19001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. The purpose of amendment 0001 is to answ er questions. See continuation pages.

B. A signed copy of this amendment shall be included in the proposal.

C. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124N19B0001

X 9B. DATED (SEE ITEM 11)

08-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Aug-2019

CODE

MICC - PRESIDIO OF MONTEREY

ATTN: BRITTNEY WILSON

400 GIGLING RD.

SEASIDE CA 93955-

W9124N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9124N19B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMD 0001 (Q&A)

Project: Bolio Sidewalks Solicitation: W9124N-19-B-0001 Q&A:

1. Does the contractor pay for the Archeologist?

Yes.

2. In order to avoid extended the exiting retaining wall at the tie-in to the 3’ sidewalk, some conforming grading will be required. Please confirm this is acceptable.

Yes, this is acceptable; however, an Archaeologist and Tribal Monitor shall be on site at all times of soil disturbance, per SOW paragraphs 2.1.h and 5.2.a.

3. There is a survey monument or pin in the existing swale to be removed. Will this need to reset by a licensed land surveyor or can it be destroyed?

The survey pin is not required to be reset.

4. The board walk is in an area with a significant cross slope. On the street side the precast beam can be set near exiting grade on drilled/dug precast piers. On the down slope side the piers will have to be several feet taller, can these be extended with a cast-in-place method, as each one will need to be slightly different in height based on the variations of the existing contours and your desire to minimize grading in the culturally sensitive area?

A registered professional engineer shall design the concrete boardwalk structure and foundation piers, per SOW paragraph 2.1.t.

Cast-in-place is acceptable as long as the concrete structural integrity, color, and desired grading to meet the contour of the existing soil surface is met.

5. You call for a wildlife exclusion fence on the boardwalk. On the street side the precast beam could be set near grade and with very minor grading and gaps could be filled with dirt, is this acceptable? On the low side do you want the fence attached to the board walk or a free-standing fence on post adjacent? What type of fence do you want, chain link?

W9124N19B0001

Per SOW paragraph 5.6, the boardwalk (raised sidewalk) must include enclosure or mesh to prevent creating animal habitat. Chain link or other “fence” is not acceptable.

Mitigation measures must be maintainable (easily replaceable in the event of damage by animals). Soil disturbance in the boardwalk section of the project must be kept to a minimum due to the cultural significance of the area.

6. It said during the walk through no color in boardwalk, but here’s the spec:

E. All precast shall consist of integrally colored concrete in a color selected by the owner.

Can you please strike out E. in an addendum?

This specification section will remain.

(End of Summary of Changes)