Atch 1-5a Annual Plots and Graphs (SAMPLE).pdf
PDF 49 KB Posted
- Attached to
- Wastewater Plant Operator Federal contract opportunity
- Solicitation number
- W9124J-23-R-WWPO
About this file
This document contains a sample wastewater treatment plant monitoring and reporting file as well as a related federal contract opportunity solicitation. The solicitation seeks a contractor to provide monitoring, testing, and reporting services to effectively operate a wastewater treatment plant located in Nevada. The contractor must ensure all employees working on the contract maintain a current Nevada Class III or higher wastewater operator certification. The solicitation was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Sam Houston for an unknown period of performance and value. The file contains wastewater plant flow, effluent, and influent data from 2013 to 2015 that may be relevant to the contract requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Response to QA-0001-6.15.23-W9124J-23-R-WWPO -6.22.23.pdf | ||
| Atch 3 - 5a USARCWWTP1.30.23.pdf | ||
| Atch 2 -5a USARCSiteVIsitsDataTracking.pdf | ||
| Atch 1- 6a. Discharge Monitoring Report (SAMPLE).pdf | ||
| Atch 01 NV008_WASTE WATER PLANT OPERATOR_PWS.v1.pdf | ||
| Atch 04 CLIN Schedule_Combined SynSol 23-R-WWPO.pdf | ||
| Atch 01 NV008_WASTE WATER PLANT OPERATOR_PWS.pdf | ||
| Atch 02 W9124J-23-R-WWPO Provisions and Clauses(3).pdf | ||
| Atch 03 Addendum to FAR 52.212 (002).pdf | ||
| Atch 05 SCA WD 2015-5593 Rev 22 - 12.27.2022.pdf | ||
| W9124J-23-R-WWPO-Waste Water Plant Operator_Combined SynSol.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Army Reserve Center WWTF NEV2010504
2013 2014 2015 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st
FLOW/100 12.3 4.28 2.6 1.04 9.2 22.98 10.56 19.8
EFF BOD 2.34 2.8 6 6 0 5 6 1
EFF TSS 0 0 0 0 0 4 3.3 0
TN 3.25 5.4 3.9 7.52 7.2 7.5 6.3 3.3
pH 8.25 8.53 7.1 8.1 7.9 7.5 7.5 7.5 TotPetHyd 0 0 0 0 0 0 0 0
1st 2nd 3rd 4th 1st 2nd 3rd 4th
2013 2014
US Army Reserve WWTF NEV201504
FLOW/100 EFF BOD EFF TSS TN pH TotPetHyd
Operations began in March 2013.
2nd 3rd 4th
Sheet1
File details come from the government source that posted it. Updated .