ATTACHMENT_1_-_SOO_(STATEMENT_OF_OBJECTIVES).pdf

PDF 140 KB Posted

Attached to
Monitoring, Testing and Reporting Services Federal contract opportunity
Solicitation number
W9124J-17-R-0058
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Sam Houston

About this file

SOO

View the file

Other files for this federal contract opportunity

Other files attached to Monitoring, Testing and Reporting Services, newest first.
File Type Posted
QA_-_W9124J-17-R-0058.pdf PDF
W9124J-17-R-0058_-_SLOAN_WATER_TESTING.pdf PDF
ATTACHMENT_2_-_CLIN_SCHEDULE.pdf PDF
ATTACHMENT_3_-_Wage_Determination_2015-5593.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES

NV008 WASTE WATER TREATMENT PLANT OPERATOR

13825 Hinson St.

Sloan NV, 89054

8 August 2017

General Information

1. GENERAL: The intent of this project is to provide the required Monitoring, Testing and

Reporting in order to effectively operate a Waste Water Treatment Plant in the State of Nevada in accordance with the Permit issued by the Nevada Department of Environmental Protection. The treatment facility operator shall be a Nevada Certified Class III or higher Operator within 50 miles of Sloan, NV.

2. Monitoring:

2.1 Representative Samples: Samples and measurements taken as requited herein shall be representative of the volume and nature of the monitored discharge. Analyses shall be performed by a State of Nevada certified laboratory. Results from this lab must accompany the Discharge

Monitoring Report (DMR).

2.2 Recording the Results: For each measurement or sample taken pursuant to the requirements of this permit the Permittee shall record the following:

2.2.1 the exact place, date, and time of sampling;

2.2.2 the dates the analyses were performed;

2.2.3 the person(s) who performed the analyses;

2.2.4 the analytical techniques or method's used; and

2.2.5 the results of all required analyses.

2.3 Additional Monitoring by Permittee: If the Permittee monitors any pollutant at the location(s) designated herein more frequently than required by this permit, using approved analytical methods as specified above, results of such monitoring shall be included in the calculation and reporting of the values required in the Discharge Monitoring Report Form.

Such increased frequency shall also be indicated. If increased frequency of testing is approved, an equitable adjustment will be negotiated.

2.4 Records Retention: All records and information resulting from the monitoring activities required by this permit, including all records of analyses performed and calibration and maintenance of instrumentation recordings from continuous monitoring instrumentation, shall be retained for a minimum of three (3) years, or longer if required by the Administrator.

2.5 Detection Limits: All laboratory analyses conducted in accordance with this discharge permit must have detection at or below the permit limits.

2.6 Schedule of Compliance/Detection Limits:

3.0 Testing:

3.1 Test Procedures: Test procedures for the analysis pollutants shall conform to regulations (40

CFR, Part 136) published pursuant to Section 304(h) of the Clean Water Act under which such procedures may be required unless other procedures are approved by the Division.

2.2.1 Analysis shall be performed by a State of Nevada certified laboratory. Analyses shall be conducted by & ''certified laboratory" using an "approved method of testing", as defined by NAC 44SA.0564 and NAC 445A0562, respectively.

2.2.2 Unless otherwise allowed by the Division, detection limits shall be half the discharge limit or less, or, if there is no discharge limit, half the applicable water quality criteria or less, or, if there is no limit or criteria, the lowest reasonably obtainable using an approved method.

4.0 Reporting:

4.1 Quarterly Reporting: Monitoring results obtained during the previous three (3) months shall be summarized for each month and reported on a Discharge Monitoring Report (DMR)

Form received no later than the 28th day of the month following the completed reporting period.

An original signed copy of these and all other reports or correspondence required herein, shall be

PARAMETER

DISCHARGE

I.A.2.

DISCHARGE

MONITORING: During the period beginning on the effective date of this permit, and lasting until the permit expires, the Permittee is authorized to operate a wastewater, treatment facility for the treatment and disposal of domestic (sanitary) wastew;:tter in accordance with the permit limitations and monitoring requirements listed in Table 1 (effluent samples shall be collected after treatment but prior to discharge into the leach field):

Table

:Disch arge

Limits

MONITORING REQUIREMENTS

- 30-Day :Average Daily Maximum

Measurement Frequency

Sample-

Type

Flow, Gallons per Day (Influent)

7,500

M&R

Continuous

Lift Station

Pumping Time or Flow Meter·

BOD5, mg/L (Effluent) 30

45 Monthly Discrete

TSS, mg/L (Effluent) 30 45 Monthly Discrete

Total Nitrogen as N, mg/l (Effluent)

10 10 Monthly Discrete pH, Std.

Units (Effluent)

6.0 to 9.0 6.0 to 9.0 Monthly Discrete

Total Petroleum

Hydrocarbons, (mg/L) (Full-range

Purge & Extract -

8015B)

(Effluent)

1.0

1.0

Quarterly

Discrete submitted to the Contracting Officer Representative (COR) and the State of Nevada at the following address:

Department of Conservation and Natural

Resources Division of Environmental

Protection

Bureau of Water Pollution Control

ATTN: Compliance Coordinator

901 Stewart Street, Suite 4901

Carson City, Nevada 89701

DMR’s must be signed by the highest ranking certified operator that is responsible for the facility. The first DMR submitted under this permit must include the written designation of the authorized elected to sign the DMR’s. The designated representative responsible for the facility must sign each subsequent DMR submitted to the division.

4.2 Annual Report: The fourth quarter report shall serve as the annual report. In addition to the appropriate DMR forms, the fourth quarter reports shall contain plots, of monitoring parameter (y-axis) versus date (x-axis) for each monitored parameter. The plots shall include data from the preceding five years, if available. Any data point from the current year that is greater that the limits in the schedule of compliance must be explained by a narrative.

4.3 The Permittee shall submit labeled and dated photographs of the leach field annually as part of the 4th quarter DMR.

5.0 Estimated Workload Data

ITEM

NAME

ESTIMATED

QUANTITY

SEWAGE PLANT OPERATOR

(Wastewater Treatment Plant Operator)

100 Hours per Month