JA.pdf
PDF 80 KB Posted
- Attached to
- Rugged Display wNext Window
- Solicitation number
- W9124P-16-R-0141
About this file
J A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PurchDescrip_10690141.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Encl 5
SED Control# 0407 5A
NONCOMPETITIVE ACQUISITION SOLICITATION AND APPROVAL
I recommend the U.S. Army Contracting Command, Aviation and Missile Contracting Center (AMCOM) Redstone Arsenal, AL 35898 negotiate for the equipment specified in the Noncompetitive Acquisition Solicitation and Approval provided by the technical points of contact and included in the contract file, in support of the Software Engineering Directorate of the U.S Army Aviation and Missile Research, Development, and Engineering Center, Redstone Arsenal, AL 35898. The total estimated cost of this effort/item is with anticipated delivery 30 days after order is placed.
Description/Noun:
HD30/2 Rugged Display with Next Window Optical TS Qty 3 ea DPM2E Processor config61 with Raytheon Software Qty 3 ea Cbl Dual Touch Screen Cable Assembly Qty 3 ea Cbl Dual DVI Short Cable Assembly Qty 3 ea Cbl Dual DVI Long Cable Assembly Qty 3 ea
Authority Cited: This recommendation is being made pursuant to the statutory authority permitting other than full and open competition. Identify the appropriate FAR citation:
_X_ FAR 6.302-1 (c) – Only one responsible source and no other supplies or services will satisfy agency requirements – brand name descriptions. Also provide the following information: Required delivery schedule: 22 Jan 16; Required lead-time: 30 days
FAR 8.405-6 - Limited sources justification and approval (used for GSA purchases)
FAR 6.302-2 - Unusual and compelling urgency. Also provide the following information:
Date requirement was first known: ; Required delivery schedule and basis for required delivery schedule: (Address the basis for why only the proposed contractor(s) can meet the required delivery schedule); Required lead-time:
; Explain how the Government will be harmed by a delay in award:
(if delivery schedule is not met, define in terms of significant monetary or mission performance degradation and the basis. Ensure that this section tracks to the Statement of Urgency/Statement of Impact.)
Encl 5
Describe why the authority cited above is appropriate for this acquisition:
The PATRIOT Software Test Facility (PSTF) requires the new monitors and associated hardware for fielding to a PATRIOT system for US and Foreign Military Sales (FMS) partner. Our project needs to procure this specific equipment in order to initially evaluate the viability of the hardware components before they are used in a tactical environment. This tactical version of the PATRIOT Hardware is a direct requirement of the system for the US and PATRIOT FMS partner. We must have this exact Tactical version of the PATRIOT Hardware in order to meet the requirement of the PATRIOT system for the new expected to be fielded systems. Esterline Federal, LLC is the sole provider of the required hardware.
Emory Winters Date Technical Lead
NICHOLAS HAAS
CONTRACTING OFFICER
WINTERS.SAMUEL.E.
III.1299414309
Digitally signed by
WINTERS.SAMUEL.E.III.1299414309
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=WINTERS.SAMUEL.E.III.1299414309 Date: 2015.12.02 15:09:24 -06'00'
HAAS.NICHOLAS.A.12554516
Digitally signed by HAAS.NICHOLAS.A.1255451649 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=HAAS.NICHOLAS.A.1255451649 Date: 2016.01.26 07:38:45 -06'00'
File details come from the government source that posted it. Updated .