ITM PWS 2027 DRAFT.pdf
PDF 249 KB Posted
- Attached to
- Information Technology Manager RFI
- Solicitation number
- W9124G-27-R-ITM
About this file
Performance Work Statement Summary
This Performance Work Statement (PWS) describes a non-personal services contract for an Information Technology Manager position supporting the U.S. Army Warrant Officer Career College (USAWOCC) at Fort Rucker, Alabama. The contract has a base year performance period from February 1, 2027 through January 31, 2028, with six (6) optional 12-month renewal years extending through January 31, 2034. The contractor must provide a qualified IT professional with a Bachelor's degree in Computer Science or related field, CompTIA Security+ certification (required), Project Management Professional certification (desired), at least 12 years of IT/project management experience, and a current U.S. SECRET security clearance. The contractor is responsible for comprehensive IT management services including helpdesk support (72-hour ticket resolution standard with 95% acceptable quality level), Active Directory and user account management (99% compliance target), DoD Mobility Unclassified Capability (DMUC) device management, Army365 license management, IT asset inventory and lifecycle replacement management, and management of all 26 USAWOCC classrooms including audio-visual equipment troubleshooting.
Key deliverables include weekly ticket resolution reports (due Friday before close of business), monthly audio-visual classroom reports, monthly lifecycle reports, and monthly re-order supply lists (all due the first business day of each month). The contractor must maintain an inventory with 98% accuracy, process lifecycle replacement requests and warranty repairs within five business days with 100% compliance, and ensure classroom deficiencies do not exceed one per week. The contractor is required to submit annual Service Contract Reports via www.sam.gov by October 31 of each calendar year. Work is performed at building 5302, Fort Rucker, Alabama 36362-5000, with support hours from 0800 to 1630 Monday through Friday, excluding federal holidays. The contract requires compliance with Army and DoD security protocols, development of a Quality Control Plan within 10 days of award, maintenance of appropriate identification badges (CAC and contractor-provided ID), and adherence to Army Physical Security Program standards. The USAWOCC currently operates 945 automation systems, 15 DMUC devices, and serves over 2,800 students annually across 26 classrooms with 110 cadre members.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought_ITM.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Information Technology Manager
17 September 2026
Part 1
General Information
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide IT support services.
1.2 Background: The purpose of this requirement is to acquire a highly qualified and proven contractor to provide Information Technology (IT) support services to the USAWOCC. The contractor shall provide technical and administrative services to assist the government in meeting its IT needs, in accordance with all established policies and goals. The contractor shall ensure the proper functioning of the information processing system and oversee necessary upgrades with annual Life Cycle Replacement (LCR) utilizing Computer Hardware, Enterprise Software and Solutions (CHESS). The contractor shall be familiar with a variety of field concepts, practices, and procedures, and rely on extensive experience and judgment to plan and accomplish goals. The USAWOCC currently has 945 automation systems, 15 DoD Mobility Unclassified Capability (DMUC) devices in place for utilization by 110 cadre, and over 2800 students yearly contained in 26 classrooms and office spaces.
1.3 Scope: The Contractor shall provide non-personal service(s) to augment the S6, Information Management Officer (IMO) and assist in sustaining and operating USAWOCC Enterprise Classroom Program facilities on Campus. The desired end state is augmentation that will allow the Information Technology Manager to perform the tasks prescribed by the Department of the Army, TRADOC, The Combined Arms Center (CAC), USAWOCC and the Fort Rucker NEC.
1.4 Objectives: The objective of this contract is to provide a highly qualified contractor to accomplish the requirements needed for the S-6 Information Technology (IT) department for the USAWOCC and ensure the proper functioning of all information systems and associated equipment.
1.5 Period of Performance:
The period of performance shall be for one (1) Base Year consisting of 12 months and six (6)12-month option years. The Period of Performance reads as follows:
Base Year 01 February 2027 through 31 January 2028
Option Year I 01 February 2028 through 31 January 2029
Option Year II 01 February 2029 through 31 January 2030
Option Year III 01 February 2030 through 31 January 2031
Option Year IV 01 February 2031 through 31 January 2032
Option Year V 01 February 2032 through 31 January 2033
Option Year VI 01 February 2033 through 31 January 2034
1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is how the contractor assures that the work provided to USAWOCC complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within 10 days after date of contract award.
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 10 days. If the Government has provided comments, the Contractor will then have 5 days to submit a Final QCP.
After receipt of the Final QCP, the Contractor may receive 1the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than 30 days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance of proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.
(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals).
(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses.
(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance.
(e) How the Contractor will ensure all keys issued will remain controlled items
(Paragraph 1.7 Key Control).
(f) How the Contractor will inventory, and track maintenance of all Government Provided Equipment / Materials.
(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and
(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.
1.5.1.1 RESERVED
1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 4 hours of identifying those issues. Verbal reports shall be followed by written reports within 24 hours.
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP).
This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
(a) New Year’s Day January 1st
(b) M. L. King Memorial Day 3rd Monday in Jan
(c) Presidents’ Day 3rd Monday in February
(d) Memorial Day last Monday in May
(e) Juneteenth June 19th
(f) Independence Day July 4th
(g) Labor Day 1st Monday in September
(h) Columbus Day 2nd Monday in October
(i) Veteran’s Day November 11th
(j) Thanksgiving Day 4th Thursday in November
(k) Christmas Day December 25th
1.5.3.2 Host Nation Holidays: RESERVED
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide; however, they may differ.
Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0730 to 1700, Monday through Friday except U.S. Holidays identified in paragraph
1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0730 to 1700, Monday through Friday. The Government facility is closed during the recognized U.S. Holidays identified in paragraph 1.5.3.1 above. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0800 to 1630, Monday through Friday, except U.S. holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall always maintain an adequate workforce, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.5.4.3.1 Contractor Work Plan: RESERVED
1.5.5 Training Holidays: RESERVED
1.5.6 Place of Performance: The primary work site will be building 5302, but work must be able to be performed throughout the USAWOCC footprint as needed. Below is the primary address where work will be performed.
5302 Outlaw Street, Fort Rucker, AL 36362-5000.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: The contract effort requires access to classified materials.
Contractor personnel performing work under this contract must have a U.S. SECRET clearance at the time of the proposal and must maintain this level for the life of the contract. The security requirements are IAW with the DoD Contract Security Classification Specification (DD Form 254).
1.6.2 Personnel Security Clearance Requirements: Contractor personnel must have an active personnel security clearance at the U.S. SECRET level in the Defense Information System for Security (DISS) at time of the proposal submission and must maintain this level for the life of the contract. If a contractor does not possess a U.S.
SECRET clearance, a favorable National Agency Check (NAC) with an interim U.S.
SECRET is acceptable, however, unfavorable adjudication of a U.S. SECRET clearance is cause for dismissal. The contractors shall bear all expenses for clearances and background checks.
1.6.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. The work to be performed under this contract is located on a military installation which has instituted controlled access procedures. Controlled access may mean there will be military police located at the entry gates. Vehicles entering the installation may be subject to stop and search procedures. As times of increased security alerts, control may be increased, or access may be restricted completely. Some gates may be closed during periods of the day or night.
The Contractor shall be responsible for furnishing to each employee, and for requiring each employee engaged on the work, to display or possess identification as may be approved and directed by the Contracting Officer. All prescribed identification shall immediately be delivered to the Contracting Officer for cancellation upon the release of any employee. The Contractor shall obtain a vehicle registration pass for each contractor vehicle and for each contractor-employee’s private vehicle brought onto the installation. Vehicle registration point is the Provost Marshal Office (PMO). To register a vehicle, the operator will be required to provide proof of vehicle registration, driver’s license, and proof of insurance. Passes issued to contractors and their employees are valid for a specific time and must be renewed upon expiration. Prior to vehicle registration, the contractor shall provide a roster of all employees’ names that will access the installation during the performance of the contract. That roster shall be provided to the Contracting Officer and to the PMO at the installation. That roster shall be updated by the contractor as necessary, and changes provided to the Contracting Officer and to the PMO.
The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
1.6.3.1 Installation Pass Log: The Contractor shall provide information to employees to enable the employee to access the installation with a pass for 7 calendar days after contract is awarded until the employee can obtain a CAC Card for entry on and off the installation of employment.
1.6.3.2 Individual Termination or Expiration of Employment: The contractor will collect any base passes for the installation on the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within 3 days.
1.6.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within 3 days.
1.6.3.4 Common Access Cards (CAC) and CAC Log: Employee CAC badges shall be issued prior to any employee performing work under this contract. FAR 52.204-9 implements Homeland Security Presidential Directive -12 (HSPD-12) and Federal Information Processing Standards Publication 201-2 (FIPS PUB 201-2), which mandates that all federal employees and Contractor personnel with routine physical access to a Federally controlled facility be issued a common identification with specific security, registration and identity proofing objectives. Specifically, Fort Rucker meets this requirement by using the Common Access Card (CAC) for all such federal employees and Contractors.
1.6.4 Background Checks: Contractors require a U.S. SECRET clearance. If said contractors do not possess a U.S. SECRET clearance favorable NAC with interim U.S.
SECRET is acceptable, however, unfavorable adjudication of U.S. SECRET clearance is cause for dismissal. The contractors shall bear all expenses for clearances and background checks.
1.6.4.1 U.S. Citizen: RESERVED
1.6.4.2 Local Nationals and Third Country Nationals: RESERVED
1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13.”)
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Contractor personnel will comply with the following Operations and Communications Security procedures:
1.6.6.1 All draft deliverables under this PWS and working papers associated with them will be shredded prior to recycling or disposal. Drafts in electronic media will be deleted or erased prior to reusing the diskette or space on a PC hard drive or shared server space. Final versions of products under this PWS will be delivered to the government as specified elsewhere.
1.6.6.2 Contractor personnel will not transmit any sensitive information over unclassified information networks.
1.6.6.3 Government furnished telecommunication and electronic communication systems and equipment, specifically including electronic mail systems, are for official use only in furtherance of the PWS.
1.6.6.4 Contractor personnel will limit Internet access to the minimum time necessary to accomplish the official inquiry or research in furtherance of the PWS.
1.6.6.5 Contractor personnel will respect all electronic communication advisories, virus warnings, and use restrictions on government-furnished telecommunications and electronic communications systems and equipment and give access to government automation security and maintenance personnel upon request.
1.6.6.6 Contractor personnel shall review the provisions of AR 25-2, Information Assurance, prior to using government-furnished telecommunications and electronic communications systems and equipment.
1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized people. NOTE: All references for keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan and the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures should be included in the Quality Control Plan.
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall notify the Government of problems, if any, being experienced. Appropriate action should be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. 10As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially about changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel. The Administrative Point of Contact is USAWOCC S-4 Rep, (334) 255-0183, DSN 558- 0183, U.S. Army Warrant Officer Career College, Fort Rucker, Alabama 36362.
1.10 Key Personnel: The following personnel are considered key personnel by the Government: Information Technology Manager. The Contractor shall provide a Program/Contract Manager who shall be responsible for the performance of the work.
The name of this person and an Alternate Program/Contract Manager, who shall act for the Contractor when the Program/Contract Manager is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer no later than 5 days after contract award.
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties must identify themselves, including proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.11.1 Common Access Card (CAC) Requirement: Employee CAC badges shall be issued prior to any employee performing work under this contract. FAR 52.204-9 implements Homeland Security Presidential Directive -12 (HSPD-12) and Federal Information Processing Standards Publication 201-2 (FIPS PUB 201-2), which mandates that all federal employees and Contractor personnel with routine physical access to a Federally controlled facility be issued a common identification with specific security, registration and identity proofing objectives. Specifically, Fort Rucker meets this requirement by using the Common Access Card (CAC) for all such federal employees and Contractors.
1.11.2 Common Access Card (CAC) Badges: Each Contractor employee will be required to obtain a CAC issued by the Government. Each Contractor employee’s name, social security number, date of birth and email address will be entered into a database (by the COR) called the Contractor Verification System (CVS). CVS is an automated system to allow Contractors' personal information to be verified when applying for a new or renewal Government identification card referred to as the CAC.
Once the Contractor employee's information is registered, the COR will electronically forward the form to the individual Contractor. Each Contractor employee is required to electronically fill out the CAC request form. Once the form is properly filled out, the COR will verify that they are authorized and required to have a CAC. The Contractor employee will be directed to go to the designated in-processing facility and obtain the CAC. Should an employee leave prior to the contract expiration, the Contractor is responsible for ensuring the employee turns-in their CAC at that time. All prescribed identification shall immediately be delivered to the COR for cancellation upon the release of any employee. Failure, inability, or delay in obtaining the CAC does not relieve the Contractor from performing under the terms of the contract.
1.11.3 Contractor-provided ID badge: The Contractor shall be responsible for furnishing each employee, and for requiring each employee to display or possess appropriate identification. The Contractor shall provide each employee an identification (ID) badge on contract start date or on employment start date. The ID badge shall be made of nonmetallic material to prevent electrical shock. The ID badge shall be easily readable and include the employee's name, contractor's name, functional area of assignment, security clearance if applicable, and color photograph. The Contractor shall furnish an identification badge to each employee performing work as part of this contract.
Identification badges shall be always worn by contractor personnel. The identification badges include as a minimum the following information:
(a) Employee’s Name
(b) Employee’ Picture
(c) Contractor’s Name
(d) Contractor’s Telephone Number
(e) Owner’s or Superintendent’s Signature
1.11.4 Display of ID Badges: Contractor personnel shall always wear their ID badge unless it presents a safety hazard. ID badges will be worn when performing work under this contract to include attending Government meetings and conferences. Unless otherwise specified in the contract, each Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit such placement.
1.11.5 Contractor personnel shall identify themselves as contractor employees when answering government telephones.
1.11.6 Utilizing Electronic Mail:
1.11.6.1 When contractor personnel send e-mail messages to Government personnel while performing this contract, the contractor’s e-mail address shall include the company name together with the person’s name.
1.11.6.2 When it is necessary for contractor personnel to have a user address on a government computer, the government should ensure that person’s e-mail address includes the name of their company.
1.11.7 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (JAN 2011):
(a) The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB)guidance M- 05-24, and Federal Information Processing Standards publication (FIPS PUB) Number 201.
(b) The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:
(1) When no longer needed for contract performance.
(2) Upon completion of the Contractor employee's employment.
(3) Upon contract completion or termination.
(c) The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these Requirements.
(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts when the subcontractor`s employees are required to have routine physical access to a Federally controlled facility and/or routine access to a Federally controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.
1.12 Duty Hours: The normal workday is an eight-hour period between 0800 hours and 1630 hours, Monday through Friday, exclusive of Federal Holidays.
1.13 Points of Contact: RESERVED
1.14 Accounting for Contract Services: The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: www.sam.gov. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative; (2)Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5)Estimated direct labor hours (including subcontractors);(6)Estimated direct labor dollars paid this reporting period (including sub-contractors); (7) Total payments(including sub-contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub- contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); and (12) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending 31 July of each government fiscal year and must be reported by 01 August of each calendar year. Contractors may use direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor’s systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.
http://www.sam.gov/
Part 2
Definitions & Acronyms
ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact
PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison USAREUR United States Army Europe UOM Unit of Measure
Part 3
Technical Requirements
3.1 Contractor Tasks: The Contractor shall perform the following tasks:
(a) Provide project planning expertise.
(b) Perform project scheduling and task breakdown.
(c) Identify project requirements.
(d) Track project issues, problems, and risks.
(e) Manage S6 Trouble Ticket Portal and Helpdesk, ensuring all tickets are resolved within 72 hours. The Contractor shall provide technical assistance to the end user over the phone, and/or in person as required, in such a way as to maintain the proper security and configuration as dictated by Department of the Army and Fort Rucker NEC policy.
(f) Manage all DoD Mobility Unclassified Capability (DMUC) devices in USAWOCC.
(g) Manage all Army365 licenses and accounts for the USAWOCC.
(h) Manage the Account Validation System for both Cadre and Students. The Contractor shall ensure all DD Form 2875’s (Request for Fort Rucker network access) are completed and uploaded completion information into the WOCC Training Tracker on the SharePoint.
(i) Manage Active Directory (AD) for both Cadre and Students, to include creating user and computer accounts.
(j) Maintain an accurate inventory of all automation equipment, the current configuration and the location of all equipment.
(k) Manage USAWOCC’s annual Life Cycle Replacement (LCR) and understand the Army’s Computer Hardware, Enterprise Software and Solutions (CHESS) purchasing process.
(l) Manage all 26 of the USAWOCC Classrooms, to include troubleshooting audio visual equipment and working directly with the Fort Rucker ECP representative for all replacement equipment and software.
(m) Manage all equipment including warranties and repairs.
3.2 Contractor Qualifications: The contractor shall have the following qualifications:
(a) A Bachelors in Computer Science, Information Systems, Engineering or other related technical or specific discipline related to the task to be supported.
CompTIA Security+ certification is required, and Project Management Professional certification is desired.
(b) At least 12 years of experience as an Information Technology/ Project manager.
(c) Current Secret clearance (minimum).
(d) Experience with Windows group permissions, printer troubleshooting, computer hardware/software repair, Active Directory account creation and troubleshooting.
(e) Experience with writing and troubleshooting PowerShell scripts for Windows11 and Office 365.
(f) Experience with managing Life Cycle Replacement (LCR) and warranty management.
3.3 Deliverables: All deliverables will meet Army established document preparation standards (grammatically correct and technically accurate) required for publication.
(a) Audio/Visual Classroom report (1st business working day of each month).
(b) Lifecycle report (1st business working day each month).
(c) Weekly ticket resolution report (weekly, every Friday before COB).
(d) Re-order supply list (monthly, first business working day of the month).
Part 4
Period of Performance
4.1 Period of Performance: A base year period with six (6) option years included.
Performance will commence upon date of award 01 February 2027 and terminate on 31 January 2034.
Part 5
Specific Tasks
5.1 Basic Services: The Contractor shall provide a full range of Information Technology (IT) management services to the USAWOCC. This includes, but is not limited to, providing comprehensive project management, network and user account administration, IT asset lifecycle management, and helpdesk support. All services shall be performed in compliance with Army and DoD standards to ensure the information technology mission is consistently supported.
5.2 Tasks: The tasks for this contract consist of the following:
5.2.1 IT Systems Administration and User Support:
5.2.1.1 Helpdesk Management: The Contractor shall manage the S6 Trouble Ticket Portal and Helpdesk to resolve user IT issues and requests.
(a) STD: The Contractor shall resolve all submitted helpdesk tickets within 72 hours of their receipt.
(b) AQL: At least 95% of all helpdesk tickets shall be resolved within 72 hours of receipt, as evidenced by the ticket’s “Resolved Date” in the S6 Trouble Ticket Portal.
5.2.1.2 User Account Management: The Contractor shall manage user and computer accounts in Active Directory (AD) and other designated systems.
(a) STD: The Contractor shall create, modify, and terminate accounts as required, ensuring compliance with all security protocols.
(b) AQL: 99% compliance with account management protocols, with no more than 1% of account actions resulting in reported security violations due to Contractor error.
5.2.1.3 Mobility Device Management: The Contractor shall manage all DoD Mobility Unclassified Capability (DMUC) devices.
(a) STD: The Contractor shall maintain all DMUC devices in a fully mission-capable status.
(b) AQL: No more than two (2) reported deficiencies per month.
5.2.2 IT Asset and Lifecycle Management:
5.2.2.1 Inventory Management: The Contractor shall maintain an accurate inventory of all automation systems and IT equipment.
(a) STD: The Contractor shall ensure the inventory is accurate and updated within 48 hours of any equipment movement, addition, or removal.
(b) AQL: The inventory shall maintain a minimum of 98% accuracy when compared to the physical count during inspections.
5.2.2.2 Lifecycle Replacement (LCR) Management: The Contractor shall manage the USAWOCC’s annual LCR process and oversee all equipment warranty repairs.
(a) STD: The Contractor shall possess a working knowledge of the Army’s Computer Hardware, Enterprise Software and Solutions (CHESS) purchasing process and submit all LCR requests and warranty repairs within five (5) business days of identification.
(b) AQL: 100% of LCR requests and warranty repairs are processed within the specified timeframe.
5.2.3 Classroom and Training Support:
5.2.3.1 Classroom Management: The Contractor shall manage all 26 of the USAWOCC’s classrooms.
(a) STD: The Contractor shall ensure all classroom audio-visual equipment is fully functional and shall work directly with the Fort Rucker ECP representative for all replacement equipment and software.
(b) AQL: No more than one (1) reported deficiency per week.
5.3 Service Contract Reporting:
5.3.1 System for Award Management (SAM) Service Contract Report (SCR): The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the {Insert Component’s Name} via a secure data collection site. The Contractor is required to completely fill in all required data fields through the following web address:
www.sam.gov. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk by clicking “View Assistance for SAM.gov” which is located at the top of the SAM.gov website. From there, you can the select “Contact Our Service Desk” which will allow you to contact SAM.gov directly. If contract period of performance ends prior to September 30, the Contractor has 30 calendar days from end date of the contract to complete the SAM SCR requirement.
Steps for Submitting a Service Contract Report (SCR):
1. Go to www.sam.gov and log in.
2. Select Entity Registrations and then select Service Contract Reporting.
3. SAM displays your entities which have service contracts and meet the reporting criteria. Select View by entity to see the service contracts for each entity.
4. Next, select Add for the service contract against which you want to create a Service Contract Report. Each service contract which meets the FAR Subpart
4.1703 reporting thresholds is displayed.
5. You will be taken to the Complete Service Contract Report page. SAM displays the contract details and allows you to report. You are required to enter the following information:
o Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).
o Prime Contractor Hours Expended: Prime contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 hours to calculate a Full-Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as Prime Contractor FTEs.
6. Report any required Tier 1 subcontractor information by selecting the Add Tier 1 Subcontract Information button.
7. When you are ready to submit the report, select Submit. This saves your report and returns you to the Select Service Contract page where you can create other SCRs or edit an existing SCR.
Steps for Editing a Submitted Report
1. Follow steps 1-4 above. Any previously submitted SCR will have a View/Edit button instead of an Add button.
2. Select View/Edit. You will be able to view the current SCR, edit available fields, and resubmit the record. You can also delete previously entered information altogether.
STD: All information provided by the Contractor shall be accurate, complete, and not exceed suspense dates noted in the corresponding paragraph above.
AQL: 100% Compliant
Deliverable: Annual SCR Report.
Part 6
Applicable Publications, Manuals, and Regulations
6.1 Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.
6.1.1 Department of Defense Contract Security Classification Specification (DD Form 254)
6.1.2 Department of Defense Security Agreement (DD Form 441)
6.1.3 National Industrial Security Program Operating Manual (DoD 5220.22-M)
6.1.4 Installation Access Control (AE Reg 190-16)
6.1.5 The Army Physical Security Program (AR 190-13)
6.1.6 Contractor Identification (AE Reg 27-715)
6.1.7 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)
6.1.8 Information Assurance Workforce Improvement Program (DoD 8570-M)
6.1.9 Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01)
6.1.10 Information Assurance (AR 25-2)
6.1.11 Electromagnetic Compatibility Directive (2004/108/EC)
6.1.12 Policies and Procedures for Property Accountability (AR 735-5)
Part 7
Attachments/Technical Exhibits
7.1 Technical Exhibit A – Performance Requirements Summary
7.2 Technical Exhibit B – Deliverables Schedule
| PERFORMANCE WORK STATEMENT (PWS) |
| Part 1 General Information |
| 1.5 Period of Performance: |
| 1.5.1.1 RESERVED |
| 1.6.4.2 Local Nationals and Third Country Nationals: RESERVED |
| 1.11.7 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011): |
| Part 2 Definitions & Acronyms |
| Part 3 Technical Requirements |
| Part 4 |
| Part 5 Specific Tasks |
| 5.2.1 IT Systems Administration and User Support: |
| 5.2.2 IT Asset and Lifecycle Management: |
| 5.2.3 Classroom and Training Support: |
| 5.3 Service Contract Reporting: |
| Steps for Submitting a Service Contract Report (SCR): |
| Steps for Editing a Submitted Report |
| Part 6 |
| Part 7 Attachments/Technical Exhibits |
File details come from the government source that posted it. Updated .