W9124X13B00010002_Amendment.doc
DOC document 41 KB Posted
- Attached to
- Remodel Building 67 Base Gym
- Solicitation number
- W9124X-13-B-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OF_1419A_Bid_Opening_Continuation_Sheet_Complete_6.pdf | ||
| OF_1419A_Bid_Opening_Continuation_Sheet_Complete_2.pdf | ||
| OF_1419A_Bid_Opening_Continuation_Sheet_Complete_4.pdf | ||
| OF_1419A_Bid_Opening_Continuation_Sheet_Complete_5.pdf | ||
| OF_1419A_Bid_Opening_Continuation_Sheet_Complete_3.pdf | ||
| Bid_Opening_Result_W9124X-13-B-0001.docx | DOCX document | |
| OF_1419_Bid_Opening_Form_Complete.pdf | ||
| RFI__4.docx | DOCX document | |
| RFI___3.docx | DOCX document | |
| RFI_Deadline.docx | DOCX document | |
| Site_Walk_Roster.pdf | ||
| W9124X13B00010001_Amendment.doc | DOC document | |
| 1110F_-_Remodel_Building_67_Type_B_Final_Drawings.pdf | ||
| Remodel_Building_67_Type_B_Final_Project_Manual_(2).pdf | ||
| W9124X13B0001_Remodel_BLDG_67_Gym.doc | DOC document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 28-Aug-2013 03:00 PM to 18-Sep-2013 03:00 PM.
The offeror acceptance period has increased by 15 from 45 to 60.
SECTION 00700 - CONTRACT CLAUSES
The following have been added by reference:
| 52.232-18 |
| Availability Of Funds |
| APR 1984 |
(End of Summary of Changes)
File details come from the government source that posted it. Updated .