This document is an amendment to a solicitation for an IDIQ contract for roofing maintenance and repair services at Fort Stewart and Hunter Army Airfield in Georgia. The solicitation is for a firm-fixed-price contract with a construction magnitude of more than $10 million over the base period and four option years. The amendment provides the government's responses to industry questions, including clarification on multiple award vs single award, site visit attendance, wage determinations, and non-priced items. It also corrects the quantities required on several bid schedule line items. The key details in the solicitation include the response date of December 3, 2024, the requirement for performance and payment bonds, and the need to submit various plans and submittals prior to commencing work. The current incumbent contract number is W9124M23D0003.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0012086717

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is to provide the Government's response to industry questions and to correct the quantities required on Bid Schedule Line Items 0138, 0179, 0180, 1138, 1179, 1180, 2138, 2179, 2180, 3138, 3179, 3180, 4138, 4179, and 4180. See the Summary of changes for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 49

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Nov-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9124M25B0001

X 9B. DATED (SEE ITEM 11)

16-Oct-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Nov-2024

CODE

MICC - FORT STEWART

976 WILLIAM H. WILSON AVE SUITE 100

FORT STEWART GA 31314

W9124M 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9124M25B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

BID SCHEDULE

Maintain and Repair Roofs (IDIQ), Fort Stewart and Hunter Army Airfield, GA Independent Government Estimate - Base Year

CUI

ITEM DESCRIPTION QTY U/M U/P AMOUNT

0001 Provide and install roof hatch, 36" x 30" 3 EA

0002 Provide and install gypsum deck plank 2" 463 SF

0003 Demolition of gypsum deck, 2" 463 SF

0004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized

1138 SF

0005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized

487 SF

0006 Provide and install 3"x16 gauge open-type metal deck, galvanized

1301 SF

0007 Demolition of 3"x16 gauge open-type metal deck, galvanized

407 SF

0008 Provide and install sheet metal patch, .020 galvanized 407 SF

0009 Demolition of lumber up 2x10 1950 BF

0010 Provide and install lumber, treated up to 2x10

2925 BF

0011 Provide and install cant strips, treated 4 X 4, cut diagonally

812 LF

0012 Demolition of cant strips 812 LF

0013 Provide and install CDX plywood sheathing up to 3/4" 9426 SF

0014 Demolition of CDX plywood sheathing up to 3/4" 9426 SF

0015 Provide and install exterior trim, pine, corner board, 1x4

325 LF

0016 Demolition of exterior trim, pine, corner board, 1x4 325 LF

0017 Provide and install exterior trim, pine, corner board, 1x6

325 LF

0018 Demolition of exterior trim, pine, corner board, 1x6 325 LF

0019 Provide and install exterior trim, pine, fascia, 1x6 812 LF

0020 Demolition of exterior trim, pine, fascia, 1x6

812 LF

0021 Provide and install exterior trim, pine, fascia, 1x8 812 LF

0022 Demolition of exterior trim, pine, fascia, 1x8

812 LF

0023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11

1301 SF

0024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11

1301 SF

0025 Provide and install fiberglass flexible insulation 6" kraft faced

1301 SF

0026 Demolition of fiberglass flexible insulation 6" kraft faced

1301 SF

0027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11

650 SF

0028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11

650 SF

0029 Provide and install fiberglass flexible insulation 6" foil side R19

2925 SF

0030 Demolition of fiberglass flexible insulation 6" foil side, R19

2925 SF

0031 Provide and install flexible fiberglass insulation, 9" foil side, R30

650 SF

0032 Demolition of 9" flexible fiberglass insulation, foil side, R30

650 SF

0033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11

650 SF

0034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11

1544 SF

0035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19

2113 SF

0036 Demolition of fiberglass flexible insulation 6" unfaced batt insulation, R19

2113 SF

0037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30

650 SF

0038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30

650 SF

0039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia

975 SF

0040 Demolition of soffit, perforated or solid, and fascia 975 SF

0041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78

455 SF

0042 Demolition of rigid board insulation, up to 2"

9751 SF

0043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56

9751 SF

0044 Demolition of rigid board insulation, wood fiber, up to 1"

195 SF

0045 Demolition of rigid board insulation wood fiber, up to 2'

19 SF

0046 Provide and install rigid board insulation, 1" Perlite, R2.78

11377 SF

0047 Demolition of rigid board insulation, Perlite, up to 2" 11377 SF

0048 Demolition of rigid board insulation, perlite, up to 1" 7395 SF

0049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14

8939 SF

0050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29

22754 SF

0051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate

4876 BF

0052 Demolition of rigid insulation, up to 1" polyisocyanurate

8939 SF

0053 Demolition of rigid insulation, up to 2" polyisocyanurate

22754 SF

0054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed

1056 SQ

0055 Add 1 layer #15 felt for low/steep slope 1056 SQ

0056 Demolition of asphalt shingles 1056 SF

0057 Provide and install glass roofing felt

82 SQ

0058 Provide and install glass roofing felt, mopped

82 SQ

0059 Provide and install organic roofing felt 82 SQ

0060 Provide and install organic roofing felt, mopped 82 SQ

0061 Install pitch pockets 24 EA

0062 Demolition of 3 ply built up roof with gravel

5689 SF

0063 Demolition of 3 ply built up roof with smooth surface 812 SF

0064 Demolition of 4 ply built up roof with gravel

8127 SF

0065 Demolition of shingle, felt or roll roofing 49 SQ

0066 Demolition of gravel ballast 407 CY

0067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies

2 SQ

0068 Demolition of 3 plies glass fiber felt 2 SQ

0069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations

65 SQ

0070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered

146 SQ

0071 Demolition of single ply roofing 487 SF

0072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered

407 SQ

0073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached

407 SQ

0074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered

8 SQ

0075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered

162 SQ

0076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached

407 SQ

0077 Provide and install PVC walkway pads, .156" thick 1500 SF

0078 Provide and install #15 organic felt, nailed to deck 82 SF

0079 Provide and install #15 organic felt, spot mopped to deck

1138 SF

0080 Provide and install #15 organic felt, fully mopped to

1138 SF

0081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

7314 SF

0082 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

7314 SF

0083 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty

2438 SF

0084 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty

2438 SF

0085 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty

5689 SF

0086 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced

2925 SF

0087 Demolition of modified bitumen roofing 2925 SF

0088 Demolition of thermoplastic roofing system

162 SQ

0089 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached

609 SQ

0090 Provide and install concrete pavers 2x2x1 1/2" 2 EA

0091 Remove and replace screws and new neoprene washers

10565 EA

0092 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system

56885 SF

0093 Framing system, light gage structural, 4 and 12 pitch 35756 SF

0094 Framing system, Sub-purlins, metal, 4" wide, 16 gage 569 LF

0095 Metal roof system, fascia, (Same as roof panels) 4876 SF

0096 Metal roof system, Perforated soffit panel, steel painted

1430 SF

0097 Provide and install ridge cap 975 SF

0098 Demolition of ridge cap 487 SF

0099 Demolition of PVC pipe flashing 39 EA

0100 Provide and install PVC pipe flashing, 90 mil thick, up to 4" diameter pipe

33 EA

0101 Demolition of copper flashing 5 SF

0102 Demolition of aluminum flashing 1138 SF

0103 Provide and install aluminum flashing, .032" thick 2438 SF

0104 Provide and install up to 4" diameter plumbing vent flashing

29 EA

0105 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish

6501 LF

0106 Provide and install stainless steel flashing, .015" thick 114 SF

0107 Demolition of stainless steel flashing

33 SF

0108 Provide and install stainless steel flashing T-Section waterstop, 22 gauge

16 SF

0109 Provide and install stainless steel scupper outlets 10x10x4"

2 EA

0110 Demolition of scupper outlets 16 EA

0111 Provide and install stainless steel scupper outlets 22x14x4"

2 EA

0112 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered

2 EA

0113 Provide and install stainless steel flashing drip edge, 5" girth

29 LF

0114 Provide and install stainless steel flashing drip edge, 8" girth

2 LF

0115 Provide demolition of steel fascia 65 SF

0116 Demolition of gutters and downspouts

1301 LF

0117 Provide and install downspouts .024 aluminum, 3x4", enameled

65 LF

0118 Provide and install downspouts .025 aluminum, 4"x5" enameled

812 LF

0119 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel

114 LF

0120 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted

569 LF

0121 Provide and install gutter .027 thick 5" box type aluminum gutter

89 LF

0122 Provide and install gutter .032" thick 5" box type aluminum gutter, enamel painted

178 LF

0123 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter

29 LF

0124 Provide and install gutter 28 gauge 5" galvanized steel painted

57 LF

0125 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted

447 LF

0126 Demolition of cast iron boots 2 EA

0127 Provide and install cast iron roof drainage boots 2 EA

0128 Provide and install metal equipment curb, painted up to 48"x48"

24 EA

0129 Demolition of metal equipment curb, painted up to 48"x48"

16 SF

0130 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish

569 LF

0131 Demolition of gravel stops 374 LF

0132 Provide and install coping cap, .050 aluminum, painted 683 SF

0133 Remove and replace roof drains 5 EA

0134 Remove and reset curb and equipment, no electrical work included

35 EA

0135 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets

16 EA

0136 Remove and install mushroom vents

16 EA

0137 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen

487 SF

0138 Gable louver, aluminum, painted, large with insect screen

250 SF

0139 Remove and reinstall ventilator 7 EA

0140 Provide continuous low profile ridge ventilator 10 EA

0141 Remove and reset ridge vent 35 EA

0142 Provide and install aluminum ridge vent, painted 16 LF

0143 Demolition of ridge vent 14 LF

0144 Demolition of soffit vents 14 LF

0145 Provide and install up to 3" aluminum soffit vent, mill or enamel finish

3 LF

0146 Provide and install under eave aluminum vent, mill finish

5 EA

0147 Demolition of eave vents 7 EA

0148 Provide and install expansion joint cover, roof to roof, aluminum

33 LF

0149 Provide and install expansion joint cover, roof to wall, aluminum

33 LF

0150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick

33 LF

0151 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick

3 LF

0152 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.

146 SF

0153 Demolition of suspension system without lath, with channels

82 SF

0154 Demolition of drywall 114 SF

0155 Provide for ceiling installation. Add to cost of gypsum wallboard

14 SF

0156 Provide for ceiling over 8' in height. Add to cost of gypsum board

14 SF

0157 Provide and install gypsum wallboard 5/8" drywall, taped and finished

195 SF

0158 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels

98 SF

0159 Demolition of acoustical ceiling panels 114 SF

0160 Pressure wash metal roof 3901 SF

0161 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat

8127 SF

0162 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint.

Painting task includes protective work

72 SF

0163 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work

114 SF

0164 Provide individual tests for asbestos containing material.

Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer

2 EA

0165 Provide removal of asbestos containing roofing material;

built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.

29 SQ

0166 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements.

Provide disposal manifests to Contracting Officer.

Abatement shall be performed by qualified asbestos abatement contractor.

98 SF

0167 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.

8 SF

0168 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer

2 EA

0169 Demolish pvc piping, up to 2" 2 LF

0170 Provide and install up to 2" pvc piping, schedule 40, include fittings

3 LF

0171 Extend galvanized plumbing vents, (3' to 7')

2 EA

0172 Extend hot flue stacks to 12" dia. (5' to 7') 2 EA

0173 Remove from roof air handler, refrigerant lines and reinstall

2 EA

0174 Extend duct work, insulated aluminum

3 LF

0175 Remove/reinstall lightning Protection System up to 25 points

3 EA

0176 Remove/reinstall LPS up to 100 points 5 EA

0177 Articulating boom lift, diesel, up to 80' 20 WK

0178 110 ton crane with riggers and spreader bar

5 WK

0179 Lightning Protection System, priced per point. Includes a complete structural lightning protection system that meets all requirements for UL Master Label Certification, excluding surge protection.

84 EA

0180 Non-prepriced items 0 LS

SUBTOTAL FS/HAAF, BASE PERIOD (TOTAL OF LINE

ITEMS 0001 THROUGH 0180)

Maintain and Repair Roofs (IDIQ), Fort Stewart and Hunter Army Airfield, GA Independent Government Estimate - Option Year 1

CUI

ITEM DESCRIPTION QTY U/M U/P AMOUNT

1001 Provide and install roof hatch, 36" x 30" 3 EA

1002 Provide and install gypsum deck plank 2" 463 SF

1003 Demolition of gypsum deck, 2" 463 SF

1004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized

1138 SF

1005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized

487 SF

1006 Provide and install 3"x16 gauge open-type metal deck, galvanized

1301 SF

1007 Demolition of 3"x16 gauge open-type metal deck, galvanized

407 SF

1008 Provide and install sheet metal patch, .020 galvanized 407 SF

1009 Demolition of lumber up 2x10 1950 BF

1010 Provide and install lumber, treated up to 2x10

2925 BF

1011 Provide and install cant strips, treated 4 X 4, cut diagonally

812 LF

1012 Demolition of cant strips 812 LF

1013 Provide and install CDX plywood sheathing up to 3/4" 9426 SF

1014 Demolition of CDX plywood sheathing up to 3/4" 9426 SF

1015 Provide and install exterior trim, pine, corner board, 325 LF

1016 Demolition of exterior trim, pine, corner board, 1x4 325 LF

1017 Provide and install exterior trim, pine, corner board, 1x6

325 LF

1018 Demolition of exterior trim, pine, corner board, 1x6 325 LF

1019 Provide and install exterior trim, pine, fascia, 1x6 812 LF

1020 Demolition of exterior trim, pine, fascia, 1x6

812 LF

1021 Provide and install exterior trim, pine, fascia, 1x8 812 LF

1022 Demolition of exterior trim, pine, fascia, 1x8

812 LF

1023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11

1301 SF

1024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11

1301 SF

1025 Provide and install fiberglass flexible insulation 6" kraft faced

1301 SF

1026 Demolition of fiberglass flexible insulation 6" kraft faced

1301 SF

1027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11

650 SF

1028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11

650 SF

1029 Provide and install fiberglass flexible insulation 6" foil side R19

2925 SF

1030 Demolition of fiberglass flexible insulation 6" foil side, R19

2925 SF

1031 Provide and install flexible fiberglass insulation, 9" foil side, R30

650 SF

1032 Demolition of 9" flexible fiberglass insulation, foil side, R30

650 SF

1033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11

650 SF

1034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11

1544 SF

1035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19

2113 SF

1036 Demolition of fiberglass flexible insulation 6" unfaced

1037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30

650 SF

1038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30

650 SF

1039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia

975 SF

1040 Demolition of soffit, perforated or solid, and fascia 975 SF

1041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78

455 SF

1042 Demolition of rigid board insulation, up to 2"

9751 SF

1043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56

9751 SF

1044 Demolition of rigid board insulation, wood fiber, up to 1"

195 SF

1045 Demolition of rigid board insulation wood fiber, up to 2'

19 SF

1046 Provide and install rigid board insulation, 1" Perlite, R2.78

11377 SF

1047 Demolition of rigid board insulation, Perlite, up to 2" 11377 SF

1048 Demolition of rigid board insulation, perlite, up to 1" 7395 SF

1049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14

8939 SF

1050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29

22754 SF

1051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate

4876 BF

1052 Demolition of rigid insulation, up to 1" polyisocyanurate

8939 SF

1053 Demolition of rigid insulation, up to 2" polyisocyanurate

22754 SF

1054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed

1056 SQ

1055 Add 1 layer #15 felt for low/steep slope 1056 SQ

1056 Demolition of asphalt shingles 1056 SF

1057 Provide and install glass roofing felt

82 SQ

1058 Provide and install glass roofing felt, mopped

82 SQ

1059 Provide and install organic roofing felt 82 SQ

1060 Provide and install organic roofing felt, mopped 82 SQ

1061 Install pitch pockets 24 EA

1062 Demolition of 3 ply built up roof with gravel

5689 SF

1063 Demolition of 3 ply built up roof with smooth surface 812 SF

1064 Demolition of 4 ply built up roof with gravel

8127 SF

1065 Demolition of shingle, felt or roll roofing 49 SQ

1066 Demolition of gravel ballast 407 CY

1067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies

2 SQ

1068 Demolition of 3 plies glass fiber felt 2 SQ

1069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations

65 SQ

1070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered

146 SQ

1071 Demolition of single ply roofing 487 SF

1072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered

407 SQ

1073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached

407 SQ

1074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered

8 SQ

1075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered

162 SQ

1076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached

407 SQ

1077 Provide and install PVC walkway pads, .156" thick 1500 SF

1078 Provide and install #15 organic felt, nailed to deck 82 SF

1079 Provide and install #15 organic felt, spot mopped to

1138 SF

1080 Provide and install #15 organic felt, fully mopped to

1138 SF

1081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

7314 SF

1082 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

7314 SF

1083 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty

2438 SF

1084 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty

2438 SF

1085 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty

5689 SF

1086 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced

2925 SF

1087 Demolition of modified bitumen roofing 2925 SF

1088 Demolition of thermoplastic roofing system

162 SQ

1089 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached

609 SQ

1090 Provide and install concrete pavers 2x2x1 1/2" 2 EA

1091 Remove and replace screws and new neoprene washers

10565 EA

1092 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system

56885 SF

1093 Framing system, light gage structural, 4 and 12 pitch 35756 SF

1094 Framing system, Sub-purlins, metal, 4" wide, 16 gage 569 LF

1095 Metal roof system, fascia, (Same as roof panels) 4876 SF

1096 Metal roof system, Perforated soffit panel, steel painted

1430 SF

1097 Provide and install ridge cap 975 SF

1098 Demolition of ridge cap 487 SF

1099 Demolition of PVC pipe flashing 39 EA

1100 Provide and install PVC pipe flashing, 90 mil thick, up

33 EA

1101 Demolition of copper flashing 5 SF

1102 Demolition of aluminum flashing 1138 SF

1103 Provide and install aluminum flashing, .032" thick 2438 SF

1104 Provide and install up to 4" diameter plumbing vent flashing

29 EA

1105 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish

6501 LF

1106 Provide and install stainless steel flashing, .015" thick 114 SF

1107 Demolition of stainless steel flashing

33 SF

1108 Provide and install stainless steel flashing T-Section waterstop, 22 gauge

16 SF

1109 Provide and install stainless steel scupper outlets 10x10x4"

2 EA

1110 Demolition of scupper outlets 16 EA

1111 Provide and install stainless steel scupper outlets 22x14x4"

2 EA

1112 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered

2 EA

1113 Provide and install stainless steel flashing drip edge, 5" girth

29 LF

1114 Provide and install stainless steel flashing drip edge, 8" girth

2 LF

1115 Provide demolition of steel fascia 65 SF

1116 Demolition of gutters and downspouts

1301 LF

1117 Provide and install downspouts .024 aluminum, 3x4", enameled

65 LF

1118 Provide and install downspouts .025 aluminum, 4"x5" enameled

812 LF

1119 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel

114 LF

1120 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted

569 LF

1121 Provide and install gutter .027 thick 5" box type aluminum gutter

89 LF

1122 Provide and install gutter .032" thick 5" box type

178 LF

1123 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter

29 LF

1124 Provide and install gutter 28 gauge 5" galvanized steel painted

57 LF

1125 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted

447 LF

1126 Demolition of cast iron boots 2 EA

1127 Provide and install cast iron roof drainage boots 2 EA

1128 Provide and install metal equipment curb, painted up to 48"x48"

24 EA

1129 Demolition of metal equipment curb, painted up to 48"x48"

16 SF

1130 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish

569 LF

1131 Demolition of gravel stops 374 LF

1132 Provide and install coping cap, .050 aluminum, painted 683 SF

1133 Remove and replace roof drains 5 EA

1134 Remove and reset curb and equipment, no electrical work included

35 EA

1135 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets

16 EA

1136 Remove and install mushroom vents

16 EA

1137 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen

487 SF

1138 Gable louver, aluminum, painted, large with insect screen

250 SF

1139 Remove and reinstall ventilator 7 EA

1140 Provide continuous low profile ridge ventilator 10 EA

1141 Remove and reset ridge vent 35 EA

1142 Provide and install aluminum ridge vent, painted 16 LF

1143 Demolition of ridge vent 14 LF

1144 Demolition of soffit vents 14 LF

1145 Provide and install up to 3" aluminum soffit vent, mill or enamel finish

3 LF

1146 Provide and install under eave aluminum vent, mill finish

5 EA

1147 Demolition of eave vents 7 EA

1148 Provide and install expansion joint cover, roof to roof, aluminum

33 LF

1149 Provide and install expansion joint cover, roof to wall, aluminum

33 LF

1150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick

33 LF

1151 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick

3 LF

1152 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.

146 SF

1153 Demolition of suspension system without lath, with channels

82 SF

1154 Demolition of drywall 114 SF

1155 Provide for ceiling installation. Add to cost of gypsum wallboard

14 SF

1156 Provide for ceiling over 8' in height. Add to cost of gypsum board

14 SF

1157 Provide and install gypsum wallboard 5/8" drywall, taped and finished

195 SF

1158 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels

98 SF

1159 Demolition of acoustical ceiling panels 114 SF

1160 Pressure wash metal roof 3901 SF

1161 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat

8127 SF

1162 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint.

Painting task includes protective work

72 SF

1163 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work

114 SF

1164 Provide individual tests for asbestos containing material.

Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer

2 EA

1165 Provide removal of asbestos containing roofing material;

built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.

29 SQ

1166 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements.

Provide disposal manifests to Contracting Officer.

Abatement shall be performed by qualified asbestos abatement contractor.

98 SF

1167 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.

8 SF

1168 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer

2 EA

1169 Demolish pvc piping, up to 2" 2 LF

1170 Provide and install up to 2" pvc piping, schedule 40, include fittings

3 LF

1171 Extend galvanized plumbing vents, (3' to 7')

2 EA

1172 Extend hot flue stacks to 12" dia. (5' to 7') 2 EA

1173 Remove from roof air handler, refrigerant lines and reinstall

2 EA

1174 Extend duct work, insulated aluminum

3 LF

1175 Remove/reinstall lightning Protection System up to 25 points

3 EA

1176 Remove/reinstall LPS up to 100 points 5 EA

1177 Articulating boom lift, diesel, up to 80' 20 WK

1178 110 ton crane with riggers and spreader

5 WK

1179 Lightning Protection System, priced per point. Includes a complete structural lightning protection system that meets all requirements for UL Master Label Certification, excluding surge protection.

1180 Non-prepriced items 0 LS

SUBTOTAL FS/HAAF, OPTION YEAR 1 (TOTAL OF LINE

Estimate - Option Year 2

CUI

ITEM DESCRIPTION QTY U/M U/P AMOUNT

2001 Provide and install roof hatch, 36" x 30" 3 EA

2002 Provide and install gypsum deck plank 2" 463 SF

2003 Demolition of gypsum deck, 2" 463 SF

2004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized

1138 SF

2005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized

487 SF

2006 Provide and install 3"x16 gauge open-type metal deck, galvanized

1301 SF

2007 Demolition of 3"x16 gauge open-type metal deck, galvanized

407 SF

2008 Provide and install sheet metal patch, .020 galvanized 407 SF

2009 Demolition of lumber up 2x10 1950 BF

2010 Provide and install lumber, treated up to 2x10

2925 BF

2011 Provide and install cant strips, treated 4 X 4, cut diagonally

812 LF

2012 Demolition of cant strips 812 LF

2013 Provide and install CDX plywood sheathing up to 3/4" 9426 SF

2014 Demolition of CDX plywood sheathing up to 3/4" 9426 SF

2015 Provide and install exterior trim, pine, corner board, 325 LF

2016 Demolition of exterior trim, pine, corner board, 1x4 325 LF

2017 Provide and install exterior trim, pine, corner board, 1x6

325 LF

2018 Demolition of exterior trim, pine, corner board, 1x6 325 LF

2019 Provide and install exterior trim, pine, fascia, 1x6 812 LF

2020 Demolition of exterior trim, pine, fascia, 1x6

812 LF

2021 Provide and install exterior trim, pine, fascia, 1x8 812 LF

2022 Demolition of exterior trim, pine, fascia, 1x8

812 LF

2023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11

1301 SF

2024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11

1301 SF

2025 Provide and install fiberglass flexible insulation 6" kraft faced

1301 SF

2026 Demolition of fiberglass flexible insulation 6" kraft faced

1301 SF

2027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11

650 SF

2028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11

650 SF

2029 Provide and install fiberglass flexible insulation 6" foil side R19

2925 SF

2030 Demolition of fiberglass flexible insulation 6" foil side, R19

2925 SF

2031 Provide and install flexible fiberglass insulation, 9" foil side, R30

650 SF

2032 Demolition of 9" flexible fiberglass insulation, foil side, R30

650 SF

2033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11

650 SF

2034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11

1544 SF

2035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19

2036 Demolition of fiberglass flexible insulation 6" unfaced

2113 SF

2037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30

650 SF

2038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30

650 SF

2039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia

975 SF

2040 Demolition of soffit, perforated or solid, and fascia 975 SF

2041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78

455 SF

2042 Demolition of rigid board insulation, up to 2"

9751 SF

2043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56

9751 SF

2044 Demolition of rigid board insulation, wood fiber, up to 1"

195 SF

2045 Demolition of rigid board insulation wood fiber, up to 2'

19 SF

2046 Provide and install rigid board insulation, 1" Perlite, R2.78

11377 SF

2047 Demolition of rigid board insulation, Perlite, up to 2" 11377 SF

2048 Demolition of rigid board insulation, perlite, up to 1" 7395 SF

2049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14

8939 SF

2050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29

22754 SF

2051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate

4876 BF

2052 Demolition of rigid insulation, up to 1" polyisocyanurate

8939 SF

2053 Demolition of rigid insulation, up to 2" polyisocyanurate

22754 SF

2054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed

1056 SQ

2055 Add 1 layer #15 felt for low/steep slope 1056 SQ

2056 Demolition of asphalt shingles 1056 SF

2057 Provide and install glass roofing felt

82 SQ

2058 Provide and install glass roofing felt, mopped

82 SQ

2059 Provide and install organic roofing felt 82 SQ

2060 Provide and install organic roofing felt, mopped 82 SQ

2061 Install pitch pockets 24 EA

2062 Demolition of 3 ply built up roof with gravel

5689 SF

2063 Demolition of 3 ply built up roof with smooth surface 812 SF

2064 Demolition of 4 ply built up roof with gravel

8127 SF

2065 Demolition of shingle, felt or roll roofing 49 SQ

2066 Demolition of gravel ballast 407 CY

2067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies

2 SQ

2068 Demolition of 3 plies glass fiber felt 2 SQ

2069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations

65 SQ

2070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered

146 SQ

2071 Demolition of single ply roofing 487 SF

2072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered

407 SQ

2073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached

407 SQ

2074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered

8 SQ

2075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered

162 SQ

2076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached

407 SQ

2077 Provide and install PVC walkway pads, .156" thick 1500 SF

2078 Provide and install #15 organic felt, nailed to deck 82 SF

2079 Provide and install #15 organic felt, spot mopped to

1138 SF

2080 Provide and install #15 organic felt, fully mopped to deck

1138 SF

2081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

7314 SF

2082 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty

7314 SF

2083 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty

2438 SF

2084 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty

2438 SF

2085 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty

5689 SF

2086 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced

2925 SF

2087 Demolition of modified bitumen roofing 2925 SF

2088 Demolition of thermoplastic roofing system

162 SQ

2089 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached

609 SQ

2090 Provide and install concrete pavers 2x2x1 1/2" 2 EA

2091 Remove and replace screws and new neoprene washers

10565 EA

2092 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system

56885 SF

2093 Framing system, light gage structural, 4 and 12 pitch 35756 SF

2094 Framing system, Sub-purlins, metal, 4" wide, 16 gage 569 LF

2095 Metal roof system, fascia, (Same as roof panels) 4876 SF

2096 Metal roof system, Perforated soffit panel, steel painted

1430 SF

2097 Provide and install ridge cap 975 SF

2098 Demolition of ridge cap 487 SF

2099 Demolition of PVC pipe flashing 39 EA

2100 Provide and install PVC pipe flashing, 90 mil thick, up

33 EA

2101 Demolition of copper flashing 5 SF

2102 Demolition of aluminum flashing 1138 SF

2103 Provide and install aluminum flashing, .032" thick 2438 SF

2104 Provide and install up to 4" diameter plumbing vent flashing

29 EA

2105 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish

6501 LF

2106 Provide and install stainless steel flashing, .015" thick 114 SF

2107 Demolition of stainless steel flashing

33 SF

2108 Provide and install stainless steel flashing T-Section waterstop, 22 gauge

16 SF

2109 Provide and install stainless steel scupper outlets 10x10x4"

2 EA

2110 Demolition of scupper outlets 16 EA

2111 Provide and install stainless steel scupper outlets 22x14x4"

2 EA

2112 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered

2 EA

2113 Provide and install stainless steel flashing drip edge, 5" girth

29 LF

2114 Provide and install stainless steel flashing drip edge, 8" girth

2 LF

2115 Provide demolition of steel fascia 65 SF

2116 Demolition of gutters and downspouts

1301 LF

2117 Provide and install downspouts .024 aluminum, 3x4", enameled

65 LF

2118 Provide and install downspouts .025 aluminum, 4"x5" enameled

812 LF

2119 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel

114 LF

2120 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted

569 LF

2121 Provide and install gutter .027 thick 5" box type aluminum gutter

89 LF

2122 Provide and install gutter .032" thick 5" box type

178 LF

2123 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter

29 LF

2124 Provide and install gutter 28 gauge 5" galvanized steel painted

57 LF

2125 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted

447 LF

2126 Demolition of cast iron boots 2 EA

2127 Provide and install cast iron roof drainage boots 2 EA

2128 Provide and install metal equipment curb, painted up to 48"x48"

24 EA

2129 Demolition of metal equipment curb, painted up to 48"x48"

16 SF

2130 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish

569 LF

2131 Demolition of gravel stops 374 LF

2132 Provide and install coping cap, .050 aluminum, painted 683 SF

2133 Remove and replace roof drains 5 EA

2134 Remove and reset curb and equipment, no electrical work included

35 EA

2135 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets

16 EA

2136 Remove and install mushroom vents

16 EA

2137 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen

487 SF

2138 Gable louver, aluminum, painted, large with insect screen

250 SF

2139 Remove and reinstall ventilator 7 EA

2140 Provide continuous low profile ridge ventilator 10 EA

2141 Remove and reset ridge vent 35 EA

2142 Provide and install aluminum ridge vent, painted 16 LF

2143 Demolition of ridge vent 14 LF

2144 Demolition of soffit vents 14 LF

2145 Provide and install up to 3" aluminum soffit vent, mill or enamel finish

3 LF

2146 Provide and install under eave aluminum vent, mill finish

5 EA

2147 Demolition of eave vents 7 EA

2148 Provide and install expansion joint cover, roof to roof, aluminum

33 LF

2149 Provide and install expansion joint cover, roof to wall, aluminum

33 LF

2150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick

33 LF

2151 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick

3 LF

2152 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.

146 SF

2153 Demolition of suspension system without lath, with channels

82 SF

2154 Demolition of drywall 114 SF

2155 Provide for ceiling installation. Add to cost of gypsum wallboard

14 SF

2156 Provide for ceiling over 8' in height. Add to cost of gypsum board

14 SF

2157 Provide and install gypsum wallboard 5/8" drywall, taped and finished

195 SF

2158 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels

98 SF

2159 Demolition of acoustical ceiling panels 114 SF

2160 Pressure wash metal roof 3901 SF

2161 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat

8127 SF

2162 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint.

Painting task includes protective work

72 SF

2163 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work

114 SF

2164 Provide individual tests for asbestos containing material.

Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer

2 EA

2165 Provide removal of asbestos containing roofing material;

built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.

29 SQ

2166 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements.

Provide disposal manifests to Contracting Officer.

Abatement shall be performed by qualified asbestos abatement contractor.

98 SF

2167 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.

8 SF

2168 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer

2 EA

2169 Demolish pvc piping, up to 2" 2 LF

2170 Provide and install up to 2" pvc piping, schedule 40, include fittings

3 LF

2171 Extend galvanized plumbing vents, (3' to 7')

2 EA

2172 Extend hot flue stacks to 12" dia. (5' to 7') 2 EA

2173 Remove from roof air handler, refrigerant lines and reinstall

2 EA

2174 Extend duct work, insulated aluminum

3 LF

2175 Remove/reinstall lightning Protection System up to 25 points

3 EA

2176 Remove/reinstall LPS up to 100 points 5 EA

2177 Articulating boom lift, diesel, up to 80' 20 WK

2178 110 ton crane with riggers and spreader

5 WK

2179 Lightning Protection System, priced per point. Includes a complete structural lightning protection system that meets all requirements for UL Master Label Certification, excluding surge protection.

2180 Non-prepriced items 0 LS

SUBTOTAL FS/HAAF, OPTION YEAR 2 (TOTAL OF LINE

Maintain and Repair Roofs (IDIQ), Fort Stewart and Hunter Army Airfield, GA Independent

Government Estimate - Option Year 3

ITEM DESCRIPTION QTY U/M U/P AMOUNT

3001 Provide and install roof hatch, 36" x 30" 3 EA

3002 Provide and install gypsum deck plank 2" 463 SF

3003 Demolition of gypsum deck, 2" 463 SF

3004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized

1138 SF

3005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized

487 SF

3006 Provide and install 3"x16 gauge open-type metal deck, galvanized

1301 SF

3007 Demolition of 3"x16 gauge open-type metal deck, galvanized

407 SF

3008 Provide and install sheet metal patch, .020 galvanized 407 SF

3009 Demolition of lumber up 2x10 1950 BF

3010 Provide and install lumber, treated up to 2x10

2925 BF

3011 Provide and install cant strips, treated 4 X 4, cut diagonally

812 LF

3012 Demolition of cant strips 812 LF

3013 Provide and install CDX plywood sheathing up to 3/4" 9426 SF

3014 Demolition of CDX plywood sheathing up to 3/4" 9426 SF

3015 Provide and install exterior trim, pine, corner board, 325 LF

3016 Demolition of exterior trim, pine, corner board, 1x4 325 LF

3017 Provide and install exterior trim, pine, corner board, 1x6

325 LF

3018 Demolition of exterior trim, pine, corner board, 1x6 325 LF

3019 Provide and install exterior trim, pine, fascia, 1x6 812 LF

3020 Demolition of exterior trim, pine, fascia, 1x6

812 LF

3021 Provide and install exterior trim, pine, fascia, 1x8 812 LF

3022 Demolition of exterior trim, pine, fascia, 1x8

812 LF

3023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11

1301 SF

3024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11

1301 SF

3025 Provide and install fiberglass flexible insulation 6" kraft faced

1301 SF

3026 Demolition of fiberglass flexible insulation 6" kraft faced

1301 SF

3027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11

650 SF

3028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11

650 SF

3029 Provide and install fiberglass flexible insulation 6" foil side R19

2925 SF

3030 Demolition of fiberglass flexible insulation 6" foil side, R19

2925 SF

3031 Provide and install flexible fiberglass insulation, 9" foil side, R30

650 SF

3032 Demolition of 9" flexible fiberglass insulation, foil side, R30

650 SF

3033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11

650 SF

3034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11

1544 SF

3035 Provide and install fiberglass flexible insulation 6"

3036 Demolition of fiberglass flexible insulation 6" unfaced

2113 SF

3037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30

650 SF

3038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30

650 SF

3039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia

975 SF

3040 Demolition of soffit, perforated or solid, and fascia 975 SF

3041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78

455 SF

3042 Demolition of rigid board insulation, up to 2"

9751 SF

3043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56

9751 SF

3044 Demolition of rigid board insulation, wood fiber, up to 1"

195 SF

3045 Demolition of rigid board insulation wood fiber, up to 2'

19 SF

3046 Provide and install rigid board insulation, 1" Perlite, R2.78

11377 SF

3047 Demolition of rigid board insulation, Perlite, up to 2" 11377 SF

3048 Demolition of rigid board insulation, perlite, up to 1" 7395 SF

3049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14

8939 SF

3050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29

22754 SF

3051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate

4876 BF

3052 Demolition of rigid insulation, up to 1" polyisocyanurate

8939 SF

3053 Demolition of rigid insulation, up…