W9124M20R0017_PWS_FINAL.pdf
PDF 228 KB Posted
- Attached to
- Aerial Burn Solicitation Federal contract opportunity
- Solicitation number
- W9124M20R0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9124M20R0017 Solicitation Amendment (3).pdf | ||
| W9124M20R0017 Solicitation Amendment (2).pdf | ||
| Q and A W9124M20R0017 Aerial Burn.pdf | ||
| W9124M20R0017 Solicitation Amendment.pdf | ||
| W9124M20R0017_SOLICITATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Fully Contractor-Operated and Maintained Exclusive Use Helicopter to Support Government Natural Resource Missions
Part 1
1. GENERAL: This is a non-personal services contract to provide a fully Contractor-operated and maintained exclusive use helicopter to support Department of the Army natural resource missions. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or sub-Contractor personnel.
1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and any other items or non-personal services necessary to perform aerial prescribed burning on Fort Stewart/Hunter Army Airfield, Georgia, as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The Contractor shall perform in accordance with (IAW) the terms and conditions of the contract and consistently with the established standards in this PWS and contract.
1.1.1 The Contractor shall utilize a Premo MK III Plastic Sphere Dispenser (PSD) ignition system compatible with the aircraft to prescribed burn ranges and timberland on Fort Stewart. The PSD system will ignite ground fuel on a grid system with spots located from 30 to 100 feet apart as prescribed by the aerial Firing Boss at the prescribed burning site.
1.1.2 The Contractor shall be responsible for igniting the grid pattern with an accuracy of +/-20% at a ground speed of 60 M.P.H. with ground winds 20 M.P.H. or less.
1.1.3 The Contractor may occasionally be required to operate on Townsend Bombing Range or Fort Jackson, SC, 1-5 days a year for prescribed burning or wildfire reconnaissance. The helicopter will return to MidCoast Regional Airport at Wright Army Airfield (WAAF) at the end of each day.
1.2 Background: Fort Stewart has utilized helicopters since the late 1980’s to prescribed burn an average of 115,000 acres annually. Aerial ignition using a helicopter is the safest, most efficient and effective method for accomplishing this mission.
1.3 Objectives: The basic service objective is to provide a fully Contractor operated helicopter and Premo MK III PSD ignition system to conduct aerial burning operations or other natural resource flight operations on Fort Stewart/Hunter Army Airfield.
1.4 Scope: The services covered under this contract include supplying one helicopter and aerial ignition systems to facilitate prescribed burning operations, wildfire suppression, inspection of range and woodland areas, and other forest management or administrative flights within the boundaries of Fort Stewart and Hunter Army Airfield, Georgia. Other natural resource mission deemed appropriate by the Chief Forester may include: fire suppression personnel shuttling, VIP tours, beetle inspection flights, detection of boundary encroachments and similar tasks.
1.5 Period of Performance (POP)/Guaranteed Hours: The Contractor shall perform the services in this PWS during the exclusive use (EU) period and may be requested for services any time during the POP.
This contract includes a base year and two (2) option years, which may be exercised at the option of the Government pending available funds.
1.6 Quality Control: Quality Control is the responsibility of the Contractor. The Contractor shall develop, implement, and maintain a Quality Assurance Program (QAP) to ensure all work described in this contract is performed at or above the standard defined in the Performance Requirements Summary (PRS).
The QAP is developed by the Contractor to ensure that it performs and delivers high-quality service and products. And it shall include methods of documenting and enforcing quality control operations of both prime Contractor and or sub-Contractor work; including inspection and testing. (see FAR 52.246-1 Contractor Inspection Requirements).
1.6.1 Quality Control Program: The Government is committed to a highly interactive relationship between quality control conducted by the Contractor and quality assurance conducted by the government.
This relationship shall be achieved through an effective Prevention Based Quality Control Program dedicated to ensuring the best possible products and services to end users. The Contractor shall provide their final written Quality Control Plan (QCP) no later than (NLT) 10 days after contract award and within five (5) days of any proposed changed to the Contracting Officer’s Representative (COR) and Contracting Officer (KO) for review and approval prior to implementation. The Quality Control Plan shall address as a minimum:
1.6.2 The Contractor’s quality control program shall demonstrate its prevention-based outlook by meeting the objectives stated in the PWS throughout all areas of performance. The QCP shall be developed to specify the Contractor’s responsibility for management and quality control actions to meet the terms of the contract.
1.6.3 The Contractor’s QCP shall be maintained throughout the life of the contract and shall include the Contractor’s procedures to routinely evaluate the effectiveness of the plan to ensure the Contractor is meeting the performance standards and requirements of the contract. Proposed changes made after KO acceptance shall be submitted in writing through the COR to the KO for review and acceptance prior to implementing any revision.
1.6.4 Inspection System: The Contractor shall develop, implement, and maintain a system to inspect their services and equipment to ensure compliance with PWS requirements which include the compliance with all applicable laws and regulations. It shall specify tasks or equipment to be inspected on a scheduled or unscheduled basis, the manner in which inspections are to be conducted, and the titles of the individuals who will perform the inspections.
1.6.5 Inspection Files: The Contractor shall keep records on-site of all inspections and maintenance conducted by the Contractor and any necessary corrective action taken. These documents shall be available for inspection by the Government during the term of the contract.
1.6.6 Deficiency Identification, Prevention, and Correction: The QCP shall include a method of identifying and preventing deficiencies in the quality of services performed before the level of performance becomes unacceptable as defined in the PRS, without dependence upon Government direction. The Contractor shall identify and prevent defects in quality of products and services performed before the level becomes unacceptable and before they are provided to the Government. The QCP at a minimum shall address process control and continuous process improvement; procedures for scheduling, conducting, and documentation of inspection; discrepancy identification; procedures for root cause analysis; corrective and preventive action procedures to include procedures for addressing Government discovered non-conformances; procedures for trend analysis; and procedures for collecting and addressing customer feedback/complaints. The QCP shall document process control and process performance measurement procedures that shall include how the Contractor shall implement preventive corrective actions. The Contractor shall demonstrate that it has designed quality into the delivery of services thereby mitigating the risk(s) associated with delivery of deficient or nonconforming services.
1.6.7 The QCP shall contain methods of communications (direct and indirect) with the Government regarding performance of the contract. Communication shall include regular and formal meetings with the Government for review and analyses of key process indicators, analysis of process deficiencies, and problem resolution.
1.6.8 Contractor Discrepancy Report (CDR): When the Contractor's performance is unsatisfactory, a CDR will be issued. The Contractor shall reply in writing within five (5) work days from the date of receipt of the CDR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.
1.6.9 Quality Assurance: The COR will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the COR must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
When an observation indicates defective performance, the COR will require the Contractor or designated on-site representative to initial the observation to acknowledge the defective performance. The acknowledgement of the observation does not necessarily constitute Contractor concurrence with the observation, only that the Contractor has been made aware of the defective performance.
1.7 Recognized Federal Holidays: The Contractor is normally not required to perform services on recognized federal holidays. However, that requirement is subject to mission execution requirements, and flights may be required and scheduled on federal holidays. The recognized federal holidays include:
New Year’s Day Labor Day Martin Luther King Jr. Day Columbus Day Presidents Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.8 Anti-Terrorism (AT) Level I Training: Contractor personnel performing work under this contract that require access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 30 calendar days after commencing performance under this contract. The Contractor shall submit employee certificates of completion within 30 calendar days after completion of the training to the COR. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html
1.9 iWATCH Training: The Contractor shall brief all personnel performing work under this contract on the local iWATCH program [training standards provided by the requiring activity Anti-Terrorism Office (ATO)]. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award with the results reported to the COR NLT 45 calendar days after contract award. New employees shall complete the training within 10 calendar days of commencing performance of work under this contract.
iWatch is simply common awareness. Contract employees can be good sources of information. iWatch training would include organization instructions on “things to look for” and a phone number to call in case the contract employees have information regarding possible terrorist or criminal activities. Providing the Contractor with awareness materials such as the iWatch brochure or wallet card is a cost effective alternative to training. The card describes suspicious activity and can be modified to include the COR in reporting procedures. Samples of the iWatch brochure and posters are available on the Antiterrorism Enterprise Portal (ATEP) at https://army.deps.mil/army/sites/PMG/prog/ATEP/iWATCH%20Army/Forms/AllItems.aspx and https://www.army.mil/e2/c/downloads/287489.pdf https://army.deps.mil/army/sites/PMG/prog/ATEP/iWATCH%20Army/Forms/AllItems.aspx https://www.army.mil/e2/c/downloads/287489.pdf
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS & ACRONYMS:
2.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.2 CONTRACT DISCREPANCY REPORT. Government form to address issues that arises when the Government identifies non-compliance issues between task implementation and signed contract requirements.
2.3 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and/or terminate contracts, and to make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
2.4 CONTRACTING OFFICER'S REPRESENTATIVE (COR) OR ALTERNATE (ACOR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor, as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.5 EXCLUSIVE USE (EU). Exclusive use refers to the primary or dominant use of property, as opposed to incidental use.
2.6 FIRING BOSS (FIRB). The Firing Boss leads ground and/or aerial ignition operations and is responsible for the safety and coordination of assigned resources on prescribed fire and wildfire incidents.
The FIRB supervises assigned firing resources and reports to a Burn Boss, Strike Team/Task Force Leader, or other assigned supervisor.
2.7 GRID. A grid consists of points located an equal distance apart such as 30’ x 30’, 150’ x 150’, or 330’ x 330’ as defined by the aircraft’s GPS or as specified by the Government.
2.8 PERFORMANCE REQUIREMENT SUMMARY (PRS). A listing of the service outputs under the contract that are to be evaluated by the COR on a regular basis, the surveillance methods to be used for these outputs, and the performance requirement of the listed outputs.
2.9 PERFORMANCE WORK STATEMENT (PWS). The Performance Work Statement (PWS) is a Statement of Work (SOW) for Performance-Based Acquisitions that clearly describes the performance objectives and standards that are expected of the Contractor. When a contract is awarded, the PWS is legally binding upon the Contractor and the U.S. Government
2.10 PERIOD OF PERFORMANCE (POP). One or more periods of time, which may be of varying and overlapping durations, in which the performance goals will be measured for the purpose of determining a Contractor’s right to, and the payment of, a performance-based award.
2.11 PLASTIC SPHERE DISPENSER (PSD). A PSD dispenser is mounted to the doorframe of a helicopter. The dispenser injects spherical containers (balls) of potassium permanganate with ethylene glycol, and ejects the spheres on a grid pattern. Spheres ignite five to ten seconds after injection with glycol.
http://acqnotes.com/acqNote/statement-of-work http://acqnotes.com/acqNote/performance-based-acquisitions
2.12 PRESCRIBED BURNING. Prescribed burning is the deliberate burning of woodland and open areas under controlled conditions within rigid weather and fuel criteria to accomplish prescribed results.
2.13 QUALITY ASSURANCE PROGRAM (QAP). A planned and systematic pattern of all actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. For the purposes of this document, quality assurance program refers to actions by the Contractor and monitored by the Government.
2.14 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). The Government’s organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.15 QUALITY CONTROL PLAN (QCP). All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.16 SUB-CONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of the contract between the Contractor and sub-Contractor.
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES:
3.1 Form sheets to record and initial start-stop times to nearest 1/l0 hour.
3.2 Fort Stewart 1:50,000 maps and copies of aerial photographs of burn areas.
3.3 Landing areas for refueling and other purposes in close proximity to the burning site. Several paved airstrips are also available subject to prior approval by the military.
3.3.1 The Contractor will land, take-off, and store the helicopter at MidCoast Regional Airport in Hinesville, GA. The storage of the aircraft will be at the Contractor’s expense. The Contractor will adhere to all rules and regulations of MidCoast Regional Airport and the Federal Aviation Administration
(FAA).
Contact information for MidCoast Regional Airport is: 912-435-3065.
3.4 At the government's option, the Firing Boss (FIRB) will ride in the helicopter to direct the pilot to the work site and will prescribe grid spacing, ground speed, and PSD dispensing on areas to be burned.
3.5 A Burn Boss and burn team will be on the ground at each area to be burned.
3.6 Premo MK III PSD balls will be furnished by the government.
3.7 Advanced plowing of fire breaks around perimeter of burn areas will delineate and secure areas for aerial burning.
3.8 A government employee to operate, feed, and monitor the Premo MK III PSD machine while in flight.
3.9 The FIRB will usually carry a portable 2-way Forestry radio for back-up communication with Forestry Branch elements and Directorate of Plans, Mobilization, Training and Security (DPTMS) Training Support Division.
3.10 Nomex clothing to include either coveralls or pants/shirt and a flight helmet for all government personnel engaged in fire suppression or prescribed burning flights.
3.11 The Government will provide a fuel truck with a 100 gallon tank and qualified driver to meet the helicopter in the field for refueling. Refueling in the field will be rare, however the fuel truck driver will be available to assist the Contractor when fueling the helicopter.
PART 4
CONTRACTOR FURNISHED ITEMS
4. CONTRACTOR FURNISHED ITEMS:
4.1 A pilot and/or alternates with a minimum of 1500 hours helicopter experience with 500 hours of air taxi experience (FAR Part 135), 500 hours of aerial application (FAR Part 137); and at least 100 hours of PSD experience. The helicopter must pass an annual FAR Part 135 inspection. Not more than three pilots (one primary and two alternates) will be used each year (1 August – 31 July). The Contractor must provide pilots’ log books to verify experience prior to any flights conducted by the pilot. All pilots must be approved by the COR prior to any changes in personnel.
4.2 An alternate pilot must be provided if the primary pilot cannot fly for any reason for an expected 24-hour period or longer. The alternate pilot shall be onsite and ready to fly within 24 hours after the primary pilot becomes unavailable. The alternate pilot shall remain on duty until the primary pilot returns.
4.3 Nomex clothing to include either flight suit or pants/shirt and a flight helmet for any pilot engaged in fire suppression or prescribed burning operations.
4.4 Licensing and compliance with all applicable state and federal regulations for the intended use of the helicopter is a Contractor responsibility.
4.5 One helicopter equivalent to or larger than a Bell 206L Long Ranger with: Minimum 4-place passenger/pilot seating, minimum of one single turbine engine with a minimum of 640 shaft horsepower and must be capable of carrying a Premo MK III PSD machine, eight extra boxes of plastic spheres for ignition operations, and pilot with two government employees on a burning flight or carry pilot plus up to four government personnel on an inspection flight.
4.6 Access to a replacement helicopter if the primary helicopter cannot fly due to maintenance or repairs for an expected 24-hour period or longer. The replacement aircraft should be ready to use within 24 hours after the primary helicopter becomes unserviceable. The replacement helicopter shall remain in service until the primary helicopter returns to duty.
4.7 Fuel and all necessary repair and maintenance for the helicopter will be at the Contractor’s expense.
When field refueling is planned, the government will meet the Contractor at MidCoast Regional Airport to fill the government fuel truck with fuel. All helicopter repairs and maintenance shall be accomplished by FAA certified technicians and coordinated with the COR as to not negatively affect natural resource missions.
4.8 Hour meter (Hobbs) for recording engine hours to the nearest 1/10th hour, readily visible to the pilot and government employee for recording time for payment.
4.9 Intercom for communication between pilot, government employee controlling the Premo MK III PSD system and the FIRB.
4.10 On board, dash-mounted radio for the pilot to communicate with MidCoast Regional Airport Control Tower and/or Fort Stewart Marne Radio at frequencies 126.25 MHz and 127.35 MHz and/or Hunter Army Airfield (HAAF) Tower:124.975 mhz, HAAF BASOPS: 126.2 respectively. Contractor must comply with Marne Radio and/or MidCoast Regional Tower requirements and/or requests, i.e., notification when entering or leaving Fort Stewart air space, stops for fueling, etc. Notification on the Forestry radio net is not acceptable, except in emergencies or aircraft radio failure.
4.11 On board radio operating through the aircraft’s intercom/headset system on the Forestry net (127- 170 MHz) for the FIRB to contact supporting ground crews, fire towers, Forestry Office and/or DPTMS Training Support Division direct at frequencies such as 164.7 MHz (Ch 1) or 163.5625 MHz (Ch 2).
Radio transmission must be clear and acceptable to Forestry personnel.
4.12 One permanently installed panel-mounted global positioning system (GPS). The GPS must utilize the WGS-84 datum, reference latitude and longitude coordinates in the degrees/minutes/decimal minutes (DM) mode for aircraft positioning; utilize an approved, fixed, external aircraft antenna; and be powered by the aircraft electrical system. Handheld equipment is not acceptable.
4.13 Two fully operational Premo MK III PSD machines. One will be used in the helicopter and one will be stored as a spare in case of mechanical failure. The Contractor must also supply sufficient ethylene glycol to inject 300,000 balls. (Government will furnish PSD balls). The PSD machines should be identical.
4.14 Maintenance and repair of the Premo MK III PSD systems and all accessories or spare parts needed to keep the systems operational including number of chutes and gear to give a 30'x100’, 150’x150’ or 330’x330’ spacing at 60 M.P.H. ground speed.
5. SPECIFIC TASKS:
5.1 Government personnel will determine helicopter mission, start and stopping times for ignition, grid spacing, and other parameters. Pilot shall decide if conditions are safe for the proposed flight. Pilot and aircraft shall be available on a one-hour notice or at the time specified by the government.
5.2 The pilot and the government personnel will confer on the mission to settle logistics, method of operation and other details.
5.3 Flight time for Contractor payment purposes shall be determined by the Hobbs engine hour meter.
The pilot and government personnel will record and initial start and stop times to the nearest 1/10th hour on a form sheet. The start time shall be when the helicopter takes off from MidCoast Regional Airport.
Stop time will be when the helicopter has landed safely back at MidCoast Regional Airport. Time shall be recorded to the nearest 1/10th hour on a form sheet initialed or signed by the pilot and the government employee. The original flight ticket will be supplied to the COR and payment will be invoiced in accordance to the original flight tickets.
5.4 Government personnel will be responsible for selection of the burning site, coordination with the military (except Marne Radio and/or MidCoast Tower) and other users of the site, delineating the burning site by pre-burning or other means, informing the pilot where to position the helicopter for the first run, and the spacing required between subsequent flight lines. The pilot is responsible for maintaining the specified distance between flight lines on panel mounted GPS unit. The pilot (Contractor) is not responsible for fires that escape from the burn site to the undesignated areas.
5.5 Government personnel may ride in passenger seats to help navigate, make course corrections while aiding the pilot in staying on flight lines, observing fire behavior, wildfires, and/or similar duties.
5.6 Flights shall be terminated at any time by the pilot when weather conditions or mechanical conditions are unsafe. Flights shall be terminated by government personnel when weather conditions adversely affect the prescribed burn prescription or objectives, when military use restricts the airspace, when the likelihood of fire crossing control lines increases, ground crews are endangered, or when government personnel deem the flight unsafe or no longer necessary.
5.7 Flights may be made for government personnel to check the progress of burns, to assess the damage of previous burns, or to check wildfires on or within the Georgia Forestry Commission Cooperative Firefighting Area adjacent to Fort Stewart. Flight time will be in accordance with paragraph 5.4 above except PSD attachments will not normally be used.
5.8 The Contractor shall be required to complete forms listed below and secure written approval through WAAF Base Operations or Hunter Army Airfield before 1 December each year (telephone: WAAF: 912- 435-3065 Hunter Army Airfield: 912-315-5110) to conduct flights on Ft. Stewart/HAAF:
5.8.1 DA Form 2400 (Certificate of Insurance)
5.8.2 DA Form 2401 (Civil Aircraft Landing Permit)
5.8.3 DA Form 2402 (Hold Harmless Agreement)
5.9 The FIRB is responsible for submitting and canceling flight plans with MidCoast Regional or relaying proposed departure times to Wright Tower/Marne Radio to alert Air Traffic Control.
5.10 The pilot will establish radio communications with Air Traffic Control (MidCoast Tower or Marne Radio) prior to departure from the airport. (Telephone contact may be made with Air Traffic Control at 912-435-3065.)
5.11 Pilot will have a discrete beacon code permanently assigned by MidCoast Traffic Control and squawk code prior to departure to allow rapid identification.
5.12 Contractor will be expected to comply with FS Regulation 95-1(Aviation General Provisions and Local Flying Rules).
5.13 Government personnel and pilot shall wear PPE to include Nomex clothing and flight helmet during all prescribed burning, and fire suppression operations.
5.14 Quality Assurance Inspection will be performed on all equipment as determined by the government
COR.
6. OPERATIONAL PERIOD:
6.1 The EU shall commence on 1 December and end 30 June; however, services may be needed for additional sporadic burning throughout the year. The government shall guarantee a minimum of 115 hours flight time during the peak time frame and not more than 150 hours for each option period exercised. The Contractor must have the helicopter, pilot, and equipment onsite by 30 November of each year. The helicopter must be stored at MidCoast Regional Airport from 30 November – 30 June every year.
6.2 The Contractor shall provide EU of the helicopter, pilot, and equipment during the peak time.
Payment for any guaranteed hours not used shall be made after the peak field operations cease on 30 June.
For any burning “off-peak” from 1 July through 30 November, during either the base period or the option periods, the Contractor is guaranteed a minimum of 7 hours per 7 day period beginning on the day burning is ordered and the Contractor is onsite to perform. The Contractor is NOT required to store the helicopter at MidCoast Regional Airport during the “off peak” period. The Contractor will be notified by the Forestry Office if service is needed during the “off peak” period. Off peak burning will be at the convenience of the Contractor and the Forestry Branch. Ferry time, test flights after maintenance/repair, and/or any other flight time outside of Forestry directed missions will NOT be paid for by the Government.
6.3 The pilot shall provide the government with a telephone number where they can be reached at any time for the purpose of scheduling flights. Flights may be scheduled on holidays, Saturdays, Sundays, as well as any weekdays when military use and weather conditions allow. The helicopter and crew shall be on the burning site within one hour after the pilot receives notification or at the time specified by the government, whichever is later. Pilot and aircraft may be required to be at or near the Forestry Office during emergency or high danger days, 1 December – 30 June. This “close stand-by” of pilot and aircraft may continue for days, weeks or longer until conditions improve.
7. DELIVERY OF SERVICES
7.1 The COR or KO will schedule service. Services may be scheduled by phone, fax or email. The Contractor is responsible for only accepting service requests from designated individuals and that service does not exceed amount authorized by task orders.
8. CONTRACT MANPOWER REPORTING
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor will report ALL Contractor manpower (including sub-Contractor manpower) required for performance of this contract. The Contractor is required to completely fill in all the information in the format using the following web address https://cmra.army.mil/. The required information includes:
(1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative
(2) Contract number, including task and delivery order number
(3) Beginning and ending dates covered by reporting period
(4) Contractor name, address, phone number, e-mail address, identity of Contractor employee entering data
(5) Estimated direct labor hours (including sub-Contractor)
(6) Estimated direct labor dollars paid this reporting period, (including sub-Contractor)
(7) Total payments (including sub-Contractor)
(8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different)
(9) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information)
(10) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest City, Country, when in an overseas location, using standardized nomenclature provided on website)
(11) Presence of deployment or contingency contract language, and number of Contractor and sub- Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each Government fiscal year and must be reported by 31 October of each calendar year.
TECHNICAL EXHIBIT 1
Performance Requirements Summary
Performance Objective Standard Performance Threshold Method of Surveillance
PRS # 1.
The Contractor shall have helicopter and pilot on a one-hour standby after notice is given per PWS paragraph 6.2.
The Contractor will not arrive late for scheduled flights.
Pilot and helicopter will not arrive more than 15 minutes late.
100 % Inspection
PRS # 2
The pilot is responsible for maintaining specified distance between flight lines per PWS paragraph 5.4.
Burning operations completed in the most efficient and safe manner possible.
Maximum use will be made of flight hours.
100% Inspection
PRS # 3
The pilot will maintain communications with MidCoast Traffic Control IAW PWS paragraph
5.10 and 5.11.
Communication will be maintained through radio and beacon.
Communication will be maintained during 100% of in flight hours.
100 % Inspection