Draft 2020 ISS ON SITE Tour Schedule.pdf

PDF 1 MB Posted

Attached to
Installation Support Services to the US Army Garrison-Redstone
Solicitation number
W9124P-20-R-0007VID
Issued by

About this file

This document contains a draft schedule for a two-day on-site tour of Installation Support Services facilities at Redstone Arsenal. The tour schedule lists over 50 buildings and areas to be visited each day, including administrative offices, laboratories, shops, warehouses, test areas, and other facilities. It provides the times of arrival and departure at each location, as well as brief descriptions.

A separate notice announces a Virtual Industry Day on June 16th and tentative on-site visits on June 17-18 to provide insight into the Army's ISS requirements at Redstone Arsenal. Interested parties must register for the Virtual Industry Day and participate in a required dry run on June 12th. The Industry Day and on-site visits are being conducted to ensure requirements are well-defined for an upcoming ISS solicitation at the Arsenal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Time on site

Drive Point Arrival Depart Building # Description

15 1 7:30 AM 7:45 AM 3712 Meet at Heiser Hall Day 1 3705 Indoor Pool 3710 Post Office 3495 Education Center 3440 Hotel (not in ISS) 3424 MWR Bowling Alley

330x Typical Admin concrete framed/CMU remodeled in 2008/2009 330x Typical Highbay/Labs 3316 School AREA Chiller Plant 33xx Renovated ADMIN 2008-09

15 2 7:58 AM 8:13 AM 3329 ISS Ops & Control Room

30 3 8:20 AM 8:50 AM 3338

Chem Lab, Roads &Grounds & Generator shop, Engineering 334x Parking Lot sealed

15 4 8:59 AM 9:14 AM 3207 Work Control GFEBS (army network access) 3494 One Stop - Finger Printing & Badges 3474 Pagyno Gym xxxx Gravel Road, Typ

15 5 9:23 AM 9:38 AM 3531 Fire Protection Shop 3583 Veterinary Clinic

20 6 9:45 AM 10:05 AM 3500 ISS M & R Shop

Typ ReSkinned Clay block or wood framed structure 3623 Police Station

3750 ATF

3664 Motor Pool 3664 Parking lot needing sealed 36XX Vehicle Fuel Point 5309 Admin 5307 Admin 5308 Admin 5304 Admin &Auditorium 5300 AMCOM Admin 5303 Admin 5301 Admin

40 7 10:20 AM 11:00 AM 5306 Sparkman Central Plant 20 11:00 AM 5302 Elevator Mech Room

11:20 AM 5302 Admin, Cafeteria, 60 11:30 AM 12:30 PM 3712 Lunch from Heiser Hall Day 1

DRAFT

Drive Point Arrival Depart Building # Description

12:30 PM 3712 Lunch from Heiser Hall Day 1 7801 Fire Station #3 72xx Warehouses Typ 73xx Solar Farm (Not in ISS) 7120 WDI Labs

7010 FBI HDS

15 8 12:46 PM 1:01 PM 7612 Old Mechanical Room Med Building 20 9 1:08 PM 7104 Davis Bacon Shop 15 7105 Steam Boiler 20 2:03 PM 7112 Davis Bacon Shop

74xx Typical Warehouse 7272 Observation Tower 75xx FBI HDS Training Site 7533 MSIC Test Area/Lab 89xx RTC E3 Test Area 90xx FBI Range 7250 RTC Climatics Test Area 7804 CCDC Lab 89xx igloo with out hvac 89xx Igloo with hvac 89xx FBI TEDAC Range 9115 Civ Rec 88xx ATF Range 88xx RTC Test Area 5 88xx RTC Test Area 5 Entrance to left 8763 LRC Explosive Receiving 78xx ATF Range 81xx McAlpine Rd under repair (not ISS) 81xx LRC Ammo Storage Area 83xx Mullbery Rd. Gravel Road, Typ 83XX Mulberry Rd Igloos 8000 ATF Range Control 802x Large Warehouses

10 10 2:50 PM 8028 Steam Boilers 10 3:10 AM 8026 HVAC units back of facility.

6610 RTC TA-4 Entrance 8011 MWR Rec Area Restrooms 7863 RTC Climatic Test Area

7855 TA-2

7891 TA1

20 11 3:28 AM 5423 Haz Waste Facility 20 3:48 AM 5424 90 day accumulation point?

4:03 AM 3712 End of Day 1 Heiser Hall

Drive Point Arrival Depart Building # Description

15 1 7:30 AM 7:45 AM 3712 Meet at Heiser Hall Day 2

5435 TMDE

20 2 7:58 AM 5400 Highbay 15 5400 Specialty Lab

20 5400 Old wing - general area, restroom and elec

& mech rooms

20 5400 Remod wing - general area, restroom and elec & mech rooms 15 5400 Elevator & equipment room 20 9:28 AM 5400 Central Plant

5405 PIF

5494 Renovating HVAC Shop & RSA 304

20 3 9:35 AM 5495 Metal & Sign Shop 20 10:15 AM 5487 HVAC & Plumbing shops 20 4 10:21 AM 5412 Carpenter Shop 15 10:56 AM 5668 Carpenter Shop Storage 60 11:16 AM Lunch from Heiser Hall Day 2

Drive Point Arrival Depart Building # Description

12:30 PM Lunch from Heiser Hall Day 2 15 5 12:36 PM 12:51 PM 5669 Recycling Shop

5681 PEO Aviation 20 6 12:59 PM 1:19 PM 5645 Landfill

5600 Mills CDC, 5600, 5601 & 5602 5220 VB Complex 5221 VB I & II Central Plant

5222 MDA

40 7 12:30 PM 1:10 PM 5224 MDA Large Central Plant

5225 MDA VB IV

5250 PEO M&S

4940 FBI TEDAC

4545 MISC Complex Entrance

4543 MISC Complex Entrance to Central Plant 49xx FBI Main Site

4500 RTC HQ

4505 ACC HQ

4400 AMC HQ

4401 AMC Central Plant

4402 USASAC HQ

4403 Lakeside Café

30 8 1:27 PM 1:57 PM 4488 Mechanical room, A wing WC out C wing

4xxx Blue Roofs Typ this area NASA (not in ISS)

6211 TA-3

6230 SMDC Aerophysics

6301 TA-6

6315 FBI Ballistics Range 4424 Fire Station Main 4428 MDA Lab renovation 4722 CCDC Admin 4762 CCDC Lab 4832 Hanger 4815 Airfield 4880 Hanger 6267 S3I 6264 S3I 6260 S3I

40 9 2:23 PM 3:03 PM 6263 S3I

x EUL (not in ISS)

4140 MWR Golf Course 4100 FAHC (not in ISS) 126 MWR Outdoor Pool

Drive Point Arrival Depart Building # Description

111 Admin Multi Story 112 Admin Multi Story x Housing (not in ISS) 376 Chapel

3145 CDC

3148 Youth Center 3155 School Age Services 3224 Commissary (not in ISS) 3220 Px 3250 RV Park 3320 Fire Station #2 3435 Recruiting BN HQ

0 10 3:28 PM 3217 End of Day 2 Heiser Hall

File details come from the government source that posted it. Updated .