This is a performance work statement for a contract to provide portable toilets and portable handwashing units at Redstone Arsenal in Alabama. The contractor will be responsible for delivering, installing, and servicing existing and new portable toilet and handwashing units according to schedules and locations specified by the contracting officer's representative. Key requirements include providing units for special events, maintaining units at stationary locations throughout the base, and responding to new placement requests. The contractor must develop a quality control plan and report monthly on level of effort. Additional duties involve ensuring employee training on antiterrorism and operations security requirements. The base period of performance is from May 2020 to April 2021 with four optional one-year extensions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Draft_Solicitation_W9124P-19-A-A040.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9124P19RA040
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amemdment is to update all the dates for the Base and options years. And re-solicitation of the requirement.
1. CONTRACT ID CODE PAGE OF PAGES
1 55
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Feb-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124P19RA040
X 9B. DATED (SEE ITEM 11)
26-Feb-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Feb-2020
CODE
ACC-RSA-CCAM-CAD-A
5303 SPARKMAN BUILDING
REDSTONE ARSENAL AL 35898
W9124P 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 10-Sep-2019 05:00 PM to 12-Mar-
2020 05:00 PM.
The solicitation issue date has changed from 26-Aug-2019 to 26-Feb-2020.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
Installation and service of portable toilets-units are located by the month unless stated otherwise. Base Year (01 Nov 19 - 31 Oct 20) Quantity of the SubCLIN's is an estimated annual total for the purpose of solicitation.
To:
Installation and service of portable toilets-units are located by the month unless stated otherwise. Base Year ((01 May 2020 - 30 Apr 21) Quantity of the SubCLIN's is an estimated annual total for the purpose of solicitation.
CLIN 0002
Installation and service of portable toilets-units are located by the month unless stated otherwise. Base Year (01 Nov 20 - 31 Oct 21) Quantity of the SubCLIN's is an estimated annual total for the purpose of solicitation.
Installation and service of portable toilets-units are located by the month unless stated otherwise. Option Year 1(01 May 2021 - 30 Apr 22) Quantity of the SubCLIN's is an estimated annual total for the purpose of solicitation.
CLIN 0003
Installation and service of portable toilets-units are located by the month unless stated otherwise. Base Year (01 Nov 21 - 31 Oct 22) Quantity of the SubCLIN's is an estimated annual total for the purpose of solicitation.
Installation and service of portable toilets-units are located by the month unless stated otherwise. Option Year 2 (01 May 2022 - 30 Apr 23) Quantity of the SubCLIN's is an estimated annual total for the purpose of solicitation.
CLIN 0004
Installation and service of portable toilets-units are located by the month unless stated otherwise. Base Year (01 Nov 22 - 31 Oct 23) Quantity of the SubCLIN's is an estimated annual total for the purpose of solicitation.
Installation and service of portable toilets-units are located by the month unless stated otherwise. Option Year 3 (01 May 2023 - 30 Apr 24) Quantity of the SubCLIN's is an estimated annual total for the purpose of solicitation.
CLIN 0005
Installation and service of portable toilets-units are located by the month unless stated otherwise. Base Year (01 Nov 23 - 31 Oct 24) Quantity of the SubCLIN's is an estimated annual total for the purpose of solicitation.
Installation and service of portable toilets-units are located by the month unless stated otherwise. Option year 4 (01 May 2024 - 30 Apr 25) Quantity of the SubCLIN's is an estimated annual total for the purpose of solicitation.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for SUBCLIN 0001AA has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035 FOB: Destination
W908RX
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-MAY-2020 TO
30-APR-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0001AB has been changed from:
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2020 TO
30-APR-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0001AC has been changed from:
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0001AD has been changed from:
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2020 TO
30-APR-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0001AE has been changed from:
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0001AF has been changed from:
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2020 TO
30-APR-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0001AG has been changed from:
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0001AH has been changed from:
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2020 TO
30-APR-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0001AJ has been changed from:
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0001AK has been changed from:
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2020 TO
30-APR-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0001AL has been changed from:
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0001AM has been changed from:
CAGE
POP 01-NOV-2019 TO
31-OCT-2020
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2020 TO
30-APR-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule for SUBCLIN 0001AN has been added:
CAGE
POP 01-MAY-2020 TO
30-APR-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AA has been changed from:
POP 01-NOV-2020 TO
31-OCT-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AB has been changed from:
CAGE
POP 01-NOV-2020 TO
31-OCT-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AC has been changed from:
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AD has been changed from:
CAGE
POP 01-NOV-2020 TO
31-OCT-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AE has been changed from:
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AF has been changed from:
CAGE
POP 01-NOV-2020 TO
31-OCT-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AG has been changed from:
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AH has been changed from:
CAGE
POP 01-NOV-2020 TO
31-OCT-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AJ has been changed from:
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AK has been changed from:
CAGE
POP 01-NOV-2020 TO
31-OCT-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AL has been changed from:
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0002AM has been changed from:
CAGE
POP 01-NOV-2020 TO
31-OCT-2021
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule for SUBCLIN 0002AN has been added:
POP 01-MAY-2021 TO
30-APR-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AA has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2022 TO
30-APR-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AB has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
POP 01-MAY-2022 TO
30-APR-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AC has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2022 TO
30-APR-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AD has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AE has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2022 TO
30-APR-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AF has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AG has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2022 TO
30-APR-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AH has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AJ has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2022 TO
30-APR-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AK has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AL has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2022 TO
30-APR-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0003AM has been changed from:
CAGE
POP 01-NOV-2021 TO
31-OCT-2022
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule for SUBCLIN 0003AN has been added:
CAGE
POP 01-MAY-2022 TO
30-APR-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AA has been changed from:
CAGE
POP 01-NOV-2022 TO
31-OCT-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AB has been changed from:
POP 01-NOV-2022 TO
31-OCT-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AC has been changed from:
CAGE
POP 01-NOV-2022 TO
31-OCT-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AD has been changed from:
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AE has been changed from:
CAGE
POP 01-NOV-2022 TO
31-OCT-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AF has been changed from:
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AG has been changed from:
CAGE
POP 01-NOV-2022 TO
31-OCT-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AH has been changed from:
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AJ has been changed from:
CAGE
POP 01-NOV-2022 TO
31-OCT-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AK has been changed from:
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AL has been changed from:
CAGE
POP 01-NOV-2022 TO
31-OCT-2023
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0004AM has been changed from:
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule for SUBCLIN 0004AN has been added:
CAGE
POP 01-MAY-2023 TO
30-APR-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AA has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
POP 01-MAY-2024 TO
30-APR-2025
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AB has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2024 TO
30-APR-2025
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AC has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AD has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2024 TO
30-APR-2025
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AE has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AF has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2024 TO
30-APR-2025
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AG has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AH has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2024 TO
30-APR-2025
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AJ has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AK has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2024 TO
30-APR-2025
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AL has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule item for SUBCLIN 0005AM has been changed from:
CAGE
POP 01-NOV-2023 TO
31-OCT-2024
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
CAGE
POP 01-MAY-2024 TO
30-APR-2025
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following Delivery Schedule for SUBCLIN 0005AN has been added:
CAGE
POP 01-MAY-2024 TO
30-APR-2025
N/A W908RX DIRECTORATE, PUBLIC WORKS
BRIAN C. RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
256-842-0035
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
Portable Toilets
General Information
1. GENERAL: This is a non-personal services contract to provide portable toilets. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform portalet delivery, setup, and maintenance as defined in this Performance Work Statement (PWS), section 5 except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background: The work to be performed shall include furnishing all labor, tools, materials, equipment, transportation, and supervision necessary to provide Installation and Service of Portable Toiletry Units at Redstone Arsenal, Alabama.
1.3 Objectives: The contractor shall furnish portable sanitary toilets and hand wash units as specified in Job Order Requests relayed from the COR. The COR will verify that units comply with the PWS prior to placement. The contractor shall service the existing holding tanks, portable toilets and hand wash units in locations specified in Attachment #4 and all new requests, other than special events, shall be added to the listing in Attachment #4, as directed by the Contracting Officer’s Representative (COR), and serviced IAW Attachment #2.
1.4 Scope: The Contractor shall maintain Portable Sanitary Toilets (handicap and regular) and Portable Hand Wash Units as identified in this PWS and Attachment 4.
1.5 Period of Performance:
Base Year [1 May 2020 – 30 April 2021] Option Year 1 [1 May 2021 – 30 April 2022] Option Year 2 [1 May 2022 – 30 April 2023] Option Year 3 [1 May 2023 – 30 April 2024] Option Year 4 [1 May 2024 – 30 April 2025]
1.6 General Information
1.6.1 Federal Observed Holidays: The contractor is not required to perform services on the Federal Holidays.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.2 Hours of Operation: The Contractor is responsible for conducting business, between the hours of 0600 – 1600 Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.3 Place of Performance: The work to be performed under this contract will be performed at various locations, including those listed in Attachment 4, on Redstone Arsenal.
1.6.4 Quality Control Program (QCP): The Contractor shall develop and maintain an effective QCP to ensure services are performed in accordance with (IAW) this PWS and Attachment 1. The QCP must be forwarded to and accepted by the KO. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of deficiencies. The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract. The contractor shall develop a QCP. After acceptance of the QCP the Contractor shall receive the contracting officer’s acceptance in writing of any proposed change to the QCP.
1.6.5 Quality Assurance: The government shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.6 Type of Contract: The Government will award a Firm-Fixed Price (FFP) Contract.
1.6.7 Security Requirements: Contractor personnel performing work under this contract must have a National Agency Check (NAC) if accessing restricted areas of Redstone Arsenal at time of the contract start date, and must maintain the level of security required for the life of the contract.
1.6.7.1 Physical Security: NA
1.6.7.2 Key Control: NA
1.6.7.2.1. NA
1.6.7.2.2. NA
1.6.7.3 Lock Combinations: NA
1.6.8 Special Qualifications: Contractor personnel operating a vehicle in performance of this contract shall have current, valid driver’s licenses.
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The KO and Contracting Officer’s Representative (COR) shall meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
1.6.10 Contracting Officer’s Representative (COR): The COR Management System Tool (Virtual Contracting Enterprise (VCE)-Acquisition Resource Center (ARC) https://arc.army.mil/COR) for nomination, tracking, documentation, and management of CORs will be used. The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: Assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.11 Key Personnel: The following personnel are considered key personnel by the Government: Project Manager and Alternate Project Manager. The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:30 a.m. to 4:00p.m., Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons.
1.6.12 Identification of Contractor Employees: The Contractor (to include subcontractors) shall provide each employee a Redstone Arsenal Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employees shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor and Subcontractor personnel changes. Foreign owned companies and foreign national contractors will only be permitted to perform under this contract when there are no qualified U.S.
companies and /or U.S. contractors. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They shall also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.13 Contractor Travel: NA
1.6.14 Contractor Personnel Conduct: Contractor personnel’s conduct shall not reflect discredit upon the 3
Government. The Contractor shall ensure that personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that any contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. In accordance with DOD Directive 5500.7-R, “Joint Ethics Regulation”, Contractor employees must avoid improperly influenced in the execution of their duties under the contract. Particular attention should be paid to acceptance of gifts/ gratuities, and on non-disclosure of sensitive or classified information. The Contractor shall ensure employee conduct complies with 41 U.S. C 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions. The Contractor shall ensure no contractor employees conduct political related activities or events on the US Army Facilities.
1.6.15 Other Direct Costs : NA
1.6.16 Data Rights : NA
1.6.17 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO, and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.18 Phase In/Phase Out: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have key personnel on board, during the 30-day phase in / phase out periods. The Contractor shall, upon the Contracting Officer's written notice, (1) furnish phase-in and phase-out services for up to 10 months after this contract expires and (2) negotiate in good faith a plan with a successor to determine the nature and extent of phase-in and phase-out services required.
The plan shall specify a training program and a date for transferring responsibilities for each division of work described in the plan, and shall be subject to the Contracting Officer's approval. The Contractor shall provide sufficient experienced personnel during the phase-in and phase-out period to ensure that the services called for by this contract are maintained at the required level of proficiency.
1.6.19 Antiterrorism (AT) and Operations Security (OPSEC)
1.6.19.1 AT Level I Training: This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to government installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel, IAW Attachment 1, deliverable #3.
AT level I awareness training is available at the following website: https://jkodirect.jten.mil.
1.6.19.2 Access and General Protection/Security Policy and Procedures: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility, or area.
Contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.19.3 AT Awareness Training for Contractor Personnel Traveling Overseas: This standard language text required US based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit Anti-Terrorism Officer (ATO) being the local point of contact, Attachment 1, deliverable #3. AOR briefings are issued by a certified and trained Level II ATO. Coordinate with your Organization or USAG-R Antiterrorism Branch no later than 90 days prior to travel time in order to schedule a briefing.
1.6.19.4 iWATCH Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The iWATCH slide presentation and supporting training video is provided by the USAG-R Antiterrorism Branch. Training material is located in the garrison contracting organizational files. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to local law enforcement and security officials. This training shall be completed within 30 calendar days of contract award and within 15 calendar days of new employees commencing performance with the results reported to the COR within 10 calendar days after completion of training by all employees and subcontractor personnel, Attachment 1, deliverable #3.
1.6.19.5 Contractor Employees Who Require Access to Government Information Systems (IS): NA
1.6.19.6 For Contracts that Require an OPSEC Standing Operating Procedure (SOP)/Plan: The contractor shall develop an OPSEC SOP/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure this individual becomes OPSEC Level II certified per
AR 530-1.
1.6.19.7 For Contracts that Require OPSEC Training: In accordance with AR 530-1, Operations Security, new Contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR, within 10 calendar days after completion of training by all employees and subcontractor personnel, Attachment 1, deliverable #3. Contractors do not need to create a CDSE account in order to take the training. They just click on the green "Launch Course" button: https://securityawareness.usalearning.gov/opsec/index.htm.
1.6.19.8 For Information Assurance (IA)/Information Technology (IT) Training: NA
1.6.19.9 For Information Assurance (IA)/Information Technology (IT) Certification: NA
1.6.19.10 For Contractors Authorized to Accompany the Force: NA
1.6.19.11 For Contractors Requiring Performance or Delivery in a Foreign Country, DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US: NA
1.6.19.12 For Contracts That Require Handling or Access to Classified Information: NA
1.6.20 Emergency Services
1.6.20.1 The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor will, in turn, notify the KO or COR within 30 minutes of the incident.
1.6.20.2 Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.
responsible for performance of all subcontractors.
PART 2
DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
2. DEFINITIONS AND ACRONYMS:
2.1 Definitions:
2.1.1 Attachment. Any documentation, appended to a contract or incorporated by reference
2.1.2 Cannibalize. Remove parts from Government property for use or for installation on other Government property.
2.1.3 Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.4 Contractor Acquired Property. Property acquired, fabricated, or otherwise provided by the contractor for performing a contract and to which the Government has title.
2.1.5 Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.6 Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.7 Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.8 Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.9 Equipment A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
2.1.10 Government Furnished Property. Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
2.1.11 Government Property. All property owned or leased by the Government. Government property includes both Government-furnished property and contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
2.1.12 Job Order Request. All requests for new services will occur on COR approved DA Form 4283 transmitted from COR via email. JOR should be returned with Contractor Level of Effort Report as stated in Technical Exhibit 2.
2.1.13 Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. The prime contractor is 7
2.1.14 Loss of Government Property. Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .