W9124P-21-R-0006.pdf
PDF 300 KB Posted
- Attached to
- Bottled Water for the installation
- Solicitation number
- W9124P
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS Bottled Water NS 02032021.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9124P21R0006 28-Feb-2021
b. TELEPHONE NUMBER
(256) 876-3953
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 05 Mar 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9124P9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
CLEDIS HENRY
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ACC-RSA-CCAM-CAD-A
5303 SPARKMAN BUILDING
REDSTONE ARSENAL AL 35898
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W908RX 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
USAG - REDSTONE ARSENAL
CHAD RANEY
4488 MARTIN ROAD
REDSTONE ARSENAL AL 35898
TEL: 256-842-0035 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,000
NAICS:
312112
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF31
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9124P21R0006
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Bottled Water QTY 96 5 Gallon Base Year
FFP
Bottled Water QTY 96 5 Gallon Container Base Year 1 April 2021 - 31 Mar 2022 FOB: Destination
PSC CD: 8960
NET AMT
1001 1 Each OPTION Bottled Water QTY 96 5 Gallon Option 1
FFP
Bottled Water QTY 96 5 Gallon Container 1 April 2022 - 31 Mar 2023
2001 1 Each OPTION Bottled Water QTY 96 5 Gallon Option 2
FFP
Bottled Water QTY 96 5 Gallon Container 1 April 2023 - 31 Mar 2024
3001 1 Each OPTION Bottled Water QTY 96 5 Gallon Option 3
FFP
Bottled Water QTY 96 5 Gallon Container 1 April 2024 - 31 Mar 2025
4001 1 Each OPTION Bottled Water QTY 96 5 Gallon Option 4
FFP
Bottled Water QTY 96 5 Gallon Container 1 April 2025 - 31 Mar 2026
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government
Section F - Deliveries or Performance
PWS
PERFORMANCE WORK STATEMENT (PWS)
Bottled Water Redstone Arsenal
Part 1
General Information
1. GENERAL: This is a non-personal services contract to provide Bottled Water Services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform bottled water delivery and maintenance services as defined in this Performance Work Statement (PWS), section 5 except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background: Redstone Arsenal is located in the heart of the Tennessee Valley, in northern Alabama. Redstone Arsenal was built in 1941 to produce conventional chemical ammunition for use in World War II. For more than 40 years, Redstone has been the heart of the Army's Rocket and Missile programs. Dr. Werner von Braun and his German rocket experts developed the first ballistic missile; this led to the establishment of National Aeronautics and Space Administration (NASA), Marshall Space Flight Center (MSFC) in 1960. Today, Redstone is home to the Army Materiel Command (AMC), United States (US) Army Aviation and Missile Command (AMCOM), the Space and Missile Defense Command (SMDC), numerous Program Executive Offices (PEO), and major components of the Defense Intelligence Agency and the Missile Defense Agency. Also located here are numerous tenant and satellite organizations. Team Redstone’s mission is to perform basic and advanced weapons system research and development, placing the right missile and aviation systems with the troops, keeping them ready to fight, providing weapon systems, services and supplies to our allies, to manage weapon systems such as the Cobra and PATRIOT, and to support project managers within the program executive office structure.
Population served: approximately 45,450 military (active, retired, and dependents), 42,630 Government civilian and Contractor personnel, and 1,416 resident family members. Size: approximately 37,910 acres and 14.2 million square feet of building space.
1.3 Objectives: Contractor shall service, clean, maintain serviceability, and deliver 5-gallon units of bottled water weekly to various designated locations on Redstone Arsenal, ensuring the number of bottles delivered to each of the locations does not exceed quantities.
1.4 Scope: Contractor shall deliver at a minimum 5-gallon units of bottled water for various locations on Redstone Arsenal as per attachment “A” building list (paragraph 7.1.1). In addition to a minimum number of bottles delivered; this contract shall have an indefinite delivery/indefinite quantity (IDIQ) FAR Part 16.5 award. The contractor shall ensure that the number of bottles delivered to each of these designated locations does not exceed that of the quantities specified in attachment “A” quantity/frequency list (paragraph 7.1.2). The Government may add or delete buildings as required to meet the both OSHA and ADEM drinking water requirements, which shall invoke the IDIQ portion of the contract.
1.5 Period of Performance: The period of performance shall be for one (1) twelve (12) month base period and four (4) 12-month option periods.
Base Year 1 April 2021 – 30 March 2022 Option Year I 1 April 2022 – 30 March 2023 Option Year II 1 April 2023 – 30 March 2024 Option Year II 1 April 2024 – 30 March 2025 Option Year IV 1 April 2025 – 30 March 2026
1.6 1.General Information
1.6.2 Recognized Holidays: The contractor is not required to perform services on Federal holidays.
1.6.2.1 Federal Observed Holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.3 Hours of Operation: The Contractor is responsible for conducting business, between the hours of 0700-1600, Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.4 Place of Performance: The work to be performed under this contract will be performed at the locations listed in TE1.
1.6.5 Quality Control Program (QCP) The Contractor shall develop and maintain an effective QCP to ensure services are performed in accordance with (IAW) this PWS.
The QCP must be forwarded to and accepted by the KO. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of deficiencies. The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract. The Contractor shall develop a Quality Control Plan (QCP). The contractor shall deliver one copy of their QCP to the COR and KO within 30 days of contract award, and within five (5) working days when changes are made thereafter. After acceptance of the QCP the Contractor shall receive the contracting officer’s acceptance in writing of any proposed change to their QC System.
1.6.6 Quality Assurance: The government shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP).
This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.6.1 Random Inspections: Inspections will be perform by the COR on a random basis, a minimum of 2 units a month.
1.6.6.2 Performance Metrics Used: Random sampling of at least 2 units a Month (e.g.
cleanliness, properly operating, and right location).
1.6.6.3 Customer Feedback: Customer feedback is typically obtained via telephone, email, or interactive customer evaluation (ICE) comments.
1.6.6.4 The COR shall validate all complaints. If determined valid, the COR will advise the KO and the Contractor of the deficiency
1.6.7 Type of Contract: The Government will award a Firm Fixed Price (FFP) type of contract.
1.6.8 Security Requirements: Contractor personnel performing work under this contract must have a favorable National Agency Check with Inquiries at time of the contract start date, and must maintain the level of security required for the life of the contract.
1.6.8.1 Physical Security: N/A
1.6.8.2 Key Control: (If applicable). The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.
The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.
1.6.8.2.1. Lost keys shall be reported to the COR and the KO. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying.
When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.
1.6.8.2.2. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer (KO).
1.6.8.3 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s QCP.
1.6.9 Special Qualifications: Contractor personnel operating a vehicle in performance of this contract shall have current, valid driver’s licenses.
1.6.10 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart
42.5. The KO and Contracting Officer’s Representative (COR) shall meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues.
1.6.11 Contracting Officer’s Representative (COR): The COR Management System Tool (Virtual Contracting Enterprise (VCE)-Acquisition Resource Center (ARC) https://arc.army.mil/COR) for nomination, tracking, documentation, and management of CORs will be used. The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: Assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications;
monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.12 Key Personnel: The following personnel are considered key personnel by the Government: The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0700 to 1600 hours, Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons.
1.6.13 Identification of Contractor Employees: The Contractor shall require all employees performing work on this contract to wear an employee badge, above the waist on the front of exterior clothing except where safety and/or health reasons prohibit. The badges shall be collected by the Contractor from terminated employees prior to their departure from Redstone Arsenal and returned to the Directorate of Operations Access Control Officer the Visitor Control Center at Gate 9.
1.6.14 Contractor Travel N/A
1.6.15 Contractor Personnel Conduct: Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that any contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. In accordance with DOD Directive 5500.7-R, “Joint Ethics Regulation”, Contractor employees must avoid improperly influenced in the execution of their duties under the contract. Particular attention should be paid to acceptance of gifts / gratuities, and on non-disclosure of sensitive or classified information. The Contractor shall ensure employee conduct complies with 41 U.S. C 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions. The Contractor shall ensure no contractor employees conduct political related activities or events on the US Army Installation or in US Army Facilities.
1.6.16 Other Direct Costs N/A
1.6.17 Data Rights N/A
1.6.18 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO, and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.19 Phase In/Phase Out : To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have key personnel on board, during the thirty (30) day phase in/ phase out periods. The Contractor shall, upon the Contracting Officer's written notice, (1) furnish phase-in and phase-out services for up to 10 months after this contract expires and (2) negotiate in good faith a plan with a successor to determine the nature and extent of phase-in and phase-out services required. The plan shall specify a training program and a date for transferring responsibilities for each division of work described in the plan, and shall be subject to the Contracting Officer's approval. The Contractor shall provide sufficient experienced personnel during the phase-in and phase-out period to ensure that the services called for by this contract are maintained at the required level of proficiency.
1.6.20 Antiterrorism (AT) and Operations Security (OPSEC)
1.6.20.1 AT Level I Training: This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to government installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a
COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://jkodirect.jten.mil.
1.6.20.2 Access and General Protection/Security Policy and Procedures: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include associated sub-contractors employees shall comply with applicable installation, facility and area Commander Installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor workforce shall comply with all personal identity verification requirements as directed by DoD, Department of the Army Headquarters, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The prime contractor Human Resources/Security Officer is responsible for the collection of all Redstone Badges and CAC cards issued to their employees. The Human Resources/Security Officer will then turn over these credentials to the COR. This applies when the contract expires; as well as, when a contractor resigns or is terminated. After accounting for all badges/CACs, the COR will turned in the credentials at the Visitor Control Center.
1.6.20.3 . Area of Responsibility (AOR) Travel Brief for Contractor Personnel Traveling Overseas. This standard language text required US based contractor employees and associated sub-contractor employees to make available and receive government provided area of responsibility (AOR) travel briefs as directed by AR 525-13. AOR-specific training will be made available upon request for contractors vacationing outside of the continental United States. AOR training is conducted in addition with annual AT Level I training. AOR briefings are issued by a certified and trained Level II ATO.
Coordinate with your Organization or USAG-R Antiterrorism Branch no later than 90 days prior to travel time in order to schedule a briefing..
1.6.20.4 iWATCH Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor, to include subcontractors, shall brief all employees on the local iWATCH program. The iWATCH slide presentation and supporting training video is provided by the USAG-R Antiterrorism Branch. Training material is located in the garrison contracting organizational files. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to local law enforcement and security officials. This training shall be completed within 30 calendar days of contract award and within 15 calendar days of new employees commencing performance with the results reported to the COR within 10 calendar days after completion of training by all employees and subcontractor personnel
1.6.20.5 Contractor Employees Who Require Access to Government Information Systems (IS): N/A
1.6.20.6 For Contracts that Require an OPSEC Standing Operating Procedure (SOP)/Plan: The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security.
This SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator.
The contractor will ensure this individual becomes OPSEC Level II certified per AR 530- 1.
1.6.20.8 For Information Assurance (IA)/Information Technology (IT) Training: N/A
1.6.20.9 For Information Assurance (IA)/Information Technology (IT) Certification: N/A
1.6.20.10 For Contractors Authorized to Accompany the Force: NA
1.6.20.11 For Contractors Requiring Performance or Delivery in a Foreign Country, DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US: N/A
1.6.20.12 For Contracts That Require Handling or Access to Classified Information: N/A
1.6.20.13 Random Antiterrorism Measures Program (RAMP) participation. Contractor personnel working on an installation are subject to participation in Installation RAMP security program (e.g. vehicles searches/inspections, wearing of ID badges, etc.).
1.6.20.14 Impact on contractor performance during increased FPCON during periods of increased threat (Contractor personnel working on an installation). During FPCON’s CHARLIE and DELTA, services may be discontinued / postponed due to higher threat.
Services may resume when the FPCON level is reduced to level BRAVO or lower. All contractor service and supply delivery vehicles entering Redstone Arsenal that have not been vetted for unescorted entrance will report to ACP #1. A valid driver’s license and a shipping bill of lading must be provided. Enclosed cargo compartments will be secured by locks or (serial numbered) security bands in order to prevent tampering. Drivers will be directed to turn off the ignition, place the keys on the dash and open all storage compartments. All passengers will exit the vehicle to a designated holding area.
Contractor service and supplies are subject to random inspection during food and water deliveries.
The following actions will be taken during heightened postures: All Fuel Tanker Trucks will be escorted by Redstone police on and off the Installation. All dump trucks and trash vehicles must be empty prior to arriving to the inspection point. All contract service and supply commercial food deliveries will be escorted by the receiving organization.
Coordination’s must be made with the receiving organization prior to arrival to ensure persons are available for escorting
1.6.20.15 Identification of Contractor Employees: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area. The Contractor (to include subcontractors) shall provide each employee a Redstone Arsenal Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employees shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor and Subcontractor personnel changes. Foreign owned companies and foreign national contractors will only be permitted to perform under this contract when there are no qualified U.S. companies and /or U.S. contractors. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They shall also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.21 Emergency Services
1.6.20.1 The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor will, in turn, notify the KO or COR within 30 minutes of the incident.
1.6.20.2 Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.
PART 2
DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
2. DEFINITIONS AND ACRONYMS:
2.1 Definitions:
2.1.1 Cannibalize. Remove parts from Government property for use or for installation on other Government property.
2.1.2 Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.3 Contractor Acquired Property. Property acquired, fabricated, or otherwise provided by the contractor for performing a contract and to which the Government has title.
2.1.4 Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.5 Contracting Officer’s Representative (COR). An employee of the U.S.
Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.
This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.6 Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.7 Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.8 Emergency medical treatment. Any treatment that includes medical personnel (stitches, X-rays, etc.)
2.1.9 Equipment A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
2.1.10 Government Furnished Property. Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification.
Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
2.1.11 Government Property. All property owned or leased by the Government.
Government property includes both Government-furnished property and contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
2.1.12. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. The prime contractor is responsible for performance of all subcontractors.
2.1.13 Loss of Government Property. Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to:—
(1) Items that cannot be found after a reasonable search;
(2) Theft:
(3) Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or
(4) Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.
2.1.14 Material. Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling, and special test equipment or real property.
2.1.15 Non-Personal Services. The personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the government and its employees. Non personal service contracts are authorized by the government in accordance with FAR 37.012, under general contracting authority, and do not require specific statutory authorization.
2.1.16. Physical Security. Actions that prevent the loss or damage of Government property.
2.1.17 Property. All tangible property, both real and personal.
2.1.18 Property Administrator. An authorized representative of the KO appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a contractor.
2.1.19 Property Records. Records created and maintained by the contractor in support of its stewardship responsibilities for the management of Government property.
2.1.20 Provide. To furnish, as in Government-furnished property, or to acquire, as in contractor-acquired property.
2.1.21 Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.22 Quality Assurance Surveillance Plan. An organized document written by the government specifying the surveillance methodology used for surveillance of contractor performance.
2.1.23 Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.24 Real Property. See Federal Management Regulation 102-71.20 (41 CFR 102- 71.20).
2.1.25 Sensitive Property means property potentially dangerous to the public safety or security if stolen, lost, or misplaced, or that shall be subject to exceptional physical security, protection, control, and accountability. Examples include weapons, ammunition, explosives, controlled substances, radioactive materials, hazardous materials or wastes, or precious metals.
2.1.26 Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.27 Unit Acquisition Cost means—
(1) For Government-furnished property, the dollar value assigned by the Government and identified in the contract; and
(2) For contractor-acquired property, the cost derived from the contractor’s records that reflect consistently applied generally accepted accounting principles.
2.1.28 Wide Area Work Flow (WAWF): A secure web based system for electronic invoicing, receipt, and acceptance. WAWF allows government vendors to submit and track invoices and receipt/acceptance documents over the web and allows government personnel to process those invoices in a real-time, paperless environment.
2.1.29 Work Day. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.30 Work Week. Monday through Friday, unless specified otherwise.
2.2 Acronyms:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CAP Contractor Acquired Property CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation GFP Government-Furnished Property HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PA Property Administrator PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit WAWF Wide Area Work Flow
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
(This section should identify those items such as property, information and/or services that will be provided for the contractor’s use (without cost to the contractor) to allow them to provide the required services, such as materials, facilities, training, etc.
Examples provided below.)
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 Services – N/A
3.2 Facilities – N/A
3.3 Utilities – N/A
3.4 Equipment – N/A
3.5 Materials – N/A
3.6 Record Keeping. – N/A
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
(This section is used to identify the materials and equipment that the contractor must provide. Examples provided below.)
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Secret Facility Clearance: N/A
4.3. Materials: The Contractor shall provide all dispensers and cups needed to use the bottled water.
4.4. Equipment: The Contractor shall provide all bottled water dispensers and cup dispensers used on this contract.
PART 5
SPECIFIC TASKS
(This section is the heart of the PWS. All of the services to be performed under the contract should be described in sufficient detail here. This includes all general tasks required by the Government.)
5. SPECIFIC TASKS:
5.1. Basic Services: The Contractor shall provide services for supplying bottled water, dispensers, and maintenance to the equipment..
5.1.1 Provide cold water dispensers equipped with water guards to include drinking cups, cup holder/dispensers at each location listed in Attachment “A”. Contractor shall service and clean coolers to maintain serviceability
5.1.2 Contractor shall deliver at a minimum 5-gallon units of bottled water for various locations on Redstone Arsenal as per attachment “A” building list (paragraph 7.1.1). In addition to a minimum number of bottles delivered, this contract shall have an indefinite delivery/indefinite quantity (IDIQ) FAR Part 16.5 award. The contractor shall ensure that the number of bottles delivered to each of these designated locations does not exceed that of the quantities specified in Attachment “A” delivery list (paragraph 7.1.2). The Government may add or delete buildings as required to meet the both OSHA and ADEM drinking water requirements, which shall invoke the IDIQ portion of the contract.
The Government will issue the Contractor a Job Order Request, IMSE-RED Form 2701, providing the location of services to be rendered, the name of the point of contact (POC) including the phone number.
5.1.3 The Contractor shall telephone the Contracting Officer’s Representative (COR) every Monday to determine if there are any Job Order Requests to be picked up at Building 4488, Redstone Arsenal, Alabama
5.1.4 The Contractor shall have the point of contact (POC), or the POC’s representative, sign a ticket acknowledging receipt of items when each delivery is made. The Contractor will ensure the POC provides a legible written name, signature and date. The Contractor shall maintain the original delivery ticket on file until the end of the contract. The Contractor shall deliver all original tickets on file to the Contracting Officer’s Representative (COR) at the end of the contract.
5.1.5 The Contractor shall deliver the tickets in adequate containers as to preserve information on tickets and prevent any fading or ink smudging. Tickets shall be in numerical order within the containers. The Contractor shall ensure that each container does not exceed a total weight of 50 pounds.
5.2. Task Heading. N/A
5.3. Service Contract Reporting (formerly Contract Manpower Reporting)
Beginning in FY 2020, contracts required to report manpower data relating to the performance of services will transition into the System for Award Management (SAM). The contractor shall report all contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor shall completely fill in all the information in the format using the following web address: www.sam.gov.
Contractors must have an entity registered in SAM, an individual SAM user account with the Entity Administrator, Entity Registration Representative, or Reporter role for that entity, and one or more contracts awarded to that entity which meet the Service Contract Reporting (SCR) thresholds.
5.3.1 Submission Instructions
1. Log in at www.sam.gov.
2. Select Entity Registrations and then select “Service Contract Reporting”.
3. SAM displays the entities which have service contracts and meet the reporting criteria. Select “View by entity” to see the service contracts for each entity.
4. Select “Add” for the appropriate service contract to create a Service Contract Report. Each service contract which meets the FAR Subpart 4.1703 reporting thresholds is displayed.
5. SAM displays the contract details and allows the report to be input at the Complete Service Contract Report page. SAM requires the following information to be entered:
• Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).
• Prime Contractor Hours Expended: Prime contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 hours to calculate a Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as Prime Contractor FTEs.
6 . Report any required Tier 1 subcontractor information by selecting the “Add Tier 1 Subcontract Information” button.
7. When the report is complete, select “Submit”. The system will return to the Select Service Contract page where a new SCR can be created or an existing SCR may be edited.
5.3.2 Editing the SCR
To edit a submitted SCR, follow steps 1-4 above, except that any previously submitted SCR will have a “View/Edit” button instead of an “Add” button. Within the “View/Edit” page the current SCR available fields may be edited and the record may be resubmitted. The record can be edited as frequently as necessary until the end of the reporting period.
5.3.4 SCR Cost
As part of its submission, the Contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. The reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractor Management Reporting (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://cmra.army.mil/. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information);
(11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
Occupational Safety and Health Administration standards 29 C.F.R. § 1910.14.
29 U.S.C. § 668(a); Exec. Order No. 12196, Occupational Safety and Health Programs for Federal Employees, 45 Fed. Reg. 12,769
6.1 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures. Any Contractor provided publications are to be procured and maintained at Contractor’s expense. (For example, insert AR 25-2, AR 530-1.)
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7.1 Attachment A – Building List and Quantity/Frequency List
7.2 Technical Exhibit 1 - Performance Requirements Summary
7.3 Technical Exhibit 2 – Deliverables Schedule
7.4 Technical Exhibit 3 - Estimated Workload Data
7.1 Attachment “A”
Building & Quantity/Frequency List
7.1.1 - Building List
Service will be at the following locations.
Gate 1 Bldg. 5106 Gate 1 Commercial truck inspection lane Bldg. 5104 Gate 1 Visitor Center Bldg. 5105 Gate 2 Bldg. 3702 Gate 5 Bldg. E-7520 Gate 10 Bldg. 3390
7.1.2 – Quantities/Frequency List
Bottles will be dropped at Redstone building 3623 DES headquarters at regular intervals based upon consumption, but no less often than monthly. Quantities to be delivered shall be specified in a delivery order but shall meet a minimum of six 5-gallon bottles per month. The maximum quantity of 5-gallon bottles shall not exceed 96 bottles per year.
7.2 TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Required Services (Tasks)
Performance Standard Acceptable Quality Level (This is the maximum…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .