This document is an amendment to a solicitation for an IDIQ contract for roofing maintenance and repair services at Fort Stewart and Hunter Army Airfield in Georgia. The solicitation is for a firm-fixed-price contract with a construction magnitude of more than $10 million over the base period and four option years. The amendment provides the government's responses to industry questions, including clarification on multiple award vs single award, site visit attendance, wage determinations, and non-priced items. It also corrects the quantities required on several bid schedule line items. The key details in the solicitation include the response date of December 3, 2024, the requirement for performance and payment bonds, and the need to submit various plans and submittals prior to commencing work. The current incumbent contract number is W9124M23D0003.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of ALL offers - W9124M25B0001 (version 1).xlsx | XLSX spreadsheet | |
| W9124M25B0001-0001.pdf | ||
| W9124M25B0001-Site Visit.pdf | ||
| W9124M25B0001-Site Visit.pdf | ||
| W9124M25B0001-IDIQ Roofing.pdf | ||
| W9124M25B0001-IDIQ Roofing (16 Oct 2024).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0012086717
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is to provide the Government's response to industry questions and to correct the quantities required on Bid Schedule Line Items 0138, 0179, 0180, 1138, 1179, 1180, 2138, 2179, 2180, 3138, 3179, 3180, 4138, 4179, and 4180. See the Summary of changes for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 49
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Nov-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9124M25B0001
X 9B. DATED (SEE ITEM 11)
16-Oct-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Nov-2024
CODE
MICC - FORT STEWART
976 WILLIAM H. WILSON AVE SUITE 100
FORT STEWART GA 31314
W9124M 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9124M25B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
BID SCHEDULE
Maintain and Repair Roofs (IDIQ), Fort Stewart and Hunter Army Airfield, GA Independent Government Estimate - Base Year
CUI
ITEM DESCRIPTION QTY U/M U/P AMOUNT
0001 Provide and install roof hatch, 36" x 30" 3 EA
0002 Provide and install gypsum deck plank 2" 463 SF
0003 Demolition of gypsum deck, 2" 463 SF
0004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized
1138 SF
0005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized
487 SF
0006 Provide and install 3"x16 gauge open-type metal deck, galvanized
1301 SF
0007 Demolition of 3"x16 gauge open-type metal deck, galvanized
407 SF
0008 Provide and install sheet metal patch, .020 galvanized 407 SF
0009 Demolition of lumber up 2x10 1950 BF
0010 Provide and install lumber, treated up to 2x10
2925 BF
0011 Provide and install cant strips, treated 4 X 4, cut diagonally
812 LF
0012 Demolition of cant strips 812 LF
0013 Provide and install CDX plywood sheathing up to 3/4" 9426 SF
0014 Demolition of CDX plywood sheathing up to 3/4" 9426 SF
0015 Provide and install exterior trim, pine, corner board, 1x4
325 LF
0016 Demolition of exterior trim, pine, corner board, 1x4 325 LF
0017 Provide and install exterior trim, pine, corner board, 1x6
325 LF
0018 Demolition of exterior trim, pine, corner board, 1x6 325 LF
0019 Provide and install exterior trim, pine, fascia, 1x6 812 LF
0020 Demolition of exterior trim, pine, fascia, 1x6
812 LF
0021 Provide and install exterior trim, pine, fascia, 1x8 812 LF
0022 Demolition of exterior trim, pine, fascia, 1x8
812 LF
0023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11
1301 SF
0024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11
1301 SF
0025 Provide and install fiberglass flexible insulation 6" kraft faced
1301 SF
0026 Demolition of fiberglass flexible insulation 6" kraft faced
1301 SF
0027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11
650 SF
0028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11
650 SF
0029 Provide and install fiberglass flexible insulation 6" foil side R19
2925 SF
0030 Demolition of fiberglass flexible insulation 6" foil side, R19
2925 SF
0031 Provide and install flexible fiberglass insulation, 9" foil side, R30
650 SF
0032 Demolition of 9" flexible fiberglass insulation, foil side, R30
650 SF
0033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11
650 SF
0034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11
1544 SF
0035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19
2113 SF
0036 Demolition of fiberglass flexible insulation 6" unfaced batt insulation, R19
2113 SF
0037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30
650 SF
0038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30
650 SF
0039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia
975 SF
0040 Demolition of soffit, perforated or solid, and fascia 975 SF
0041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78
455 SF
0042 Demolition of rigid board insulation, up to 2"
9751 SF
0043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56
9751 SF
0044 Demolition of rigid board insulation, wood fiber, up to 1"
195 SF
0045 Demolition of rigid board insulation wood fiber, up to 2'
19 SF
0046 Provide and install rigid board insulation, 1" Perlite, R2.78
11377 SF
0047 Demolition of rigid board insulation, Perlite, up to 2" 11377 SF
0048 Demolition of rigid board insulation, perlite, up to 1" 7395 SF
0049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14
8939 SF
0050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29
22754 SF
0051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate
4876 BF
0052 Demolition of rigid insulation, up to 1" polyisocyanurate
8939 SF
0053 Demolition of rigid insulation, up to 2" polyisocyanurate
22754 SF
0054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed
1056 SQ
0055 Add 1 layer #15 felt for low/steep slope 1056 SQ
0056 Demolition of asphalt shingles 1056 SF
0057 Provide and install glass roofing felt
82 SQ
0058 Provide and install glass roofing felt, mopped
82 SQ
0059 Provide and install organic roofing felt 82 SQ
0060 Provide and install organic roofing felt, mopped 82 SQ
0061 Install pitch pockets 24 EA
0062 Demolition of 3 ply built up roof with gravel
5689 SF
0063 Demolition of 3 ply built up roof with smooth surface 812 SF
0064 Demolition of 4 ply built up roof with gravel
8127 SF
0065 Demolition of shingle, felt or roll roofing 49 SQ
0066 Demolition of gravel ballast 407 CY
0067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies
2 SQ
0068 Demolition of 3 plies glass fiber felt 2 SQ
0069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations
65 SQ
0070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered
146 SQ
0071 Demolition of single ply roofing 487 SF
0072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered
407 SQ
0073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached
407 SQ
0074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered
8 SQ
0075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered
162 SQ
0076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached
407 SQ
0077 Provide and install PVC walkway pads, .156" thick 1500 SF
0078 Provide and install #15 organic felt, nailed to deck 82 SF
0079 Provide and install #15 organic felt, spot mopped to deck
1138 SF
0080 Provide and install #15 organic felt, fully mopped to
1138 SF
0081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
7314 SF
0082 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
7314 SF
0083 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty
2438 SF
0084 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty
2438 SF
0085 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty
5689 SF
0086 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced
2925 SF
0087 Demolition of modified bitumen roofing 2925 SF
0088 Demolition of thermoplastic roofing system
162 SQ
0089 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached
609 SQ
0090 Provide and install concrete pavers 2x2x1 1/2" 2 EA
0091 Remove and replace screws and new neoprene washers
10565 EA
0092 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system
56885 SF
0093 Framing system, light gage structural, 4 and 12 pitch 35756 SF
0094 Framing system, Sub-purlins, metal, 4" wide, 16 gage 569 LF
0095 Metal roof system, fascia, (Same as roof panels) 4876 SF
0096 Metal roof system, Perforated soffit panel, steel painted
1430 SF
0097 Provide and install ridge cap 975 SF
0098 Demolition of ridge cap 487 SF
0099 Demolition of PVC pipe flashing 39 EA
0100 Provide and install PVC pipe flashing, 90 mil thick, up to 4" diameter pipe
33 EA
0101 Demolition of copper flashing 5 SF
0102 Demolition of aluminum flashing 1138 SF
0103 Provide and install aluminum flashing, .032" thick 2438 SF
0104 Provide and install up to 4" diameter plumbing vent flashing
29 EA
0105 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish
6501 LF
0106 Provide and install stainless steel flashing, .015" thick 114 SF
0107 Demolition of stainless steel flashing
33 SF
0108 Provide and install stainless steel flashing T-Section waterstop, 22 gauge
16 SF
0109 Provide and install stainless steel scupper outlets 10x10x4"
2 EA
0110 Demolition of scupper outlets 16 EA
0111 Provide and install stainless steel scupper outlets 22x14x4"
2 EA
0112 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered
2 EA
0113 Provide and install stainless steel flashing drip edge, 5" girth
29 LF
0114 Provide and install stainless steel flashing drip edge, 8" girth
2 LF
0115 Provide demolition of steel fascia 65 SF
0116 Demolition of gutters and downspouts
1301 LF
0117 Provide and install downspouts .024 aluminum, 3x4", enameled
65 LF
0118 Provide and install downspouts .025 aluminum, 4"x5" enameled
812 LF
0119 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel
114 LF
0120 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted
569 LF
0121 Provide and install gutter .027 thick 5" box type aluminum gutter
89 LF
0122 Provide and install gutter .032" thick 5" box type aluminum gutter, enamel painted
178 LF
0123 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter
29 LF
0124 Provide and install gutter 28 gauge 5" galvanized steel painted
57 LF
0125 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted
447 LF
0126 Demolition of cast iron boots 2 EA
0127 Provide and install cast iron roof drainage boots 2 EA
0128 Provide and install metal equipment curb, painted up to 48"x48"
24 EA
0129 Demolition of metal equipment curb, painted up to 48"x48"
16 SF
0130 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish
569 LF
0131 Demolition of gravel stops 374 LF
0132 Provide and install coping cap, .050 aluminum, painted 683 SF
0133 Remove and replace roof drains 5 EA
0134 Remove and reset curb and equipment, no electrical work included
35 EA
0135 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets
16 EA
0136 Remove and install mushroom vents
16 EA
0137 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen
487 SF
0138 Gable louver, aluminum, painted, large with insect screen
250 SF
0139 Remove and reinstall ventilator 7 EA
0140 Provide continuous low profile ridge ventilator 10 EA
0141 Remove and reset ridge vent 35 EA
0142 Provide and install aluminum ridge vent, painted 16 LF
0143 Demolition of ridge vent 14 LF
0144 Demolition of soffit vents 14 LF
0145 Provide and install up to 3" aluminum soffit vent, mill or enamel finish
3 LF
0146 Provide and install under eave aluminum vent, mill finish
5 EA
0147 Demolition of eave vents 7 EA
0148 Provide and install expansion joint cover, roof to roof, aluminum
33 LF
0149 Provide and install expansion joint cover, roof to wall, aluminum
33 LF
0150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick
33 LF
0151 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick
3 LF
0152 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.
146 SF
0153 Demolition of suspension system without lath, with channels
82 SF
0154 Demolition of drywall 114 SF
0155 Provide for ceiling installation. Add to cost of gypsum wallboard
14 SF
0156 Provide for ceiling over 8' in height. Add to cost of gypsum board
14 SF
0157 Provide and install gypsum wallboard 5/8" drywall, taped and finished
195 SF
0158 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels
98 SF
0159 Demolition of acoustical ceiling panels 114 SF
0160 Pressure wash metal roof 3901 SF
0161 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat
8127 SF
0162 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint.
Painting task includes protective work
72 SF
0163 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work
114 SF
0164 Provide individual tests for asbestos containing material.
Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer
2 EA
0165 Provide removal of asbestos containing roofing material;
built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.
29 SQ
0166 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements.
Provide disposal manifests to Contracting Officer.
Abatement shall be performed by qualified asbestos abatement contractor.
98 SF
0167 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.
8 SF
0168 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer
2 EA
0169 Demolish pvc piping, up to 2" 2 LF
0170 Provide and install up to 2" pvc piping, schedule 40, include fittings
3 LF
0171 Extend galvanized plumbing vents, (3' to 7')
2 EA
0172 Extend hot flue stacks to 12" dia. (5' to 7') 2 EA
0173 Remove from roof air handler, refrigerant lines and reinstall
2 EA
0174 Extend duct work, insulated aluminum
3 LF
0175 Remove/reinstall lightning Protection System up to 25 points
3 EA
0176 Remove/reinstall LPS up to 100 points 5 EA
0177 Articulating boom lift, diesel, up to 80' 20 WK
0178 110 ton crane with riggers and spreader bar
5 WK
0179 Lightning Protection System, priced per point. Includes a complete structural lightning protection system that meets all requirements for UL Master Label Certification, excluding surge protection.
84 EA
0180 Non-prepriced items 0 LS
SUBTOTAL FS/HAAF, BASE PERIOD (TOTAL OF LINE
ITEMS 0001 THROUGH 0180)
Maintain and Repair Roofs (IDIQ), Fort Stewart and Hunter Army Airfield, GA Independent Government Estimate - Option Year 1
CUI
ITEM DESCRIPTION QTY U/M U/P AMOUNT
1001 Provide and install roof hatch, 36" x 30" 3 EA
1002 Provide and install gypsum deck plank 2" 463 SF
1003 Demolition of gypsum deck, 2" 463 SF
1004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized
1138 SF
1005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized
487 SF
1006 Provide and install 3"x16 gauge open-type metal deck, galvanized
1301 SF
1007 Demolition of 3"x16 gauge open-type metal deck, galvanized
407 SF
1008 Provide and install sheet metal patch, .020 galvanized 407 SF
1009 Demolition of lumber up 2x10 1950 BF
1010 Provide and install lumber, treated up to 2x10
2925 BF
1011 Provide and install cant strips, treated 4 X 4, cut diagonally
812 LF
1012 Demolition of cant strips 812 LF
1013 Provide and install CDX plywood sheathing up to 3/4" 9426 SF
1014 Demolition of CDX plywood sheathing up to 3/4" 9426 SF
1015 Provide and install exterior trim, pine, corner board, 325 LF
1016 Demolition of exterior trim, pine, corner board, 1x4 325 LF
1017 Provide and install exterior trim, pine, corner board, 1x6
325 LF
1018 Demolition of exterior trim, pine, corner board, 1x6 325 LF
1019 Provide and install exterior trim, pine, fascia, 1x6 812 LF
1020 Demolition of exterior trim, pine, fascia, 1x6
812 LF
1021 Provide and install exterior trim, pine, fascia, 1x8 812 LF
1022 Demolition of exterior trim, pine, fascia, 1x8
812 LF
1023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11
1301 SF
1024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11
1301 SF
1025 Provide and install fiberglass flexible insulation 6" kraft faced
1301 SF
1026 Demolition of fiberglass flexible insulation 6" kraft faced
1301 SF
1027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11
650 SF
1028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11
650 SF
1029 Provide and install fiberglass flexible insulation 6" foil side R19
2925 SF
1030 Demolition of fiberglass flexible insulation 6" foil side, R19
2925 SF
1031 Provide and install flexible fiberglass insulation, 9" foil side, R30
650 SF
1032 Demolition of 9" flexible fiberglass insulation, foil side, R30
650 SF
1033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11
650 SF
1034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11
1544 SF
1035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19
2113 SF
1036 Demolition of fiberglass flexible insulation 6" unfaced
1037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30
650 SF
1038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30
650 SF
1039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia
975 SF
1040 Demolition of soffit, perforated or solid, and fascia 975 SF
1041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78
455 SF
1042 Demolition of rigid board insulation, up to 2"
9751 SF
1043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56
9751 SF
1044 Demolition of rigid board insulation, wood fiber, up to 1"
195 SF
1045 Demolition of rigid board insulation wood fiber, up to 2'
19 SF
1046 Provide and install rigid board insulation, 1" Perlite, R2.78
11377 SF
1047 Demolition of rigid board insulation, Perlite, up to 2" 11377 SF
1048 Demolition of rigid board insulation, perlite, up to 1" 7395 SF
1049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14
8939 SF
1050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29
22754 SF
1051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate
4876 BF
1052 Demolition of rigid insulation, up to 1" polyisocyanurate
8939 SF
1053 Demolition of rigid insulation, up to 2" polyisocyanurate
22754 SF
1054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed
1056 SQ
1055 Add 1 layer #15 felt for low/steep slope 1056 SQ
1056 Demolition of asphalt shingles 1056 SF
1057 Provide and install glass roofing felt
82 SQ
1058 Provide and install glass roofing felt, mopped
82 SQ
1059 Provide and install organic roofing felt 82 SQ
1060 Provide and install organic roofing felt, mopped 82 SQ
1061 Install pitch pockets 24 EA
1062 Demolition of 3 ply built up roof with gravel
5689 SF
1063 Demolition of 3 ply built up roof with smooth surface 812 SF
1064 Demolition of 4 ply built up roof with gravel
8127 SF
1065 Demolition of shingle, felt or roll roofing 49 SQ
1066 Demolition of gravel ballast 407 CY
1067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies
2 SQ
1068 Demolition of 3 plies glass fiber felt 2 SQ
1069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations
65 SQ
1070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered
146 SQ
1071 Demolition of single ply roofing 487 SF
1072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered
407 SQ
1073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached
407 SQ
1074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered
8 SQ
1075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered
162 SQ
1076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached
407 SQ
1077 Provide and install PVC walkway pads, .156" thick 1500 SF
1078 Provide and install #15 organic felt, nailed to deck 82 SF
1079 Provide and install #15 organic felt, spot mopped to
1138 SF
1080 Provide and install #15 organic felt, fully mopped to
1138 SF
1081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
7314 SF
1082 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
7314 SF
1083 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty
2438 SF
1084 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty
2438 SF
1085 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty
5689 SF
1086 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced
2925 SF
1087 Demolition of modified bitumen roofing 2925 SF
1088 Demolition of thermoplastic roofing system
162 SQ
1089 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached
609 SQ
1090 Provide and install concrete pavers 2x2x1 1/2" 2 EA
1091 Remove and replace screws and new neoprene washers
10565 EA
1092 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system
56885 SF
1093 Framing system, light gage structural, 4 and 12 pitch 35756 SF
1094 Framing system, Sub-purlins, metal, 4" wide, 16 gage 569 LF
1095 Metal roof system, fascia, (Same as roof panels) 4876 SF
1096 Metal roof system, Perforated soffit panel, steel painted
1430 SF
1097 Provide and install ridge cap 975 SF
1098 Demolition of ridge cap 487 SF
1099 Demolition of PVC pipe flashing 39 EA
1100 Provide and install PVC pipe flashing, 90 mil thick, up
33 EA
1101 Demolition of copper flashing 5 SF
1102 Demolition of aluminum flashing 1138 SF
1103 Provide and install aluminum flashing, .032" thick 2438 SF
1104 Provide and install up to 4" diameter plumbing vent flashing
29 EA
1105 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish
6501 LF
1106 Provide and install stainless steel flashing, .015" thick 114 SF
1107 Demolition of stainless steel flashing
33 SF
1108 Provide and install stainless steel flashing T-Section waterstop, 22 gauge
16 SF
1109 Provide and install stainless steel scupper outlets 10x10x4"
2 EA
1110 Demolition of scupper outlets 16 EA
1111 Provide and install stainless steel scupper outlets 22x14x4"
2 EA
1112 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered
2 EA
1113 Provide and install stainless steel flashing drip edge, 5" girth
29 LF
1114 Provide and install stainless steel flashing drip edge, 8" girth
2 LF
1115 Provide demolition of steel fascia 65 SF
1116 Demolition of gutters and downspouts
1301 LF
1117 Provide and install downspouts .024 aluminum, 3x4", enameled
65 LF
1118 Provide and install downspouts .025 aluminum, 4"x5" enameled
812 LF
1119 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel
114 LF
1120 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted
569 LF
1121 Provide and install gutter .027 thick 5" box type aluminum gutter
89 LF
1122 Provide and install gutter .032" thick 5" box type
178 LF
1123 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter
29 LF
1124 Provide and install gutter 28 gauge 5" galvanized steel painted
57 LF
1125 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted
447 LF
1126 Demolition of cast iron boots 2 EA
1127 Provide and install cast iron roof drainage boots 2 EA
1128 Provide and install metal equipment curb, painted up to 48"x48"
24 EA
1129 Demolition of metal equipment curb, painted up to 48"x48"
16 SF
1130 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish
569 LF
1131 Demolition of gravel stops 374 LF
1132 Provide and install coping cap, .050 aluminum, painted 683 SF
1133 Remove and replace roof drains 5 EA
1134 Remove and reset curb and equipment, no electrical work included
35 EA
1135 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets
16 EA
1136 Remove and install mushroom vents
16 EA
1137 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen
487 SF
1138 Gable louver, aluminum, painted, large with insect screen
250 SF
1139 Remove and reinstall ventilator 7 EA
1140 Provide continuous low profile ridge ventilator 10 EA
1141 Remove and reset ridge vent 35 EA
1142 Provide and install aluminum ridge vent, painted 16 LF
1143 Demolition of ridge vent 14 LF
1144 Demolition of soffit vents 14 LF
1145 Provide and install up to 3" aluminum soffit vent, mill or enamel finish
3 LF
1146 Provide and install under eave aluminum vent, mill finish
5 EA
1147 Demolition of eave vents 7 EA
1148 Provide and install expansion joint cover, roof to roof, aluminum
33 LF
1149 Provide and install expansion joint cover, roof to wall, aluminum
33 LF
1150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick
33 LF
1151 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick
3 LF
1152 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.
146 SF
1153 Demolition of suspension system without lath, with channels
82 SF
1154 Demolition of drywall 114 SF
1155 Provide for ceiling installation. Add to cost of gypsum wallboard
14 SF
1156 Provide for ceiling over 8' in height. Add to cost of gypsum board
14 SF
1157 Provide and install gypsum wallboard 5/8" drywall, taped and finished
195 SF
1158 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels
98 SF
1159 Demolition of acoustical ceiling panels 114 SF
1160 Pressure wash metal roof 3901 SF
1161 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat
8127 SF
1162 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint.
Painting task includes protective work
72 SF
1163 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work
114 SF
1164 Provide individual tests for asbestos containing material.
Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer
2 EA
1165 Provide removal of asbestos containing roofing material;
built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.
29 SQ
1166 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements.
Provide disposal manifests to Contracting Officer.
Abatement shall be performed by qualified asbestos abatement contractor.
98 SF
1167 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.
8 SF
1168 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer
2 EA
1169 Demolish pvc piping, up to 2" 2 LF
1170 Provide and install up to 2" pvc piping, schedule 40, include fittings
3 LF
1171 Extend galvanized plumbing vents, (3' to 7')
2 EA
1172 Extend hot flue stacks to 12" dia. (5' to 7') 2 EA
1173 Remove from roof air handler, refrigerant lines and reinstall
2 EA
1174 Extend duct work, insulated aluminum
3 LF
1175 Remove/reinstall lightning Protection System up to 25 points
3 EA
1176 Remove/reinstall LPS up to 100 points 5 EA
1177 Articulating boom lift, diesel, up to 80' 20 WK
1178 110 ton crane with riggers and spreader
5 WK
1179 Lightning Protection System, priced per point. Includes a complete structural lightning protection system that meets all requirements for UL Master Label Certification, excluding surge protection.
1180 Non-prepriced items 0 LS
SUBTOTAL FS/HAAF, OPTION YEAR 1 (TOTAL OF LINE
Estimate - Option Year 2
CUI
ITEM DESCRIPTION QTY U/M U/P AMOUNT
2001 Provide and install roof hatch, 36" x 30" 3 EA
2002 Provide and install gypsum deck plank 2" 463 SF
2003 Demolition of gypsum deck, 2" 463 SF
2004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized
1138 SF
2005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized
487 SF
2006 Provide and install 3"x16 gauge open-type metal deck, galvanized
1301 SF
2007 Demolition of 3"x16 gauge open-type metal deck, galvanized
407 SF
2008 Provide and install sheet metal patch, .020 galvanized 407 SF
2009 Demolition of lumber up 2x10 1950 BF
2010 Provide and install lumber, treated up to 2x10
2925 BF
2011 Provide and install cant strips, treated 4 X 4, cut diagonally
812 LF
2012 Demolition of cant strips 812 LF
2013 Provide and install CDX plywood sheathing up to 3/4" 9426 SF
2014 Demolition of CDX plywood sheathing up to 3/4" 9426 SF
2015 Provide and install exterior trim, pine, corner board, 325 LF
2016 Demolition of exterior trim, pine, corner board, 1x4 325 LF
2017 Provide and install exterior trim, pine, corner board, 1x6
325 LF
2018 Demolition of exterior trim, pine, corner board, 1x6 325 LF
2019 Provide and install exterior trim, pine, fascia, 1x6 812 LF
2020 Demolition of exterior trim, pine, fascia, 1x6
812 LF
2021 Provide and install exterior trim, pine, fascia, 1x8 812 LF
2022 Demolition of exterior trim, pine, fascia, 1x8
812 LF
2023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11
1301 SF
2024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11
1301 SF
2025 Provide and install fiberglass flexible insulation 6" kraft faced
1301 SF
2026 Demolition of fiberglass flexible insulation 6" kraft faced
1301 SF
2027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11
650 SF
2028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11
650 SF
2029 Provide and install fiberglass flexible insulation 6" foil side R19
2925 SF
2030 Demolition of fiberglass flexible insulation 6" foil side, R19
2925 SF
2031 Provide and install flexible fiberglass insulation, 9" foil side, R30
650 SF
2032 Demolition of 9" flexible fiberglass insulation, foil side, R30
650 SF
2033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11
650 SF
2034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11
1544 SF
2035 Provide and install fiberglass flexible insulation 6" unfaced batt insulation, R19
2036 Demolition of fiberglass flexible insulation 6" unfaced
2113 SF
2037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30
650 SF
2038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30
650 SF
2039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia
975 SF
2040 Demolition of soffit, perforated or solid, and fascia 975 SF
2041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78
455 SF
2042 Demolition of rigid board insulation, up to 2"
9751 SF
2043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56
9751 SF
2044 Demolition of rigid board insulation, wood fiber, up to 1"
195 SF
2045 Demolition of rigid board insulation wood fiber, up to 2'
19 SF
2046 Provide and install rigid board insulation, 1" Perlite, R2.78
11377 SF
2047 Demolition of rigid board insulation, Perlite, up to 2" 11377 SF
2048 Demolition of rigid board insulation, perlite, up to 1" 7395 SF
2049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14
8939 SF
2050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29
22754 SF
2051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate
4876 BF
2052 Demolition of rigid insulation, up to 1" polyisocyanurate
8939 SF
2053 Demolition of rigid insulation, up to 2" polyisocyanurate
22754 SF
2054 Provide and install asphalt shingles, Inorganic, class A, 210- 234 pounds per square includes anti-fungus, 15# felt underlayment and ridge shingles, pneumatic nailed
1056 SQ
2055 Add 1 layer #15 felt for low/steep slope 1056 SQ
2056 Demolition of asphalt shingles 1056 SF
2057 Provide and install glass roofing felt
82 SQ
2058 Provide and install glass roofing felt, mopped
82 SQ
2059 Provide and install organic roofing felt 82 SQ
2060 Provide and install organic roofing felt, mopped 82 SQ
2061 Install pitch pockets 24 EA
2062 Demolition of 3 ply built up roof with gravel
5689 SF
2063 Demolition of 3 ply built up roof with smooth surface 812 SF
2064 Demolition of 4 ply built up roof with gravel
8127 SF
2065 Demolition of shingle, felt or roll roofing 49 SQ
2066 Demolition of gravel ballast 407 CY
2067 Demolition of coal tar pitch built-up roof system with gravel/slag surfacing; 4 plies
2 SQ
2068 Demolition of 3 plies glass fiber felt 2 SQ
2069 Provide roof consulting; Infra-red survey to include random moisture survey, extensive core sampling, moisture meter surveys and written report including plan, photos and recommendations
65 SQ
2070 Provide and install EPDM, 15-year warranty, .29 PSF single ply roof system, fully adhered
146 SQ
2071 Demolition of single ply roofing 487 SF
2072 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, fully adhered
407 SQ
2073 Provide and install EPDM, 15-year warranty, .40 PSF single ply roof system, mechanically attached
407 SQ
2074 Provide and install PVC, 15-year warranty, .33 PSF single ply roof system, full adhered
8 SQ
2075 Provide and install PVC, 15-year warranty, .40 PSF single ply roof system, fully adhered
162 SQ
2076 Provide and install PVC, 15-year warranty, .40PSF single ply roof system, mechanically attached
407 SQ
2077 Provide and install PVC walkway pads, .156" thick 1500 SF
2078 Provide and install #15 organic felt, nailed to deck 82 SF
2079 Provide and install #15 organic felt, spot mopped to
1138 SF
2080 Provide and install #15 organic felt, fully mopped to deck
1138 SF
2081 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
7314 SF
2082 Provide and install modified bitumen roof SBS modified, granule surface cap sheet, poly reinforced, mopped, 15-year warranty
7314 SF
2083 Provide and install modified bitumen roof glass fiber reinforced, mopped, 15-year warranty
2438 SF
2084 Provide and install modified bitumen roof glass fiber reinforced, mopped , 15-year warranty
2438 SF
2085 Provide and install modified bitumen roof smooth surface, cap sheet, mopped, 15-year warranty
5689 SF
2086 Provide and install modified bitumen roof granule surface, cap sheet, torched, 15-year warranty, poly reinforced
2925 SF
2087 Demolition of modified bitumen roofing 2925 SF
2088 Demolition of thermoplastic roofing system
162 SQ
2089 Provide and install thermoplastic polyolefin roofing system, 15-year warranty, mechanically attached
609 SQ
2090 Provide and install concrete pavers 2x2x1 1/2" 2 EA
2091 Remove and replace screws and new neoprene washers
10565 EA
2092 Standing seam metal roof, 1 3/4", 24 gauge structural, fluorocarbon paint system
56885 SF
2093 Framing system, light gage structural, 4 and 12 pitch 35756 SF
2094 Framing system, Sub-purlins, metal, 4" wide, 16 gage 569 LF
2095 Metal roof system, fascia, (Same as roof panels) 4876 SF
2096 Metal roof system, Perforated soffit panel, steel painted
1430 SF
2097 Provide and install ridge cap 975 SF
2098 Demolition of ridge cap 487 SF
2099 Demolition of PVC pipe flashing 39 EA
2100 Provide and install PVC pipe flashing, 90 mil thick, up
33 EA
2101 Demolition of copper flashing 5 SF
2102 Demolition of aluminum flashing 1138 SF
2103 Provide and install aluminum flashing, .032" thick 2438 SF
2104 Provide and install up to 4" diameter plumbing vent flashing
29 EA
2105 Provide and install aluminum drip edge, .016" thick, up to 8" girth, white or mill finish
6501 LF
2106 Provide and install stainless steel flashing, .015" thick 114 SF
2107 Demolition of stainless steel flashing
33 SF
2108 Provide and install stainless steel flashing T-Section waterstop, 22 gauge
16 SF
2109 Provide and install stainless steel scupper outlets 10x10x4"
2 EA
2110 Demolition of scupper outlets 16 EA
2111 Provide and install stainless steel scupper outlets 22x14x4"
2 EA
2112 Provide and install stainless steel scupper outlets 4" to 8"x8'x5" tapered
2 EA
2113 Provide and install stainless steel flashing drip edge, 5" girth
29 LF
2114 Provide and install stainless steel flashing drip edge, 8" girth
2 LF
2115 Provide demolition of steel fascia 65 SF
2116 Demolition of gutters and downspouts
1301 LF
2117 Provide and install downspouts .024 aluminum, 3x4", enameled
65 LF
2118 Provide and install downspouts .025 aluminum, 4"x5" enameled
812 LF
2119 Provide and install downspouts 28 gauge 3"x4" corrugated, galvanized steel
114 LF
2120 Provide and install downspouts 28 gauge 4"x5" corrugated, galvanized steel, epoxy painted
569 LF
2121 Provide and install gutter .027 thick 5" box type aluminum gutter
89 LF
2122 Provide and install gutter .032" thick 5" box type
178 LF
2123 Provide and install gutter .032 custom fabricated with gravel stop aluminum gutter
29 LF
2124 Provide and install gutter 28 gauge 5" galvanized steel painted
57 LF
2125 Provide and install gutter 26 gauge 6" galvanized steel, gutter painted
447 LF
2126 Demolition of cast iron boots 2 EA
2127 Provide and install cast iron roof drainage boots 2 EA
2128 Provide and install metal equipment curb, painted up to 48"x48"
24 EA
2129 Demolition of metal equipment curb, painted up to 48"x48"
16 SF
2130 Provide and install gravel stops .032" thick aluminum, up to 12" face height, mill finish
569 LF
2131 Demolition of gravel stops 374 LF
2132 Provide and install coping cap, .050 aluminum, painted 683 SF
2133 Remove and replace roof drains 5 EA
2134 Remove and reset curb and equipment, no electrical work included
35 EA
2135 Provide rooftop equipment curb, (to 16 SF.) factory fabricated to match roof sheets
16 EA
2136 Remove and install mushroom vents
16 EA
2137 Provide continuous aluminum louver, black finish, 18" to 24" tall with insect screen
487 SF
2138 Gable louver, aluminum, painted, large with insect screen
250 SF
2139 Remove and reinstall ventilator 7 EA
2140 Provide continuous low profile ridge ventilator 10 EA
2141 Remove and reset ridge vent 35 EA
2142 Provide and install aluminum ridge vent, painted 16 LF
2143 Demolition of ridge vent 14 LF
2144 Demolition of soffit vents 14 LF
2145 Provide and install up to 3" aluminum soffit vent, mill or enamel finish
3 LF
2146 Provide and install under eave aluminum vent, mill finish
5 EA
2147 Demolition of eave vents 7 EA
2148 Provide and install expansion joint cover, roof to roof, aluminum
33 LF
2149 Provide and install expansion joint cover, roof to wall, aluminum
33 LF
2150 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", aluminum, .032" thick
33 LF
2151 Provide and install expansion joint, butyl, 1/16", 29" wide, with butyl or neoprene center with foam insulation, metal flanges; for joint openings to 5", stainless steel, .018" thick
3 LF
2152 Provide and install suspension system without lath with channels 1 1/2" main @ 48" o.c. w 7/8" @ 16" o.c.
146 SF
2153 Demolition of suspension system without lath, with channels
82 SF
2154 Demolition of drywall 114 SF
2155 Provide for ceiling installation. Add to cost of gypsum wallboard
14 SF
2156 Provide for ceiling over 8' in height. Add to cost of gypsum board
14 SF
2157 Provide and install gypsum wallboard 5/8" drywall, taped and finished
195 SF
2158 Provide and install 2x2x5/8" or 2x4x5/8" fiberglass acoustical ceiling panels
98 SF
2159 Demolition of acoustical ceiling panels 114 SF
2160 Pressure wash metal roof 3901 SF
2161 Apply to existing metal roof flexible acrylic waterproofing system with emulsion saturant, polyester fabric and acylic top coat
8127 SF
2162 Provide and install Paint exterior ferrous metal, one coat zinc primer and two coats aluminum paint.
Painting task includes protective work
72 SF
2163 Provide and install Paint wood surface, one coat primer, one coat enamel or alkyd or latex. Painting task includes protective work
114 SF
2164 Provide individual tests for asbestos containing material.
Tests shall be obtained by qualified asbestos abatement removal roofing contractor and performed by a qualified laboratory. Provide test results to Contracting Officer
2 EA
2165 Provide removal of asbestos containing roofing material;
built-up roof membrane. Removal procedures shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Abatement shall be performed by qualified asbestoss abatement contractor.
29 SQ
2166 Provide removal of asbestos containing roofing material, built-up flashing. Removal procedures shall ocmply with State of Georgia EPA requirements.
Provide disposal manifests to Contracting Officer.
Abatement shall be performed by qualified asbestos abatement contractor.
98 SF
2167 Provide removal of asbestos containing material; soffit and fascia hardboard. Removal procedure shall comply with State of Georgia EPA requirements. Provide disposal manifests to Contracting Officer. Add to disposal cost of non-asbestos material.
8 SF
2168 Provide individual test (core cut) for composition of roofing materials. Repair test area. Test will determine suitability of infrared scan. Provide report to Contracting Officer
2 EA
2169 Demolish pvc piping, up to 2" 2 LF
2170 Provide and install up to 2" pvc piping, schedule 40, include fittings
3 LF
2171 Extend galvanized plumbing vents, (3' to 7')
2 EA
2172 Extend hot flue stacks to 12" dia. (5' to 7') 2 EA
2173 Remove from roof air handler, refrigerant lines and reinstall
2 EA
2174 Extend duct work, insulated aluminum
3 LF
2175 Remove/reinstall lightning Protection System up to 25 points
3 EA
2176 Remove/reinstall LPS up to 100 points 5 EA
2177 Articulating boom lift, diesel, up to 80' 20 WK
2178 110 ton crane with riggers and spreader
5 WK
2179 Lightning Protection System, priced per point. Includes a complete structural lightning protection system that meets all requirements for UL Master Label Certification, excluding surge protection.
2180 Non-prepriced items 0 LS
SUBTOTAL FS/HAAF, OPTION YEAR 2 (TOTAL OF LINE
Maintain and Repair Roofs (IDIQ), Fort Stewart and Hunter Army Airfield, GA Independent
Government Estimate - Option Year 3
ITEM DESCRIPTION QTY U/M U/P AMOUNT
3001 Provide and install roof hatch, 36" x 30" 3 EA
3002 Provide and install gypsum deck plank 2" 463 SF
3003 Demolition of gypsum deck, 2" 463 SF
3004 Provide and install 1 1/2"x18 gauge open-type metal deck galvanized
1138 SF
3005 Demolition of 1 1/2"x18 gauge open-type metal deck, galvanized
487 SF
3006 Provide and install 3"x16 gauge open-type metal deck, galvanized
1301 SF
3007 Demolition of 3"x16 gauge open-type metal deck, galvanized
407 SF
3008 Provide and install sheet metal patch, .020 galvanized 407 SF
3009 Demolition of lumber up 2x10 1950 BF
3010 Provide and install lumber, treated up to 2x10
2925 BF
3011 Provide and install cant strips, treated 4 X 4, cut diagonally
812 LF
3012 Demolition of cant strips 812 LF
3013 Provide and install CDX plywood sheathing up to 3/4" 9426 SF
3014 Demolition of CDX plywood sheathing up to 3/4" 9426 SF
3015 Provide and install exterior trim, pine, corner board, 325 LF
3016 Demolition of exterior trim, pine, corner board, 1x4 325 LF
3017 Provide and install exterior trim, pine, corner board, 1x6
325 LF
3018 Demolition of exterior trim, pine, corner board, 1x6 325 LF
3019 Provide and install exterior trim, pine, fascia, 1x6 812 LF
3020 Demolition of exterior trim, pine, fascia, 1x6
812 LF
3021 Provide and install exterior trim, pine, fascia, 1x8 812 LF
3022 Demolition of exterior trim, pine, fascia, 1x8
812 LF
3023 Provide and install fiberglass flexible insulation 3-1/2" kraft faced, R11
1301 SF
3024 Demolition of figerglass flexible insulation 3-1/2" kraft faced, R11
1301 SF
3025 Provide and install fiberglass flexible insulation 6" kraft faced
1301 SF
3026 Demolition of fiberglass flexible insulation 6" kraft faced
1301 SF
3027 Provide and install fiberglass flexible insulation 3-1/2" foil side, R11
650 SF
3028 Demolition of fiberglass flexible insulation 3-1/2" foil 1 side, R11
650 SF
3029 Provide and install fiberglass flexible insulation 6" foil side R19
2925 SF
3030 Demolition of fiberglass flexible insulation 6" foil side, R19
2925 SF
3031 Provide and install flexible fiberglass insulation, 9" foil side, R30
650 SF
3032 Demolition of 9" flexible fiberglass insulation, foil side, R30
650 SF
3033 Provide and install fiberglass flexible insulation 3-1/2" unfaced batt, R11
650 SF
3034 Demolition of fiberglass flexible insulation 3-1/2" unfaced batt, R11
1544 SF
3035 Provide and install fiberglass flexible insulation 6"
3036 Demolition of fiberglass flexible insulation 6" unfaced
2113 SF
3037 Provide and install flexible fiberglass insulation, 9" unfaced batt, R30
650 SF
3038 Demolition of flexible fiberglass insulation, 9" unfaced batt, R30
650 SF
3039 Provide and install vinyl soffit, perforated or solid, and solid vinyl fascia
975 SF
3040 Demolition of soffit, perforated or solid, and fascia 975 SF
3041 Provide and install rigid board insulation, 1" mineral fiberboard, R2.78
455 SF
3042 Demolition of rigid board insulation, up to 2"
9751 SF
3043 Provide and install rigid board insulation, 2" mineral fiberboard, R5.56
9751 SF
3044 Demolition of rigid board insulation, wood fiber, up to 1"
195 SF
3045 Demolition of rigid board insulation wood fiber, up to 2'
19 SF
3046 Provide and install rigid board insulation, 1" Perlite, R2.78
11377 SF
3047 Demolition of rigid board insulation, Perlite, up to 2" 11377 SF
3048 Demolition of rigid board insulation, perlite, up to 1" 7395 SF
3049 Provide and install rigid board insulation, 1" polyisocyanurate, R7.14
8939 SF
3050 Provide and install rigid board insulation, 2" polyisocyanurate, R14.29
22754 SF
3051 Provide and install rigid board insulation, tapered insulation, polyisocyanurate
4876 BF
3052 Demolition of rigid insulation, up to 1" polyisocyanurate
8939 SF
3053 Demolition of rigid insulation, up…
This is the start of the file's text. The full file is on GovTribe.