Repair Roof, Bldg 9592 IJO No. K18-11-7J

SPECIFICATIONS

DOCUMENT 00010

TABLE OF CONTENTS

DIVISION 1 ‑ GENERAL REQUIREMENTS

Section 01000

General Requirements

DIVISION 2 ‑ SITE CONSTRUCTION

Section 02050

Demolition

DIVISION 3 ‑ CONCRETE

DIVISION 4 ‑ MASONRY

DIVISION 5 ‑ METALS

DIVISION 6 ‑ WOOD AND PLASTICS

DIVISION 7 ‑ THERMAL AND MOISTURE PROTECTION

DIVISION 8 ‑ DOORS AND WINDOWS

DIVISION 9 – FINISHES

SECTION 099611

ELASTOMERIC ROOF COATING SYSTEM

DIVISION 10 – SPECIALTIES

DIVISION 11 ‑ EQUIPMENT

DIVISION 12 ‑ FURNISHINGS

DIVISION 13 ‑ SPECIAL CONSTRUCTION

DIVISION 14 ‑ CONVEYING SYSTEMS

DIVISION 15 ‑ MECHANICAL

DIVISION 16 – ELECTRICAL

DIVISION 31 –EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

END OF TABLE OF CONTENTS

SECTION 01000

GENERAL REQUIREMENTS

PART 1 ‑ GENERAL

1.01

SUMMARY

A.

EXAMINATION OF PREMISES: Prior to submitting a proposal, it is highly recommended that the Contractor visit the site and fully inform themselves of the amount / character of the work and the local conditions.

B.

WORK BY OTHERS: The Contractor shall afford the Government and separate contractors reasonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall connect and coordinate his work with theirs as required by the Contract Documents.

C.

USE OF PREMISES: Contractor shall execute the work in a careful and orderly manner with the least possible disturbance to the public, building employees and functioning of the existing building.

D.

COORDINATION: Contractor shall be responsible for coordinating all work under the contract.

E.

REGULATORY REQUIREMENTS: All work shall be done in accordance with rules and regulations of local state and federal agencies.

F.

LAYING OUT WORK: Contractor shall take and verify all conditions and measurements on job and shall be strictly responsible for same. Any questions and discrepancies shall be brought to the immediate attention of the Contracting Officer.

G.

"OR EQUAL" PRODUCTS: Equal products of other manufacturers will be accepted only on written approval by the Contracting Officer.

H.

MANUFACTURER'S DIRECTIONS: All manufactured articles, materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned as directed by the manufacturer.

I.

PROTECTION OF PERSONS AND PROPERTY: Contractor shall provide and maintain all temporary signs, signals, barricades and/or devices required to ensure safety and protection of property.

1.

Provide protecting devices where required in strict accordance with OSHA rules and regulations.

2.

All work in progress shall be adequately braced and protected until work is completed.

J.

CUTTING & PATCHING: Do not cut and patch in a manner that would result in a failure of the work to perform as intended, decrease energy performance, increase maintenance, decrease operational life, or decrease safety performance.

1.

Match existing materials for cutting and patching work with new materials conforming to project requirements.

2.

Perform work with workmen skilled in the trades involved. Prepare sample area of each type of work for approval.

3.

Cutting: Use cutting tools, not chopping tools. Make neat holes. Minimize damage to adjacent work. Inspect for concealed utilities and structure before cutting.

4.

Patching: Make patches, seams, and joints durable and inconspicuous. Comply with tolerances for new work.

K.

CLEANING: Contractor shall maintain premises and public property free from accumulation of waste, debris and rubbish caused by operations.

1.

Maintain streets, sidewalks and entrances free of encumbrance at all times.

2.

FINAL CLEANING: Contractor shall be responsible to thoroughly clean all work areas for acceptance by Owner.

L.

GUARANTEE: Prior to final acceptance of the work, submit a written statement to the owner guaranteeing all equipment and systems against defective materials and workmanship for one (1) year from the date of acceptance. Upon written notice and at no expense to the owner, promptly repair all defective materials.

PART 2 ‑ PRODUCTS ‑ Not Applicable To This Section

PART 3 ‑ EXECUTION ‑ Not Applicable To This Section

END OF SECTION

SECTION 02050

DEMOLITION

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ENGINEERING MANUALS (EM)

EM 385‑1‑1

(2008; Errata 1-2010; Changes 1-3 2010; Changes 4-6

2011; Change 7 2012) U.S. Army Corps of Engineers

Safety and Health Requirements Manual

1.2 GENERAL REQUIREMENTS

The work includes demolition, salvage of identified items and materials, and removal of resulting rubbish and debris. Rubbish and debris shall be removed from the site daily, unless otherwise directed, to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the Contracting Officer. In the interest of occupational safety and health, the work shall be performed in accordance with EM 385‑1‑1, Section 23, Demolition, and other applicable Sections. In the interest of conservation, salvage shall be pursued to the maximum extent possible; salvaged items and materials shall be disposed of as specified.

1.3 DUST CONTROL

The amount of dust resulting from demolition shall be controlled to prevent the spread of dust to occupied portions of the construction site and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.

1.4 PROTECTION

1.4.1 Protection of Personnel

During the demolition work the Contractor shall continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the demolition site. The Contractor shall ensure that no elements determined to be unstable are left unsupported and shall be responsible for placing and securing bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.

1.4.2 Protection of Existing Property

Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The Contractor shall take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government; any damaged items shall be repaired or replaced as approved by the Contracting Officer. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.

1.5 BURNING

The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.6 USE OF EXPLOSIVES

Use of explosives will not be permitted.

1.7 AVAILABILITY OF WORK AREAS

Areas in which the work is to be accomplished will be available in accordance with the direction of the Contracting Officer.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 DISPOSITION OF MATERIAL

Title to material and equipment to be demolished, is vested in the Contractor upon receipt of notice to proceed. The Government will not be responsible for the condition, loss or damage to such property after notice to proceed.

3.2 CLEAN UP

Debris shall be removed and transported in a manner that prevents spillage on streets or adjacent areas. Local regulations regarding hauling and disposal shall apply.

—End of Section—

SECTION 09 96 11

ELASTOMERIC ROOF COATING SYSTEM

PART 1 GENERAL

1.01

SUMMARY

A. Furnish and install elastomeric roof coating system, including:

1. Roofing manufacturer's requirements for the specified warranty.

2. Preparation of roofing substrates.

3. Elastomeric roof coating.

4. Other roofing-related items specified or indicated on drawings or otherwise necessary to provide a complete weatherproof roofing system.

B. Disposal of demolition debris and construction waste is the responsibility of the contractor. Perform disposal in manner complying with all applicable federal, state, and local regulations.

C. Comply with the published recommendations and instructions of the roof coating manufacturer.

D. Commencement of work by the Contractor shall constitute acknowledgement by the Contractor that this specification can be satisfactorily executed, under the project conditions and with all necessary prerequisites for warranty acceptance by roofing coating manufacturer.

1.02

REFERENCES

A. Referenced Standards: These standards form part of this specification only to the extent they are referenced as specification requirements.

1. ASTM C 1653 - Standard Test Methods for Water Vapor Transmission of Organic Coating Films; 2008 or later.

1.03

SUBMITTALS

A. Product Data:

1. Provide coating manufacturer's printed data sufficient to show that all components of coating system, including accessories, comply with the specified requirements and with the coating manufacturer's requirements and recommendations for the system type specified; include data for each product used in conjunction with coating system.

2. Installation Instructions: Provide manufacturer's instructions to installer, marked up to show exactly how all components will be installed; where instructions allow installation options, clearly indicate which option will be used.

1.04

QUALITY ASSURANCE

A. Applicator Qualifications: Installer shall have the following:

1. Current Firestone accepted status.

2. At least 5 years’ experience in installing specified system.

B. Pre-Installation Conference: Before start of metal roof coating application, Contractor shall hold a meeting to discuss the proper installation of materials and requirements to achieve the intended result.

1.

Require attendance with all parties directly influencing the quality of the work or affected by the performance of the work.

2.

Notify COR well in advance of meeting.

1.05

DELIVERY, STORAGE AND HANDLING

A. Deliver products in manufacturer's original containers, dry and undamaged, with seals and labels intact and legible.

B. Store materials clear of ground and moisture with weather protective covering.

C. Keep combustible materials away from ignition sources.

1.06

WARRANTY

A. Comply with all warranty procedures required by manufacturer, including notifications, scheduling, and inspections.

B. Warranty: 10 Year Limited Warranty covering material and accessories.

PART 2 PRODUCTS

2.01

MANUFACTURERS

A. Acceptable Manufacturer: The manufacturer shall meet the following qualifications:

a. Specializing in manufacturing the coating system to be provided.

b. ISO 9002 certified.

B. Manufacturer of Rust Inhibitive Metal Primer: Same manufacturer as elastomeric coating.

2.02

ELASTOMERIC COATING DESCRIPTION

A.

Coating System:

1. Vehicle Base : Acrylic Resin, 100%

2. Elongation

a. Initial Elongation: 180% @ 77°F

b. Aged Elongation: 130%@73°F; 1,000 hours Xenon Arc exposure

3. Tensile Strength: 240 psi 1000 Hrs.

4. Content:

a. Solids by weight: 67 ± 2%

b. Solids by volume: 52 ± 2%

5. Permeance: 4 perms according to ASTM D1653

6. Color : Match existing

2.03 ACCESSORY MATERIALS

A.

Rust Inhibitive Metal Primer.

B.

Elastomeric Seam Tape, a polyester fabric backed, modified butyl rubber adhesive tape.

PART 3 INSTALLATION

3.01

WEATHER REQUIREMENTS FOR APPLICATION

A.

Application Acrylic Roof Coating Materials, including Acrylic Rust Inhibitive Metal Primer must be performed at 50 °F (10 °C) and rising. Temperatures must remain above 50 °F (10 °) for both application and cure time. Cure time will vary, depending on weather conditions. Low temperatures and high humidity will prolong cure time required.

B.

Do not begin work if rain is expected within twenty-four (24) hours of application. Do not apply if weather does not permit four to six (4 to 6) hours dry time prior to rain, fog or temperatures falling below 50 °F (10 °C).

3.02

SUBSTRATE PREPARATION

A.

It is the contractor’s responsibility to ensure that the substrate (roof surface to be coated) is adequately prepared to receive the Elastomeric Roof Coating System

B.

Holes, splits and openings in the metal roof must be repaired prior to application of the Elastomeric Roof Coating System.

1.

Holes less than or equal to (6.4 mm) in diameter can be patched using Acrylic Patching Cement and/or Elastomeric Seam Tape.

C.

New metal must be installed on all deteriorated metal panels with dents, holes or splits greater than 1/4" (6.4 mm) in any dimension.

1.

When a panel has deteriorated in the center but is still sound at the edges, it can be covered by a new panel without removing the damaged section.

2.

The new panel must be completely secured in the side laps with the screws of the proper type and size and taped at both ends.

D.

New metal must weather a minimum of six (6) months or be cleaned to remove residual oil. Residue can be removed using an environmentally safe cleaner.

E.

Replace loose or missing fasteners with oversized fasteners.

F.

Loose panels must be reattached using the appropriate fasteners to ensure panels are pulled together flush.

G.

Remove existing sealing materials (i.e., bituminous mastic, calk type sealant materials, etc.).

H.

Substrates must be clean and dry with no oils, grease, moisture or loose debris. Power washing is recommended.

I.

Treat all areas of corrosion with Rust Inhibitive Metal Primer or Acrylic Rust Inhibitive Metal Primer prior to applying repair products and coating.

J.

When Elastomeric Seam Tape is used, it is recommended that the installed tape be coated with Elastomeric Coating the same day as installation.

K.

Seal end laps with Elastomeric Seam Tape or three-coursed with Polyester Fabric and Acrylic Patching Cement.

L.

Side laps (vertical seams) must be sealed. Note: It is not necessary to seal vertical seams on standing seam roofs.

M. Install Elastomeric Seam Tape on all breaks in metal at corrugations

N.

On standing seam roofs, metal closures must be sealed with Acrylic Patching Cement.

O.

Caulk all reglets and termination bars.

P.

Corrective measures must be taken in areas where water ponds for more than forty-eight (48) hours. The inclusion of crickets or other remediation measures to remove low spots must be completed prior to coating application.

3.03

ELASTOMERIC ROOF COATING APPLICATION

A.

Inspect the roof to ensure that preparatory work has been properly completed and all substrate problem areas have been corrected.

B.

IMPORTANT: Allow for complete coverage by multiplying the total square feet of the area to be coated by a minimum of 1.15. The extra material will compensate for the additional surface area of corrugation and irregular metal surfaces, and will insure that adequate coating is on hand to complete the job.

C.

Apply a base coat of Elastomeric Roof Coating that is a different color than the surface coating to be used (Gray base coat is recommended, any color can be used).

D.

Base coat may be applied with airless sprayer, brush, or roller.

E.

Allow base coat to dry a minimum of twenty-four (24) hours before applying top coat.

F.

Inspect base coat prior to application of top coat. Confirm proper adhesion and that surface is clean.

G.

Provide finish coat in accordance with manufacturer’s application guide relative to current condition.

H.

All work to secure/maintain the manufacturer’s warranty must be completed using materials from that manufacturer.

I.

Inspect the completed application for uncoated areas, loose panels, gaps, holes, and joints that have been improperly taped.

J.

Correct any defects.

—End of Section—