESIGN-BUILD (SINGLE AWARD)
The following have been added by full text:
PROPOSAL SUBMISSION INSTRUCTIO
Section 00 22 11
PROPOSAL SUBMISSION INSTRUCTIONS, CONDITIONS,
NOTICE TO OFFERORS, BASIS OF AWARD, AND LOCAL INSTRUCTIONS
SWD IDIQ MATOC
For an UNRESTRICTED POOL OF CONTRACTS
PERFORMANCE PRICE TRADE-OFF
1. PROPOSAL OVERVIEW. This Request for Proposal (RFP) solicits SWD IDIQ MATOC(s). The purpose of the Source Selection plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). In-as-much as the proposal shall describe the capability of the Offeror to perform any resulting contract, the proposal should be specific and complete in every detail. The proposal should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract. The proposal should be practical, legible, clear, and coherent. Local Instructions, including Federal Acquisition Regulation (FAR) Provisions are located in Section 00 21 00.
The contracts will be a firm fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), with a pool of more than two (2) contracts. The MATOC pool of contracts are for design-build, design-bid-build, and construction services to meet the requirements and time constraints for military missions, civil projects, and IIS customers of the Southwestern Division (SWD), primarily the Fort Worth District U.S. Army Cops of Engineers.
This MATOC pool of contracts is for UNRESTRICTED competition. The estimated shared amount between the pool of contracts is $450 million. Each contract shall have a base period plus four option periods. A guaranteed minimum, of $25,000.00, will be on the base year only. The Government intends to award more than two (2) IDIQ MATOC contracts to establish a pool of contractors. Once a pool of contracts are established, the contractors will compete for each task order.
FOR OFFICIAL USE ONLY
The scope of this SWD MATOC includes, but is not limited to, construction, renovation, repairs, preventive maintenance, environmental abatement, and operations activities. The contracts are not only intended to execute new construction, design-build and design-bid-build, but to provide a timely response to remediation of real and personal property facilities, e.g., maintenance, repair, asbestos and lead-base paint abatement, and minor construction situations relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection.
The contractor shall perform in accordance with the attached Scope of Work, with the Scope of Work provided with each Task Order and within strict accordance of the terms and conditions specified herein.
1.1 Proposal Submissions and the Trade-Off Process. This process permits tradeoffs among cost or price and non-cost factors and allows the Government to accept other than the lowest priced proposal. Offerors submit their performance and capability information for review and consideration by the Government. Relative weights among technical factors are provided in paragraph 6 Technical Evaluation Weights. The SSEB reviews, evaluates, and rates the proposals against the source selection criteria in the RFP. A competitive range consisting of the most highly qualified technical offerors will be established prior to discussion (if held). The SSEB will review, evaluate and rate the seed/initial task order project technical proposals against the source selection criteria in the RFP for those offerors included in the competitive range. Concurrently, the Government analyzes price proposals of Offerors utilizing the seed/initial task order project cost proposal. Price will not be rated, but will be a factor in making the final best value determination for award. The SSA compares proposals to one another and determines the best value for the government. The perceived benefits of the higher priced proposal must merit the additional cost, and the rationale for tradeoffs must be documented.
1.2 Seed/Initial Task Order Project. The scope of work for a seed/initial task order project is provided, in Section 00 73 20, as part of this solicitation. Technical and cost proposals for the seed/initial task order project are to be submitted as part of the response to this solicitation. The seed/initial task order project cost proposal will be used to evaluate price for the basic MATOC contract. The best value seed/initial task order project proposal may be awarded to one of the most highly rated contractors on the MATOC pool as the initial task order.
2. PROPOSAL SUBMISSION INSTRUCTIONS
2.1 Who May Submit. Any legally organized Service Disabled Veteran Owned Small Business (SDVOSB) may submit a proposal.
2.2 Where to Submit. Offerors shall submit their proposals to the Fort Worth District at the address shown in Block 7 of the Standard Form 1442.
2.3 Submission Deadline. Proposals shall be received by the Fort Worth District no later than the time and date specified in Block 13 of Standard Form 1442.
2.4 General Requirements.
2.4.1 In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failures to submit and organize proposals as requested may adversely affect an Offeror's evaluation. Offerors should provide sufficient detail and clearly define all items required in this section.
The Contracting Officer may remove any Offeror from further consideration during any phase of the procurement if the Offeror fails to meet the submittal requirements of the RFP or to reduce the competitive range for purposes of efficiency pursuant to FAR 15.306(c)(2).
2.4.2 Tabs. Proposal shall be organized and tabbed as shown in paragraph 2.5 Submission Format.
2.4.3 Size of Printed Matter Submissions.
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
2.4.3.1 Written proposal materials shall be submitted in standard three ring loose-leaf binders. Proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents. Font size shall not be less than 10 point. Each page shall be identified with the appropriate page number centered at the bottom of the page.
Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches and folded to 8-1/2 inches x 11 inches shall be used. 11 x 17 inch sheets will be counted as 2 8-1/2 inch x 11 inch sheets. Volume II, Technical Proposal, shall not exceed 90 pages (90 single-sided), excluding the cover sheet and Table of Contents. The Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror must comply with the page limitations. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.
2.4.3.2 The proposals shall contain a detailed table of contents. If more than one binder is used, the complete table of contents shall be included in each. A cover sheet identifying the Offeror (name, address, point of contact) project description, and solicitation number shall be provided. The second sheet shall be a Table of Contents. Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. The Government will not evaluate any information beyond the page limitation noted above.
2.4.3.3 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision, shall be submitted in appropriate number of copies (e.g., if two (2) copies of the original page was required, then two (2) copies of the revised page will also be required, and shall be a different color than the original pages they are to replace.
2.4.4 Number of Copies. Offerors shall submit an original and one (1) hard copy of Volume I and an original and five (5) hard copies of Volumes II of their Proposal in both hard copy and electronic format. Within three (3) days of contract award, the awardees shall submit Volumes I and II, updated to include all revisions, in electronic format on a CD-ROM. If the seed/initial task order project is awarded, the awardee shall also submit that paperwork.
2.5 Submission Format.
2.5.1 The Proposal will be tabbed and submitted in a three ring binders in the following format:
VOLUME I – Price/Cost Proposal
TAB A – SF 1442, completed and signed by an authorized person from the company or team
TAB B – Section 00 11 00 – Contract Line Item (CLIN) Schedule for the seed/initial task order project
TAB C – Section 00 45 00 – Representations and Certifications
TAB D – PROPOSAL DATA SHEET – See the format provided in this Section. Ensure to include Offeror’s telephone number, FAX number, e-mail address and DUNS number. Duns number will be used to access CCASS data.
TAB E – Bid Bond (Standard Form 24)
1. Financial Capacity. Submit a letter of current bonding capacity from an acceptable Surety/Bonding Company. The letter shall address the offeror’s bonding capacity 1) for an individual task order and 2) aggregate bonding capacity. The information submitted will be considered for reasonableness considering the contract capacity of $5,000,000.00 and the offeror’s ability to secure additional bonding protection.
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
2. The bid guarantee shall be submitted in accordance with Section 00 72 00, Contract Clause 52.228-1 Bid Guarantee. The bid guarantee amount shall be 20% of the bid price for the seed / initial task order project.
TAB F – Pre Award Information (e.g. Bank and Supplier References)
In accordance with FAR 9.103(a) “… contracts shall be awarded to responsible prospective contractors only.”
To be determined responsible, a prospective contractor must meet the standards at FAR 9.104 that requires a prospective contractor to have adequate financial resources to perform the contract or the ability to obtain them.
As an aid in assessing responsibility, the offeror shall notify their bank/suppliers that the Corps of Engineers may contact them, and shall authorize the bank/suppliers to release the following information regarding the Offeror’s account. If a written authorization is required by their bank, Offerors shall provide that authorization with their proposal.
Name and telephone number of bank’s point of contact Number of year’s business has been conducted with each bank Types of open accounts (checking, loans, etc.)
Balance of current accounts (the banks will provide a "range of figures" for this information, such as, medium five-figures range) Means by which loans are secured and if paid as agreed Point of contact and telephone number of three (3) different suppliers
For the purpose of evaluating the preaward survey information submitted hereunder:
Preaward survey data will be evaluated and scored, as it relates to the probability of the offeror successfully accomplishing the proposed effort.
The Government will use pre-award survey data provided by the offeror and data obtained from other sources to perform this assessment.
TAB G – Subcontracting Plan (for large businesses only) - Subcontracting Plan shall be prepared in accordance with FAR 52.219-9 and the subcontracting goals established by the Fort Worth District. Failure to submit an acceptable subcontracting plan may make the offeror ineligible for award of the contract.
VOLUME II – Technical Proposal
THE TECHNICAL PROPOSAL SHALL NOT INCLUDE ANY COST INFORMATION AND SHALL
NOT EXCEED THE PAGE LIMIT ANNOTATED ABOVE. ALL INFORMATION SHALL BE
PROVIDED WITHIN THESE TABBED SECTIONS AND SHALL NOT BE INCLUDED AS AN
APPENDIX OR ATTACHMENT).
TAB 1 – FACTOR 1: CONSTRUCTION PAST PERFORMANCE (Worksheet & Questionnaire Provided)
TAB 2 – FACTOR 2: CORPORATE RELEVANT SPECIALIZED EXPERIENCE (No Worksheet Provided)
TAB 3 – FACTOR 3: DESIGN SUPPORT (No Worksheet Provided)
TAB 4 – FACTOR 4: MANAGEMENT EFFECTIVENESS (No Worksheet Provided)
TAB 5 – FACTOR 5: RELEVANT SPECIAL EXPERIENCE FOR INITIAL TASK ORDER
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION
FAR 3.104
3. VOLUME II: TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS
3.1 FACTOR 1: CONSTRUCTION PAST PERFORMANCE (VOLUME II, TAB 1). Offerors shall be evaluated on construction projects completed or in progress in the last five years that are same/similar in nature to the project requirements solicited under this RFP. The Offeror’s past performance will be evaluated to determine technical capability to perform the proposed contract and how well it satisfied its customers. The information presented in the Offeror’s submittal, together with that from other sources available to the Government will comprise the input for evaluation of this factor. The following elements will be evaluated:
• Quality of Construction
• Timeliness of Performance
• Customer Satisfaction
• Subcontractor…