Amendment 002 Responses to RFIs.pdf

PDF 76 KB Posted

Attached to
Latrines, handwash stations, blivets, and light towers Boise, ID
Solicitation number
W9124X24Q0014
Issued by

About this file

This document is a set of responses to industry questions regarding a Request for Information (RFI) related to a federal contract opportunity. The key details are:

The contract opportunity is for the provision of latrines, handwash stations, grey water tanks (blivets), and light towers for training at ranges in Boise, Idaho. The solicitation number is W9124X24Q0014, with a NAICS code of 562991 - Septic Tank and Related Services. The solicitation is a Request for Quotation (RFQ) under FAR Part 12 for commercial items, with award to be made on a lowest price, technically acceptable basis. The government is renting the grey water tanks and light towers, and will be responsible for refueling the light towers. The contractor will not be responsible for connecting the grey water tanks. The requirement includes 132 portable latrines, with the earliest load-in date of June 6 and latest turn-in dates ranging from June 24 to June 27, depending on the equipment. There is no incumbent contractor, as this is a new requirement. Questions are due by May 30, 2024, and quotations are due by June 3, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Answers to Requests for Information from Industry

Question:

Can you please update us what Grey Water Bilvets is?

Answer:

250 Gal above ground grey water tanks.

Questions:

The master schedule does not show the greywater tanks at Range 10 and does not show their service. How often do these tanks require service?

The blivets should be placed at range 10. Every 3 Days.

Question:

What connections do the tanks require and what will they be connected to?

Answer:

They will not be connected to anything. Our field kitchen has a drainage hose (approx. 5” diameter), and we will drain grey water into the tanks from the kitchen. There just needs to be a greater than 5” diameter opening on the top of the tank.

Question:

Will the contractor be responsible for the connection?

Answer:

No.

Question:

Are you buying the ground grey water blivit tanks or will they be rented as well?

Answer:

These will be rented.

Question:

Will fueling of the light towers be required by the contractor or will the base be responsible for that?

Answer:

Unit will refuel light towers.

Question:

What is the earliest that we can begin load in of the equipment?

Answer:

6 June.

Question:

What is the earliest that we can begin load out and when must the gear be removed by?

Answer:

Light towers – 26 June, greywater tanks - 24 June, Latrines – Battalion Compound 9 27 June, ATHP 10 26 June, all others 24 June.

Question:

Is there an incumbent? What is the previous contract value?

Answer:

No. This is a new requirement.

Question:

Clarifying there is a need for 132 portable latrines? (when spelled out in the SOO it says on hundred twenty two)

Answer:

The requirement is for 132 latrines.

Question:

Will the lights need to be moved once they are set up or will they remain in Company Area 1 for the duration of the training iteration?

Answer:

Unit will tow lights to several training areas, and return them to company area 1 for turn in to vendor.

Question:

What is the rough square footage of space that needs to be illuminated? (this will determine the size/wattage of lights we need to use)

Answer:

Varies, we need 4-7kW type towers, diesel powered, with the capability to be towed (preferably pintle type tow hitch)

Question:

With regard to the lights, are there restrictions or preferences on how the lights will be powered? (ie do the lights need to be stand alone diesel powered or will there be access to electrical hook ups)

Stand alone diesel powered only light towers.

Question:

Schedule- location Range 10: Multipurpose training range has 4 services scheduled (on the left) but the total number of days scheduled (on the right) are 5.

same with range 10 CTCP. scheduled on the left 5 but the days on the right are 6.

This was a typographical error. The correct services are: Range 10 MTR – 5 services

Range 10 CTCP - 6 services

Question:

Meanwhile we don’t provide light towers, will that be okay if we don’t provide light towers?

Answer:

To be considered responsive the contractor must bid all items outlined in the Statement of Requirements.